CN109853476B - Paving process of decorative bricks on retaining wall - Google Patents

Paving process of decorative bricks on retaining wall Download PDF

Info

Publication number
CN109853476B
CN109853476B CN201910224665.3A CN201910224665A CN109853476B CN 109853476 B CN109853476 B CN 109853476B CN 201910224665 A CN201910224665 A CN 201910224665A CN 109853476 B CN109853476 B CN 109853476B
Authority
CN
China
Prior art keywords
decorative
partition wall
bricks
brick
retaining wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910224665.3A
Other languages
Chinese (zh)
Other versions
CN109853476A (en
Inventor
王启才
高腾
于刚
刘奇
韩文会
梁超
存明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Chaoyang Water Conservancy Engineering Co ltd
Original Assignee
Beijing Chaoyang Water Conservancy Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Chaoyang Water Conservancy Engineering Co ltd filed Critical Beijing Chaoyang Water Conservancy Engineering Co ltd
Priority to CN201910224665.3A priority Critical patent/CN109853476B/en
Publication of CN109853476A publication Critical patent/CN109853476A/en
Application granted granted Critical
Publication of CN109853476B publication Critical patent/CN109853476B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a paving process of decorative bricks on a retaining wall, which relates to the technical field of riverway repair, wherein a reserved area for paving the decorative bricks is arranged on the retaining wall, the bottom of the reserved area is arranged below a water level change area, and the decorative bricks are arranged in the reserved area; the retaining wall is built in two parts; the retaining wall is divided into a first partition wall positioned on the lower side of the reserved area and a second partition wall positioned on the upper side of the reserved area; when the decorative brick is paved, the method comprises the following steps: s1, constructing a first partition wall; s2, paving decorative bricks; and S3, constructing a second partition wall. The invention has the effect of firmer connection between the decorative brick and the retaining wall.

