CN109834364A CN201910178306.9A CN201910178306A CN109834364A CN 109834364 A CN109834364 A CN 109834364A CN 201910178306 A CN201910178306 A CN 201910178306A CN 109834364 A CN109834364 A CN 109834364A
Authority
CN
China
Prior art keywords
shear bar
shape frame
contraband shape
welding
discharge bin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910178306.9A
Other languages
Chinese (zh)
Inventor
高明
邹鹤民
杨小春
刘帅帅
胡兴
梁炼兵
邹志明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 16th Bureau Group Co Ltd
Third Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Original Assignee
China Railway 16th Bureau Group Co Ltd
Third Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 16th Bureau Group Co Ltd, Third Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd filed Critical China Railway 16th Bureau Group Co Ltd
Priority to CN201910178306.9A priority Critical patent/CN109834364A/en
Publication of CN109834364A publication Critical patent/CN109834364A/en
Pending legal-status Critical Current

Links

Landscapes

  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The present invention relates to beam piece top surface steel bar meter technical field, specially a kind of shear bar positioning trolley and its construction method, a kind of shear bar positioning trolley, including discharge bin, it is set to beam piece top face, including lower supporting plate;Locating rack, including Contraband shape frame body, the Contraband shape frame body are connect by adjusting screw rod with the lower supporting plate;The Contraband shape frame body includes Contraband shape frame top plate and Contraband shape frame bottom plate, and the Contraband shape frame bottom plate is provided with multiple positioning ports;Running gear is connect with the discharge bin, for driving the discharge bin to be moved forward and backward.Welding and assembling height and the welding position that shear bar can be accurately controlled by locating rack, on the one hand improve construction quality, on the other hand make shear bar welding more convenient;Operating platform is set, can further improve the convenience of shear bar welding;Be arranged discharge bin, can convenient working personnel shear bar is taken, improve operating efficiency;The setting convenient working personnel of rain-proof shelter weld shear bar under complicated weather.

Description

A kind of shear bar positioning trolley and its construction method
Technical field
The present invention relates to beam piece top surface steel bar meter technical field, specially a kind of shear bar positioning trolley and its construction party Method.
Background technique
Currently, Bridge Beam piece top surface reinforcing bar (gluten) and shear bar welding are usually man-hour manually hand-held shear bar and use electric arc The mode of weldering and the gluten of beam piece top surface weld.Not only the degree of automation is low for this mode, and standardization level is low, and constructs and miss Poor big, the error in length that shear bar stretches out gluten net is big, and subsequent deck paving is caused to be possible to many adverse effects occur, such as protects Covering thickness deficiency etc., to generate serious adverse effect to the quality of entire engineering, duration.
Summary of the invention
In view of the problems of the existing technology the present invention, proposes a kind of shear bar positioning trolley and its construction method.
The technical solution adopted by the present invention to solve the technical problems is: a kind of shear bar positioning trolley, including
Discharge bin is set to beam piece top face, including lower supporting plate;
Locating rack, including Contraband shape frame body, the Contraband shape frame body are connect by adjusting screw rod with the lower supporting plate;The Contraband shape frame Body includes Contraband shape frame top plate and Contraband shape frame bottom plate, and the Contraband shape frame bottom plate is provided with multiple positioning ports;
Running gear is connect with the discharge bin, for driving the discharge bin to be moved forward and backward.
Preferably, the adjusting screw rod includes Limit screw head, the studdle body being connect with the Limit screw head, Body is adjusted with the integrally formed screw thread of the studdle body other end, and adjusts the adjusting that body is used cooperatively with the screw thread Nut;
The Contraband shape frame top plate and the Contraband shape frame bottom plate are provided with the screw through hole passed through for the studdle body;
The lower supporting plate, which is provided with, adjusts the height adjusting holes that body is used cooperatively with the screw thread.
Preferably, the running gear includes the bracket set on beam piece two sides, set on the walking track of cradle top, with The traveling wheel that the walking track is cooperatively connected, the driving motor being connect with the traveling wheel, the traveling wheel and the lower branch The connection of fagging bottom.
Preferably, the discharge bin, which is located at beam piece two sides, is also connected with operating platform;The operating platform is equipped with behaviour Make chair;The operating platform is additionally provided with the speed connecting with the driving motor and adjusts pedal.
Preferably, being equipped at the top of the discharge bin rain-proof shed.
Preferably, beam piece top surface is additionally provided with locating rack height adjustment to hindsight.
A kind of construction method of shear bar positioning trolley, includes the following steps
Step 1, welding and assembling height, welding lengthwise position and the welding lateral position of shear bar are calculated according to drawing;
Step 2, the mounting height of locating rack is adjusted according to drawing to adapt to the welding and assembling height of shear bar in step 1;
Step 3, locating rack the welding to be welded of shear bar in step 1 is moved to by longitudinal tandem by running gear to indulge To position;
Step 4, shear bar and beam piece top surface gluten are welded according to the welding lateral position of shear bar, repeats step 3 to step 4 It welds and completes to whole shear bars.
Preferably, before the step 1 or the step 2 or the step 3 by shear bar to be welded stack to In discharge bin.
Preferably, the step 2 specifically includes
Step 21, the studdle body of two adjusting screw rods is each passed through to the screw through hole at Contraband shape frame body both ends, and spiral shell will be adjusted The screw thread of bar adjusts body by regulating nut height adjusting holes connection corresponding with lower supporting plate and regulating nut and screw thread are adjusted The relative rotation circle number of body is identical;
Step 22, Contraband shape frame body is adjusted to desired height according to locating rack height adjustment to hindsight and by adjusting screw rod;
Step 23, Contraband shape frame body is connect with lower supporting plate adaptability by remaining adjusting screw rod.
Preferably, the step 4 specifically includes
Step 41, positioning port corresponding to shear bar welding lateral position to be welded is determined;
Step 42, shear bar is put into the positioning port of Contraband shape frame bottom plate and its top is made to offset with Contraband shape frame top plate;
Step 43, shear bar and beam piece top surface gluten are welded by arc welding mode, repeats step 41 to step 43 to same Whole shear bars that shear bar welds lengthwise position, which weld, to be completed.
The invention has the advantages that 1, the welding and assembling height and welding position of shear bar can be accurately controlled by locating rack It sets, on the one hand improves construction quality, on the other hand make shear bar welding more convenient;
2, operating platform is set, can further improve the convenience of shear bar welding;
3, be arranged discharge bin, can convenient working personnel shear bar is taken, improve operating efficiency;
4, the setting convenient working personnel of rain-proof shelter weld shear bar under complicated weather, avoid influencing the duration.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of shear bar positioning trolley of the present invention;
Fig. 2 is the partial enlarged view of locating rack in Fig. 1;
Fig. 3 is that shear bar is installed to the side view of locating rack;
Fig. 4 is the connection side view of Contraband shape frame body and lower supporting plate;
Fig. 5 is the side view of shear bar and gluten welding;
Wherein, 1, lower supporting plate, 2, Contraband shape frame body, 3, adjusting screw rod, 21, positioning port, 41, bracket, 42, walking track, 43, row Walk wheel, 44, driving motor, 5, rain-proof shed, 6, locating rack height adjustment is to hindsight.
Specific embodiment
To further illustrate the technical scheme of the present invention below with reference to the accompanying drawings and specific embodiments.
As shown in Figures 1 to 5, a kind of shear bar positioning trolley, including discharge bin, locating rack and running gear.Discharge bin Set on beam piece top face, including lower supporting plate 1, lower supporting plate 1 not only can be used as the frame body for being used to support locating rack, but also can be with For placing finished product shear bar, can convenient working personnel shear bar is taken, improve operating efficiency.
Locating rack includes Contraband shape frame body 2, and the Contraband shape frame body 2 is connect by adjusting screw rod 3 with the lower supporting plate 1, institute Stating Contraband shape frame body 2 includes Contraband shape frame top plate and Contraband shape frame bottom plate, and the Contraband shape frame bottom plate is provided with multiple positioning ports 21.It can when construction Suitable positioning port 21 is chosen according to actual welding position.
The adjusting screw rod 3 includes Limit screw head, the studdle body connecting with the Limit screw head, with the branch It supports the integrally formed screw thread of the screw body other end and adjusts body, and adjust the regulating nut that body is used cooperatively with the screw thread.Institute It states Contraband shape frame top plate and the Contraband shape frame bottom plate is provided with the screw through hole passed through for the studdle body, the lower supporting plate 1 It is provided with and adjusts the height adjusting holes that body is used cooperatively with the screw thread.
Beam piece top surface is additionally provided with auxiliary positioning frame and adjusts the locating rack height adjustment of height to hindsight 6.
Running gear is connect with the discharge bin, for driving the discharge bin to be moved forward and backward.The running gear includes Bracket 41 set on beam piece two sides, the walking track 42 set on 41 top of bracket, the row being cooperatively connected with the walking track 42 Wheel 43 is walked, the driving motor 44 connecting with the traveling wheel 43, the traveling wheel 43 is connect with 1 bottom of lower supporting plate.It is logical Discharge bin back-and-forth motion can freely be controlled and discharge bin is rested in required position by crossing running gear.
The discharge bin is located at beam piece two sides and is also connected with operating platform, and the operating platform is equipped with operations chair, described Operating platform is additionally provided with the speed connecting with the driving motor 44 and adjusts pedal.Operating personnel can drive in operating platform and put Feed bin is mobile, and can adjust the movement speed that pedal controls discharge bin by speed, e.g., puts when speed is adjusted when pedal is floored The movement speed of feed bin is most fast, and when loosening speed and adjusting pedal, discharge bin movement speed is slack-off, adjusts when being totally released speed Discharge bin stops movement when pedal.The operating position of operating platform is longitudinally staggered with locating rack, and the width of beam piece top surface is generally 230 centimetres, operating personnel can directly weld shear bar by operating platform and bracket 41.
Rain-proof shed 5, rain-proof shed 5 are equipped at the top of the discharge bin can be used for sunshade, rain cover, so that the positioning trolley of the application It can use in the presence of a harsh environment, convenient working personnel weld shear bar under complicated weather, avoid influencing the duration.
A kind of construction method of shear bar positioning trolley, comprising the following steps: step 1, shear bar is calculated according to drawing Welding and assembling height, welding lengthwise position and welding lateral position.
Step 2, the mounting height of locating rack is adjusted according to drawing to adapt to the welding and assembling height of shear bar in step 1.Specifically Including step 21, the studdle body of two adjusting screw rods 3 is each passed through to the screw through hole at 2 both ends of Contraband shape frame body, and will be adjusted The screw thread of screw rod 3 adjusts body and passes through regulating nut height adjusting holes connection corresponding with lower supporting plate 1 and regulating nut and screw thread The relative rotation circle number for adjusting body is identical.
Step 22, needed for Contraband shape frame body 2 being adjusted to according to locating rack height adjustment to hindsight 6 and by adjusting screw rod 3 Highly.Regulating nut is always maintained at constant, the screw thread adjusting when regulating nut rotates in the forward direction with the dynamics that engages that screw thread adjusts body Body relative adjustment nut moves up, and when regulating nut reversely rotates, screw thread adjusts body relative adjustment nut and moves down.It adjusts Section nut edge can be set to can be manually rotated the finger of regulating nut and pinch portion.Regulating nut rotates a circle can be adjusted in screw thread It walks 1 centimetre on body.
Step 23, Contraband shape frame body 2 is connect by remaining adjusting screw rod 3 with 1 adaptability of lower supporting plate, is adjusted for convenience Nut adjusts the relative position moved on body both to adjust in screw thread, regulating nut and screw thread adjusting body to engage dynamics general It is smaller, and the effect of remaining adjusting screw rod 3 be increase total connection dynamics so that locating rack connect with lower supporting plate 1 it is more firm Gu.
Step 3, locating rack is moved to by longitudinal tandem by the weldering to be welded of shear bar in step 1 by running gear Connect lengthwise position.Assuming that the direction that locating rack is moved forward and backward is longitudinal direction, locating rack just starts positioned at longitudinal initial end, locating rack Height adjustment hindsight 6 can be set the both lateral sides in longitudinal initial end, and locating rack carries out height tune in longitudinal initial end Section.
Step 4, shear bar and beam piece top surface gluten are welded according to the welding lateral position of shear bar, repeat step 3 to Step 4 is welded to whole shear bars and is completed.Step 41 is specifically included, is determined corresponding to shear bar welding lateral position to be welded Positioning port 21.
Step 42, shear bar is put into the positioning port 21 of Contraband shape frame bottom plate and its top is made to offset with Contraband shape frame top plate.
Step 43, shear bar and beam piece top surface gluten are welded by arc welding mode, repeat step 41 to step 43 to Whole shear bars of same shear bar welding lengthwise position, which weld, to be completed.After shear bar is put into positioning port 21 with hand, hand It does not unclamp first, exists side by side even if being welded shear bar and gluten with arc welding.When laterally row's shear bar is all welded and then more Longitudinal measure position is changed, is completed until whole shear bars weld.Two operating personnels are needed when the positioning trolley of the application uses, And the welding efficiency of shear bar also at least improves twice.
Shear bar to be welded is stacked into discharge bin before the step 1 or the step 2 or the step 3, Convenient working personnel take shear bar, improve operating efficiency.
Embodiment described above is only that preferred embodiments of the present invention will be described, not to design of the invention It is defined with range.Without departing from the design concept of the invention, ordinary people in the field is to technical side of the invention The all variations and modifications that case is made, should all drop into protection scope of the present invention, the claimed technology contents of the present invention, Through being all described in the claims.

Claims (10)

1. a kind of shear bar positioning trolley, it is characterised in that: including
Discharge bin is set to beam piece top face, including lower supporting plate (1);
Locating rack, including Contraband shape frame body (2), the Contraband shape frame body (2) are connected by adjusting screw rod (3) and the lower supporting plate (1) It connects;The Contraband shape frame body (2) includes Contraband shape frame top plate and Contraband shape frame bottom plate, and the Contraband shape frame bottom plate is provided with multiple positioning ports (21);
Running gear is connect with the discharge bin, for driving the discharge bin to be moved forward and backward.
2. a kind of shear bar positioning trolley according to claim 1, it is characterised in that: the adjusting screw rod (3) includes limit Position screw head, the studdle body being connect with the Limit screw head, with the integrally formed spiral shell of the studdle body other end Line adjusts body, and adjusts the regulating nut that body is used cooperatively with the screw thread;
The Contraband shape frame top plate and the Contraband shape frame bottom plate are provided with the screw through hole passed through for the studdle body;
The lower supporting plate (1), which is provided with, adjusts the height adjusting holes that body is used cooperatively with the screw thread.
3. a kind of shear bar positioning trolley according to claim 1, it is characterised in that: the running gear includes being set to beam The bracket (41) of piece two sides, the walking track (42) being set at the top of bracket (41) are cooperatively connected with walking track (42) Traveling wheel (43), the driving motor (44) being connect with the traveling wheel (43), the traveling wheel (43) and the lower supporting plate (1) Bottom connection.
4. a kind of shear bar positioning trolley according to claim 1, it is characterised in that: the discharge bin is located at beam piece two sides It is also connected with operating platform;The operating platform is equipped with operations chair;The operating platform is additionally provided with and the driving motor (44) speed connected adjusts pedal.
5. a kind of shear bar positioning trolley according to claim 1, it is characterised in that: be equipped with and keep off the rain at the top of the discharge bin Canopy (5).
6. a kind of shear bar positioning trolley according to claim 1, it is characterised in that: beam piece top surface is additionally provided with positioning Frame height adjustment is to hindsight (6).
7. a kind of construction method of shear bar positioning trolley, it is characterised in that: include the following steps
Step 1, welding and assembling height, welding lengthwise position and the welding lateral position of shear bar are calculated according to drawing;
Step 2, the mounting height of locating rack is adjusted according to drawing to adapt to the welding and assembling height of shear bar in step 1;
Step 3, locating rack the welding to be welded of shear bar in step 1 is moved to by longitudinal tandem by running gear to indulge To position;
Step 4, shear bar and beam piece top surface gluten are welded according to the welding lateral position of shear bar, repeats step 3 to step 4 It welds and completes to whole shear bars.
8. a kind of construction method of shear bar positioning trolley according to claim 7, it is characterised in that: in the step 1 Or shear bar to be welded is stacked into discharge bin before the step 2 or the step 3.
9. a kind of construction method of shear bar positioning trolley according to claim 7, it is characterised in that: step 2 tool Body includes
Step 21, the studdle body of two adjusting screw rods (3) is each passed through to the screw through hole at Contraband shape frame body (2) both ends, and will The screw thread of adjusting screw rod (3) adjusts body by regulating nut height adjusting holes connection corresponding with lower supporting plate (1) and adjusts spiral shell Cap is identical as the screw thread adjusting relative rotation circle number of body;
Step 22, Contraband shape frame body (2) is adjusted to institute according to locating rack height adjustment to hindsight (6) and by adjusting screw rod (3) Need height;
Step 23, Contraband shape frame body (2) is connect with lower supporting plate (1) adaptability by remaining adjusting screw rod (3).
10. a kind of construction method of shear bar positioning trolley according to claim 7, it is characterised in that: step 4 tool Body includes
Step 41, positioning port (21) corresponding to shear bar welding lateral position to be welded is determined;
Step 42, shear bar is put into the positioning port (21) of Contraband shape frame bottom plate and its top is made to offset with Contraband shape frame top plate;
Step 43, shear bar and beam piece top surface gluten are welded by arc welding mode, repeats step 41 to step 43 to same Whole shear bars that shear bar welds lengthwise position, which weld, to be completed.
CN201910178306.9A 2019-03-11 2019-03-11 A kind of shear bar positioning trolley and its construction method Pending CN109834364A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910178306.9A CN109834364A (en) 2019-03-11 2019-03-11 A kind of shear bar positioning trolley and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910178306.9A CN109834364A (en) 2019-03-11 2019-03-11 A kind of shear bar positioning trolley and its construction method

Publications (1)

Publication Number Publication Date
CN109834364A true CN109834364A (en) 2019-06-04

Family

ID=66885584

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910178306.9A Pending CN109834364A (en) 2019-03-11 2019-03-11 A kind of shear bar positioning trolley and its construction method

Country Status (1)

Country Link
CN (1) CN109834364A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08100531A (en) * 1994-09-30 1996-04-16 Maeda Corp Bar arrangement and support tool for arranged bar
CN205393830U (en) * 2016-02-25 2016-07-27 浙江省交通工程建设集团有限公司 Shear bar electric welding small handcart and bridge floor shear bar welding system
CN107044208A (en) * 2017-05-02 2017-08-15 中国建筑第八工程局有限公司 Assembly type locating module and construction method for prefabricated wallboard reserved joint bar
CN206625580U (en) * 2017-03-02 2017-11-10 中国建筑第八工程局有限公司 Post joint bar regulating positioning device
CN206971092U (en) * 2017-07-11 2018-02-06 山东东泰工程咨询有限公司 Roof steel bar colligation chassis
CN210046130U (en) * 2019-03-11 2020-02-11 中铁十六局集团第三工程有限公司 Shear rib positioning trolley

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08100531A (en) * 1994-09-30 1996-04-16 Maeda Corp Bar arrangement and support tool for arranged bar
CN205393830U (en) * 2016-02-25 2016-07-27 浙江省交通工程建设集团有限公司 Shear bar electric welding small handcart and bridge floor shear bar welding system
CN206625580U (en) * 2017-03-02 2017-11-10 中国建筑第八工程局有限公司 Post joint bar regulating positioning device
CN107044208A (en) * 2017-05-02 2017-08-15 中国建筑第八工程局有限公司 Assembly type locating module and construction method for prefabricated wallboard reserved joint bar
CN206971092U (en) * 2017-07-11 2018-02-06 山东东泰工程咨询有限公司 Roof steel bar colligation chassis
CN210046130U (en) * 2019-03-11 2020-02-11 中铁十六局集团第三工程有限公司 Shear rib positioning trolley

Similar Documents

Publication Publication Date Title
CN202688836U (en) Allocating and transporting device of replaceable milling-planning device for installing road building machine
US9404228B1 (en) Accessory control system for paving operations machine
US6497531B2 (en) Concrete curing machine
CN201940737U (en) Welding device on automatic production line of steel bar truss
CN109555319A (en) A kind of reinforced mesh automatic banding device
CN210619336U (en) Screw rod material loading machine of adjustable promotion angle
CN108712148A (en) The cleaning ferry bus and its control method of photovoltaic array
CN109834364A (en) A kind of shear bar positioning trolley and its construction method
CN208548870U (en) The cleaning ferry bus of photovoltaic array
CN210046130U (en) Shear rib positioning trolley
HU195264B (en) Line-packing machine and packing-machine unit for same
CN209616055U (en) A kind of vcehicular tunnel side wall concrete dabbing rack
CN103894767B (en) Prismatic table shape nacelle slope automatic welding chassis
CN206406738U (en) vehicle-mounted awning
CN209506824U (en) A kind of belt elevator
KR20170089556A (en) Apparatus for supporting ship hull
CN110103328A (en) A kind of semi-automatic curing means and method for different cross section concrete prefabricated parts
CN104475870B (en) Automatic centering and reversing edge trimmer
CN106012719B (en) Track-laying machine
CN212494643U (en) Heavy-duty automobile beam correcting unit
CN109127628A (en) The cleaning ferry bus and its conveying device of photovoltaic array
CN209025678U (en) Trestle suitable for the construction of tunnel inverted arch fill concrete paving and leveling
CN206105248U (en) I -steel welded fastening frame
CN208846014U (en) A kind of double freedom adjusting platform
CN209025680U (en) It vibrates the trestle of construction suitable for tunnel inverted arch fill concrete

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination