CN109853533A - The construction method of static-pressure expanding bottom pile - Google Patents

The construction method of static-pressure expanding bottom pile Download PDF

Info

Publication number
CN109853533A
CN109853533A CN201910275041.4A CN201910275041A CN109853533A CN 109853533 A CN109853533 A CN 109853533A CN 201910275041 A CN201910275041 A CN 201910275041A CN 109853533 A CN109853533 A CN 109853533A
Authority
CN
China
Prior art keywords
hammer
tube
inner tamping
ram
enlarged footing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910275041.4A
Other languages
Chinese (zh)
Inventor
王磊
沈保汉
杨家丽
童金清
刘建刚
薛晓红
余淑芬
江彦达
王爱红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910275041.4A priority Critical patent/CN109853533A/en
Publication of CN109853533A publication Critical patent/CN109853533A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a kind of construction method of static-pressure expanding bottom pile, including equipment immersed tube system it is in place, immersed tube, base expanding and base expanding, pour, tube drawing step, base expanding and base expanding include embrace a pressure, press, back-pressure, it is interior ram, it is interior ram, the interactive base-enlarging method such as interior rammer double-click.The present invention improves and enriches existing base-enlarging method, dry and wet.Construction quality of the present invention is good, easy for construction, construction efficiency is high, effect is good.

Description

The construction method of static-pressure expanding bottom pile
Technical field
The present invention relates to a kind of construction methods of static-pressure expanding bottom pile.
Background technique
Existing static-pressure expanding bottom pile technique mainly embraces pressure, press base expanding and base expanding technique, and the filler material energy squeezed out in outer tube has Limit, often card is managed.
Existing static pressure, immersed tube base expanding and base expanding pile construction method mainly has following several:
1) diesel hammer hammers inside and outside double-jacket tube ram-expanded pile (abbreviation rammed bulb pile);
2) electrically operated hammer hammers inside and outside double-jacket tube ram-expanded pile (referred to as complete to ram stake, ZL99101432.4), although eliminating The common fault of conventional method, but also have shortcomings: pile is difficult when meeting intermediate hard interbedded layer or artesian water;Have in work progress certain Noise and vibration, have soil compaction effect to surrounding building and underground utilities, applying man-hour requirement using oise-reducing means and setting up defences Shake the corresponding measures such as ditch.
3) hammering (rams pore-forming by column hammer with pipe;Casing is sunk to designed elevation by back-pressure casing) complex carrier rammer expansion Stake, is the stake being made of carrier and concrete pile body, its pile sinking difficulty in decannulation of early stage.
4) internal-tamping immersed tube bored concrete tamping-extending pile (ZL200610039707.9), using drop hammer certainly, vibration hammer, double hammer single tubes fill It sets, interior rammer interaction immersed tube technique, interior hammer ram rams the Concrete Filled material in outer tube repeatedly and forms enlarged footing.Work progress is to week Side building and underground piping have certain soil compaction effect;When level of ground water is higher, especially there is artesian area, pile has one Fixed difficulty.
5) double-jacket tube ram-expanded pile (abbreviation static-pressure expanding bottom pile ZL200620040782.2) inside and outside roof pressing type, roof pressing type is quiet Tube head by inside and outside double-jacket tube while after being pressed into projected depth in forcing stake and pressing, proposes inner tube, by filler material and does in batches In rigid concrete or low slump concrete investment outer tube, then by filler material and dry concrete or low collapsed in batches with inner tube Degree of falling concrete is compacted repeatedly, is formed at stake end and is met enlarged footing.The disadvantage is that: stake body product is big, and structure is complicated, cost compared with It is high;Since the self weight of stake machine is larger, counterweight is also needed, occurs to fall into machine and squeeze flat adjacent stake in softer ground construction;Hardening should be taken Ground measure.
6) non-borrow composite underreamed pile (referred to as compound club-footed pile ZL201010130246.2), plays immersed tube expansion in soil cement Bottom stake, has many advantages, such as relative to traditional technology;
7) hugging pressure type inner and outer pipes ram-expanded pile (the compound club-footed pile ZL201510331164.7 of abbreviation static pressure), although having very big excellent Point, but stake body product is big, and self weight counterweight is larger, and card Guan Wenti, process, quality controllable etc. are needed there is also shortcoming into one Step is improved.
Summary of the invention
A kind of construction method of the purpose of the present invention is to provide construction qualities static-pressure expanding bottom pile good, easy for construction.
The technical solution of the invention is as follows:
A kind of construction method of static-pressure expanding bottom pile, including equipment immersed tube system it is in place, immersed tube, base expanding and base expanding, pour, tube drawing step, Be characterized in: the immersed tube system includes outer tube, and setting inner tamping tube is hammered into shape in outer tube;The inner tamping tube hammer includes the lower part that diameter is D3 Interior hammer ram, the top inner tamping tube that diameter is D2, interior hammer ram link into an integrated entity with inner tamping tube, and it is D1's that diameter is equipped at the top of inner tamping tube On ram disk, it is to ram disk under D4 that interior hammer ram lower part, which is equipped with diameter,;D1 >=D2, D2≤D3;
Interior hammer ram top is equipped with the hook of connecting steel wire ropes;
The base expanding and base expanding step at least uses one of following method:
(1) hydraulic armful of compressing cylinder in static pressure equipment rack directly embraces inner tamping tube hammer, along guide rail to down toward set depth, squeezes Filler material in outlet pipe;Filling and above-mentioned extrusion step is repeated, forms enlarged footing;
(2) in hydraulic armful of compressing cylinder of two sets be arranged in static pressure equipment rack, upper a set of hydraulic armful of compressing cylinder directly embraces interior rammer Pipe hammer, embraces downwards along guide rail and is depressed into set depth, squeezes out the filler material in outer tube;Filling and above-mentioned armful of pressure is repeated, squeezes out, Form enlarged footing;Under a set of hydraulic armful of compressing cylinder directly embrace outer tube, prevent squeeze enlarged footing process middle external tube with pipe, filling Material, which squeezes, does not go out to be formed card pipe;
(3) hydraulic top-pressure oil cylinder withstands inner tamping tube tup, is pressed downwards along guide rail to set depth, squeezes out the filling in outer tube Material;Filling and above-mentioned armful of pressure is repeated, squeezes out, forms enlarged footing;Under a set of hydraulic armful of compressing cylinder directly embrace outer tube, prevent Extruding enlarged footing process middle external tube squeezes with pipe, filler material and does not go out to be formed card pipe;
(4) it above mentions inner tamping tube to hammer into shape to certain depth, unclamps the wirerope of connection inner tamping tube hammer on hoist engine, inner tamping tube hammer is freely fallen Body, the interior filler material rammed in outer tube;Filling and above-mentioned interior rammer process is repeated, forms enlarged footing;Under a set of hydraulic armful of pressure oil Cylinder directly embraces outer tube, prevents interior rammer enlarged footing process middle external tube from squeezing with pipe, filler material and does not go out to be formed card pipe;
(5) inner tamping tube hammer inner cavity is equipped with interior rammer from dropping hammer, and forms mother and sons' hammer;Above mention intracavitary in inner tamping tube hammer dropped hammer certainly to certain Highly, drop hammer freely falling body certainly, inside rams down and rams disk, be repeated filler and it is above-mentioned in ram process, form enlarged footing;Under A set of hydraulic armful of compressing cylinder directly embraces outer tube, prevent in ram enlarged footing during, outer tube is squeezed and is not gone out shape with pipe, filler material Cheng Kaguan;
(6) above mention inner tamping tube hammer in it is intracavitary drop hammer certainly, drive inner tamping tube hammer into shape to certain altitude, hooking slits are hammered into shape by inner tamping tube It is inserted in pivot pin, the wirerope on hoist engine above mentions inner tamping tube hammer inner cavity and drops hammer certainly, when uplink, makes hook around the inside sidespin of pin shaft Turn, screw in inner tamping tube, block from the head that drops hammer, drives inner tamping tube hammer uplink together;Conversely, hook rotates outward around pin shaft, It screws out outside inner tamping tube, does not block from the head that drops hammer, do not drive inner tamping tube hammer uplink together, voluntarily free uplink of dropping hammer certainly, Mu Zichui Freely falling body, inner tamping tube hammer, drop hammer the filler material double-clicked in outer tube certainly;Filler and above-mentioned interior rammer step is repeated, is formed and is expanded Major part;Under a set of hydraulic armful of compressing cylinder directly embrace outer tube, prevent in ram enlarged footing during, outer tube with pipe, filler material squeeze It does not go out to form card pipe.
Disk, inner tamping tube, interior hammer ram is rammed to link into an integrated entity, under ram disk and interior hammer ram in it is partable, up and down can be opposite Mobile form.
By adjusting compacted coefficient D ∈ (D1、D2、D3、D4…Dn, V) and adjust the compacted degree of the soil body;D1、D2、D3、D4… DnWhen to ram filler material, in primary, secondary, the n times deflection three times ... of 2100kw.m respective impact energy;V is filler material Volume.
Size, the shape of enlarged footing are adjusted by adjusting shape factor α ∈ (H, h, C, E, V);H is the height to feed intake;h Including hOn、hUnder, degree of lifting and outer tube underthrust depth respectively on outer tube;C is to ram to expand outer distance of the tube bottom away from stake bottom, E when completing Inner tamping tube hammers distance of the bottom away from outer tube bottom into shape when expanding completion to ram, and V is the volume of filler material.
By adjusting coefficient of bearing caoacity m=Rk/ Y adjusts the compaction of the soil body, the vertical limit of prediction prediction enlarged footing Bearing capacity, Y are enlarged footing terminal piling pressure.
The material of filler material is adjusted to adjust the number of plies of enlarged footing, monolayer material enlarged footing is formed or multilayer material expands Head;Filler material is the non-cementing material of unlike material bulk solid, unlike material mixture glue cementing material;It feeds intake, logical material uses: outer Pipe and inner tamping tube hammer mouth, side wall mouth feed intake, filling are pressed to feed intake.
The present invention improves and enriches existing base-enlarging method, embrace pressure, press, back-pressure, interior rammer, it is interior ram, the double-click of interior rammer Deng interaction base expanding and base expanding, dry and wet.Construction quality of the present invention is good, easy for construction, construction efficiency is high, effect is good.
Below with reference to embodiment, the invention will be further described.
Specific embodiment
A kind of construction method of static-pressure expanding bottom pile, including equipment immersed tube system it is in place, immersed tube, base expanding and base expanding, pour, tube drawing step Suddenly, the immersed tube system includes outer tube, and setting inner tamping tube is hammered into shape in outer tube;The inner tamping tube hammer rams in the lower part of D3 including diameter Hammer, the top inner tamping tube that diameter is D2, interior hammer ram link into an integrated entity with inner tamping tube, and the upper rammer that diameter is D1 is equipped at the top of inner tamping tube Disk is hit, it is to ram disk under D4 that interior hammer ram lower part, which is equipped with diameter,;D1 >=D2, D2≤D3;
Interior hammer ram top is equipped with the hook of connecting steel wire ropes;
The base expanding and base expanding step at least uses one of following method:
(1) hydraulic armful of compressing cylinder in static pressure equipment rack directly embraces inner tamping tube hammer, along guide rail to down toward set depth, squeezes Filler material in outlet pipe;Filling and above-mentioned extrusion step is repeated, forms enlarged footing;
(2) in hydraulic armful of compressing cylinder of two sets be arranged in static pressure equipment rack, upper a set of hydraulic armful of compressing cylinder directly embraces interior rammer Pipe hammer, embraces downwards along guide rail and is depressed into set depth, squeezes out the filler material in outer tube;Filling and above-mentioned armful of pressure is repeated, squeezes out, Form enlarged footing;Under a set of hydraulic armful of compressing cylinder directly embrace outer tube, prevent squeeze enlarged footing process middle external tube with pipe, filling Material, which squeezes, does not go out to be formed card pipe;
(3) hydraulic top-pressure oil cylinder withstands inner tamping tube tup, is pressed downwards along guide rail to set depth, squeezes out the filling in outer tube Material;Filling and above-mentioned armful of pressure is repeated, squeezes out, forms enlarged footing;Under a set of hydraulic armful of compressing cylinder directly embrace outer tube, prevent Extruding enlarged footing process middle external tube squeezes with pipe, filler material and does not go out to be formed card pipe;
(4) it above mentions inner tamping tube to hammer into shape to certain depth, unclamps the wirerope of connection inner tamping tube hammer on hoist engine, inner tamping tube hammer is freely fallen Body, the interior filler material rammed in outer tube;Filling and above-mentioned interior rammer process is repeated, forms enlarged footing;Under a set of hydraulic armful of pressure oil Cylinder directly embraces outer tube, prevents interior rammer enlarged footing process middle external tube from squeezing with pipe, filler material and does not go out to be formed card pipe;
(5) inner tamping tube hammer inner cavity is equipped with interior rammer from dropping hammer, and forms mother and sons' hammer;Above mention intracavitary in inner tamping tube hammer dropped hammer certainly to certain Highly, drop hammer freely falling body certainly, inside rams down and rams disk, be repeated filler and it is above-mentioned in ram process, form enlarged footing;Under A set of hydraulic armful of compressing cylinder directly embraces outer tube, prevent in ram enlarged footing during, outer tube is squeezed and is not gone out shape with pipe, filler material Cheng Kaguan;
(6) above mention inner tamping tube hammer in it is intracavitary drop hammer certainly, drive inner tamping tube hammer into shape to certain altitude, hooking slits are hammered into shape by inner tamping tube It is inserted in pivot pin, the wirerope on hoist engine above mentions inner tamping tube hammer inner cavity and drops hammer certainly, when uplink, makes hook around the inside sidespin of pin shaft Turn, screw in inner tamping tube, block from the head that drops hammer, drives inner tamping tube hammer uplink together;Conversely, hook rotates outward around pin shaft, It screws out outside inner tamping tube, does not block from the head that drops hammer, do not drive inner tamping tube hammer uplink together, voluntarily free uplink of dropping hammer certainly, Mu Zichui Freely falling body, inner tamping tube hammer, drop hammer the filler material double-clicked in outer tube certainly;Filler and above-mentioned interior rammer step is repeated, is formed and is expanded Major part;Under a set of hydraulic armful of compressing cylinder directly embrace outer tube, prevent in ram enlarged footing during, outer tube with pipe, filler material squeeze It does not go out to form card pipe.
Disk, inner tamping tube, interior hammer ram is rammed to link into an integrated entity, under ram disk and interior hammer ram in it is partable, up and down can be opposite Mobile form.
By adjusting compacted coefficient D ∈ (D1、D2、D3、D4…Dn, V) and adjust the compacted degree of the soil body;D1、D2、D3、D4… DnWhen to ram filler material, in primary, secondary, the n times deflection three times ... of 2100kw.m respective impact energy;V is filler material Volume.
Size, the shape of enlarged footing are adjusted by adjusting shape factor α ∈ (H, h, C, E, V);H is the height to feed intake;h Including hOn、hUnder, degree of lifting and outer tube underthrust depth respectively on outer tube;C is to ram to expand outer distance of the tube bottom away from stake bottom, E when completing Inner tamping tube hammers distance of the bottom away from outer tube bottom into shape when expanding completion to ram, and V is the volume of filler material.
By adjusting coefficient of bearing caoacity m=Rk/ Y adjusts the compaction of the soil body, the vertical limit of prediction prediction enlarged footing Bearing capacity, Y are enlarged footing terminal piling pressure.
The material of filler material is adjusted to adjust the number of plies of enlarged footing, monolayer material enlarged footing is formed or multilayer material expands Head;Filler material is the non-cementing material of unlike material bulk solid, unlike material mixture glue cementing material;It feeds intake, logical material uses: outer Pipe and inner tamping tube hammer mouth, side wall mouth feed intake, filling are pressed to feed intake.

Claims (6)

1. a kind of construction method of static-pressure expanding bottom pile, including equipment immersed tube system it is in place, immersed tube, base expanding and base expanding, pour, tube drawing step, It is characterized in that: the immersed tube system includes outer tube, setting inner tamping tube is hammered into shape in outer tube;It is under D3 that the inner tamping tube hammer, which includes diameter, Hammer ram, the top inner tamping tube that diameter is D2, interior hammer ram link into an integrated entity with inner tamping tube in portion, and it is D1 that diameter is equipped at the top of inner tamping tube On ram disk, it is to ram disk under D4 that interior hammer ram lower part, which is equipped with diameter,;D1 >=D2, D2≤D3;
Interior hammer ram top is equipped with the hook of connecting steel wire ropes;
The base expanding and base expanding step at least uses one of following method:
(1) hydraulic armful of compressing cylinder in static pressure equipment rack directly embraces inner tamping tube hammer, along guide rail to down toward set depth, squeezes Filler material in outlet pipe;Filling and above-mentioned extrusion step is repeated, forms enlarged footing;
(2) in hydraulic armful of compressing cylinder of two sets be arranged in static pressure equipment rack, upper a set of hydraulic armful of compressing cylinder directly embraces interior rammer Pipe hammer, embraces downwards along guide rail and is depressed into set depth, squeezes out the filler material in outer tube;Filling and above-mentioned armful of pressure is repeated, squeezes out, Form enlarged footing;Under a set of hydraulic armful of compressing cylinder directly embrace outer tube, prevent squeeze enlarged footing process middle external tube with pipe, filling Material, which squeezes, does not go out to be formed card pipe;
(3) hydraulic top-pressure oil cylinder withstands inner tamping tube tup, is pressed downwards along guide rail to set depth, squeezes out the filling in outer tube Material;Filling and above-mentioned armful of pressure is repeated, squeezes out, forms enlarged footing;Under a set of hydraulic armful of compressing cylinder directly embrace outer tube, prevent Extruding enlarged footing process middle external tube squeezes with pipe, filler material and does not go out to be formed card pipe;
(4) it above mentions inner tamping tube to hammer into shape to certain depth, unclamps the wirerope of connection inner tamping tube hammer on hoist engine, inner tamping tube hammer is freely fallen Body, the interior filler material rammed in outer tube;Filling and above-mentioned interior rammer process is repeated, forms enlarged footing;Under a set of hydraulic armful of pressure oil Cylinder directly embraces outer tube, prevents interior rammer enlarged footing process middle external tube from squeezing with pipe, filler material and does not go out to be formed card pipe;
(5) inner tamping tube hammer inner cavity is equipped with interior rammer from dropping hammer, and forms mother and sons' hammer;Above mention intracavitary in inner tamping tube hammer dropped hammer certainly to certain Highly, drop hammer freely falling body certainly, inside rams down and rams disk, be repeated filler and it is above-mentioned in ram process, form enlarged footing;Under A set of hydraulic armful of compressing cylinder directly embraces outer tube, prevent in ram enlarged footing during, outer tube is squeezed and is not gone out shape with pipe, filler material Cheng Kaguan;
(6) above mention inner tamping tube hammer in it is intracavitary drop hammer certainly, drive inner tamping tube hammer into shape to certain altitude, hooking slits are hammered into shape by inner tamping tube It is inserted in pivot pin, the wirerope on hoist engine above mentions inner tamping tube hammer inner cavity and drops hammer certainly, when uplink, makes hook around the inside sidespin of pin shaft Turn, screw in inner tamping tube, block from the head that drops hammer, drives inner tamping tube hammer uplink together;Conversely, hook rotates outward around pin shaft, It screws out outside inner tamping tube, does not block from the head that drops hammer, do not drive inner tamping tube hammer uplink together, voluntarily free uplink of dropping hammer certainly, Mu Zichui Freely falling body, inner tamping tube hammer, drop hammer the filler material double-clicked in outer tube certainly;Filler and above-mentioned interior rammer step is repeated, is formed and is expanded Major part;Under a set of hydraulic armful of compressing cylinder directly embrace outer tube, prevent in ram enlarged footing during, outer tube with pipe, filler material squeeze It does not go out to form card pipe.
2. the construction method of static-pressure expanding bottom pile according to claim 1 connects it is characterized in that: ramming disk, inner tamping tube, interior hammer ram Be connected into one, under ram disk and interior hammer ram in partable, upper and lower relatively-movable form.
3. the construction method of static-pressure expanding bottom pile according to claim 1, it is characterized in that: by adjusting compacted coefficient D ∈ (D1、 D2、D3、D4…Dn, V) and adjust the compacted degree of the soil body;D1、D2、D3、D4…DnIt is corresponding in 2100kw.m when to ram filler material Primary, secondary, the n times deflection three times ... of impact energy;V is the volume of filler material.
4. the construction method of static-pressure expanding bottom pile according to claim 1,2 or 3, it is characterized in that: by adjusting shape factor α ∈ (H, h, C, E, V) adjusts size, the shape of enlarged footing;H is the height to feed intake;H includes hOn、hUnder, respectively pulled out on outer tube Height and outer tube underthrust depth;C is to ram to expand outer distance of the tube bottom away from stake bottom when completing, E be ram expand inner tamping tube when completing hammer into shape bottom away from The distance of outer tube bottom, V are the volume of filler material.
5. the construction method of static-pressure expanding bottom pile according to claim 1,2 or 3, it is characterized in that: by adjusting bearing capacity system Number m=Rk/ Y adjusts the compaction of the soil body, the ultimate vertical bearing capacity of prediction prediction enlarged footing, and Y is that enlarged footing terminates piling Power.
6. the construction method of static-pressure expanding bottom pile according to claim 1,2 or 3, it is characterized in that: the material of adjustment filler material To adjust the number of plies of enlarged footing, formation monolayer material enlarged footing or multilayer material enlarged footing;Filler material is unlike material bulk solid Non- cementing material, unlike material mixture glue cementing material;Feed intake, logical material uses: outer tube and inner tamping tube hammer mouth, side wall mouth are thrown Material, pressure are filled and are fed intake.
CN201910275041.4A 2019-04-08 2019-04-08 The construction method of static-pressure expanding bottom pile Pending CN109853533A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910275041.4A CN109853533A (en) 2019-04-08 2019-04-08 The construction method of static-pressure expanding bottom pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910275041.4A CN109853533A (en) 2019-04-08 2019-04-08 The construction method of static-pressure expanding bottom pile

Publications (1)

Publication Number Publication Date
CN109853533A true CN109853533A (en) 2019-06-07

Family

ID=66903387

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910275041.4A Pending CN109853533A (en) 2019-04-08 2019-04-08 The construction method of static-pressure expanding bottom pile

Country Status (1)

Country Link
CN (1) CN109853533A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114182724A (en) * 2021-12-24 2022-03-15 王磊 Construction method and construction equipment for immersed tube club-footed pile

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2581509Y (en) * 2002-04-01 2003-10-22 曹兴明 Three-purpose pile driver for drilling, vibration extracting and vibration tamping foundation large head pile
CN101798809A (en) * 2010-03-16 2010-08-11 朱建新 Non-borrow composite underreamed pile constructing method
JP2010236323A (en) * 2009-03-31 2010-10-21 Mitani Sekisan Co Ltd Foundation pile structure for on-site formation, and construction method of foundation pile
CN105239575A (en) * 2015-11-06 2016-01-13 李全民 Construction device and construction method of bored cast-in-place static pressure pipe pile with enlarged bottom
CN105350525A (en) * 2015-11-09 2016-02-24 朱建新 Construction method for piles
CN106049465A (en) * 2016-06-06 2016-10-26 朱建新 Construction method for pile
CN108118698A (en) * 2018-01-19 2018-06-05 朱建新 The construction method of stake and special Static pressure pile driver

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2581509Y (en) * 2002-04-01 2003-10-22 曹兴明 Three-purpose pile driver for drilling, vibration extracting and vibration tamping foundation large head pile
JP2010236323A (en) * 2009-03-31 2010-10-21 Mitani Sekisan Co Ltd Foundation pile structure for on-site formation, and construction method of foundation pile
CN101798809A (en) * 2010-03-16 2010-08-11 朱建新 Non-borrow composite underreamed pile constructing method
CN105239575A (en) * 2015-11-06 2016-01-13 李全民 Construction device and construction method of bored cast-in-place static pressure pipe pile with enlarged bottom
CN105350525A (en) * 2015-11-09 2016-02-24 朱建新 Construction method for piles
CN106049465A (en) * 2016-06-06 2016-10-26 朱建新 Construction method for pile
CN108118698A (en) * 2018-01-19 2018-06-05 朱建新 The construction method of stake and special Static pressure pile driver

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114182724A (en) * 2021-12-24 2022-03-15 王磊 Construction method and construction equipment for immersed tube club-footed pile

Similar Documents

Publication Publication Date Title
US7201540B2 (en) Construction process for composite pile foundation
CN102733376B (en) Composite pile and its construction method
CN104074186B (en) The casing device of pore-forming and construction method thereof in a kind of building lot
CN105350525A (en) Construction method for piles
CN108118698A (en) The construction method of stake and special Static pressure pile driver
CN102444122A (en) Construction method of pile
CN103821138A (en) Composite pile construction method
US4230425A (en) Method and installation for producing cast-in-situ piles
CN115288131B (en) Construction method of prefabricated hollow internally-rammed carrier pile
CN109853564A (en) A kind of construction method and dedicated inner tamping tube hammer of compaction pile
CN109853565A (en) The construction method of hidden pipe pile
CN101936004A (en) Precast expanding pile as well as construction method and construction mechanical equipment thereof
CN109853533A (en) The construction method of static-pressure expanding bottom pile
RU2679172C1 (en) Cast-in-place pile manufacturing method and a device for its implementation
CN112240022A (en) Construction method and construction equipment for static pressure immersed tube pile
CN106013093B (en) A kind of pile construction method
CN113699980B (en) Deep foundation treatment method
WO2021189840A1 (en) Construction method and construction apparatus for static-pressure tube-sinking pile
CN112323836A (en) Construction method of combined assembly type deep foundation pile
CN105178315A (en) Pouring type pile driver and pile driving method using pile driver
CN109853561A (en) The construction method of static pressed pile
CN106567386A (en) Pouring type pile driver and pile driving method therefor
CN100387789C (en) Concrete pile construction method
CN112012199A (en) Novel BNT carrier pile and construction equipment construction method thereof
CN205012337U (en) Pour formula pile driver

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190607