CN109854253A - 一种既有地铁暗挖叠岛换乘车站的扩建方法 - Google Patents
一种既有地铁暗挖叠岛换乘车站的扩建方法 Download PDFInfo
- Publication number
- CN109854253A CN109854253A CN201910212952.2A CN201910212952A CN109854253A CN 109854253 A CN109854253 A CN 109854253A CN 201910212952 A CN201910212952 A CN 201910212952A CN 109854253 A CN109854253 A CN 109854253A
- Authority
- CN
- China
- Prior art keywords
- existing
- station
- transfer station
- folds
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
本发明公开了一种既有地铁暗挖叠岛换乘车站的扩建方法,通过在既有换乘车站一侧新建外挂明挖站台结构来扩建,新建外挂明挖结构与既有换乘车站之间通过从明挖结构一侧施工的暗挖连接通道相连接。本发明通过新建明挖站台结构,使车站站台宽度增大一倍;通过优化换乘流线使既有叠岛车站内换乘客流变为原来的1/2,从而成倍提高了既有车站换乘能力。本发明中新建站台结构采用明挖法施工,技术成熟可靠,降低施工风险,减少工程造价。本发明中新建连接通道采用暗挖法施工,减少工程占地,避免对道路交通造成影响。本发明中新建连接通道与既有车站接口的施工、既有线缆改移、站台门、信号系统改造等施工,均在天窗时间进行,以避免对车站运营造成影响。
Description
技术领域
本发明属于既有地铁车站扩建技术领域,具体涉及一种既有地铁暗挖叠岛换乘车站的扩建方法。
背景技术
随着许多城市人口增长以及地铁线网趋于完善,地铁换乘站的客流压力日渐显现,既有换乘能力难以满足实际客流需要,对于既有地铁车站的改造扩建成为地铁建设未来将要面对的问题。
地铁暗挖叠岛换乘车站埋深大,施工难度高,周边环境一般较为复杂,对其进行大规模改造扩建的难度较明挖车站显著增加。
发明内容
本发明为解决现有技术存在的问题而提出,其目的是提供一种既有地铁暗挖叠岛换乘车站的扩建方法。
本发明的技术方案是:一种既有地铁暗挖叠岛换乘车站的扩建方法,包括以下步骤:
ⅰ.通过多个降水井进行降水施工,使地下水降至基坑底标高以下。
ⅱ.施工明挖围护结构。
ⅲ.采用顺做法施工新建明挖站台结构,在暗挖连接通道处侧墙预留接口环梁。
ⅳ.施工最下层暗挖连接通道初期支护,待监测数据稳定后施工该通道二次衬砌。
ⅴ.由下至上依次施工暗挖连接通道初期支护及二次衬砌。
ⅵ.既有地铁暗挖叠岛换乘车站的站内改移接口范围内侧墙的既有线缆。
ⅶ.在接口范围内设置钢板防护,从暗挖连接通道内分块破除既有地铁暗挖叠岛换乘车站侧墙。
ⅷ.分块施工接口环梁进行受力转换。
ⅸ.由下至上依次破除侧墙进行施工接口,待下一层接口混凝土达到设计强度后方可进行上一层接口施工。
ⅹ.新建明挖站台结构完成土建及设备安装调试后,拆除既有车站侧墙内侧防护钢板,施工新增站台板。
步骤ⅶ中破除既有地铁暗挖叠岛换乘车站侧墙包括以下内容:
先凿除一侧边柱部位侧墙混凝土,再施做边柱及部分环梁结构,架设临时支撑,重复以上步骤完成另一侧边柱及环框梁施工;此外,在开洞过程中侧墙预留200mm厚度最后凿除,并在车站内侧架设钢板防护。
在站厅层暗挖连接通道内,在既有地铁暗挖叠岛换乘车站侧墙对应车门位置处凿除两个洞口,同一层各连接通道间可跳孔施工,缩短工期。
步骤ⅹ中站台板可采用装配式结构,以加快施工进度,减小对运营的影响。
在新建明挖站台结构侧新增站台门系统,原站台门保留,利用既有应急门。
受既有侧墙开孔条件限制,如新建通道结构净高难以满足过风面积要求,可在新建站台结构内设置大系统送风机和排风机,风机在过渡季和夏季均要开启。
步骤ⅵ中既有线缆可以沿侧墙上下挪动,也可改移至站台板下。
破除既有地铁暗挖叠岛换乘车站侧墙时保留既有钢筋,以便与暗挖连接通道进行锚固。
所述既有地铁暗挖叠岛换乘车站与新建明挖站台结构通过暗挖连接通道连接。
步骤ⅱ中明挖围护结构可采用钻孔灌注桩、地连墙、钻孔咬合桩。
本发明的有益效果如下:
本发明通过新建明挖站台结构,使车站站台宽度增大一倍;通过优化换乘流线使既有叠岛车站内换乘客流变为原来的1/2,从而成倍提高了既有车站换乘能力。
本发明中新建站台结构采用明挖法施工,技术成熟可靠,降低施工风险,减少工程造价。
本发明中新建连接通道采用暗挖法施工,减少工程占地,避免对道路交通造成影响。
本发明中新建连接通道与既有车站接口的施工,以及既有线缆改移、站台门、信号系统改造等施工,均在天窗时间进行,通过采取必要的技术措施和管理措施,以避免对车站运营造成影响。
附图说明
图1 是本发明中新建站台与既有暗挖叠岛车站站厅层平面图;
图2 是本发明中新建站台与既有暗挖叠岛车站站台层平面图;
图3 是本发明中新建站台与既有暗挖叠岛车站横剖面图;
图4 是本发明中既有暗挖叠岛车站换乘流线示意图;
图5 是本发明扩建后换乘流线示意图;
图6 是本发明中新建站厅层连接通道横剖面图;
图7 是本发明中新建站台层连接通道横剖面图;
图8 是本发明中连接通道与既有车站侧墙接口处凿除施工示意图。
具体实施方式
以下,参照附图和实施例对本发明进行详细说明:
如图1~8所示,一种既有地铁暗挖叠岛换乘车站的扩建方法,包括以下步骤:
ⅰ.通过多个降水井进行降水施工,使地下水降至基坑底标高以下。
ⅱ.施工明挖围护结构。
ⅲ.采用顺做法施工新建明挖站台结构,在暗挖连接通道处侧墙预留接口环梁。
ⅳ.施工最下层暗挖连接通道初期支护,待监测数据稳定后施工该通道二次衬砌。
ⅴ.由下至上依次施工暗挖连接通道初期支护及二次衬砌。
ⅵ.既有地铁暗挖叠岛换乘车站的站内改移接口范围内侧墙的既有线缆。
ⅶ.在接口范围内设置钢板防护,从暗挖连接通道内分块破除既有地铁暗挖叠岛换乘车站侧墙。
ⅷ.分块施工接口环梁进行受力转换。
ⅸ.由下至上依次破除侧墙进行施工接口,待下一层接口混凝土达到设计强度后方可进行上一层接口施工。
ⅹ.新建明挖站台结构完成土建及设备安装调试后,拆除既有车站侧墙内侧防护钢板,施工新增站台板。
步骤ⅶ中破除既有地铁暗挖叠岛换乘车站侧墙包括以下内容:
先凿除一侧边柱部位侧墙混凝土,再施做边柱及部分环梁结构,架设临时支撑,重复以上步骤完成另一侧边柱及环框梁施工;此外,在开洞过程中侧墙预留200mm厚度最后凿除,并在车站内侧架设钢板防护。
在站厅层暗挖连接通道内,在既有地铁暗挖叠岛换乘车站侧墙对应车门位置处凿除两个洞口,同一层各连接通道间可跳孔施工,缩短工期。
步骤ⅹ中站台板可采用装配式结构,以加快施工进度,减小对运营的影响。
在新建明挖站台结构侧新增站台门系统,原站台门保留,利用既有应急门。
受既有侧墙开孔条件限制,如新建通道结构净高难以满足过风面积要求,可在新建站台结构内设置大系统送风机和排风机,风机在过渡季和夏季均要开启。
在新建站台结构内需增设给排水、供电等相关设备设施,并对既有信号系统及车载软件进行改造升级。
步骤ⅵ中既有线缆可以沿侧墙上下挪动,也可改移至站台板下。必要时可按照新路径完成管线施工后,在天窗时间更换接头,废弃既有线缆,以避免影响车站运营。
破除既有地铁暗挖叠岛换乘车站侧墙时保留既有钢筋,以便与暗挖连接通道进行锚固。
所述既有地铁暗挖叠岛换乘车站与新建明挖站台结构通过暗挖连接通道连接。
步骤ⅱ中明挖围护结构可采用钻孔灌注桩、地连墙、钻孔咬合桩。
其中,步骤ⅰ~ⅲ为外挂新建明挖站台结构施工,步骤ⅳ~ⅴ为暗挖连接通道施工,步骤ⅵ~ⅹ为与既有地铁暗挖叠岛换乘车站接口施工。
所述新建明挖站台结构为地下四层,地下一层为设备层,地下二至四层分别与既有暗挖叠岛车站的站厅层和站台层连接。
所述暗挖通道中的防水层采用与既有叠岛叠岛车站侧墙相同的防水材料,以便连接。
本发明通过新建明挖站台结构,使车站站台宽度增大一倍;通过优化换乘流线使既有叠岛车站内换乘客流变为原来的1/2,从而成倍提高了既有车站换乘能力。
本发明中新建站台结构采用明挖法施工,技术成熟可靠,降低施工风险,减少工程造价。
本发明中新建连接通道采用暗挖法施工,减少工程占地,避免对道路交通造成影响。
本发明中新建连接通道与既有车站接口的施工,以及既有线缆改移、站台门、信号系统改造等施工,均应以不影响运营为前提,仅在天窗时间施工,需保证各工序间有序、高效衔接,以避免对车站运营造成影响。
本发明新建明挖站台结构可新增出入口或结合周边商业综合开发,以发挥城市轨道交通的商业价值。
Claims (10)
1.一种既有地铁暗挖叠岛换乘车站的扩建方法,其特征在于:包括以下步骤:
(ⅰ)通过多个降水井进行降水施工,使地下水降至基坑底标高以下
(ⅱ)施工明挖围护结构
(ⅲ)采用顺做法施工新建明挖站台结构,在暗挖连接通道处侧墙预留接口环梁
(ⅳ)施工最下层暗挖连接通道初期支护,待监测数据稳定后施工该通道二次衬砌
(ⅴ)依次由下至上依次施工暗挖连接通道初期支护及二次衬砌
(ⅵ)既有地铁暗挖叠岛换乘车站的站内改移接口范围内侧墙的既有线缆
(ⅶ)在接口范围内设置钢板防护,从暗挖连接通道内分块破除既有地铁暗挖叠岛换乘车站侧墙
(ⅷ)分块施工接口环梁进行受力转换
(ⅸ)由下至上依次破除侧墙进行施工接口,待下一层接口混凝土达到设计强度后方可进行上一层接口施工
(ⅹ)新建明挖站台结构完成土建及设备安装调试后,拆除既有车站侧墙内侧防护钢板,施工新增站台板。
2.根据权利要求1所述的一种既有地铁暗挖叠岛换乘车站的扩建方法,其特征在于:步骤(ⅶ)中破除既有地铁暗挖叠岛换乘车站侧墙包括以下内容:
先凿除一侧边柱部位侧墙混凝土,再施做边柱及部分环梁结构,架设临时支撑,重复以上步骤完成另一侧边柱及环框梁施工;此外,在开洞过程中侧墙预留200mm厚度最后凿除,并在车站内侧架设钢板防护。
3.根据权利要求2所述的一种既有地铁暗挖叠岛换乘车站的扩建方法,其特征在于:在站厅层暗挖连接通道内,在既有地铁暗挖叠岛换乘车站侧墙对应车门位置处凿除两个洞口,同一层各连接通道间可跳孔施工,缩短工期。
4.根据权利要求1所述的一种既有地铁暗挖叠岛换乘车站的扩建方法,其特征在于:步骤(ⅹ)中站台板可采用装配式结构,以加快施工进度,减小对运营的影响。
5.根据权利要求1所述的一种既有地铁暗挖叠岛换乘车站的扩建方法,其特征在于:在新建明挖站台结构侧新增站台门系统,原站台门保留,利用既有应急门。
6.根据权利要求1所述的一种既有地铁暗挖叠岛换乘车站的扩建方法,其特征在于:受既有侧墙开孔条件限制,如新建通道结构净高难以满足过风面积要求,可在新建站台结构内设置大系统送风机和排风机,风机在过渡季和夏季均要开启。
7.根据权利要求1所述的一种既有地铁暗挖叠岛换乘车站的扩建方法,其特征在于:步骤(ⅵ)中既有线缆可以沿侧墙上下挪动,也可改移至站台板下。
8.根据权利要求2所述的一种既有地铁暗挖叠岛换乘车站的扩建方法,其特征在于:破除既有地铁暗挖叠岛换乘车站侧墙时保留既有钢筋,以便与暗挖连接通道进行锚固。
9.根据权利要求1所述的一种既有地铁暗挖叠岛换乘车站的扩建方法,其特征在于:所述既有地铁暗挖叠岛换乘车站与新建明挖站台结构通过暗挖连接通道连通。
10.根据权利要求1所述的一种既有地铁暗挖叠岛换乘车站的扩建方法,其特征在于:步骤(ⅱ)中明挖围护结构可采用钻孔灌注桩、地连墙、钻孔咬合桩。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910212952.2A CN109854253B (zh) | 2019-03-20 | 2019-03-20 | 一种既有地铁暗挖叠岛换乘车站的扩建方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910212952.2A CN109854253B (zh) | 2019-03-20 | 2019-03-20 | 一种既有地铁暗挖叠岛换乘车站的扩建方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109854253A true CN109854253A (zh) | 2019-06-07 |
CN109854253B CN109854253B (zh) | 2021-08-03 |
Family
ID=66901341
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910212952.2A Active CN109854253B (zh) | 2019-03-20 | 2019-03-20 | 一种既有地铁暗挖叠岛换乘车站的扩建方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109854253B (zh) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111594181A (zh) * | 2020-05-07 | 2020-08-28 | 中铁十八局集团有限公司 | 新增暗挖通道与既有站厅层连通接驳施工方法 |
CN112324176A (zh) * | 2020-09-22 | 2021-02-05 | 中铁武汉勘察设计研究院有限公司 | 既有旅客地道与站房立柱合建结构加装扶梯的改造方法 |
CN112359868A (zh) * | 2020-11-02 | 2021-02-12 | 上海市城市建设设计研究总院(集团)有限公司 | 紧贴既有地下结构的地下通道施工方法 |
CN112727134A (zh) * | 2020-12-10 | 2021-04-30 | 中铁五局集团建筑工程有限责任公司 | 一种改扩建既有高架运营地铁车站建筑主体结构的施工方法 |
CN113027495A (zh) * | 2021-05-26 | 2021-06-25 | 中国铁路设计集团有限公司 | 一种由区间隧道组织实施的暗挖大跨度车站修建方法 |
CN113404083A (zh) * | 2021-04-08 | 2021-09-17 | 中铁十六局集团有限公司 | 一种t型连通结构的施工方法 |
CN116443052A (zh) * | 2023-03-10 | 2023-07-18 | 广州地铁设计研究院股份有限公司 | 地铁既有线路与新建线路换乘结构与换乘方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20110130196A (ko) * | 2010-05-27 | 2011-12-05 | 주식회사 코아이엔씨 | 지하철 정거장 및 지하철 정거장의 시공방법 |
CN103469817A (zh) * | 2013-09-30 | 2013-12-25 | 中铁一局集团有限公司 | 一种既有地铁车站主体结构扩建施工方法 |
CN107905794A (zh) * | 2017-09-25 | 2018-04-13 | 上海建工集团股份有限公司 | 一种保留隧道局部管片的地铁车站拓建方法 |
CN108397200A (zh) * | 2018-01-29 | 2018-08-14 | 中建市政工程有限公司 | 地铁车站隧道连接段结构后做式施工方法 |
CN109339106A (zh) * | 2018-10-08 | 2019-02-15 | 中铁第四勘察设计院集团有限公司 | 一种明挖暗做整体衬砌的施工方法 |
-
2019
- 2019-03-20 CN CN201910212952.2A patent/CN109854253B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20110130196A (ko) * | 2010-05-27 | 2011-12-05 | 주식회사 코아이엔씨 | 지하철 정거장 및 지하철 정거장의 시공방법 |
CN103469817A (zh) * | 2013-09-30 | 2013-12-25 | 中铁一局集团有限公司 | 一种既有地铁车站主体结构扩建施工方法 |
CN107905794A (zh) * | 2017-09-25 | 2018-04-13 | 上海建工集团股份有限公司 | 一种保留隧道局部管片的地铁车站拓建方法 |
CN108397200A (zh) * | 2018-01-29 | 2018-08-14 | 中建市政工程有限公司 | 地铁车站隧道连接段结构后做式施工方法 |
CN109339106A (zh) * | 2018-10-08 | 2019-02-15 | 中铁第四勘察设计院集团有限公司 | 一种明挖暗做整体衬砌的施工方法 |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111594181A (zh) * | 2020-05-07 | 2020-08-28 | 中铁十八局集团有限公司 | 新增暗挖通道与既有站厅层连通接驳施工方法 |
WO2021223573A1 (zh) * | 2020-05-07 | 2021-11-11 | 中铁十八局集团有限公司 | 新增暗挖通道与既有站厅层连通接驳施工结构 |
CN112324176A (zh) * | 2020-09-22 | 2021-02-05 | 中铁武汉勘察设计研究院有限公司 | 既有旅客地道与站房立柱合建结构加装扶梯的改造方法 |
CN112359868A (zh) * | 2020-11-02 | 2021-02-12 | 上海市城市建设设计研究总院(集团)有限公司 | 紧贴既有地下结构的地下通道施工方法 |
CN112727134A (zh) * | 2020-12-10 | 2021-04-30 | 中铁五局集团建筑工程有限责任公司 | 一种改扩建既有高架运营地铁车站建筑主体结构的施工方法 |
CN113404083A (zh) * | 2021-04-08 | 2021-09-17 | 中铁十六局集团有限公司 | 一种t型连通结构的施工方法 |
CN113027495A (zh) * | 2021-05-26 | 2021-06-25 | 中国铁路设计集团有限公司 | 一种由区间隧道组织实施的暗挖大跨度车站修建方法 |
CN113027495B (zh) * | 2021-05-26 | 2021-07-23 | 中国铁路设计集团有限公司 | 一种由区间隧道组织实施的暗挖大跨度车站修建方法 |
CN116443052A (zh) * | 2023-03-10 | 2023-07-18 | 广州地铁设计研究院股份有限公司 | 地铁既有线路与新建线路换乘结构与换乘方法 |
Also Published As
Publication number | Publication date |
---|---|
CN109854253B (zh) | 2021-08-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109854253A (zh) | 一种既有地铁暗挖叠岛换乘车站的扩建方法 | |
CN105298501A (zh) | 暗挖车站附属风道结构施工方法 | |
CN107119711B (zh) | 一种大范围邻接既有换乘车站的衔接结构及施工方法 | |
CN204457792U (zh) | 一种用多导洞法扩挖大直径盾构隧道而建造的地铁车站 | |
CN113668604B (zh) | 一种矩形顶管一体化成型地铁车站下穿箱涵的施工方法 | |
CN105736001A (zh) | 一种采用预制构件建造地铁车站的施工方法 | |
Paul et al. | Comparative study of construction technologies for underground metro stations in India | |
CN104632245A (zh) | 一种用多导洞扩挖大直径盾构隧道建地铁车站的方法 | |
CN109958445A (zh) | 用于超浅埋大型地下空间的棚架施工法 | |
CN109056810B (zh) | 既有建筑下方明挖或盖挖地下主体结构的横向扩挖构造及其施工方法 | |
KR20190062329A (ko) | 병렬 터널과 개착 공법을 융합한 하이브리드 지하 정거장 건설공법 | |
CN112160755A (zh) | 一种先行施工盾构隧道后扩挖车站的地铁线路施工方法 | |
CN103485791A (zh) | 一种用于公路隧道原位维修或扩建的施工方法 | |
JP2024007536A (ja) | 大深度地下鉄駅における縦方向に直交する突き出し型風道構造及び施工方法 | |
CN105781570A (zh) | 一种地铁无内支撑轨排井及其施工方法 | |
CN113027495B (zh) | 一种由区间隧道组织实施的暗挖大跨度车站修建方法 | |
CN106930768A (zh) | 隧洞施工方法及应用 | |
CN204457789U (zh) | 一种用桩拱墙支撑扩挖大直径盾构隧道建造的地铁车站 | |
CN112096425B (zh) | 一种马头门位置的横通道支护系统及其施工方法 | |
CN210597377U (zh) | 一种综合管廊与地铁车站的共建结构 | |
CN112855181A (zh) | 一种先顶管后盾构上下平行叠交隧道构造及其施工方法 | |
CN112727484A (zh) | 一种先盾构后顶管上下平行叠交隧道构造及其施工方法 | |
CN105986830B (zh) | 路边条状地下车库的暗挖建造方法 | |
KR101427812B1 (ko) | 개착식 지하구조물 시공방법 | |
CN115354667A (zh) | 液化土内地铁盾构超近距离实施明挖上跨结构的保护方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |