CN109854275A - 富水砂岩巷道过断层破碎带治理方法 - Google Patents

富水砂岩巷道过断层破碎带治理方法 Download PDF

Info

Publication number
CN109854275A
CN109854275A CN201811580421.0A CN201811580421A CN109854275A CN 109854275 A CN109854275 A CN 109854275A CN 201811580421 A CN201811580421 A CN 201811580421A CN 109854275 A CN109854275 A CN 109854275A
Authority
CN
China
Prior art keywords
rich water
crushed zone
tunnel
administering method
passing fault
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811580421.0A
Other languages
English (en)
Inventor
任尧喜
丁国利
姜作华
董华旭
刘亚平
李冠军
马帝涛
郝友义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Longkou Mining Group Co Ltd
Original Assignee
Longkou Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Longkou Mining Group Co Ltd filed Critical Longkou Mining Group Co Ltd
Priority to CN201811580421.0A priority Critical patent/CN109854275A/zh
Publication of CN109854275A publication Critical patent/CN109854275A/zh
Pending legal-status Critical Current

Links

Abstract

本发明涉及富水砂岩巷道过断层破碎带治理方法,依次包括以下步骤:S1、引水泄压钻孔;S2、对破壁进行注浆;S3、超前预注浆;S4、钻探放水孔。本发明优点是:通过上述工艺,有效将巷道围岩进行加固、对裂隙进行充填,增加围岩稳定性,减少涌水量,确保施工安全,有效减少排水费用,经济效益显著,具有广泛的推广意义。

Description

富水砂岩巷道过断层破碎带治理方法
技术领域
本发明涉及一种富水砂岩巷道过断层破碎带治理方法,属于煤炭施工领域。
背景技术
在煤矿钻探的砂岩中施工中,通常会遇到断层破碎带巷道出水。巷道继续掘进引发岩层破碎、裂隙发育、导水性强,威胁巷道安全掘进。
发明内容
为克服现有技术的缺陷,本发明提供一种富水砂岩巷道过断层破碎带治理方法,本发明的技术方案是:
富水砂岩巷道过断层破碎带治理方法,依次包括以下步骤:
S1、引水泄压钻孔;
S2、对破壁进行注浆;
S3、超前预注浆;
S4、钻探放水孔。
所述的步骤S1为:距离迎头位置后退18-22个,施工泄水钻孔4-6个,单孔深30m,并进行注浆。
所述的步骤S2为:在出水段巷道,即距离迎头位置退后24m的范围,对巷道进行全断面防渗加固注浆,其中,注浆孔100个,单孔深5m;在 迎头施工止浆岩帽,注浆孔10个,单孔深10m。
所述的步骤S3为:设计超前钻孔10个,整体呈扇形布置,单孔深60m。
所述的步骤S4为:钻探放水孔1个,单孔深80m。
本发明的优点是:①通过引水泄压、破壁注浆将巷道散水、淋水导入排水管路,有效改善了巷道面貌;②通过施工止浆岩帽(岩柱)有效防止迎脸有裂隙跑浆,使注浆效果更好;③通过超前预注浆,能够使岩石裂隙得到有效加固,在注浆控制范围内掘进过程中可避免较大涌水的出现,可使巷道岩石力学性能有很好的加固,增加了围岩强度,确保施工过程中的安全。适用于矿井巷道掘进、隧道工程等巷道穿岩层破碎带、富水区域的防治水工作中。
具体实施方式
下面结合具体实施例来进一步描述本发明,本发明的优点和特点将会随着描述而更为清楚。但这些实施例仅是范例性的,并不对本发明的范围构成任何限制。本领域技术人员应该理解的是,在不偏离本发明的精神和范围下可以对本发明技术方案的细节和形式进行修改或替换,但这些修改和替换均落入本发明的保护范围内。
本发明涉及一种富水砂岩巷道过断层破碎带治理方法,依次包括以下步骤:
S1、引水泄压钻孔;
S2、对破壁进行注浆;
S3、超前预注浆;
S4、钻探放水孔。
所述的步骤S1为:距离迎头位置后退18-22个,施工泄水钻孔4-6个,单孔深30m,并进行注浆。
所述的步骤S2为:在出水段巷道,即距离迎头位置退后24m的范围,对巷道进行全断面防渗加固注浆,其中,注浆孔100个,单孔深5m;在 迎头施工止浆岩帽,注浆孔10个,单孔深10m。
所述的步骤S3为:设计超前钻孔10个,整体呈扇形布置,单孔深60m。
所述的步骤S4为:钻探放水孔1个,单孔深80m。
通过上述工艺,有效将巷道围岩进行加固、对裂隙进行充填,增加围岩稳定性,减少涌水量,确保施工安全,有效减少排水费用,经济效益显著,具有广泛的推广意义。