Description

Paving process of decorative bricks on retaining wall
Technical Field
The invention relates to the technical field of riverway repair, in particular to a paving process of decorative bricks on a retaining wall.
Background
In order to consolidate the soil of river bank and prevent water and soil loss, retaining wall is usually built at river bank to block the soil. Conventional embankment retaining walls are typically blocks of concrete or stone bricks. A retaining wall, which is built at a river course in a city, has a side facing river water generally perpendicular to the water surface, and a fence is installed at an upper side of the retaining wall to prevent pedestrians from entering the river course.
In actual construction, need lay the decoration brick of decorating usefulness at the one side of barricade towards the river course sometimes, make the barricade more pleasing to the eye, the image, when the pedestrian when the rest beside the river course, see the decoration brick of arranging on the barricade, can make pedestrian's mood better. Wherein, the position that decorates the brick and lay is located the variable amplitude region of the top water level of retaining wall for the downside of decorating the brick of laying can not deviate from the surface of water when the water level changes.
As shown in fig. 1, a retaining wall 1 made of concrete is provided with a reserved area 2 for paving decorative bricks, the bottom of the reserved area 2 is disposed below a water level changing area, the decorative bricks 3 are arranged in the reserved area 2, and the decorative bricks 3 are adhered to the retaining wall 1 by concrete.
The above prior art solutions have the following drawbacks: the decorative brick 3 is fixedly connected with the retaining wall 1 in a concrete bonding mode, and concrete for bonding is filled between the decorative brick 3 and the retaining wall 1, so that a gap formed by the concrete exists between the decorative brick 3 and the retaining wall 1, and after long-time use, once the concrete for bonding fails, the connection between the decorative brick 3 and the retaining wall 1 may become loose, and even the decorative brick 3 falls off from the retaining wall 1.
Disclosure of Invention
The invention aims to provide a paving process of decorative bricks on a retaining wall, which has the advantage of firmer connection between the decorative bricks and the retaining wall.
The above object of the present invention is achieved by the following technical solutions:
a paving process of decorative bricks on a retaining wall is characterized in that a reserved area for paving the decorative bricks is formed in the retaining wall, the bottom of the reserved area is arranged below a water level change area, and the decorative bricks are arranged in the reserved area;
the retaining wall is built in two parts; the retaining wall is divided into a first partition wall positioned on the lower side of the reserved area and a second partition wall positioned on the upper side of the reserved area;
when the decorative brick is paved, the method comprises the following steps:
s1, constructing a first partition wall;
the method comprises the following steps that a worker builds a first partition wall by using masonry and concrete, the worker coats the concrete on the surface of the first partition wall after the first partition wall is formed, and the surface of the first partition wall facing to river water is perpendicular to the water surface when the first partition wall is built;
s2, paving decorative bricks;
after the first partition wall is built and the concrete on the first partition wall is not solidified, arranging the decorative bricks on the upper surface of the first partition wall, and aligning the surface of the decorative bricks facing the river water side with the surface of the first partition wall facing the river water side when arranging the decorative bricks;
s3, constructing a second partition wall;
after arranging the decorative bricks on the first partition wall, a worker piles concrete and masonry on the upper surface of the first partition wall, constructs the second partition wall on the first partition wall, and when constructing the second partition wall, directly concretes the second partition wall together with the decorative bricks.
By adopting the technical scheme, the decorative bricks are arranged on the retaining wall by using the method, compared with the installation of the decorative bricks after the retaining wall is completely manufactured, the retaining wall is more firmly connected with the decorative bricks, so that concrete used for bonding cannot be filled between the second partition wall and the decorative bricks, the second partition wall is more tightly connected with the decorative bricks, the decorative bricks are more firmly arranged, and the service life is longer. Wherein, when arranging the decorative brick of co-altitude, can overlap joint decorative brick while concreting.
The invention is further configured to: when the decorative tile is arranged on the first partition wall, concrete is applied between the decorative tile and the first partition wall for temporary bonding.
Through adopting above-mentioned technical scheme, can reduce the condition that takes place the skew when decorating the brick and arrange on first division wall and take place.
The invention is further configured to: when arranging the decorative brick on the first partition wall, the accommodating groove arranged along the length direction of the first partition wall is formed in the first partition wall, and the accommodating groove is formed in the upper surface of the first partition wall.
Through adopting above-mentioned technical scheme, when arranging the decoration brick, the staff will decorate in the partial embedding holding tank of brick, make when decorating brick and first dividing wall fixed connection together, the part of decorating the brick is via in the first dividing wall of holding tank embedding, let and decorate the brick and keep vertical, when decorating the brick and receiving the impact of concrete, in the bottom embedding holding tank of decorating the brick, make the holding tank restrict arranging of decorating the brick, it is more stable to decorate arranging of brick on first dividing wall, when receiving the impact, be difficult for taking place the slope
