CN109816940A - The fault alarm method and device of sewage treatment plant - Google Patents
The fault alarm method and device of sewage treatment plant Download PDFInfo
- Publication number
- CN109816940A CN109816940A CN201910217416.1A CN201910217416A CN109816940A CN 109816940 A CN109816940 A CN 109816940A CN 201910217416 A CN201910217416 A CN 201910217416A CN 109816940 A CN109816940 A CN 109816940A
- Authority
- CN
- China
- Prior art keywords
- node
- warning message
- zero
- causality
- degree
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 159
- 239000010865 sewage Substances 0.000 title claims abstract description 136
- 230000008569 process Effects 0.000 claims abstract description 101
- 238000012545 processing Methods 0.000 claims abstract description 69
- 230000000694 effects Effects 0.000 claims description 25
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 22
- 238000010586 diagram Methods 0.000 claims description 15
- 238000004590 computer program Methods 0.000 claims description 14
- 238000013138 pruning Methods 0.000 claims description 13
- 230000001419 dependent effect Effects 0.000 claims description 6
- 239000011159 matrix material Substances 0.000 claims description 6
- 238000003860 storage Methods 0.000 claims description 6
- 238000010276 construction Methods 0.000 claims description 4
- 235000013399 edible fruits Nutrition 0.000 claims description 4
- 108010001267 Protein Subunits Proteins 0.000 claims description 2
- 230000003647 oxidation Effects 0.000 description 35
- 238000007254 oxidation reaction Methods 0.000 description 35
- 238000012423 maintenance Methods 0.000 description 22
- 238000012544 monitoring process Methods 0.000 description 21
- 239000010802 sludge Substances 0.000 description 20
- 238000004519 manufacturing process Methods 0.000 description 12
- 238000005273 aeration Methods 0.000 description 10
- QVGXLLKOCUKJST-UHFFFAOYSA-N atomic oxygen Chemical compound [O] QVGXLLKOCUKJST-UHFFFAOYSA-N 0.000 description 8
- 229910052760 oxygen Inorganic materials 0.000 description 8
- 239000001301 oxygen Substances 0.000 description 8
- 238000007726 management method Methods 0.000 description 7
- 230000006378 damage Effects 0.000 description 6
- 239000000203 mixture Substances 0.000 description 6
- 238000006243 chemical reaction Methods 0.000 description 5
- 238000009826 distribution Methods 0.000 description 5
- 239000003344 environmental pollutant Substances 0.000 description 5
- 231100000719 pollutant Toxicity 0.000 description 5
- 238000001914 filtration Methods 0.000 description 4
- 230000006870 function Effects 0.000 description 4
- 238000004062 sedimentation Methods 0.000 description 4
- 238000004891 communication Methods 0.000 description 3
- 230000007423 decrease Effects 0.000 description 3
- 239000003814 drug Substances 0.000 description 3
- 230000009102 absorption Effects 0.000 description 2
- 238000010521 absorption reaction Methods 0.000 description 2
- 230000032683 aging Effects 0.000 description 2
- 238000004378 air conditioning Methods 0.000 description 2
- 230000008901 benefit Effects 0.000 description 2
- 238000013500 data storage Methods 0.000 description 2
- 238000012217 deletion Methods 0.000 description 2
- 230000037430 deletion Effects 0.000 description 2
- 239000005446 dissolved organic matter Substances 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000005189 flocculation Methods 0.000 description 2
- 230000016615 flocculation Effects 0.000 description 2
- 238000010438 heat treatment Methods 0.000 description 2
- 239000012535 impurity Substances 0.000 description 2
- 230000010365 information processing Effects 0.000 description 2
- 244000005700 microbiome Species 0.000 description 2
- 239000002245 particle Substances 0.000 description 2
- 239000002957 persistent organic pollutant Substances 0.000 description 2
- 230000001376 precipitating effect Effects 0.000 description 2
- 238000000746 purification Methods 0.000 description 2
- 230000009467 reduction Effects 0.000 description 2
- 238000009423 ventilation Methods 0.000 description 2
- 241000208340 Araliaceae Species 0.000 description 1
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 description 1
- 235000003140 Panax quinquefolius Nutrition 0.000 description 1
- OAICVXFJPJFONN-UHFFFAOYSA-N Phosphorus Chemical compound [P] OAICVXFJPJFONN-UHFFFAOYSA-N 0.000 description 1
- 230000002159 abnormal effect Effects 0.000 description 1
- 238000004458 analytical method Methods 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 238000005842 biochemical reaction Methods 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000015556 catabolic process Effects 0.000 description 1
- 238000005660 chlorination reaction Methods 0.000 description 1
- 238000005352 clarification Methods 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000006731 degradation reaction Methods 0.000 description 1
- 230000000249 desinfective effect Effects 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 230000009977 dual effect Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 239000007789 gas Substances 0.000 description 1
- 235000008434 ginseng Nutrition 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 229910001385 heavy metal Inorganic materials 0.000 description 1
- 230000007062 hydrolysis Effects 0.000 description 1
- 238000006460 hydrolysis reaction Methods 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 229920002521 macromolecule Polymers 0.000 description 1
- 230000007257 malfunction Effects 0.000 description 1
- 238000013507 mapping Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 230000020477 pH reduction Effects 0.000 description 1
- 239000013618 particulate matter Substances 0.000 description 1
- 230000002085 persistent effect Effects 0.000 description 1
- 229910052698 phosphorus Inorganic materials 0.000 description 1
- 239000011574 phosphorus Substances 0.000 description 1
- 238000012805 post-processing Methods 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 238000012958 reprocessing Methods 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 239000002893 slag Substances 0.000 description 1
- 150000003384 small molecules Chemical class 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 230000008719 thickening Effects 0.000 description 1
- 230000001960 triggered effect Effects 0.000 description 1
- 230000003612 virological effect Effects 0.000 description 1
Landscapes
- Testing And Monitoring For Control Systems (AREA)
Abstract
The fault alarm method and device of a kind of sewage treatment plant are provided, which includes: the system topology figure for constructing sewage treatment plant, and the system topology figure describes the association between the component part that each system includes in sewage treatment plant;Obtain current multiple warning messages;System topology figure based on building determines the possibility causality figure between the multiple warning message;According to determining possibility causality figure, the alert process sequence for being directed to the multiple warning message is generated.Using the fault alarm method and device of the sewage treatment plant of exemplary embodiment of the present, the association between multiple warning messages can be embodied, and the processing sequence of multiple warning messages is provided, helps to improve the treatment effeciency to sewage treatment plant's alarm.
Description
Technical field
All things considered of the present invention is related to technical field of sewage, more particularly, is related to a kind of event of sewage treatment plant
Hinder alarm method and device.
Background technique
Sewage treatment is to make sewage purification using the method for physics, chemistry and biology, can recycle, be multiplexed, to reach
To protection environment and the purpose for making full use of water resource.The basic principle of sewage treatment is by filtering, absorption, precipitating, oxidation
With reduction etc. processes, realize sewage in a variety of inorganic pollutions and organic pollutant removal and conversion.In order to guarantee at sewage
Reason process can be gone on smoothly, and the process flow of multistage close association will be not only arranged in sewage treatment plant, there is provision of a variety of
Auxiliary system and auxiliary facility.
Large and medium-sized sewage treatment plant's land occupation is in large scale, and on-site further includes other than complicated process flow system
Power supply-distribution system, blast aeration system, automatic medicament feeding system, monitoring system, heating ventilation air-conditioning system and fire protection alarm system etc..This
A little systems can be further divided into the smaller subsystem of range again, as process flow system can be analyzed to sewage disposal system with
Sludge treating system.It is more inside the multiple systems and same system of sewage treatment plant due to the complexity of sewage disposal process
The characteristics of close-coupled is all shown between a subsystem.
With being gradually increased for sewage treatment plant's automatization level, each process section device therefor, instrument and meter type and
Quantity is more and more.The monitoring system of most of sewage treatment plants has passed through integration networks mechanics of communication, software technology and control
Technology processed realizes the decentralised control and centralized management to these equipment, instrument and meter.The architecture of monitoring system is generally divided into
Two layers, lower layer is read the data of each equipment and instrument and meter by PLC (programmable logic controller (PLC)), and is issued real-time control and referred to
It enables, realizes the local control of equipment;Upper layer, as server, engineer station and operator station, is led to using industrial personal computer or business PC
The communication with PLC is crossed, realizes data acquisition and status display, history data store and trend analysis, the long-range start and stop of equipment and ginseng
Number setting, alarm and alert process generate report and with the communication of other systems etc..
In general, PLC is placed near equipment or power distribution station, and server, engineer station and operator station are placed in central control
Room (abbreviation Central Control Room).In Central Control Room, operation maintenance personnel should check equipment, the operation data of instrument and meter in time, grasp comprehensively
The condition of production, pays close attention to various warning messages again, all harm for production of eliminating the effects of the act rapidly.Generally, warning message
It is divided into two kinds, one is the alarm that processing parameter is more than threshold value, another kind is that device parameter is more than itself threshold value or failure
The alarm of damage.The characteristics of former is alarmed is that equipment self-condition is good, but exceeded situation occur in certain productions, need to life
Production adjusts.The characteristics of latter is alarmed is equipment due to longtime running, aging or operation maintenance personnel misoperation etc., is made
There is performance decline or damage in equipment, leads to its partial failure or is unable to run, but relevant production run is normal.At this moment, it needs
Want operation maintenance personnel on-call maintenance or more exchange device.Sometimes, two kinds of alarms may occur simultaneously, and operation maintenance personnel needs basis
Actual conditions take neatly counter-measure, so that loss is preferably minimized level.
Although the monitoring screen in present sewage treatment plant Central Control Room has been able to show various alarms, and there are also special
Device guarantees that warning message can be received by the operation maintenance personnel outside Central Control Room and be handled in time, but existing sewage treatment plant reports
Police's formula does not consider the incidence relation between multiple warning messages, does not consider the processing priority of multiple warning messages yet, causes
Alert process is not prompt enough.
Summary of the invention
The fault alarm method and device for being designed to provide a kind of sewage treatment plant of exemplary embodiment of the present invention,
To overcome at least one above-mentioned defect.
One side according to an exemplary embodiment of the present invention provides a kind of fault alarm method of sewage treatment plant, comprising:
The system topology figure of sewage treatment plant is constructed, the system topology figure describes each system in sewage treatment plant and includes
Component part between association;Obtain current multiple warning messages;System topology figure based on building, determine described in
Possibility causality figure between multiple warning messages;According to determining possibility causality figure, generates and be directed to the multiple report
The alert process sequence of alert information.
Optionally, the system topology figure may include the property set and Bian Ji of node collection, node, wherein node collection
In each node component part that can include for each system in sewage treatment plant, by side will be present associated two nodes into
Row connection, indicates there is connection between two component parts connected by side, and each attribute in the property set of node can be
Component part corresponding with node prestores warning message.
Optionally, the system topology figure can be stored in the form of adjacency matrix, and the property set of node can be with chain
The form of table stores.
Optionally, the system topology figure based on building determines that the possibility cause and effect between the multiple warning message is closed
The step of system's figure can include: searched from the property set of node and the multiple warning message is matched respectively multiple prestores alarm
Information;Determine with matched the multiple prestore the corresponding multiple component parts of warning message;According to the multiple composition portion
Divide the incidence relation present in the system topology figure, generates the possible causality figure.
Optionally, it according to the multiple component part incidence relation present in the system topology figure, generates
The step of possibility causality figure can include: traverse all warning messages, obtain multiple warning message combinations, any alarm
It include two warning messages in information combination;For any warning message combine, determine in the system topology figure with
With the presence or absence of the side being connected between corresponding two component parts of two warning messages in any warning message combination
Perhaps access is if there is the side or access being connected, then according to two component parts in the system topology figure
Existing incidence relation determines the cause and effect points relationship between two warning messages;According to all warning messages and it is corresponding because
Fruit points relationship generates the possible causality figure.
Optionally, the possible causality figure may include node collection and side collection, wherein each node that node is concentrated can
For the warning message of acquisition, associated two nodes will be present by side and be attached, indicates two connected by side alarms
Exist between information may causality, and by while direction indicate while terminal node warning message dependent on side
The warning message of start node generates.
Optionally, according to determining possibility causality figure, the alert process sequence for being directed to the multiple warning message is generated
The step of column can include: the node that search in-degree is zero from possible causality figure;If the section that the in-degree searched is zero
The quantity of point is not more than 1, then by be zero with the in-degree searched node corresponding warning message deposit alert process sequence in;
It is determining according to history partial ordering relation to be with the in-degree searched if the quantity for the node that the in-degree searched is zero is greater than 1
The processing priority of the corresponding warning message of zero node, and will be zero with the in-degree searched according to determining processing priority
Node corresponding warning message deposit alert process sequence in;From may delete in causality figure the node that in-degree is zero with
And with the associated side of node that in-degree is zero, obtain beta pruning after possibility causality figure, and return execution from may cause and effect close
The step of being the node that search in-degree is zero in figure.
Optionally, the history partial ordering relation may include the history alarm treatment sequence between different warning messages, wherein
According to the determination of history partial ordering relation be zero with the in-degree searched the corresponding warning message of node processing priority the step of
If can include: there is the report for the corresponding each warning message of node for being zero with the in-degree searched in history alarm treatment sequence
Alert disposition sequence phase situation first each other, then sequentially exist according to the alarm treatment of each warning message in history alert process sequence
The frequency that first situation occurs, to determine the processing priority of the corresponding warning message of the node for being zero with the in-degree searched.
Optionally, the place of the corresponding warning message of the node for being zero with the in-degree searched according to the determination of history partial ordering relation
The step of managing priority can further include: if there is no the nodes pair for being zero with the in-degree searched in history alarm treatment sequence
The alarm treatment sequence for the warning message answered, then according to the search time for the node that search in-degree is zero from possible causality figure
The processing priority of the corresponding warning message of the node that sequence determination is zero with the in-degree searched.
Optionally, the fault alarm method can further include: shows the alert process sequence of generation, and shows the multiple
The warning reason of warning message and alarm treatment method for each warning message.
In another general aspect, a kind of accident warning device of sewage treatment plant is provided, comprising: topological diagram construction unit,
The system topology figure of sewage treatment plant is constructed, the system topology figure describes each system in sewage treatment plant and includes
Component part between association;Warning message acquiring unit obtains current multiple warning messages;Causality figure is established single
Member, the system topology figure based on building determine the possibility causality figure between the multiple warning message;Alert process
Sequence generating unit generates the alert process sequence for being directed to the multiple warning message according to determining possibility causality figure.
Optionally, the system topology figure may include the property set and Bian Ji of node collection, node, wherein node collection
In each node component part that can include for each system in sewage treatment plant, by side will be present associated two nodes into
Row connection, indicates there is connection between two component parts connected by side, and each attribute in the property set of node can be
Component part corresponding with node prestores warning message.
Optionally, the system topology figure can be stored in the form of adjacency matrix, and the property set of node can be with chain
The form of table stores.
Optionally, causality figure establishes unit can include: information matches subelement, from the property set of node search with
The multiple warning message is matched respectively multiple to prestore warning message;Component part determines subelement, determines matched with institute
It is the multiple to prestore the corresponding multiple component parts of warning message;Relational graph generates subelement, according to the multiple component part
The incidence relation present in the system topology figure generates the possible causality figure.
Optionally, relational graph, which generates subelement, can traverse all warning messages, obtain multiple warning message combinations, Ren Yibao
Include two warning messages in alert information combination, combines, determined in the system topology figure for any warning message
With the presence or absence of being connected between corresponding two component parts of two warning messages in being combined with any warning message
Perhaps access is if there is the side or access being connected on side, then according to two component parts in the system topology figure
Present in incidence relation determine the cause and effect points relationship between two warning messages, according to all warning messages and corresponding
Cause and effect points relationship generates the possible causality figure.
Optionally, the possible causality figure may include node collection and side collection, wherein each node that node is concentrated can
For the warning message of acquisition, associated two nodes will be present by side and be attached, indicates two connected by side alarms
Exist between information may causality, and by while direction indicate while terminal node warning message dependent on side
The warning message of start node generates.
Optionally, alert process sequence generating unit can include: search subelement, from may search in causality figure into
The node that degree is zero;Storing sub-units, if the quantity for the node that the in-degree searched is zero is not more than 1, storing sub-units
By be zero with the in-degree searched node corresponding warning message deposit alert process sequence in, if the in-degree searched is
The quantity of zero node is greater than 1, then the node that it is zero with the in-degree searched that storing sub-units are determined according to history partial ordering relation
The processing priority of corresponding warning message, and according to determining processing priority by be zero with the in-degree searched node pair
In the warning message deposit alert process sequence answered;Beta pruning subelement deletes the section that in-degree is zero from possible causality figure
Point and the associated side of node for being zero with in-degree, the possibility causality figure after obtaining beta pruning, search subelement continue from can
The node that in-degree is zero can be searched in causality figure.
Optionally, the history partial ordering relation may include the history alarm treatment sequence between different warning messages, wherein
If there is the alarm treatment for the corresponding each warning message of node for being zero with the in-degree searched in history alarm treatment sequence
Sequence phase situation first each other, then storing sub-units can be suitable according to the alarm treatment of each warning message in history alert process sequence
The frequency that the first situation of sequence occurs, to determine the processing priority of the corresponding warning message of the node for being zero with the in-degree searched.
Optionally, if there is no the corresponding alarms of node for being zero with the in-degree searched in history alarm treatment sequence
The alarm treatment sequence of information, then storing sub-units can searching according to the node that search in-degree is zero from possible causality figure
The processing priority of the corresponding warning message of the node that Suo Cixu determination is zero with the in-degree searched.
Optionally, the accident warning device can further include: display unit shows the alert process sequence of generation, and shows
Show the warning reason of the multiple warning message and the alarm treatment method for each warning message.
In another general aspect, a kind of computer readable storage medium for being stored with computer program is provided, feature exists
In when the computer program realizes the fault alarm method of above-mentioned sewage treatment plant when being executed by processor.
In another general aspect, a kind of computing device is provided, the computing device includes: processor;Memory is stored with
Computer program realizes the fault alarm method of above-mentioned sewage treatment plant when the computer program is executed by processor.
Using the fault alarm method and device of the sewage treatment plant of exemplary embodiment of the present, multiple reports can be embodied
Association between alert information, and the processing sequence of multiple warning messages is provided, help to improve the place to sewage treatment plant's alarm
Manage efficiency.
Detailed description of the invention
Pass through the detailed description carried out below with reference to the attached drawing for being exemplarily illustrated embodiment, exemplary embodiment of the present
Above and other objects, features and advantages will become apparent, in which:
Fig. 1 shows the flow chart of the fault alarm method of sewage treatment plant according to an exemplary embodiment of the present invention;
Fig. 2 shows the possibility causes and effects between the multiple warning messages of determination in Fig. 1 according to an exemplary embodiment of the present invention
The flow chart of the step of relational graph;
Fig. 3 show in Fig. 2 according to an exemplary embodiment of the present invention according to multiple component parts in system topology
Incidence relation present in figure generates the flow chart of the step of possible causality figure;
Fig. 4 shows the alert process that the generation in Fig. 1 according to an exemplary embodiment of the present invention is directed to multiple warning messages
The flow chart of the step of sequence;
Fig. 5 shows sewage disposal system, sludge treating system and blast aeration system according to an exemplary embodiment of the present invention
The schematic diagram of system;
Fig. 6 shows the corresponding system topology figure of three systems shown in fig. 5 according to an exemplary embodiment of the present invention;
Fig. 7 shows the exemplary diagram of possible causality figure according to an exemplary embodiment of the present invention;
Fig. 8 shows the block diagram of the accident warning device of sewage treatment plant according to an exemplary embodiment of the present invention;
Fig. 9 shows the block diagram that causality figure according to an exemplary embodiment of the present invention establishes unit;
Figure 10 shows the block diagram of alert process sequence generating unit according to an exemplary embodiment of the present invention.
Specific embodiment
Now, different example embodiments is more fully described with reference to the accompanying drawings, wherein some exemplary embodiments are attached
It is shown in figure.
Fig. 1 shows the flow chart of the fault alarm method of sewage treatment plant according to an exemplary embodiment of the present invention.
Referring to Fig.1, in step slo, the system topology figure of sewage treatment plant is constructed.Here, the system topological knot
Composition describes the association between the component part that each system includes in sewage treatment plant.
As an example, the component part that each system includes in sewage treatment plant may include but be not limited to it is multiple for realizing control
Unit is managed everywhere in system and/or the equipment and sewage treatment process of monitoring function.
In a preferred embodiment, system topology figure may include the property set and Bian Ji of node collection, node.Namely
It says, it is the figure of system topology figure that constructed system topology figure, which is the system topology of extension, in step S10
Shape indicates and the combination of the property set of node.
For example, the component part that each node that node is concentrated can include for each system in sewage treatment plant, it will by side
There are associated two nodes to be attached, and indicates there is connection, the category of node between two component parts connected by side
Property each attribute for concentrating can prestore warning message for component part corresponding with node, that is, may by each component part
Attribute of the warning message of generation as node.
Based on system topology figure constructed by aforesaid way, each component part in sewage treatment plant can be indicated simultaneously
Between topological structure relationship and component part prestore warning message.
For example, system topology figure ESG, ESG=(V, E) are a digraph, wherein V is node collection, V=
{v1,...,vm, indicate that the m component part that each system includes in sewage treatment plant, E are side collection, E={ e1,...,eq, packet
Containing q side, the oriented relationship between two component parts, { v are indicateda_1,...,va_pIndicate a-th of node vaProperty set,
Altogether include p attribute, prestores warning message for describe component part.
As an example, system topology figure can be stored in the form of adjacency matrix, node on computer disposal
Property set can be stored in the form of chained list.However, the present invention is not limited thereto, can also be using other modes come storage system topology
The property set of structure chart and node.
In step S20, current multiple warning messages are obtained.
Here, multiple warning messages of acquisition can be what each component part in sewage treatment plant generated at current time
Warning message.As an example, the type of multiple warning messages may include equipment alarm information (for example, the relevant parameter of equipment is super
The warning message crossing itself threshold value or equipment fault damage and generating) and/or Process Alarm information (for example, sewage treatment
The warning message that technological parameter is generated more than threshold value).
In step s 30, the system topology figure based on building determines that the possibility cause and effect between multiple warning messages is closed
System's figure.
Here, identified possible causality figure is alternatively referred to as causality figure, to indicate multiple warning messages it
Between causality that may be present.Here, it can be determined according to sewage treatment process sequence, it can between multiple warning messages
Causality existing for energy.
In exemplary embodiments of the present invention, the absolute causality between the multiple warning messages of searching has been avoided, and has changed
To find the possibility causality between multiple warning messages, alert process sequence is determined based on this, alarm can be reduced and close
The difficulty and complexity of connection problem and alert process issue of priority, for seeking alert process sequence provides possibility automatically.
The step of determining the possibility causality figure between multiple warning messages is introduced referring to Fig. 2.It should be understood that figure
Determined shown in 2 may causality figure mode it is merely illustrative, other be used to determine the possibility between multiple warning messages because
The method of fruit relational graph is also feasible.
Fig. 2 shows the possibility causes and effects between the multiple warning messages of determination in Fig. 1 according to an exemplary embodiment of the present invention
The flow chart of the step of relational graph.
Referring to Fig. 2, in step S301, searched from the property set of node matched multiple with multiple warning messages difference
Prestore warning message.
For example, being directed to any warning message, can come to search and any report from the property set of node in the following manner
What alert information matched prestores warning message: the component part alarmed is determined based on any warning message, from it is identified
It is searched in the property set of the corresponding node of the component part alarmed, prestores warning message with what any warning message matched.
In a preferred embodiment, alarm is prestored to guarantee to find match multiple from the property set of node
Information need to detect the content integrity of multiple warning messages of acquisition after getting multiple warning messages.Example
Such as, by taking any warning message of acquisition as an example, judge obtain any warning message in whether comprising component part title and
Alarm content, if in any warning message obtained including the title and alarm content of component part, it is determined that any report
The content of alert information is complete, if do not included in the title and/or alarm of component part in any warning message obtained
Hold, it is determined that the content of any warning message is incomplete, at this point, need to be by inputting come content (such as group of completion missing
At title of part and/or alarm content), to execute subsequent step based on complete warning message.
In step s 302, determine with matched multiple prestore the corresponding multiple component parts of warning message.
In step S303, according to multiple component parts incidence relation present in system topology figure, generation can
It can causality figure.
The incidence relation next life present in system topology figure according to multiple component parts is introduced referring to Fig. 3
The step of at possible causality figure.It should be understood that the mode of the possible causality figure of generation shown in Fig. 3 is merely illustrative, other
Method for generating possible causality figure is also feasible.
Fig. 3 show in Fig. 2 according to an exemplary embodiment of the present invention according to multiple component parts in system topology
Incidence relation present in figure generates the flow chart of the step of possible causality figure.
All warning messages are traversed in step s310 referring to Fig. 3, obtain multiple warning message combinations.Here, any
It include two warning messages in warning message combination.
In one embodiment, n warning message A of dual traversal can be passed through1,A2,…,AnMode, obtain alarm combination Ai
With Aj(1≤i, j≤n and i ≠ j).
In step S311, two alarm signals in combining in system topology figure with k-th of warning message are determined
It ceases between corresponding two component parts with the presence or absence of the side or access being connected.
Here, there is the side being connected between two component parts can refer to two component parts in system topology figure
Between be directly connected to by a directed edge.There are accesses can refer to two compositions in system topology figure between two component parts
It is connected between part by two or two or more sides.
For example, by taking above-mentioned cited embodiment as an example A alarm can be combinediWith AjCorresponding two component parts mapping
For the node collection { V on ESGb,Vc, it is searched on ESG from V using DFS (depth-first search) algorithmbTo VcSide or access.
If phase is not present between corresponding two component parts of two warning messages in combining with k-th of warning message
The side of connection or access, then follow the steps S312: so that k=k+1, and return to step S311.
It is connected if existed between corresponding two component parts of two warning messages in being combined with k-th of warning message
The side connect or access, then follow the steps S313: being associated with pass present in system topology figure according to two component parts
It is the cause and effect points relationship determined between two warning messages.
In step S314, judge whether k is equal to M.
As an example, the initial value of k can be 1, at this point, 1≤k≤M, M are the number of warning message combination, M is greater than zero
Natural number.However, the present invention is not limited thereto, the initial value for being also possible to k is M, judges whether k is equal to 1 in step S314, herein
In the case of, k=k-1 should be made in step S312 and S315 to realize circulation.
If k is not equal to M, S315 is thened follow the steps: so that k=k+1, and return to step S311.
If k is equal to M, S316 is thened follow the steps: according to all warning messages and corresponding cause and effect points relationship, generating
The possibility causality figure.
By taking above-mentioned cited embodiment as an example, if there is from VbTo VcThe side being connected or access, then store report
Warning message A in alert combinationiAnd AjAnd cause and effect points relationship between the two.It is above-mentioned having been executed to all alarms combination
After circular treatment, using the warning message stored as node, the cause and effect points relationship between warning message is side, more to establish
Possibility causality figure PCRG between a warning message.
In a preferred embodiment, possible causality figure may include node collection and side collection.
For example, each node that node is concentrated can be the warning message obtained, associated two nodes will be present by side
It is attached, indicates there is possible causality between two warning messages connected by side, and the Compass for passing through side
Show while terminal node warning message dependent on while the warning message of start node generate.
Fig. 1 is returned, in step s 40, according to determining possibility causality figure, generates the report for being directed to multiple warning messages
Alert processing sequence.
It in a preferred embodiment, can be by carrying out beta pruning processing to possible causality figure, to obtain alert process sequence.
It is introduced referring to Fig. 4 according to determining possibility causality figure and generates the alarm for multiple warning messages
The step of processing sequence.It should be understood that the mode shown in Fig. 4 for generating alert process sequence is merely illustrative, other are used for basis can
The method that energy causality figure generates alert process sequence is also feasible.
Fig. 4 shows the alert process that the generation in Fig. 1 according to an exemplary embodiment of the present invention is directed to multiple warning messages
The flow chart of the step of sequence.
Referring to Fig. 4, in step S401, judge whether possible causality figure is empty graph.
If possible causality figure is empty graph, then does not generate the alert process sequence for multiple warning messages.
If possible causality figure is not empty graph, thens follow the steps S402: search for in-degree from possible causality figure
The node for being zero.
Here, the node that in-degree is zero can refer to be directed toward oneself there is no cause and effect points relationship in possible causality figure
The node on side.
In step S403, judge whether the quantity for the node that the in-degree searched is zero is greater than 1.
If the quantity for the node that the in-degree searched is zero is greater than 1, S404 is thened follow the steps: according to history partial ordering relation
The processing priority of the corresponding warning message of the node that determination is zero with the in-degree searched, and according to determining processing priority
By be zero with the in-degree searched node corresponding warning message deposit alert process sequence in.
As an example, history partial ordering relation may include the history alarm treatment sequence between different warning messages, to be based on
History alarm treatment between different warning messages sequentially determines the processing priority of warning message.In alert process sequence
Multiple warning messages are ranked up according to the processing priority of warning message.
For example, if the corresponding warning message of a node in the node that each in-degree is zero is in history alarm treatment sequence
In disposition sequence prior to other nodes for searching, it is determined that the processing priority of the corresponding warning message of a node
Also formerly.
In addition to the above, corresponding if there is the node for being zero with the in-degree searched in history alarm treatment sequence
Each warning message alarm treatment sequence mutually first each other situation, then according to each warning message in history alert process sequence
The alarm treatment sequence frequency that formerly situation occurs, to determine the corresponding warning message of the node for being zero with the in-degree searched
Processing priority.
In addition, according to the processing of the corresponding warning message of node that the determination of history partial ordering relation is zero with the in-degree searched
The step of priority, can further include: if there is no the node for being zero with the in-degree searched is corresponding in history alarm treatment sequence
Warning message alarm treatment sequence, then according to from may search in-degree is zero in causality figure node search-order
The processing priority of the corresponding warning message of the node that determination is zero with the in-degree searched.For example, the section formerly scanned for
The processing priority of the corresponding warning message of point is also first.
Here, history alarm treatment sequence between different warning messages can expert by sewage treatment field or scene
Alarm treatment sequence between multiple warning messages that operation maintenance personnel rule of thumb provides, for example, two air blowers are shut down simultaneously
The processing priority of alarm is higher than influent COD upper limit alarm.As an example, putting into operation a period of time to system, one is had
The alert process sequence that series is generated, at this point, warning message A1Prior to A2Processed and warning message A2Prior to A1It is processed
Situation may occur simultaneously, in the case, can be according to warning message A1Prior to A2Processed and warning message A2Prior to A1Quilt
The frequency occurred in history alarm treatment sequence is handled, determines the A in current alerts processing sequence1And A2First post-processing time
Sequence.If warning message A1Prior to A2Processed number is greater than warning message A2Prior to A1Processed number, then report currently
A in alert processing sequence1Processing priority be higher than A2Processing priority.
That is, sequentially or the search-order for the node that in-degree be zero can be searched for determine using history alarm treatment
The processing priority of multiple warning messages.
If the quantity for the node that the in-degree searched is zero is not more than (that is, being less than or equal to) 1, then follow the steps
S405: by be zero with the in-degree searched node corresponding warning message deposit alert process sequence in.
Here, in cause and effect points relationship while start node warning message processing priority be higher than while terminal node
The processing priority of the warning message of point.In alert process sequence multiple warning messages according to warning message processing priority
It is ranked up, the processing priority for the warning message being first stored in alert process sequence is stored in alert process sequence after being higher than
The processing priority of warning message.
In step S406, the node that in-degree is zero and the node for being zero with in-degree are deleted from possible causality figure
Associated side, the possibility causality figure after obtaining beta pruning, and return to step S401.
In a preferred embodiment, the fault alarm method of sewage treatment plant according to an exemplary embodiment of the present invention can be also
It include: the alert process sequence that display generates.
For example, multiple warning messages can be shown according to processing priority carry out sequence in alert process sequence, with for
Operation maintenance personnel processing warning message offer assists help, this had both facilitated new operation maintenance personnel and has adapted to new working environment as early as possible, mentioned
High its ability for handling emergency problem, it helps reduce post threshold, allow other staff also can interim part-time operation maintenance personnel
Post helps sewage treatment plant to reduce cost of human resources.
In addition, the fault alarm method of sewage treatment plant according to an exemplary embodiment of the present invention can further include: display is more
The warning reason of a warning message and alarm treatment method for each warning message.
For example, can be stored in advance in the database multiple warning messages warning reason and corresponding alarm treatment method,
After getting multiple warning messages, warning reason corresponding with multiple warning messages and alarm treatment are searched for from database
Method, to be shown.
That is, shown report of the fault alarm method of exemplary embodiment of the present in most of monitoring systems
On the basis of alert record (such as alarm date, time of fire alarming, alert locations, monitored variable and alarm trigger condition), increase to report
The display of alert reason and alarm treatment method, enable operation maintenance personnel quickly know alert consitions triggering possibility warning reason and
Countermeasure.
The example of a sewage treatment plant will be passed through below, it is next using the fault alarm method of above-mentioned sewage treatment plant to introduce
Generate the process of alert process sequence.
Sewage treatment is to make sewage purification using the method for physics, chemistry and biology, can recycle, be multiplexed, to reach
To protection environment and the purpose for making full use of water resource.The basic principle is that passing through filtering, absorption, precipitating, oxidation and reduction etc.
Process realizes the removal and conversion of a variety of inorganic pollutions and organic pollutant in sewage.In order to guarantee sewage disposal process energy
It enough goes on smoothly, the process flow of multistage close association will be not only arranged in sewage treatment plant, there is provision of a variety of auxiliary systems
With auxiliary facility.Large and medium-sized sewage treatment plant's land occupation is in large scale, and on-site also wraps other than complicated process flow system
Include power supply-distribution system, blast aeration system, automatic medicament feeding system, monitoring system, heating ventilation air-conditioning system and fire protection alarm system etc..
These systems can be further divided into the smaller subsystem of range again, as process flow system can be analyzed to sewage disposal system
And sludge treating system.Due to the complexity of sewage disposal process, inside the multiple systems and same system of sewage treatment plant
The characteristics of close-coupled is all shown between multiple subsystems.
Fig. 5 shows sewage disposal system, sludge treating system and blast aeration system according to an exemplary embodiment of the present invention
The schematic diagram of system.It should be understood that Fig. 5 is with sewage disposal system, sludge treating system and the blast aeration system in sewage treatment plant
It is introduced for the equipment component that system includes, the other equipment in sewage treatment plant can also be shown using the present invention
Fault alarm method described in example property embodiment is handled, and the present invention is to this without enumerating.
Fig. 5 gives sewage disposal system, sludge treating system and blast aeration system and its pass of certain sewage treatment plant
System.As shown in figure 5, the sewage into sewage treatment plant first flows through coarse rack, the impurity of larger particles in the water that shuts off.Elevator pump
The water pump in room, which is taken out, rises sewage to certain altitude, guarantees that sewage can flow through subsequent each processing unit by gravity.Next,
Sewage further removes the impurity of smaller particle by fine fack.Sewage turns under the drive of the motor in rotation setting pot
It is dynamic, to realize girt-water separation.The effect of hydrolysis acidification pool is to retain the non-dissolved organic matter in sewage and be gradually changed into
Dissolved organic matter, it is difficult to which biodegradable macromolecular substances are converted into the small-molecule substance for being easy to degrade, to improve sewage
Biodegradability and degradation speed.Integrated oxidation ditch uses inversion A2O technique (anoxic-anaerobic-aerobic), activated sludge benefit
Biochemical reaction is carried out with the pollutant in the air and sewage entered by exposure, to realize denitrogenation dephosphorizing.The air entered by exposure is by air blast
Air blower in computer room generates, and is delivered in oxidation ditch via pipeline and valve.Air blower in air blast computer room receives power distribution station drop
The control signal of 380V industrial electro and PLC (programmable logic controller (PLC)) after pressure realizes energy control for need.In integrated oxidation ditch
Activated sludge, a part persistent loop, another part then flow to secondary settling tank together with sewage.The effect of secondary settling tank is to make to mix
Liquid clarification is concentrated to realize that sludge separates, and the sludge being separated temporarily is stored in sludge pump sump.The water outlet of secondary settling tank enters
Efficient sedimentation tank makes the further flocculation sedimentation of the particulate matter in sewage by adding PAC and PAM medicament.Add after efficient sedimentation tank
Filtering cloth filtering pool is in order to stop the suspended matter after flocculation sedimentation in sewage, to remove total solid suspended matter, total phosphorus and heavy metal.
Disinfecting tank is gone out by chlorination removes the viral germ of influence environment in sewage, keeps processed sewage up to standard
Discharge.The activated sludge of sludge pump sump is temporarily stored in addition to a part flows back into integrated oxidation ditch, it is most of with remaining dirty
The form of mud is by injection sludge reservoir.However, needing since excess sludge water content at this time is still very high in sludge dewatering computer room
Further thickening is converted into the lower mud cake of water content, is finally again transported mud cake and grid slag outside factory together by transport vehicle.
Above-mentioned sewage disposal system, sludge treating system are fitted with corresponding set with each unit of blast aeration system
Standby and instrument and meter is to complete control and monitoring function.Here, control function can refer to the start and stop of control each unit equipment and turn
Speed enables entire process flow safely and conveniently to carry out, for example, controlling the operating and stopping and air blast of blender in oxidation ditch
The frequency control etc. of machine.And monitoring function can refer to using instrument and meter measurement, show and record entire process flow and equipment
Critical data.These data are both foundation and O&M people of the operation maintenance personnel according to water inlet with water outlet status adjusting process process
Member's optimization production process is to meet the energy-saving basis for waiting requirements.Present most of monitoring systems can be according to monitoring data
Abnormal conditions warning message is sent from trend operation maintenance personnel by the monitoring screen in Central Control Room.Table 1 gives at the sewage
Manage each component part and the possible warning message occurred related with equipment, the state of instrument and meter and show value of factory.
Table 1
Not only quantity is big for the warning message of the monitoring system of sewage treatment plant, but also complicated, generally has following features.
(1) alarm quantity is more.
Since sewage treatment plant is related to multiple systems, and each system includes multiple units and equipment and necessary survey again
Measuring appratus and instrument, in addition same instrument and meter might have it is multiple.For example, certain sewage treatment plant described in Fig. 5, oxidation
The impeller of ditch outer fissure has shared 8.Theoretically, the Various types of data of sewage treatment plant can be shown and note in monitoring system
Record.Correspondingly, by the suitable trigger condition of selection and bound threshold value, monitoring system shows the stateful and number with record
Alert if can be also arranged in value.Therefore, in the large and medium-sized sewage treatment plant of a high degree of automation, quantity meeting of alarming
Very much.
(2) alarm content is wide.
Since an equipment might have multiple monitoring data, intelligent instrument and meter may once measure multiple parameters,
Therefore, the content of alarm may be very extensive.For example, the content of frequency conversion air blower and alert correlation includes work electricity in table 1
Stream and frequency.In addition, pump used in the sewage treatment plant is both provided with local and long-range two kinds of control modes, and correspondingly, alarm
Information will also divide into local alarm and remote alarms.In order to guarantee that pump is in normal operating conditions with the motor in other equipment
And production process is gone on smoothly, can also be arranged the alarm of motor frequent start-stop, motor ultra-long time work alarm with it is multiple
Associated working status alert of motor etc..
(3) there are different types of warning messages.
In general, the type of warning message can be divided into two kinds, and one is Process Alarm information, another kind is equipment alarm
Information.The characteristics of former is alarmed is that equipment self-condition is good, but exceeded situation occur in certain productions, need to make production
Adjustment.The characteristics of latter is alarmed is equipment due to longtime running, aging or operation maintenance personnel misoperation etc., goes out equipment
Existing performance decline or damage, lead to its partial failure or are unable to run, but relevant production run is normal.
(4) there is association between multiple alarms.
When having multiple warning messages while occurring, there may be incidence relations between part or all of warning message.Example
Such as, there is direct relation between the working condition alarm and oxidation ditch DO (dissolved oxygen) Threshold Alerts of frequency conversion air blower.Because may
It stops working just because of air blower, causes oxidation ditch aeration insufficient, the content for having in turn resulted in dissolved oxygen in oxidation ditch is too low.
When resuming operation for air blower, into oxidation ditch, aeration quantity increases, and not only blower frequency setting alarm can release, but also aoxidize
Ditch DO Threshold Alerts can may also release therewith.
(5) alert process has anxious slow.
When multiple alert if are triggered, some more urgent alarms need priority processing, and others are alarmed, right
Actual production influence is smaller, can will be placed in the processing priority that it is handled below.For example, if air blower stppage alarm with
Oxidation ditch outer fissure impeller stppage alarm occurs simultaneously, then the necessary priority processing of air blower stppage alarm, otherwise may cause
It is exceeded in turn result in water outlet for hypoxgia for aeration zone.And oxidation ditch outer fissure shares 8 impellers, some impeller failure, it is right
The influence of production technology can be smaller.
Based on association existing between multiple warning messages, after some warning message is processed, it is associated therewith its
He can then automatically terminate warning message, mathematically, this incidence relation between multiple warning messages can be abstracted as cause and effect
Relational graph.Here, not only quantity is big for the alarm being related to due to sewage treatment plant, but also alarm content and type of alarm are also more, this
It is very big to will lead to causality figure.If retrieving or modifying warning message based on the causality figure, calculating will lead to
The time-consuming of machine processing increases, and also adds the difficulty to alarm information processing, reduces the efficiency of alert process.
For this purpose, in exemplary embodiments of the present invention, based on the possibility causality figure next life between multiple warning messages
At alert process sequence, and alert process sequence is supplied to operation maintenance personnel and is referred to, to reduce the difficulty of alarm information processing
Degree, improves the efficiency of alert process.
Fig. 6 shows the corresponding system topology figure of three systems shown in fig. 5 according to an exemplary embodiment of the present invention.
Here, in order to keep figure clear, the warning message of part components and instrument and meter in table 1 is only listed in Fig. 6.
For example, possibility causality the figure PCRG, PCRG=(V, E) of multiple alarms are a digraphs, wherein V is section
Point set, node vi(vi∈ V) indicate a warning message;E is side collection, side eij=< vi,vj> ∈ E is one by node viRefer to
To node vjDirected edge, indicate warning message viWith warning message vjBetween possibility causality, that is, warning message vj's
Generation possibly relies on warning message vi。
Here, warning message vjGeneration possibly rely on warning message viMean warning message viReleasing may promote
Make warning message vjIt releases, it is also possible to not interfere with alarm vj.This phenomenon is physical presence in sewage treatment plant, for example,
There are possible causalities between stopping alarm and the alarm of oxidation ditch outer fissure DO lower limit simultaneously for two air blowers.There is oxidation ditch
The alarm of outer fissure DO lower limit, this illustrates that the content of dissolved oxygen in outer fissure is too low.This may be since what is supplied to outer fissure only has two
Air blower all stops working, it is also possible to due to influent load is excessive, returned sludge is very few or alarm DO instrument damage etc. other
Reason.If the alarm of oxidation ditch outer fissure DO lower limit is as two air blowers while caused by shutting down, two air blowers restore
After a period of work, it being increased to normal level to the dissolved oxygen of outer fissure, the alarm of oxidation ditch outer fissure DO lower limit can automatically terminate, and
Without other operations.Caused by if the alarm of oxidation ditch outer fissure DO lower limit is the other reasons other than shutting down as air blower,
Even if two air blowers are all resumed work, the alarm of oxidation ditch outer fissure DO lower limit is still had, and at this moment to be found other reasons, be made it
Release alarm.
Assuming that system to be analyzed is as shown in figure 5, the warning message occurred is respectively A1,A2,…,An(by taking n >=2 as an example).?
Before generating alert process sequence using above-mentioned fault alarm method, needed first to warning message A1,A2,…,AnContent carry out
Integrity detection, to ensure that the content of warning message is complete.
Fig. 7 shows the exemplary diagram of possible causality figure according to an exemplary embodiment of the present invention.
In the present example it is assumed that the monitoring system of sewage treatment plant detects following 4 warning messages:
A, oxidation ditch outer fissure DO lower limit is alarmed;
B, influent COD upper limit alarm;
C, it is discharged COD upper limit alarm;
D, 1# and 2# air blower while stopping alarm.
Moreover, it is assumed that the history alarm treatment sequence in history partial ordering relation are as follows: influent COD upper limit alarm < 1# and 2# drum
Blower while stopping alarm.
In the case, using above-mentioned 4 detected warning message, search graph 6 is to obtain between 4 warning messages
Possible causality figure (as shown in Figure 7).
In Fig. 7, the warning message that in-degree is 0 is influent COD upper limit alarm and 1# and 2# air blower stopping alarm simultaneously.
According to history partial ordering relation, obtain two warning messages processing order (that is, processing priority) be 1# and 2# air blower simultaneously
Stopping alarm is prior to influent COD upper limit alarm.
Then, deletion of node 1 (1# and 2# air blower while stopping alarm) and (the influent COD upper limit report of node 2 in Fig. 7
It is alert) and two associated sides of node.At this point, only node oxidation ditch outer fissure DO lower limit in possibility causality figure after beta pruning
Alarm and water outlet COD upper limit alarm, directed edge is alarmed by node oxidation ditch outer fissure DO lower limit is directed toward water outlet COD upper limit alarm, by
This can determine that the processing order of two warning messages is the alarm of node oxidation ditch outer fissure DO lower limit prior to being discharged COD upper limit report
It is alert.
Pass through above-mentioned treatment process, it may be determined that go out the processing priority of 4 warning messages by the alert process sequence after arriving first
Be classified as: 1# and 2# air blower simultaneously alarm prior to influent COD upper limit alarm prior to oxidation ditch outer fissure DO lower limit by stopping alarm
Prior to being discharged COD upper limit alarm.
Preferably, producible alert process sequence is supplied to the monitoring system of sewage treatment plant, with other alarm contents
It is shown in monitoring system simultaneously.As an example, the processing order of each warning message of numeral mark can be used, or directly
It is arranged according to the processing priority of each warning message by the processing order after arriving first.
However, the present invention is not limited thereto can also show alert process sequence, for example, using list by other means
Form or patterned mode show alert process sequence.
For 4 warning messages shown in Fig. 7, the reason for causing one kind of alarm most possible is sewage treatment plant's distribution
Between to air blower power main circuit fuse be blown, and intake at the same there is over-standard phenomenon.In a practical situation, once
The main circuit fuse powered to air blower is blown, and all air blowers stop working immediately, and monitoring system detects air blower
It shuts down, 1# and 2# air blower stopping alarm simultaneously can be issued.Air blower stopping will cause a series of chain reaction.If air blast
Machine is not supplied to the aerobic zone of oxidation ditch, and the dissolved oxygen concentration of oxidation ditch outer fissure can decline.Once the dissolved oxygen of oxidation ditch outer fissure
Concentration is lower than some value, can trigger the alarm of oxidation ditch outer fissure DO lower limit.And oxidation ditch aerobic zone for hypoxgia, and can to live
Property sludge in microorganism be difficult to keep it is enough activity to decompose the pollutant in sewage, this will cause water outlet pollutant level
It is exceeded, triggering water outlet COD upper limit alarm.If the COD intake at this time occurs exceeded again, and pollutant in sewage can be made into one
Step increases, and more microorganisms will require more oxygen, and making this, insufficient dissolved oxygen concentration further declines, accelerates oxidation
The alarm of ditch outer fissure DO lower limit.Equally, the pollutant increased can also be accelerated to be discharged COD upper limit alarm.
For above situation, sewage treatment plant's management and the correct disposal process of operation maintenance personnel should be: firstly, more renewing
Main circuit fuse, restore the power supply to air blower;The exceeded reason of influent COD is searched again, prevents the dirt of big load in time
Water discharge;Whether the DO instrument and water outlet COD instrument for finally checking oxidation ditch outer fissure work normally, if cisco unity malfunction, then tie up
Repair processing.
Fault alarm method according to an embodiment of the present invention, in the case where obtaining multiple warning messages, to assist sewage
Treatment plant's management and operation maintenance personnel emergency disposal alarm problem provide strong help.
Further, it should be understood that not repaired, oxidation ditch outer fissure if the DO instrument of oxidation ditch outer fissure is faulty always for a period of time
Just stopping alarm does not have causality to the alarm of DO lower limit simultaneously with 1# and 2# air blower, at this point, finally reprocessing oxidation ditch outer fissure
The alarm of DO lower limit may be more suitable.Therefore, in actual use, the management of sewage treatment plant and operation maintenance personnel need to be according to reality
Situation carrys out flexible Application based on alert process sequence provided by fault alarm method of the invention, to realize to alarm failure
Quick processing.
It should be understood that exposed for sewage disposal system, sludge treating system and air blast in above-mentioned cited embodiment
What the sewage treatment plant of gas system composition was introduced, and only list several warning messages of limited quantity.But the present invention
Shown in fault alarm method be not limited only to the part system and warning message of above-mentioned sewage treatment plant, for sewage treatment plant
Other systems and warning message be also it is applicable, the present invention no longer illustrates this one by one.
Fig. 8 shows the block diagram of the accident warning device of sewage treatment plant according to an exemplary embodiment of the present invention.
As shown in figure 8, the accident warning device of sewage treatment plant according to an exemplary embodiment of the present invention includes: topological diagram
Construction unit 10, warning message acquiring unit 20, causality figure establish unit 30 and alert process sequence generating unit 40.
Particularly, topological diagram construction unit 10 constructs the system topology figure of sewage treatment plant.Here, system topological
Structure chart describes the association between the component part that each system includes in sewage treatment plant.
In a preferred embodiment, system topology figure may include the property set and Bian Ji of node collection, node.That is, should
System topology figure is the combination of the graphical representation of system topology figure and the property set of node.
For example, the component part that each node that node is concentrated can include for each system in sewage treatment plant, it will by side
There are associated two nodes to be attached, and indicates there is connection, the category of node between two component parts connected by side
Property each attribute for concentrating can prestore warning message for corresponding with node component part.
As an example, system topology figure can be stored in the form of adjacency matrix, the property set of node can be with chained list
Form store.
Warning message acquiring unit 20 obtains current multiple warning messages.
Here, multiple warning messages of acquisition can be what each component part in sewage treatment plant generated at current time
Warning message.As an example, the type of multiple warning messages may include equipment alarm information and/or Process Alarm information.
Causality figure establishes system topology figure of the unit 30 based on building, determines between the multiple warning message
Possibility causality figure.
Here, causality figure is established unit 30 and can be determined according to sewage treatment process sequence, multiple alarm signals
Causality that may be present between breath.
Fig. 9 shows the block diagram that causality figure according to an exemplary embodiment of the present invention establishes unit 30.
As shown in figure 9, causality figure according to an exemplary embodiment of the present invention establishes unit 30 can include: information matches
Subelement 301, component part determine that subelement 302 and relational graph generate subelement 303.
Particularly, information matches subelement 301 is searched from the property set of node and is matched respectively with multiple warning messages
Multiple prestore warning message.
Component part determine subelement 302 determine with matched multiple prestore the corresponding multiple composition portions of warning message
Point.
Relational graph generates subelement 303 and is associated with pass present in the system topology figure according to multiple component parts
System, generating may causality figure.
For example, relational graph, which generates subelement 303, can traverse all warning messages, multiple warning message combinations are obtained.Here,
It include two warning messages in any warning message combination.It combines, is determined in the system topological knot for any warning message
With the presence or absence of being connected between corresponding two component parts of two warning messages in combining in composition with any warning message
Perhaps access is if there is the side or access being connected on side, then according to two component parts in system topology figure
Existing incidence relation determines the cause and effect points relationship between two warning messages, according to all warning messages and it is corresponding because
Fruit points relationship, generating may causality figure.
In a preferred embodiment, possible causality figure may include node collection and side collection.
For example, each node that node is concentrated can be the warning message obtained, associated two nodes will be present by side
It is attached, indicates there is possible causality between two warning messages connected by side, and the Compass for passing through side
Show while terminal node warning message dependent on while the warning message of start node generate.
Fig. 8 is returned to, alert process sequence generating unit 40 generates according to determining possibility causality figure and is directed to multiple reports
The alert process sequence of alert information.
In a preferred embodiment, alert process sequence generating unit 40 can be by carrying out beta pruning to possible causality figure
Processing, to obtain alert process sequence.
Figure 10 shows the block diagram of alert process sequence generating unit 40 according to an exemplary embodiment of the present invention.
As shown in Figure 10, alert process sequence generating unit 40 according to an exemplary embodiment of the present invention can include: search
Subelement 401, storing sub-units 402 and beta pruning subelement 403.
Particularly, search subelement 401 node that search in-degree is zero from possible causality figure.
For example, search subelement 401 can first judge may causality figure whether be empty graph, if possible causality figure
It is not empty graph, then the node that search in-degree is zero from possible causality figure.If possible causality figure is empty graph, then searches
Large rope unit 401 is not handled possible causality figure.
If the quantity for the node that the in-degree searched is zero is not more than 1, storing sub-units 402 will enter with what is searched
In the corresponding warning message deposit alert process sequence of the node that degree is zero.
If the quantity for the node that the in-degree searched is zero is greater than 1, storing sub-units 402 are according to history partial ordering relation
The processing priority of the corresponding warning message of the node that determination is zero with the in-degree searched, and according to determining processing priority
By be zero with the in-degree searched node corresponding warning message deposit alert process sequence in.
As an example, history partial ordering relation may include the history alarm treatment sequence between different warning messages.
If the corresponding warning message of a node in the node that each in-degree is zero is in history alarm treatment sequence
Alarm treatment sequence is prior to other nodes searched, then storing sub-units 402 determine the corresponding alarm signal of a node
The processing priority of breath is also first.
In addition to the above, corresponding if there is the node for being zero with the in-degree searched in history alarm treatment sequence
Each warning message alarm treatment sequence mutually first each other situation, then storing sub-units 402 are according to suitable in history alert process
The alarm treatment sequence frequency that formerly situation occurs of each warning message, the node that the in-degree to determine and search is zero in sequence
The processing priority of corresponding warning message.
If there is no the corresponding warning messages of node for being zero with the in-degree searched in history alarm treatment sequence
Alarm treatment sequence, then storing sub-units 402 are secondary according to the search for the node that search in-degree is zero from possible causality figure
The processing priority of the corresponding warning message of the node that sequence determination is zero with the in-degree searched.
Node beta pruning subelement 403 node that deletion in-degree is zero from possible causality figure and be zero with in-degree
Associated side, the possibility causality figure after obtaining beta pruning, search subelement 401 continue from may search in causality figure into
The node that degree is zero.
In a preferred embodiment, the accident warning device of sewage treatment plant according to an exemplary embodiment of the present invention can be also
Including display unit (not shown), display unit can be used for showing the alert process sequence of generation.
In addition, display unit can also show the warning reason of multiple warning messages and at the alarm of each warning message
Set method.
An exemplary embodiment of the present invention also provides a kind of computing device.The computing device includes processor and storage
Device.Memory is for storing computer program.The computer program is executed by processor so that processor executes above-mentioned dirt
The computer program of the fault alarm method of water treatment plant.
An exemplary embodiment of the present invention also provides a kind of computer-readable storage medium for being stored with computer program
Matter.The computer-readable recording medium storage has the event for making processor execute above-mentioned sewage treatment plant when being executed by a processor
Hinder the computer program of alarm method.The computer readable recording medium is can to store appointing for the data read by computer system
Meaning data storage device.The example of computer readable recording medium includes: read-only memory, random access memory, read-only light
Disk, tape, floppy disk, optical data storage devices and carrier wave (are such as passed through wired or wireless transmission path by the data of internet
It is defeated).
Using the fault alarm method and device of the sewage treatment plant of exemplary embodiment of the present, for sewage treatment plant
In coupling feature between each system, it is contemplated that the incidence relation between multiple warning messages, and provide multiple reports with this
The processing sequence of alert information, helps to improve the treatment effeciency to sewage treatment plant's alarm.
In addition, can be generated using the fault alarm method and device of the sewage treatment plant of exemplary embodiment of the present
One alert process sequence can manage for sewage treatment plant and operation maintenance personnel positions and find that rapidly emergency problem provides side
It helps, them can be assisted to adopt right measures and solve the problems, such as alarm, very well satisfy sewage treatment plant's management and operation maintenance personnel
Daily need.
In addition, using the fault alarm method and device of the sewage treatment plant of exemplary embodiment of the present, for sewage
Treatment plant's quantity is big, content is wide, point type, is related and has suddenly slow warning message, is found and is reported using system topology figure
Possibility causality between alert information, and then find possible optimal alert process sequence, obtained alert process sequence
Not only there is certain guidance to sewage treatment plant's management and operation maintenance personnel, but also avoided the true causality between warning message, opened
A kind of new approaches of alarm failure processing are opened up out.
In addition, using the fault alarm method and device of the sewage treatment plant of exemplary embodiment of the present, to meet dirt
Water treatment plant's management and the actual use of operation maintenance personnel are starting point, and designed method and apparatus both can be used as an independence
Computer program, can also be used as monitoring system even wisdom water utilities system a functional module, be present in wisdom water utilities
Among system, to reinforce the informationization and intelligent level of sewage treatment plant.
Although being particularly shown and describing the present invention, those skilled in the art referring to its exemplary embodiment
It should be understood that in the case where not departing from the spirit and scope of the present invention defined by claim form can be carried out to it
With the various changes in details.
Claims (22)
1. a kind of fault alarm method of sewage treatment plant characterized by comprising
The system topology figure of sewage treatment plant is constructed, the system topology figure describes each system in sewage treatment plant
Including component part between association;
Obtain current multiple warning messages;
System topology figure based on building determines the possibility causality figure between the multiple warning message;
According to determining possibility causality figure, the alert process sequence for being directed to the multiple warning message is generated.
2. fault alarm method as described in claim 1, which is characterized in that the system topology figure include node collection,
The property set and Bian Ji of node,
Wherein, each node that node is concentrated is the component part that each system includes in sewage treatment plant, and pass will be present by side
Two nodes of connection are attached, and indicate there is connection between two component parts connected by side, in the property set of node
Each attribute be that corresponding with node component part prestores warning message.
3. fault alarm method as claimed in claim 2, which is characterized in that the system topology figure is with adjacency matrix
Form stores, and the property set of node stores in the form of chained list.
4. fault alarm method as claimed in claim 2, which is characterized in that the system topology figure based on building determines
The step of possibility causality figure between the multiple warning message includes:
It is searched from the property set of node and the multiple warning message is matched respectively multiple prestores warning message;
Determine with matched the multiple prestore the corresponding multiple component parts of warning message;
According to the multiple component part incidence relation present in the system topology figure, the possible cause and effect is generated
Relational graph.
5. fault alarm method as claimed in claim 4, which is characterized in that according to the multiple component part in the system
Incidence relation present in topology diagram, the step of generating the possible causality figure include:
All warning messages are traversed, multiple warning message combinations is obtained, includes two warning messages in any warning message combination;
It combines, is determined in being combined in the system topology figure with any warning message for any warning message
With the presence or absence of the side or access being connected between corresponding two component parts of two warning messages, if there is what is be connected
Side or access then determine two alarms according to two component parts incidence relation present in the system topology figure
Cause and effect points relationship between information;
According to all warning messages and corresponding cause and effect points relationship, the possible causality figure is generated.
6. fault alarm method as claimed in claim 5, which is characterized in that it is described possibility causality figure include node collection and
Side collection,
Wherein, each node that node is concentrated is the warning message obtained, and associated two nodes will be present by side and connected
Connect, indicate to exist between two warning messages connect by side may causality, and by while when being directed toward expression
The warning message of terminal node is generated dependent on the warning message of the start node on side.
7. fault alarm method as described in claim 1, which is characterized in that according to determining possibility causality figure, generate
For the multiple warning message alert process sequence the step of include:
The node that search in-degree is zero from possible causality figure;
If the quantity for the node that the in-degree searched is zero be not more than 1, by be zero with the in-degree searched node it is corresponding
Warning message deposit alert process sequence in;
If the quantity for the node that the in-degree searched is zero is greater than 1, determined to enter with what is searched according to history partial ordering relation
The processing priority of the corresponding warning message of the node that degree is zero, and according to determining processing priority by with the in-degree that searches
In the corresponding warning message deposit alert process sequence of the node for being zero;
The node that in-degree is zero and the associated side of node for being zero with in-degree are deleted from possible causality figure, obtain beta pruning
Possibility causality figure afterwards, and return and execute the step of searching for the node that in-degree is zero from possible causality figure.
8. fault alarm method as claimed in claim 7, which is characterized in that the history partial ordering relation includes different alarm signals
History alarm treatment sequence between breath,
Wherein, the processing of the corresponding warning message of the node for being zero with the in-degree searched according to the determination of history partial ordering relation is preferential
Grade the step of include:
If there is the alarm for the corresponding each warning message of node for being zero with the in-degree searched in history alarm treatment sequence
Disposition sequence phase situation first each other, then it is sequentially first according to the alarm treatment of each warning message in history alert process sequence
The frequency that situation occurs, to determine the processing priority of the corresponding warning message of the node for being zero with the in-degree searched.
9. fault alarm method as claimed in claim 8, which is characterized in that determine and search according to history partial ordering relation
The step of processing priority of the corresponding warning message of the node that in-degree is zero further include:
If there is no the alarms for the corresponding warning message of node for being zero with the in-degree searched in history alarm treatment sequence
Disposition sequence then determines to enter with what is searched according to the search-order for the node that search in-degree is zero from possible causality figure
The processing priority of the corresponding warning message of the node that degree is zero.
10. fault alarm method as described in claim 1, which is characterized in that the fault alarm method further include: display life
At alert process sequence, and show the warning reason of the multiple warning message and the alarm treatment for each warning message
Method.
11. a kind of accident warning device of sewage treatment plant characterized by comprising
Topological diagram construction unit, constructs the system topology figure of sewage treatment plant, and the system topology figure describes dirt
The association between component part that each system includes in water treatment plant;
Warning message acquiring unit obtains current multiple warning messages;
Causality figure establishes unit, the system topology figure based on building, determine between the multiple warning message can
It can causality figure;
Alert process sequence generating unit is generated according to determining possibility causality figure for the multiple warning message
Alert process sequence.
12. accident warning device as claimed in claim 11, which is characterized in that the system topology figure includes node
The property set and Bian Ji of collection, node,
Wherein, each node that node is concentrated is the component part that each system includes in sewage treatment plant, and pass will be present by side
Two nodes of connection are attached, and indicate there is connection between two component parts connected by side, in the property set of node
Each attribute be that corresponding with node component part prestores warning message.
13. accident warning device as claimed in claim 12, which is characterized in that the system topology figure is with adjacency matrix
Form store, the property set of node stores in the form of chained list.
14. accident warning device as claimed in claim 12, which is characterized in that causality figure establishes unit and includes:
Information matches subelement, is searched and the multiple warning message is matched respectively multiple prestores report from the property set of node
Alert information;
Component part determines subelement, determine with matched the multiple prestore the corresponding multiple component parts of warning message;
Relational graph generates subelement, is associated with pass present in the system topology figure according to the multiple component part
System generates the possible causality figure.
15. accident warning device as claimed in claim 14, which is characterized in that relational graph generates subelement and traverses all alarms
Information obtains multiple warning message combinations, includes two warning messages in any warning message combination, for any warning message
Combination determines two warning messages corresponding two in combining in the system topology figure with any warning message
With the presence or absence of the side being connected, perhaps access is if there is the side or access being connected between a component part, then according to two
A component part incidence relation present in the system topology figure determines that the cause and effect between two warning messages is directed toward
Relationship generates the possible causality figure according to all warning messages and corresponding cause and effect points relationship.
16. accident warning device as claimed in claim 15, which is characterized in that the possibility causality figure includes node collection
With side collection,
Wherein, each node that node is concentrated is the warning message obtained, and associated two nodes will be present by side and connected
Connect, indicate to exist between two warning messages connect by side may causality, and by while when being directed toward expression
The warning message of terminal node is generated dependent on the warning message of the start node on side.
17. accident warning device as claimed in claim 11, which is characterized in that alert process sequence generating unit includes:
Subelement is searched for, the node that search in-degree is zero from possible causality figure;
Storing sub-units, if the quantity for the node that the in-degree searched is zero be not more than 1, storing sub-units will with search
In-degree be zero node corresponding warning message deposit alert process sequence in, if the node that the in-degree searched is zero
Quantity is greater than 1, then the corresponding alarm of node that storing sub-units are zero with the in-degree searched according to the determination of history partial ordering relation
The processing priority of information, and according to determining processing priority by be zero with the in-degree searched the corresponding alarm signal of node
In breath deposit alert process sequence;
Beta pruning subelement, from may delete in causality figure node that in-degree is zero and with in-degree be zero node it is associated
Side, the possibility causality figure after obtaining beta pruning, it is zero that search subelement, which continues the search in-degree from possible causality figure,
Node.
18. accident warning device as claimed in claim 17, which is characterized in that the history partial ordering relation includes different alarms
History alarm treatment sequence between information,
Wherein, if there is the corresponding each warning message of node for being zero with the in-degree searched in history alarm treatment sequence
Alarm treatment sequence mutually first each other situation, then storing sub-units according to each warning message in history alert process sequence report
The alert disposition sequence frequency that formerly situation occurs, to determine the place of the corresponding warning message of the node for being zero with the in-degree searched
Manage priority.
19. accident warning device as claimed in claim 18, which is characterized in that if be not present in history alarm treatment sequence
The alarm treatment sequence of the corresponding warning message of the node for being zero with the in-degree searched, then storing sub-units are according to from may be because
The corresponding alarm of node that the search-order determination for the node that in-degree is zero is zero with the in-degree searched is searched in fruit relational graph
The processing priority of information.
20. accident warning device as claimed in claim 11, which is characterized in that the accident warning device further include: display
Unit, shows the alert process sequence of generation, and shows the warning reason of the multiple warning message and be directed to each alarm signal
The alarm treatment method of breath.
21. a kind of computer readable storage medium for being stored with computer program, which is characterized in that when the computer program exists
The fault alarm method of the sewage treatment plant as described in any one of claims 1 to 10 is realized when being executed by processor.
22. a kind of computing device, which is characterized in that the computing device includes:
Processor;
Memory is stored with computer program, when the computer program is executed by processor, realize as claim 1 to
The fault alarm method of sewage treatment plant described in any one of 10.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910217416.1A CN109816940B (en) | 2019-03-21 | 2019-03-21 | Fault alarm method and device for sewage treatment plant |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910217416.1A CN109816940B (en) | 2019-03-21 | 2019-03-21 | Fault alarm method and device for sewage treatment plant |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109816940A true CN109816940A (en) | 2019-05-28 |
CN109816940B CN109816940B (en) | 2023-05-09 |
Family
ID=66609905
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910217416.1A Active CN109816940B (en) | 2019-03-21 | 2019-03-21 | Fault alarm method and device for sewage treatment plant |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109816940B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111028487A (en) * | 2019-12-27 | 2020-04-17 | 杭州青泓科技有限公司 | Water treatment monitoring method and system |
CN112863134A (en) * | 2020-12-31 | 2021-05-28 | 浙江清华长三角研究院 | Intelligent diagnosis system and method for rural sewage treatment facility abnormal operation |
CN115378796A (en) * | 2022-08-23 | 2022-11-22 | 中国建设银行股份有限公司 | Method, device, equipment and storage medium for determining maximum fault time |
CN115903679A (en) * | 2022-10-18 | 2023-04-04 | 中广核工程有限公司 | Nuclear power plant alarm list display method, system and device |
Citations (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5581242A (en) * | 1991-08-22 | 1996-12-03 | Hitachi, Ltd. | Automatic alarm display processing system in plant |
JP2000224669A (en) * | 1999-02-02 | 2000-08-11 | Toshiba Corp | Plant monitoring device |
US20090193436A1 (en) * | 2008-01-30 | 2009-07-30 | Inventec Corporation | Alarm display system of cluster storage system and method thereof |
CN101634851A (en) * | 2009-08-25 | 2010-01-27 | 西安交通大学 | Method based on cause-and-effect relation of variables for diagnosing failures in process industry |
CN102638100A (en) * | 2012-04-05 | 2012-08-15 | 华北电力大学 | District power network equipment abnormal alarm signal association analysis and diagnosis method |
CN103440730A (en) * | 2013-07-22 | 2013-12-11 | 清华大学 | Relevant alarm identification method based on data extraction |
CN104238527A (en) * | 2014-09-24 | 2014-12-24 | 天津创业环保集团股份有限公司 | Precise control method of sewage treatment plant aeration total quantity |
CN104298225A (en) * | 2014-09-25 | 2015-01-21 | 中国石油化工股份有限公司 | Modeling and graphical displaying method for causal relationship reasoning model of unusual working conditions of chemical process |
CN104931857A (en) * | 2015-06-25 | 2015-09-23 | 山东大学 | Power distribution network fault locating method based on D-S evidence theory |
CN105096041A (en) * | 2015-07-24 | 2015-11-25 | 北京中电普华信息技术有限公司 | Index change traceability and prediction method and apparatus |
CN105893700A (en) * | 2016-04-26 | 2016-08-24 | 陆新建 | Chemical production on-line fault detection and diagnosis technique based on physical-large data hybrid model |
CN106843111A (en) * | 2017-03-10 | 2017-06-13 | 中国石油大学(北京) | The accurate source tracing method of hydrocarbon production system alarm signal root primordium and device |
CN106933208A (en) * | 2015-10-09 | 2017-07-07 | 费希尔-罗斯蒙特系统公司 | Distributed industrial performance monitoring and analysis |
CN107403223A (en) * | 2017-07-10 | 2017-11-28 | 广东工业大学 | A kind of causal network Structure Deduction method based on leaf node prioritizing selection |
CN108171142A (en) * | 2017-12-26 | 2018-06-15 | 中南大学 | A kind of causal method of key variables in determining complex industrial process |
CN108494591A (en) * | 2018-03-16 | 2018-09-04 | 北京京东金融科技控股有限公司 | system alarm processing method and device |
-
2019
- 2019-03-21 CN CN201910217416.1A patent/CN109816940B/en active Active
Patent Citations (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5581242A (en) * | 1991-08-22 | 1996-12-03 | Hitachi, Ltd. | Automatic alarm display processing system in plant |
JP2000224669A (en) * | 1999-02-02 | 2000-08-11 | Toshiba Corp | Plant monitoring device |
US20090193436A1 (en) * | 2008-01-30 | 2009-07-30 | Inventec Corporation | Alarm display system of cluster storage system and method thereof |
CN101634851A (en) * | 2009-08-25 | 2010-01-27 | 西安交通大学 | Method based on cause-and-effect relation of variables for diagnosing failures in process industry |
CN102638100A (en) * | 2012-04-05 | 2012-08-15 | 华北电力大学 | District power network equipment abnormal alarm signal association analysis and diagnosis method |
CN103440730A (en) * | 2013-07-22 | 2013-12-11 | 清华大学 | Relevant alarm identification method based on data extraction |
CN104238527A (en) * | 2014-09-24 | 2014-12-24 | 天津创业环保集团股份有限公司 | Precise control method of sewage treatment plant aeration total quantity |
CN104298225A (en) * | 2014-09-25 | 2015-01-21 | 中国石油化工股份有限公司 | Modeling and graphical displaying method for causal relationship reasoning model of unusual working conditions of chemical process |
CN104931857A (en) * | 2015-06-25 | 2015-09-23 | 山东大学 | Power distribution network fault locating method based on D-S evidence theory |
CN105096041A (en) * | 2015-07-24 | 2015-11-25 | 北京中电普华信息技术有限公司 | Index change traceability and prediction method and apparatus |
CN106933208A (en) * | 2015-10-09 | 2017-07-07 | 费希尔-罗斯蒙特系统公司 | Distributed industrial performance monitoring and analysis |
CN105893700A (en) * | 2016-04-26 | 2016-08-24 | 陆新建 | Chemical production on-line fault detection and diagnosis technique based on physical-large data hybrid model |
CN106843111A (en) * | 2017-03-10 | 2017-06-13 | 中国石油大学(北京) | The accurate source tracing method of hydrocarbon production system alarm signal root primordium and device |
CN107403223A (en) * | 2017-07-10 | 2017-11-28 | 广东工业大学 | A kind of causal network Structure Deduction method based on leaf node prioritizing selection |
CN108171142A (en) * | 2017-12-26 | 2018-06-15 | 中南大学 | A kind of causal method of key variables in determining complex industrial process |
CN108494591A (en) * | 2018-03-16 | 2018-09-04 | 北京京东金融科技控股有限公司 | system alarm processing method and device |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111028487A (en) * | 2019-12-27 | 2020-04-17 | 杭州青泓科技有限公司 | Water treatment monitoring method and system |
CN111028487B (en) * | 2019-12-27 | 2021-07-13 | 杭州青泓科技有限公司 | Water treatment monitoring method and system |
CN112863134A (en) * | 2020-12-31 | 2021-05-28 | 浙江清华长三角研究院 | Intelligent diagnosis system and method for rural sewage treatment facility abnormal operation |
CN112863134B (en) * | 2020-12-31 | 2022-11-18 | 浙江清华长三角研究院 | Intelligent diagnosis system and method for rural sewage treatment facility abnormal operation |
CN115378796A (en) * | 2022-08-23 | 2022-11-22 | 中国建设银行股份有限公司 | Method, device, equipment and storage medium for determining maximum fault time |
CN115378796B (en) * | 2022-08-23 | 2024-08-16 | 中国建设银行股份有限公司 | Method, device, equipment and storage medium for determining maximum fault time |
CN115903679A (en) * | 2022-10-18 | 2023-04-04 | 中广核工程有限公司 | Nuclear power plant alarm list display method, system and device |
Also Published As
Publication number | Publication date |
---|---|
CN109816940B (en) | 2023-05-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109816940A (en) | The fault alarm method and device of sewage treatment plant | |
CN111145378A (en) | Automatic video inspection system and method for road traffic incident | |
CN117420283B (en) | Integrated multi-channel water quality monitoring method and system | |
CN111832909B (en) | Emergency response system and method for illegal sewage discharge | |
CN114578008B (en) | Decision support system and method for water quality risk management of sewage plant | |
CN111003883A (en) | Intelligent integrated real-time information alarm method and system for sewage treatment equipment | |
CN111404482B (en) | Photovoltaic power station monitoring method and system | |
Cicceri et al. | A novel architecture for the smart management of wastewater treatment plants | |
CN116562580A (en) | Waste water and waste gas treatment system and method for lithium carbonate production workshop | |
CN116216807A (en) | Intelligent dosing system based on sewage treatment | |
CN114545850A (en) | Internet of things intelligent management system for hospital water system | |
CN110276549A (en) | Chemical company's waste water chemical pollutant spy factor inventory construction method and device | |
CN108698869A (en) | Industrial waste water purifying handles real-time monitoring system | |
CN116430821B (en) | Data processing method and device for industrial production process model | |
CN102929241A (en) | Safe operation guide system of purified terephthalic acid device and application of safe operation guide system | |
CN108614510A (en) | sewage plant operation management method and system | |
CN111762824A (en) | Sewage treatment monitoring system based on block chain | |
CN116770930A (en) | Integrated sewage discharge system for modularized building | |
CN111381567B (en) | Safety detection system and method for industrial control system | |
JP2005074418A (en) | Monitoring and controlling net work system for cleaned water supply facility | |
CN216155703U (en) | Water plant system | |
CN210313784U (en) | Wisdom is integrated management system for sewage treatment | |
CN114706907A (en) | Tracing method for pollutants in drainage pipe network | |
CN112631221A (en) | Sewage treatment remote monitoring system and method thereof | |
JPH10133737A (en) | Plant operation support system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20240815 Address after: Room 103, No. 780, Tanghekou Street, Tanghekou Town, Huairou District, Beijing Patentee after: DASMART ENVIRONMENTAL TECHNOLOGIES (BEIJING) Co.,Ltd. Country or region after: China Address before: 100176 Building 1, 8 boxing 1st Road, Beijing Economic and Technological Development Zone, Daxing District, Beijing Patentee before: BEIJING ETECHWIN ELECTRIC Co.,Ltd. Country or region before: China |
|
TR01 | Transfer of patent right |