Claims (5)

1.富水砂岩巷道过断层破碎带治理方法,其特征在于,依次包括以下步骤:
S1、引水泄压钻孔;
S2、对破壁进行注浆;
S3、超前预注浆;
S4、钻探放水孔。
2.根据权利要求1所述的富水砂岩巷道过断层破碎带治理方法,其特征在于,所述的步骤S1为:距离迎头位置后退18-22个,施工泄水钻孔4-6个,单孔深30m,并进行注浆。
3.根据权利要求1所述的富水砂岩巷道过断层破碎带治理方法,其特征在于,所述的步骤S2为:在出水段巷道,即距离迎头位置退后24m的范围,对巷道进行全断面防渗加固注浆,其中,注浆孔100个,单孔深5m;在 迎头施工止浆岩帽,注浆孔10个,单孔深10m。
4.根据权利要求1所述的富水砂岩巷道过断层破碎带治理方法,其特征在于,所述的步骤S3为:设计超前钻孔10个,整体呈扇形布置,单孔深60m。
5.根据权利要求1所述的富水砂岩巷道过断层破碎带治理方法,其特征在于,所述的步骤S4为:钻探放水孔1个,单孔深80m。
CN201811580421.0A 2018-12-24 2018-12-24 富水砂岩巷道过断层破碎带治理方法 Pending CN109854275A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811580421.0A CN109854275A (zh) 2018-12-24 2018-12-24 富水砂岩巷道过断层破碎带治理方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811580421.0A CN109854275A (zh) 2018-12-24 2018-12-24 富水砂岩巷道过断层破碎带治理方法

Publications (1)

Publication Number Publication Date
CN109854275A true CN109854275A (zh) 2019-06-07

Family

ID=66892028

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811580421.0A Pending CN109854275A (zh) 2018-12-24 2018-12-24 富水砂岩巷道过断层破碎带治理方法

Country Status (1)

Country Link
CN (1) CN109854275A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110439579A (zh) * 2019-09-17 2019-11-12 中国水利水电第四工程局有限公司 一种敞开式tbm富水隧洞超前预注浆方法
CN110486049A (zh) * 2019-08-29 2019-11-22 龙口矿业集团有限公司 一种富水砂岩巷道过断层破碎带综合治理方法
CN111810197A (zh) * 2019-08-27 2020-10-23 淮南矿业(集团)有限责任公司 一种工作面断层构造带的预注浆加固方法

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020036997A (ko) * 2002-04-11 2002-05-17 조희남 지하수 심정용 그라우팅 파이프 장치
CN101832142A (zh) * 2010-02-11 2010-09-15 中铁十二局集团有限公司 一种隧道信息化跟踪精确注浆方法
CN102606175A (zh) * 2012-03-12 2012-07-25 山东新阳能源有限公司 煤矿井下砂岩裂隙承压水封堵方法
CN103628894A (zh) * 2013-10-24 2014-03-12 重庆大学 一种基于变角伞状超前注浆的富水断层破碎带垮塌巷道巷修方法
CN105041325A (zh) * 2015-07-13 2015-11-11 长沙理工大学 一种高压富水特大断层软弱角砾岩隧道的施工方法
CN107060834A (zh) * 2017-06-26 2017-08-18 山东大学 巷道顶板富水破碎条件下引流慢渗注浆控制工艺
CN107642360A (zh) * 2017-07-25 2018-01-30 彭峰 全断面超前预注浆施工方法
CN107762533A (zh) * 2017-10-18 2018-03-06 中交公局桥隧工程有限公司 一种高压富水软弱围岩山岭隧道的超前预注浆方法
CN108590715A (zh) * 2018-03-22 2018-09-28 重庆建工第七建筑工程有限责任公司 一种暗挖突涌水隧道预留岩盘全断面径向注浆施工方法

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020036997A (ko) * 2002-04-11 2002-05-17 조희남 지하수 심정용 그라우팅 파이프 장치
CN101832142A (zh) * 2010-02-11 2010-09-15 中铁十二局集团有限公司 一种隧道信息化跟踪精确注浆方法
CN102606175A (zh) * 2012-03-12 2012-07-25 山东新阳能源有限公司 煤矿井下砂岩裂隙承压水封堵方法
CN103628894A (zh) * 2013-10-24 2014-03-12 重庆大学 一种基于变角伞状超前注浆的富水断层破碎带垮塌巷道巷修方法
CN105041325A (zh) * 2015-07-13 2015-11-11 长沙理工大学 一种高压富水特大断层软弱角砾岩隧道的施工方法
CN107060834A (zh) * 2017-06-26 2017-08-18 山东大学 巷道顶板富水破碎条件下引流慢渗注浆控制工艺
CN107642360A (zh) * 2017-07-25 2018-01-30 彭峰 全断面超前预注浆施工方法
CN107762533A (zh) * 2017-10-18 2018-03-06 中交公局桥隧工程有限公司 一种高压富水软弱围岩山岭隧道的超前预注浆方法
CN108590715A (zh) * 2018-03-22 2018-09-28 重庆建工第七建筑工程有限责任公司 一种暗挖突涌水隧道预留岩盘全断面径向注浆施工方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
周兴旺: "《注浆施工手册》", 31 May 2014, 煤炭工业出版社 *
张晋毅: "复杂地质条件下轨道交通长大隧道设计技术", 《地下空间与工程学报》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111810197A (zh) * 2019-08-27 2020-10-23 淮南矿业(集团)有限责任公司 一种工作面断层构造带的预注浆加固方法
CN111810197B (zh) * 2019-08-27 2022-04-08 淮南矿业(集团)有限责任公司 一种工作面断层构造带的预注浆加固方法
CN110486049A (zh) * 2019-08-29 2019-11-22 龙口矿业集团有限公司 一种富水砂岩巷道过断层破碎带综合治理方法
CN110439579A (zh) * 2019-09-17 2019-11-12 中国水利水电第四工程局有限公司 一种敞开式tbm富水隧洞超前预注浆方法
CN110439579B (zh) * 2019-09-17 2020-11-24 中国水利水电第四工程局有限公司 一种敞开式tbm富水隧洞超前预注浆方法

Similar Documents

Publication Publication Date Title
WO2020192055A1 (zh) 一种顶板含水层两步骤注浆改性保水采煤方法
CN105178981B (zh) 破碎软岩巷道全断面封闭式深浅耦合让压锚注支护方法
CN103899329B (zh) 一种大变形破碎围岩巷道的治理方法
CN109339786B (zh) 一种预制裂缝定向水力压裂起裂方法
CN102619552B (zh) 导向槽定向水力压穿增透及消突方法
CN103195442B (zh) 一种煤矿巷道均布注浆结构及其施工工艺
CN107701188A (zh) 一种用于沿空掘巷窄煤柱采空侧静态胀裂切顶卸压法
CN106761740B (zh) 一种坚硬煤层顶板耦合致裂方法
CN109854275A (zh) 富水砂岩巷道过断层破碎带治理方法
CN101603431B (zh) 一种突出危险煤层石门揭煤加固方法
CN109209472B (zh) 一种冲孔、爆破、注水相互耦合的煤层卸压防突方法
CN107060758B (zh) 一种区段小煤柱留设施工方法
CN104790951B (zh) 弱化距煤层100~350m高位坚硬顶板的方法及装置
WO2016019826A1 (zh) 基于水力割缝的冻结式石门揭煤方法
CN102493821B (zh) 一种高应力巷道煤岩体的支护方法
CN103195467B (zh) 一种水力压裂与注浆固化相结合的石门揭煤方法
CN103089276B (zh) 深浅孔与高低压耦合注浆工艺
CN112593853B (zh) 一种煤矿矸石充填与减水开采的施工方法
CN102287198A (zh) 一种过江盾构隧道破碎地层联络通道的施工方法
CN103334770A (zh) 一种长大反坡隧道超高水压富水破碎带施工方法
CN107304676A (zh) 一种遗留煤柱下冲击地压的防治方法
CN202882966U (zh) 一种可回收软岩自攻丝锚杆
CN101608552A (zh) 煤层底板含水层加固并在加固过程中保护隔水层的方法
CN105804754B (zh) 一种煤层为主含水层矿井井筒揭煤方法
CN107355226A (zh) Tbm施工隧洞断层破碎带洞段处理结构

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190607

RJ01 Rejection of invention patent application after publication