The invention is further configured to: before arranging the decorative brick, an insertion block inserted into the accommodating groove is ground on the surface of the decorative brick, which is in contact with the first partition wall;
when arranging the decorative tile on the first partition wall, the worker inserts the insert into the receiving groove on the first partition wall.
Through adopting above-mentioned technical scheme, when arranging the brick of will decorating on first division wall, the staff will insert the holding tank on the first division wall in the inserted block, and the inserted block is polished out on decorating the brick, make as integrated into one piece with decorating the brick, make when the inserted block inserts the holding tank, decorate the more firm that brick and first division wall are connected, polish decorating the brick through the staff in addition, make when the inserted block inserts the holding tank, decorate the face of brick orientation river one side and the face parallel and level of first division wall orientation river one side.
The invention is further configured to: when the accommodating groove is formed in the first partition wall, a plurality of baffle plates are arranged in the accommodating groove at equal intervals along the length direction of the accommodating groove.
Through adopting above-mentioned technical scheme, when will decorating during the brick inserts the holding tank, two adjacent decoration bricks are parted by the baffle for there is the clearance between a plurality of decoration bricks of same height, can effectually avoid expend with heat and contract with cold to the influence of decorating the brick, and it is more convenient when arranging the decoration brick for the staff.
The invention is further configured to: when arranging the decorative tiles, an elastic filling strip is arranged between two adjacent decorative tiles.
Through adopting above-mentioned technical scheme, the elasticity filling strip receives the clamp of adjacent two decoration bricks tightly, fills in the space between two decoration bricks more easily, with two decoration bricks fill up to the elasticity filling strip has elasticity, when decoration brick emergence expend with heat and contract with cold phenomenon, can take place elastic deformation. The elasticity filling strip receives the clamp of adjacent two decoration bricks tightly, fills in more easily between two decoration bricks, fills up the space between two decoration bricks to the elasticity filling strip has elasticity, when decoration brick takes place expend with heat and contract with cold phenomenon, can take place elastic deformation.
The invention is further configured to: the elastic filling strip is a T-shaped strip and is divided into a transverse strip and a vertical strip perpendicular to the transverse strip, and when the elastic filling strip is filled between two adjacent decorative bricks, the vertical strip is filled between the two adjacent decorative bricks; the horizontal bar is attached to the contact surface of the two decorative bricks and the concrete.
Through adopting above-mentioned technical scheme, when the concrete impacted the elasticity filler strip, the horizontal bar on the elasticity filler strip was laminated with the face that decorative brick and concrete contacted, slowed down the impact of concrete.
The invention is further configured to: and when the concrete for constructing the second division wall is not solidified, paving transverse bricks on the surface of the second division wall parallel to river water.
Through adopting above-mentioned technical scheme for horizontal brick can be quick arrange on the second bulkhead for staff's arrangement also has filled the elasticity filler strip between the adjacent horizontal brick of arranging on the second bulkhead moreover, lets the staff can arrange the work by faster completion.
The invention is further configured to: when arranging the transverse tiles, the transverse tiles are aligned with the decorative tiles.
Through adopting above-mentioned technical scheme for the part of horizontal brick is pressed on decorating the brick, when the pedestrian stands in the edge of barricade, only can take place the contact with horizontal brick, can not direct and barricade contact, thereby reduces the wearing and tearing to the barricade.
The invention is further configured to: when the transverse bricks and the longitudinal bricks are aligned, a 45-degree bevel is cut at the joint of the decorative bricks and the transverse bricks, inclined planes are respectively formed on the decorative bricks and the transverse bricks, and then the inclined planes on the decorative bricks and the transverse bricks are connected together to form a neat corner.
By adopting the technical scheme, the arrangement between the transverse bricks and the decorative bricks is more tidy.
In conclusion, the beneficial technical effects of the invention are as follows:
1. the concrete for bonding is not filled between the retaining wall and the decorative bricks, so that the retaining wall and the decorative bricks are connected more tightly, the arrangement of the decorative bricks is firmer, and the service life is longer;
2. the decorative bricks are arranged more firmly by arranging the accommodating groove on the first partition wall;
3. through setting up the elasticity filling strip, can effectually prevent that the concrete from overflowing from between the adjacent decorative brick.
Drawings
FIG. 1 is a schematic view of a prior art decorative brick laid on a retaining wall;
FIG. 2 is a schematic view of the decoration bricks laid on the retaining wall in this embodiment;
FIG. 3 is a flow chart illustrating the process of laying decorative bricks on the retaining wall according to this embodiment;
FIG. 4 is a schematic view of the retaining wall in this embodiment;
FIG. 5 is a schematic view of a decorative tile of the present embodiment;
fig. 6 is a schematic view of the elastic filler strip in this embodiment.
In the figure, 1, a retaining wall; 11. a first dividing wall; 12. a second partition wall; 2. a reserved area; 3. decorating the brick; 31. inserting a block; 4. accommodating grooves; 5. a baffle plate; 6. an elastic filler strip; 61. a horizontal bar; 62. vertical bars; 7. and (4) transverse bricks.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 2, the retaining wall 1 is constructed in two parts for the retaining wall disclosed in the present invention. The retaining wall 1 is divided into a first partition wall 11 located at the lower side of the reserved area 2 and a second partition wall 12 located at the upper side of the reserved area 2.
As shown in fig. 3, when the decoration brick 3 is paved, the following steps are mainly performed:
s1, building a first partition wall 11;
the worker piles up the first division wall 11 with masonry and concrete to after the first division wall 11 is moulded, the worker at the surface coating concrete of first division wall 11, when building first division wall 11, set up the face of first division wall 11 towards river one side to be perpendicular with the surface of water.
S2, paving the decorative bricks 3;
after the first partition wall 11 is completely laid and the concrete on the first partition wall 11 is not set, the decorative bricks 3 are arranged on the upper surface of the first partition wall 11, and the face of the decorative brick 3 facing the river is aligned with the face of the first partition wall 11 facing the river when the decorative brick 3 is arranged. In order to prevent the decorative tile 3 from being inclined and deviated when being arranged on the first partition wall 11, concrete is coated between the decorative tile 3 and the first partition wall 11 for temporary bonding.
S3, building a second partition wall 12;
after arranging the decorative bricks 3 on the first partition wall 11, a worker stacks concrete and masonry on the upper surface of the first partition wall 11, constructs the second partition wall 12 on the first partition wall 11, and when constructing the second partition wall 12, the second partition wall 12 and the decorative bricks 3 are directly cast together with concrete, integrally formed, so that the connection between the second partition wall 12 and the first partition wall 11 is firmer.
When the decorative bricks 3 are arranged on the retaining wall 1 by using the method, compared with the installation of the decorative bricks 3 after the retaining wall 1 is completely manufactured, the retaining wall 1 is more firmly connected with the decorative bricks 3, so that concrete for bonding is not filled between the second partition wall 12 and the decorative bricks 3, the connection between the second partition wall 12 and the decorative bricks 3 is tighter, the arrangement of the decorative bricks is firmer, and the service life is longer. Wherein, when arranging the decorative brick 3 of different heights, can overlap joint decorative brick 3 while concreting.
Referring to fig. 2 and 4, when the decorative tile 3 is disposed on the first partition wall 11, the first partition wall 11 is provided with receiving grooves 4 disposed along the length direction of the first partition wall 11, and the receiving grooves 4 are disposed on the upper surface of the first partition wall 11 and located on the side of the first partition wall 11 facing the river. When arranging the decorative tile 3, the worker inserts a part of the decorative tile 3 into the receiving groove 4 so that the part of the decorative tile 3 is inserted into the first partition wall 11 via the receiving groove 4 when the decorative tile 3 is fixedly connected with the first partition wall 11.
When the second partition wall 12 is piled up and poured, the concrete for building the second partition wall 12 can impact the decorative bricks 3, and workers are required to support the decorative bricks 3 when building the second partition wall 12, so that the decorative bricks 3 are prevented from inclining when being impacted by the concrete, and the arrangement of the decorative bricks 3 is prevented from being influenced. Offer holding tank 4 on first partition 11 to in the partial embedding holding tank 4 that will decorate brick 3, let decorate brick 3 and keep vertical, when decorating brick 3 and receive the impact, decorate in brick 3's the bottom embedding holding tank 4, make holding tank 4 restrict decorating arranging of brick 3, decorate brick 3 and arrange more stably on first partition 11, when receiving the impact, be difficult for taking place the slope.
In the actual arrangement of the decorative tiles 3, the surface of the decorative tile 3 facing the river water side needs to be aligned with the surface of the first partition wall 11 facing the river water side, so that the surface of the retaining wall 1 facing the river water side, on which the decorative tile 3 is arranged, is more orderly. In order to align the surface of the decorative tile 3 facing the river with the surface of the first partition wall 11 facing the river when the decorative tile 3 is inserted into the receiving groove 4, the decorative tile 3 may be trimmed, and referring to fig. 5, an insert 31 inserted into the receiving groove 4 is ground on the surface of the decorative tile 3 contacting the first partition wall 11. When arranging decorative tile 3 on first divider 11, the staff inserts inserted block 31 in holding tank 4 on first divider 11, and inserted block 31 is polished out on decorative tile 3, makes as integrated into one piece with decorative tile 3, makes when inserted block 31 inserts holding tank 4, and decorative tile 3 is connected more firmly with first divider 11, and polishes decorative tile 3 through the staff, makes when inserted block 31 inserts holding tank 4, and the face of decorative tile 3 towards river one side is the same level as the face of first divider 11 towards river one side.
In actual construction, a plurality of decorative bricks 3 are generally arranged on the retaining wall 1, the plurality of decorative bricks 3 form a plane, in order to prevent the influence of expansion and contraction of heat on the decorative bricks 3, when arranging the decorative tiles 3, a certain gap is left between the adjacent decorative tiles 3, and in order to ensure that when arranging the decorative tiles 3 with the same height, the gap between the adjacent two decorative tiles 3 is convenient for the operator to reserve, referring to fig. 2 and 4, a plurality of baffle plates 5 are arranged in the accommodating groove 4, the baffle plates 5 are arranged in the accommodating groove 4 at equal intervals along the length direction of the accommodating groove 4, and the distance between the adjacent blocking plates 5 is set to be not less than the length of the decorative tile 3, so that the decorative tile 3 can be inserted into the accommodating groove 4 provided with the blocking plates 5, the adjacent two decorative tiles 3 are separated by the blocking plates 5, make to have the clearance between a plurality of decoration bricks 3 of same height, it is more convenient when arranging decoration brick 3 to let the staff. In order to let not co-altitude decorative tile 3 when arranging, the clearance between two adjacent decorative tile 3 is convenient for arrange, the staff has arranged elasticity filler strip 6 between two adjacent decorative tile 3, elasticity filler strip 6 is made by elastic material, for example, rubber, silica gel etc, elasticity filler strip 6 receives the clamp of two adjacent decorative tile 3 tightly, pack more easily between two decorative tile 3, fill up the space between two decorative tile 3, and elasticity filler strip 6 has elasticity, when decorative tile 3 takes place the expend with heat and contract with cold phenomenon, elastic deformation can take place.
Also pack the elasticity filler strip 6 between two adjacent decoration brick 3 of same height, fill up the space between two adjacent decoration brick 3 of same height for it is more inseparable between the decoration brick 3 of arranging, when building second division wall 12, the concrete on second division wall 12 can receive blockking of elasticity filler strip 6, can not follow the space outflow between the decoration brick 3.
When building second part wall 12, the concrete on the second part wall 12 can strike ornamental brick 3, it is more firm to let the arrangement of elasticity filler strip 6 between two adjacent ornamental bricks 3, can not let elasticity filler strip 6 deviate from between two ornamental bricks 3 when receiving the impact of concrete, refer to fig. 6, set up elasticity filler strip 6 into T type strip, divide into horizontal bar 61 and perpendicular to horizontal bar 61's vertical bar 62, when filling elasticity filler strip 6 between two adjacent ornamental bricks 3, vertical bar 62 is filled between two adjacent ornamental bricks 3, horizontal bar 61 and two face laminating that ornamental brick 3 deviates from river one side, when the concrete strikes elasticity filler strip 6, horizontal bar 61 on the elasticity filler strip 6 and the face laminating that ornamental brick 3 and concrete contacted, the impact to the concrete slows down.
As shown in fig. 2, after the second partition wall 12 is constructed, the transverse bricks 7 are laid on the surface of the second partition wall 12 parallel to the river, the transverse bricks 7 have the same size as the decorative bricks 3, and the transverse bricks 7 are also decorative bricks. In order to make the transverse bricks 7 easier to lay, the transverse bricks 7 are laid on the second partition wall 12 when the concrete for constructing the second partition wall 12 is not solidified, so that the transverse bricks 7 can be quickly arranged on the second partition wall 12, arrangement of workers is accelerated, and elastic filling strips 6 are filled between the adjacent transverse bricks 7 arranged on the second partition wall 12, so that the workers can complete arrangement work more quickly.
After the retaining plate 5 is built, the corners of the cross positions between the transverse bricks 7 and the decorative bricks 3 are concrete corners, when a pedestrian stands at the edge of the retaining wall 1, the corners of the retaining wall 1 are rubbed by soles sometimes, and after multiple rubs, the corners of the retaining wall 1 are damaged, so that workers need to repair the corners of the retaining wall 1.
In order to reduce the wear of the retaining wall 1, when arranging the lateral bricks 7, the worker aligns the surface of the lateral bricks 7 facing the river water side with the surface of the decorative bricks 3 facing the river water side so that the portions of the lateral bricks 7 are pressed against the decorative bricks 3, and when a pedestrian stands at the edge of the retaining wall 1, the pedestrian only comes into contact with the lateral bricks 7 and does not directly come into contact with the retaining wall 1, thereby reducing the wear of the retaining wall 1.
In order to arrange the transverse bricks 7 and the decorative bricks 3 more orderly, a 45-degree bevel is cut at the joint of the decorative bricks 3 and the transverse bricks 7, a bevel is respectively formed on the decorative bricks 3 and the transverse bricks 7, and then the bevels on the decorative bricks 3 and the transverse bricks 7 are connected together to form a tidy corner.
The implementation principle of the embodiment is as follows: after arranging the decorative bricks 3 on the first partition wall 11, a worker stacks concrete and masonry on the upper surface of the first partition wall 11, constructs the second partition wall 12 on the first partition wall 11, and when constructing the second partition wall 12, the second partition wall 12 and the decorative bricks 3 are directly cast together with concrete, integrally formed, so that the connection between the second partition wall 12 and the first partition wall 11 is firmer.
The embodiments of the present invention are preferred embodiments of the present invention, and the scope of the present invention is not limited by these embodiments, so: all equivalent changes made according to the structure, shape and principle of the invention are covered by the protection scope of the invention.

Claims (8)

1. A paving process of decorative bricks on a retaining wall is characterized in that a reserved area (2) used for paving decorative bricks (3) is formed in the retaining wall (1), the bottom of the reserved area (2) is arranged below a water level change area, and the decorative bricks (3) are arranged in the reserved area (2);
the method is characterized in that: the retaining wall (1) is built in two parts; the retaining wall (1) is divided into a first partition wall (11) positioned on the lower side of the reserved area (2) and a second partition wall (12) positioned on the upper side of the reserved area (2);
when the decorative brick (3) is paved, the method comprises the following steps:
s1, building a first partition wall (11);
the method comprises the following steps that a worker builds a first partition wall (11) by masonry and concrete, after the first partition wall (11) is formed, the worker coats the concrete on the surface of the first partition wall (11), and when the first partition wall (11) is built, the surface, facing the river, of the first partition wall (11) is perpendicular to the water surface;
s2, paving the decorative bricks (3);
after the first partition wall (11) is built and the concrete on the first partition wall (11) is not solidified, arranging the decorative bricks (3) on the upper surface of the first partition wall (11), and aligning the surface of the decorative bricks (3) facing the river water side with the surface of the first partition wall (11) facing the river water side when arranging the decorative bricks (3);
when the decorative bricks (3) are arranged on the first partition wall (11), accommodating grooves (4) arranged along the length direction of the first partition wall (11) are formed in the first partition wall (11), and the accommodating grooves (4) are arranged on the upper surface of the first partition wall (11) and are positioned on one side, facing river water, of the first partition wall (11);
before arranging the decorative tile (3), an insertion block (31) inserted into the accommodating groove (4) is ground on the surface of the decorative tile (3) contacting with the first partition wall (11); when arranging the decorative tile (3) on the first partition wall (11), a worker inserts the insert block (31) into the receiving groove (4) on the first partition wall (11);
s3, building a second partition wall (12);
after arranging the decorative bricks (3) on the first partition wall (11), a worker piles concrete and masonry on the upper surface of the first partition wall (11), builds the second partition wall (12) on the first partition wall (11), and when building the second partition wall (12), directly concretes the second partition wall (12) together with the decorative bricks (3).
2. The paving process of the decorative bricks on the retaining wall according to claim 1, characterized in that: when the decorative tile (3) is arranged on the first partition wall (11), concrete is applied between the decorative tile (3) and the first partition wall (11) for temporary bonding.
3. The paving process of the decorative bricks on the retaining wall according to claim 1, characterized in that: when the accommodating groove (4) is formed in the first partition wall (11), a plurality of baffle plates (5) are arranged in the accommodating groove (4), and the baffle plates (5) are arranged in the accommodating groove (4) at equal intervals along the length direction of the accommodating groove (4).
4. The paving process of the decorative bricks on the retaining wall according to claim 1, characterized in that: when arranging the decorative tiles (3), an elastic filling strip (6) is arranged between two adjacent decorative tiles (3).
5. The paving process of the decorative bricks on the retaining wall according to claim 4, wherein the paving process comprises the following steps: the elastic filling strip (6) is a T-shaped strip and is divided into a transverse strip (61) and a vertical strip (62) perpendicular to the transverse strip (61), and when the elastic filling strip (6) is filled between two adjacent decorative bricks (3), the vertical strip (62) is filled between two adjacent decorative bricks (3); the horizontal bar (61) is jointed with the contact surfaces of the two decorative bricks (3) and the concrete.
6. The paving process of the decorative bricks on the retaining wall according to claim 1, characterized in that: when the concrete for constructing the second partition wall (12) is not solidified, transverse bricks (7) are laid on the surface of the second partition wall (12) parallel to river water.
7. The paving process of the decorative bricks on the retaining wall according to claim 6, wherein the paving process comprises the following steps: when arranging the transverse tiles (7), the transverse tiles (7) are aligned with the decorative tiles (3).
8. The paving process of the decorative bricks on the retaining wall according to claim 7, wherein: when the transverse bricks (7) and the longitudinal bricks are aligned, a 45-degree bevel angle is cut at the joint of the decorative brick (3) and the transverse brick (7), a bevel is respectively formed on the decorative brick (3) and the transverse brick (7), and then the bevels on the decorative brick (3) and the transverse brick (7) are butted together to form a neat corner.
CN201910224665.3A 2019-03-23 2019-03-23 Paving process of decorative bricks on retaining wall Active CN109853476B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910224665.3A CN109853476B (en) 2019-03-23 2019-03-23 Paving process of decorative bricks on retaining wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910224665.3A CN109853476B (en) 2019-03-23 2019-03-23 Paving process of decorative bricks on retaining wall

Publications (2)

Publication Number Publication Date
CN109853476A CN109853476A (en) 2019-06-07
CN109853476B true CN109853476B (en) 2020-11-24

Family

ID=66901698

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910224665.3A Active CN109853476B (en) 2019-03-23 2019-03-23 Paving process of decorative bricks on retaining wall

Country Status (1)

Country Link
CN (1) CN109853476B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2010235998A1 (en) * 2010-10-25 2012-05-10 Rb Products Pty Ltd A building module
CN104264952A (en) * 2014-10-16 2015-01-07 吕国兵 Brick paving technology of exterior wall brick and brick paving template
CN107858998A (en) * 2017-10-18 2018-03-30 深圳市东深工程有限公司 A kind of barricade and construction method applied to engineering flood bank reinforcing of passing the flood period
CN208563258U (en) * 2018-07-27 2019-03-01 闫长辉 A kind of hydraulic engineering ecological protection slope wall

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2010235998A1 (en) * 2010-10-25 2012-05-10 Rb Products Pty Ltd A building module
CN104264952A (en) * 2014-10-16 2015-01-07 吕国兵 Brick paving technology of exterior wall brick and brick paving template
CN107858998A (en) * 2017-10-18 2018-03-30 深圳市东深工程有限公司 A kind of barricade and construction method applied to engineering flood bank reinforcing of passing the flood period
CN208563258U (en) * 2018-07-27 2019-03-01 闫长辉 A kind of hydraulic engineering ecological protection slope wall

Also Published As

Publication number Publication date
CN109853476A (en) 2019-06-07

Similar Documents

Publication Publication Date Title
US9458638B2 (en) Leave-in-place concrete formwork combining plate dowels, divider plates, and/or finishing, armoring and/or sealing molding
US20080277561A1 (en) Mold box and method of manufacturing multiple blocks
US20140007529A1 (en) System for constructing walls using blocks equipped with coupling means
RU2285764C2 (en) Reinforcing control joint assembly for concrete panels
CN109853476B (en) Paving process of decorative bricks on retaining wall
TWI725922B (en) Floor rack
US3578733A (en) Method for making jointed concrete structures
CN106894319B (en) Grooving method for cement concrete pavement
US20120121327A1 (en) Methods and devices for forming contraction joints in concrete works
EA002459B1 (en) Process for the articulated imbrication of concrete slabs (in situ)
JP2018115475A (en) Concrete block and laying structure using the same
US3292508A (en) Wedge device
CN209412844U (en) A kind of assembled resin concrete drainage ditch
KR101842997B1 (en) Pavement Structure and Method of Car Load using Blocks
KR101803177B1 (en) Concrete panel mounted with front/side finishing materials by connecting elements
US3706264A (en) Jointed concrete structures
KR20090095204A (en) Method of repairing and reinforcing submarine concrete constructions
US1383459A (en) Method of making pavements
CN217782456U (en) Embedded-locked brick wall
US2124084A (en) Building block and structure formed therefrom
RU2779685C1 (en) Method for laying paving slabs
CN112726314B (en) Urban road structure and construction process thereof
CN220888527U (en) Spliced river channel slope protection brick structure
CN215801704U (en) Hexagonal block laying assistor
CN216551403U (en) Combined type concrete pavement water permeable brick

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant