CN109826235A - A kind of replacement method of municipal administration well lid installing frame - Google Patents
A kind of replacement method of municipal administration well lid installing frame Download PDFInfo
- Publication number
- CN109826235A CN109826235A CN201910165462.1A CN201910165462A CN109826235A CN 109826235 A CN109826235 A CN 109826235A CN 201910165462 A CN201910165462 A CN 201910165462A CN 109826235 A CN109826235 A CN 109826235A
- Authority
- CN
- China
- Prior art keywords
- installing frame
- well lid
- road surface
- prefabricated
- replacement method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 19
- 238000005553 drilling Methods 0.000 claims abstract description 17
- 230000032258 transport Effects 0.000 claims abstract description 4
- 239000004568 cement Substances 0.000 claims description 20
- 239000000839 emulsion Substances 0.000 claims description 12
- 239000002002 slurry Substances 0.000 claims description 8
- 239000004567 concrete Substances 0.000 claims description 4
- 238000009434 installation Methods 0.000 claims description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 4
- 239000011178 precast concrete Substances 0.000 claims description 3
- 239000002344 surface layer Substances 0.000 claims description 3
- 238000002627 tracheal intubation Methods 0.000 claims description 3
- 239000000428 dust Substances 0.000 abstract description 5
- 239000002893 slag Substances 0.000 abstract description 5
- 239000002699 waste material Substances 0.000 description 10
- 238000010586 diagram Methods 0.000 description 8
- 238000005520 cutting process Methods 0.000 description 5
- 239000010410 layer Substances 0.000 description 4
- 239000010426 asphalt Substances 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 239000011449 brick Substances 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 239000011440 grout Substances 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
- 238000007711 solidification Methods 0.000 description 1
- 230000008023 solidification Effects 0.000 description 1
- 238000003892 spreading Methods 0.000 description 1
Landscapes
- Road Repair (AREA)
Abstract
A kind of replacement method of municipal administration well lid installing frame, is included the following steps, step 1: being drawn out a circular mark line concentric with the old installing frame of well lid on road surface using compasses;Step 2: being cut into an annular grooving on road surface along mark line using the drilling pipe in cutter device after fork truck transports cutter device above mark line;Step 3: forming a mounting groove on road surface after fork truck is hung out the road crust that grooving goes out using boom hoisting;Step 4: new washer and prefabricated installing frame are transported in mounting groove, prefabricated installing frame surface is adjusted to concordant with road surface using more leveling bars;Step 5: being sealed using air bag to the gap between prefabricated installing frame and vertical shaft.The present invention is for solving the problems, such as that existing well lid installing frame replacement velocity is slow, being easy to produce a large amount of dust and disintegrating slag.
Description
Technical field
The present invention relates to a kind of replacement methods of municipal well lid installing frame.
Background technique
Well lid, which is used primarily on highway, does draining use, is found everywhere on road.If road low bearing capacity, well lid exceeds the time limit to take
Labour, be easy to cause well room to collapse, sink, and it is damaged that heavy duty, overloaded vehicle rolloff will lead to part well lid, installing frame.Once occurring
Problem, the safety of road are subject to influence, and the existing restorative procedure to the well lid that goes wrong is first using cutting machine, in breakage
It is cut into a round grooving on road bituminous layers, is then being removed the bitumen layer in annular grooving using pneumatic pick, then again
Waste and old installing frame is taken out, finally new installing frame is being installed and is spreading new bitumen layer, due to needing will to hit using pneumatic pick
Broken breakage bitumen layer, not only replacement velocity is slow, but also can generate a large amount of dust and disintegrating slag, and it is very inconvenient that cleaning is got up.
Summary of the invention
The technical problem to be solved by the present invention is to a kind of replacement methods of municipal well lid installing frame, for solving existing well lid
Installing frame replacement velocity is slow, is easy to produce the problem of a large amount of dust and disintegrating slag.
To solve the above-mentioned problems, the invention solves technical solution are as follows:
A kind of replacement method of municipal administration well lid installing frame, includes the following steps,
Step 1: a circular mark line concentric with the old installing frame of well lid is drawn out on road surface using compasses;
Step 2: being existed using the drilling pipe in cutter device along mark line after fork truck transports cutter device above mark line
An annular grooving is cut on road surface;
Step 3: forming a mounting groove on road surface after fork truck is hung out the road crust that grooving goes out using boom hoisting;
Step 4: new washer and prefabricated installing frame are transported in mounting groove, using more leveling bars by prefabricated installing frame surface
It adjusts to concordant with road surface;
Step 5: being sealed using air bag to the gap between prefabricated installing frame and vertical shaft;
Step 6: plain cement is circulated into the gap between prefabricated installing frame and mounting groove, after theing cement solidifies, from vertical shaft
Take out air bag;
Step 7: removing each leveling bar, the replacement to municipal well lid installing frame is completed.
Need to be equipped with dreg-containing disk in vertical shaft below well lid before carrying out above-mentioned second step, the dreg-containing disk includes circle
Plate is fixedly connected with a circle rubber slab at plectane edge, more nuts is welded on plectane, are mounted in each nut
First jackscrew, each first jackscrew one end are resisted against on vertical shaft inner wall.
The compasses include compass body, idler wheel are equipped in one supporting leg lower end of compass body, under another supporting leg
End is equipped with the sleeve for being inserted into chalk.
The cutter device includes bracket, drilling pipe and support plate, multiple guide sleeves and multiple oil cylinders is equipped on bracket, each
Guide rod is equipped in guide sleeve, each lower end of the guide rod is connected with each cylinder piston rod lower end even support plate, installed on the supporting plate
There is hydraulic motor, hydraulic motor output shaft is connect with drilling pipe, and two intubations corresponding with fork of forklift truck are equipped on bracket.
The curved bar that two one end of boom hoisting are hinged on has been respectively fixedly connected with one piece of arc folder two curved bar one end
Plate a, wherein curved bar is connect by wirerope with fork of forklift truck far from intermediate plate one end.
The leveling bar includes the body of rod, and body of rod one end is connect by screw with prefabricated installing frame, and other end is equipped with the
Two jackscrews, the second jackscrew are resisted against on road surface.
The air bag includes support tube, and emulsion tube is cased with outside support tube, and emulsion tube upper and lower ends distinguish support tube or more
Both ends connection, the gap between emulsion tube and support tube are connected by hose and inflator.
Prefabricated installing frame includes precast concrete annular element, and installing frame is arranged in concrete annular element.
Technical effect of the invention are as follows: after the drilling pipe in cutter device is cut into an annular grooving on road surface, fork truck
Road crust, waste and old installing frame and old washer are hung out together using boom hoisting, later put new washer and prefabricated installing frame
It sets in mounting groove, finally the gap between prefabricated installing frame and road surface is blocked using cement or pitch, is eliminated
The process that pneumatic pick is crushed road surface reduces dust and disintegrating slag;On the other hand, being newly packed into installing frame is prefabricated component, therefore is reduced existing
The usage amount of field cement or pitch, so that the time shortening that thes cement solidifies, improves construction efficiency.
Detailed description of the invention
Following further describes the present invention with reference to the drawings:
Fig. 1 is the structural schematic diagram when present invention is crossed using compasses,
Fig. 2 is structural schematic diagram of the present invention when being cut using cutter device road pavement,
Fig. 3 is overlooking structure diagram of the present invention about cutter device,
Fig. 4 be the present invention using boom hoisting to after cutting road surface and waste and old installing frame lift by crane when structural representation
Figure,
Fig. 5 is overlooking structure diagram of the present invention about boom hoisting,
Fig. 6 is structural schematic diagram of the present invention when installing prefabricated installing frame,
Fig. 7 is schematic top plan view of the present invention when installing prefabricated installing frame,
Fig. 8 is structural schematic diagram of present invention when using air bag,
Fig. 9 is the present invention in the structural schematic diagram by prefabricated installing frame after the installation is completed,
Figure 10 is hydraulic diagram of the invention.
In figure: road surface 1, compasses 2, cutter device 4, dreg-containing disk 3, fork truck 5, boom hoisting 6, leveling bar 7, prefabricated installing frame
8, air bag 9, vertical shaft 10, old installing frame 11, idler wheel 21, sleeve 22, plectane 31, rubber slab 32, nut 33, the first jackscrew 34, insert
Pipe 41, oil cylinder 42, guide rod 43, hydraulic motor 44, drilling pipe 45, curved bar 61, clamping plate 62, the body of rod 71, the second jackscrew 72, support tube
91, emulsion tube 92, inflator 93, hose 94.
Specific embodiment
A kind of replacement method of municipal administration well lid installing frame, includes the following steps,
As shown in Figure 1, step 1: a round mark concentric with the old installing frame 11 of well lid is drawn out on road surface 1 using compasses 2
Remember line;
As shown in Figures 2 and 3, step 2: after fork truck 5 transports cutter device 4 above mark line, using in cutter device 4
Drilling pipe 45 is cut into an annular grooving along mark line on road surface 1;
As shown in Figures 4 and 5, step 3: fork truck 5 using boom hoisting 6 by grooving go out 1 surface layer of road surface hang out after, on road surface 1
Form a mounting groove;
It as shown in Figures 6 and 7, will using more leveling bars 7 step 4: new washer and prefabricated installing frame 8 are transported in mounting groove
Prefabricated 8 surface of installing frame is adjusted to concordant with road surface 1, can if 8 bottom surface of prefabricated installing frame and installation groove bottom gap are larger
To pour into some sandstones into gap;
As shown in figure 8, step 5: being sealed using air bag 9 to the gap between prefabricated installing frame 8 and vertical shaft 10;
Step 6: plain-water slurry is circulated into the gap between prefabricated installing frame 8 and mounting groove, cement slurry can not diffuse out seam
Gap, it is desirable that cement grout identity distance has 15CM or so distance from the ground, wherein used cement can be quick hardening cement, to cement
After solidification, air bag 9 is taken out from vertical shaft 10;
As shown in figure 9, step 7: to the gap of the underfill cement slurry between prefabricated 8 side of installing frame and mounting groove as change
Shape seam, then blocks deformation joint using pitch, removes each leveling bar 7, completes the replacement to municipal well lid installing frame.
After drilling pipe 45 in cutter device 4 is cut into an annular grooving on road surface 1, fork truck 5 will using boom hoisting 6
1 surface layer of road surface, waste and old installing frame 11 and old washer are hung out together, and new washer and prefabricated installing frame 8 are placed into mounting groove later
It is interior, finally the gap between prefabricated installing frame 8 and road surface 1 is blocked using cement or pitch, it is broken to eliminate pneumatic pick
The process on road surface 1 reduces dust and disintegrating slag.
As shown in Fig. 5 to 7, need to be equipped with dreg-containing disk 3, institute in vertical shaft 10 below well lid before carrying out above-mentioned second step
Stating dreg-containing disk 3 includes plectane 31, is fixedly connected with a circle rubber slab 32 at 31 edge of plectane, more spiral shells are welded on plectane 31
Mother 33, is mounted on the first jackscrew 34, each 34 one end of the first jackscrew is resisted against on 10 inner wall of vertical shaft in each nut 33.
After the road surface 1 and waste and old installing frame 11 that will be come out by ring cutting are taken out, some sandstones or brick are had on roadbed
Equal sundries need to make in order to avoid these sundries are fallen in vertical shaft 10, therefore before hanging out road surface 1 and waste and old installing frame 11
Dreg-containing disk 3 is used, to catch the sundries fallen in work progress;On the other hand, it is sometimes desirable to which the well lid of replacement is applied in dirt
On well, if do not blocked to 10 well head of vertical shaft, the foul smell in well can be gushed out upwards, and when constructing, worker must face again
Well head, these foul smell gushed out can to worker construct bring discomfort, so to vertical shaft 10 blocked just very it is necessary to.Make
Plectane 31 can be fixed in vertical shaft 10 by multiple jackscrews, allow rubber slab 32 to be adjacent to 10 inner wall of vertical shaft, allow rubber by the used time
Plate 32 is close to 10 inner wall of vertical shaft, to prevent foul smell in well from gushing out and preventing sundries or tool from falling in well.
As shown in Figure 1, the compasses 2 include 2 ontology of compasses, idler wheel 21 is installed in 2 ontology of compasses, one supporting leg lower end,
Another supporting leg lower end is equipped with the sleeve 22 for being inserted into chalk.In use, compasses 2 are adjusted to after an angle admittedly
It is fixed, then by idler wheel 21 after waste and old 11 inner wall of installing frame, mark line, 4 edge of cutter device are drawn on road surface 1 using chalk
Label wire cutting, can thus allow the grooving being cut into and waste and old installing frame 11 coaxial, due to waste and old installing frame 11 with it is perpendicular
Well 10 is coaxial, therefore after being coaxially put into prefabricated installing frame 8 in mounting groove with vertical shaft 10, can guarantee prefabricated installing frame 8
Gap between periphery and mounting groove inner wall is uniform, enable to be cast in gap concrete or pitch to installing frame into
Row is uniformly bonded.
As shown in Figures 2 and 3, the cutter device 4 includes bracket, drilling pipe 45 and support plate, is equipped with multiple lead on bracket
Set and multiple oil cylinders 42, are equipped with guide rod 43, each 43 lower end of guide rod and 42 piston-rod lower end of each oil cylinder are uniform in each guide sleeve
Support plate connection, is equipped with hydraulic motor 44,44 output shaft of hydraulic motor connect with drilling pipe 45, sets on bracket on the supporting plate
There are two intubations 41 corresponding with 5 pallet fork of fork truck.Hydraulic motor 44 and each oil cylinder 42 can connect with the hydraulic system of fork truck 5
It is logical, in use, controlling each 42 synchronization lifting of oil cylinder by manual three-position four-way valve, hydraulic horse is controlled by manual two position two-way valve
Up to 44 rotations, fork truck 5 can star fluid-power motor after by 45 alignment mark line of drilling pipe, then be bored by the control of each oil cylinder 42
Pipe 45 is slowly fed, while to watering at drilling pipe 45, can be by drilling pipe 45 from road surface 1 after drilling pipe 45 cuts to base course
Extraction, completes cutting, and cutter device 4 is transported to other places by fork truck 5.
As shown in Figures 4 and 5, the curved bar 61 that 6 two one end of boom hoisting are hinged on is fixed respectively two 61 one end of curved bar
It is connected with one piece of curved splint 62, wherein a curved bar 61 is connect by wirerope with 5 pallet fork of fork truck far from intermediate plate one end.It uses
When, the waste and old installing frame 11 being cut into and road surface 1 can be taken out by fork truck 5, be used simple and convenient.
As shown in FIGS. 6 to 8, the leveling bar 7 includes the body of rod 71, and 71 one end of the body of rod is connected by screw and prefabricated installing frame 8
It connects, other end is equipped with the second jackscrew 72, and the second jackscrew 72 is resisted against on road surface 1.
The air bag 9 includes support tube 91, emulsion tube 92 is cased with outside support tube 91,92 upper and lower ends of emulsion tube are propped up respectively
The connection of 91 upper and lower ends of stay tube, the gap between emulsion tube 92 and support tube 91 are connected by hose 94 and inflator 93.
First pass through rotation leveling bar 7 on jackscrew, by prefabricated installing frame 8 adjust to it is concordant with road surface 1 and with vertical shaft 10 together
Axis is being inflated using inflator 93 into the gap between emulsion tube 92 and support tube 91, to prefabricated installing frame 8 and vertical shaft 10
Between gap be sealed, then use in the gap that plain-water slurry is poured between prefabricated installing frame 8 and mounting groove, by
In closure of the emulsion tube 92 to the gap between prefabricated installing frame 8 and vertical shaft 10, therefore plain cement will be unable to be flowed into vertical shaft 10
In, after plain cement will solidify, so that it may air bag 9 is taken out, it, can be full of seam since plain-water slurry is fluid liquid
Gap avoids generating hole in set cement.
Prefabricated installing frame 8 includes precast concrete annular element, and installing frame is arranged in concrete annular element.Prefabricated installing frame
8 can be pre-formed using mold in the factory, reduces the usage amount of live cement or pitch, so that theing cement solidifies the time
Shorten, improves construction efficiency.
Claims (8)
1. a kind of replacement method of municipal administration well lid installing frame, it is characterised in that: include the following steps,
Step 1: a circular mark concentric with the old installing frame of well lid (11) is drawn out on road surface (1) using compasses (2)
Line;
Step 2: using the drilling pipe (45) in cutter device (4) after fork truck (5) transports cutter device (4) above mark line
An annular grooving is cut on road surface (1) along mark line;
Step 3: being formed on road surface (1) after fork truck (5) is hung out road surface (1) surface layer that grooving goes out using boom hoisting (6)
One mounting groove;
Step 4: new washer and prefabricated installing frame (8) are transported in mounting groove, using more leveling bars (7) by prefabricated installation
Frame (8) surface is adjusted to concordant with road surface (1);
Step 5: being sealed using air bag (9) to the gap between prefabricated installing frame (8) and vertical shaft (10);
Step 6: plain-water slurry is circulated into the gap between prefabricated installing frame (8) and mounting groove, cement slurry can not diffuse out seam
Gap takes out air bag (9) from vertical shaft (10) after theing cement solidifies;
Step 7: the gap of the underfill cement slurry to prefabricated installing frame (8) between side and mounting groove is used as deformation joint
Pitch blocks deformation joint, removes each leveling bar (7), completes the replacement to municipal well lid installing frame.
2. a kind of replacement method of municipal well lid installing frame according to claim 1, it is characterised in that: carrying out above-mentioned the
It needs to be equipped with dreg-containing disk (3) in vertical shaft (10) below well lid before two steps, the dreg-containing disk (3) includes plectane (31), in circle
Plate (31) edge is fixedly connected with a circle rubber slab (32), more nuts (33) is welded on plectane (31), in each nut
(33) it is mounted on the first jackscrew (34) in, each the first jackscrew (34) one end is resisted against on vertical shaft (10) inner wall.
3. a kind of replacement method of municipal well lid installing frame according to claim 1, it is characterised in that: the compasses (2)
Including compasses (2) ontology, idler wheel (21) are installed in one supporting leg lower end of compasses (2) ontology, the installation of another supporting leg lower end
There is the sleeve (22) for being inserted into chalk.
4. a kind of replacement method of municipal well lid installing frame according to claim 1, it is characterised in that: the cutter device
(4) include bracket, drilling pipe (45) and support plate, multiple guide sleeves and multiple oil cylinders (42) are installed on bracket, in each guide sleeve
Equipped with guide rod (43), each guide rod (43) lower end is connected with each oil cylinder (42) piston-rod lower end even support plate, on the supporting plate
It is equipped with hydraulic motor (44), hydraulic motor (44) output shaft is connect with drilling pipe (45), and two and fork truck (5) are equipped on bracket
The corresponding intubation (41) of pallet fork.
5. a kind of replacement method of municipal well lid installing frame according to claim 1, it is characterised in that: boom hoisting (6)
The curved bar (61) that two one end are hinged on has been respectively fixedly connected with one piece of curved splint (62) two curved bar (61) one end,
In curved bar (61) connect by wirerope with fork truck (5) pallet fork far from intermediate plate one end.
6. a kind of replacement method of municipal well lid installing frame according to claim 1, it is characterised in that: the leveling bar
It (7) include the body of rod (71), the body of rod (71) one end is connect by screw with prefabricated installing frame (8), and other end is equipped with the second top
Silk (72), the second jackscrew (72) are resisted against on road surface (1).
7. a kind of replacement method of municipal well lid installing frame according to claim 1, it is characterised in that: the air bag (9)
It including support tube (91), is cased with emulsion tube (92) outside support tube (91), emulsion tube (92) upper and lower ends distinguish support tube (91)
Upper and lower ends connection, the gap between emulsion tube (92) and support tube (91) are connected by hose (94) and inflator (93).
8. a kind of replacement method of municipal well lid installing frame according to claim 1, it is characterised in that: prefabricated installing frame
It (8) include precast concrete annular element, installing frame is arranged in concrete annular element.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910165462.1A CN109826235B (en) | 2019-03-05 | 2019-03-05 | Replacement method for municipal well lid mounting frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910165462.1A CN109826235B (en) | 2019-03-05 | 2019-03-05 | Replacement method for municipal well lid mounting frame |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109826235A true CN109826235A (en) | 2019-05-31 |
CN109826235B CN109826235B (en) | 2024-04-09 |
Family
ID=66865397
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910165462.1A Active CN109826235B (en) | 2019-03-05 | 2019-03-05 | Replacement method for municipal well lid mounting frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109826235B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112095672A (en) * | 2020-09-15 | 2020-12-18 | 谢更礼 | Device for replacing road well cover |
CN113215913A (en) * | 2021-04-20 | 2021-08-06 | 交通运输部公路科学研究所 | Assembly type quick plate changing method for airport cement concrete road surface layer with lamp cylinder |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1453432A (en) * | 2002-04-26 | 2003-11-05 | 志贺产业株式会社 | Changing method for inspecting & repairing manhole cover or frame |
CN101338568A (en) * | 2007-07-06 | 2009-01-07 | 株式会社宇岩建设 | upper maintenance method for overhauling well |
DE102008033178A1 (en) * | 2008-07-15 | 2010-01-21 | Curt Espenlaub | Device for bringing manhole cover in road surface layer at contour line, has load receiving ring held for travelling path and road, and other load receiving rings held for high loaded manhole cover |
CN202450423U (en) * | 2012-02-13 | 2012-09-26 | 芜湖山猫工程机械有限责任公司 | Milling-planing machine for maintenance of manholes |
CN202730618U (en) * | 2012-08-28 | 2013-02-13 | 陕西万里路面养护设备有限公司 | Inspection well milling machine |
KR101454224B1 (en) * | 2014-03-14 | 2014-10-23 | 삼서공업 주식회사 | Manhole repair method using variable type circular cutter for excuting drilling and curring of road surface and compass type height adjuster |
CN105421204A (en) * | 2015-12-10 | 2016-03-23 | 山东济宁金易德机械有限公司 | Road well lid repairing machine |
CN205934975U (en) * | 2016-08-16 | 2017-02-08 | 郑开艳 | Automatic maintenance device of road inspection shaft |
CN107310050A (en) * | 2017-07-14 | 2017-11-03 | 袁奥 | Catch pit port cutter device and the manhole constructing method |
CN206956899U (en) * | 2017-07-02 | 2018-02-02 | 辽宁科技学院 | A kind of lower well body of municipal administration removes device |
CN208440960U (en) * | 2018-06-08 | 2019-01-29 | 宜昌建林园林工程有限公司 | Bituminous pavement cutter device around a kind of well lid |
-
2019
- 2019-03-05 CN CN201910165462.1A patent/CN109826235B/en active Active
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1453432A (en) * | 2002-04-26 | 2003-11-05 | 志贺产业株式会社 | Changing method for inspecting & repairing manhole cover or frame |
CN101338568A (en) * | 2007-07-06 | 2009-01-07 | 株式会社宇岩建设 | upper maintenance method for overhauling well |
DE102008033178A1 (en) * | 2008-07-15 | 2010-01-21 | Curt Espenlaub | Device for bringing manhole cover in road surface layer at contour line, has load receiving ring held for travelling path and road, and other load receiving rings held for high loaded manhole cover |
CN202450423U (en) * | 2012-02-13 | 2012-09-26 | 芜湖山猫工程机械有限责任公司 | Milling-planing machine for maintenance of manholes |
CN202730618U (en) * | 2012-08-28 | 2013-02-13 | 陕西万里路面养护设备有限公司 | Inspection well milling machine |
KR101454224B1 (en) * | 2014-03-14 | 2014-10-23 | 삼서공업 주식회사 | Manhole repair method using variable type circular cutter for excuting drilling and curring of road surface and compass type height adjuster |
CN105421204A (en) * | 2015-12-10 | 2016-03-23 | 山东济宁金易德机械有限公司 | Road well lid repairing machine |
CN205934975U (en) * | 2016-08-16 | 2017-02-08 | 郑开艳 | Automatic maintenance device of road inspection shaft |
CN206956899U (en) * | 2017-07-02 | 2018-02-02 | 辽宁科技学院 | A kind of lower well body of municipal administration removes device |
CN107310050A (en) * | 2017-07-14 | 2017-11-03 | 袁奥 | Catch pit port cutter device and the manhole constructing method |
CN208440960U (en) * | 2018-06-08 | 2019-01-29 | 宜昌建林园林工程有限公司 | Bituminous pavement cutter device around a kind of well lid |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112095672A (en) * | 2020-09-15 | 2020-12-18 | 谢更礼 | Device for replacing road well cover |
CN113215913A (en) * | 2021-04-20 | 2021-08-06 | 交通运输部公路科学研究所 | Assembly type quick plate changing method for airport cement concrete road surface layer with lamp cylinder |
Also Published As
Publication number | Publication date |
---|---|
CN109826235B (en) | 2024-04-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105133655B (en) | Construction method of well lid of road surface inspection well and auxiliary installation device | |
CN203022024U (en) | Integrally-movable formwork for pipe gallery cast-in-situ construction | |
CN109826235A (en) | A kind of replacement method of municipal administration well lid installing frame | |
CN107661977A (en) | It is a kind of that the method for changing conticaster ladle pivoting support is integrally lifted according to crane gear | |
CN109083591B (en) | Drilling bored concrete pile body and pile cap integrated drilling pore-forming method | |
CN105133575A (en) | Suspended formwork supporting device for casting lining on surface of underground continuous wall and construction method | |
CN102561193A (en) | Construction technology of closure section for rotary continuous beam for overpass electrified railway and hanging basket thereof | |
CN116591281A (en) | Water accumulation and drainage device for high-rise building construction | |
CN105421204A (en) | Road well lid repairing machine | |
CN203835417U (en) | Tunnel supporting steel arch installation device and clamp | |
CN109989406A (en) | Foundation pit support replacement construction | |
CN205224050U (en) | Steel reinforcement cage is hung and is put device | |
CN207934328U (en) | A kind of concrete lintel constructing structure | |
CN102345287A (en) | Construction method of large-diameter cast-in-situ thin-wall concrete composite pile and special hole forming device | |
CN109083184A (en) | A kind of prefabricated cushion cap of land sectional type and its production and installation method | |
CN103552911B (en) | A kind of movable boom hoisting and the construction installation method of use thereof | |
CN205934931U (en) | Lid is in same direction as foundation ditch structure of digging way of doing things construction | |
CN105780661B (en) | High pier cunning turns over integrated construction template system | |
CN210459305U (en) | Municipal administration well lid replacement device | |
CN207633332U (en) | A kind of borehole filling pile cage of reinforcement absolute altitude control system | |
CN113931444B (en) | Post-cast edge beam integral type template structure and construction method thereof | |
CN109732773A (en) | The installation node and installation method of the hinged concrete prefabricated element of support | |
CN104878775A (en) | Turnable top-down method steel pipe column verticality adjusting guide device and construction method thereof | |
CN201495548U (en) | Manual hole digging filling pile protective wall concrete material receiving platform | |
CN205171337U (en) | Road well lid repairing machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |