CN109812046A - One kind is to pull-type steel plate shear force wall strengthening construction structure and method - Google Patents
One kind is to pull-type steel plate shear force wall strengthening construction structure and method Download PDFInfo
- Publication number
- CN109812046A CN109812046A CN201910237196.9A CN201910237196A CN109812046A CN 109812046 A CN109812046 A CN 109812046A CN 201910237196 A CN201910237196 A CN 201910237196A CN 109812046 A CN109812046 A CN 109812046A
- Authority
- CN
- China
- Prior art keywords
- steel plate
- wall
- shear wall
- shear
- pull
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 67
- 239000010959 steel Substances 0.000 title claims abstract description 67
- 238000010276 construction Methods 0.000 title claims abstract description 22
- 238000005728 strengthening Methods 0.000 title claims abstract description 22
- 238000000034 method Methods 0.000 title claims abstract description 18
- 230000002787 reinforcement Effects 0.000 claims abstract description 7
- 238000007789 sealing Methods 0.000 claims abstract description 5
- 238000003466 welding Methods 0.000 claims abstract description 4
- 238000009826 distribution Methods 0.000 claims abstract description 3
- 239000004567 concrete Substances 0.000 claims description 5
- 238000005260 corrosion Methods 0.000 claims description 5
- 239000011083 cement mortar Substances 0.000 claims description 4
- 238000005553 drilling Methods 0.000 claims description 4
- 210000004209 hair Anatomy 0.000 claims description 4
- 239000007787 solid Substances 0.000 claims description 4
- 229920000742 Cotton Polymers 0.000 claims description 3
- 230000007797 corrosion Effects 0.000 claims description 3
- 239000000428 dust Substances 0.000 claims description 3
- 239000011440 grout Substances 0.000 claims description 3
- 238000009877 rendering Methods 0.000 claims description 3
- 239000002184 metal Substances 0.000 claims 1
- 238000009435 building construction Methods 0.000 abstract description 2
- 239000010410 layer Substances 0.000 description 7
- 238000012946 outsourcing Methods 0.000 description 5
- 238000001514 detection method Methods 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 description 2
- 230000002265 prevention Effects 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 238000004026 adhesive bonding Methods 0.000 description 1
- 238000004873 anchoring Methods 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000003822 epoxy resin Substances 0.000 description 1
- 230000003628 erosive effect Effects 0.000 description 1
- PCHJSUWPFVWCPO-UHFFFAOYSA-N gold Chemical compound [Au] PCHJSUWPFVWCPO-UHFFFAOYSA-N 0.000 description 1
- 239000010931 gold Substances 0.000 description 1
- 229910052737 gold Inorganic materials 0.000 description 1
- 239000004519 grease Substances 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 239000002932 luster Substances 0.000 description 1
- 239000011490 mineral wool Substances 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 239000003973 paint Substances 0.000 description 1
- 229920000647 polyepoxide Polymers 0.000 description 1
- 239000011241 protective layer Substances 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 238000005476 soldering Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Abstract
The present invention provides one kind to pull-type steel plate shear force wall strengthening construction structure and method, it shears face of wall and is laid with one layer of steel plate, sealing welding between steel plate, and modified epoxyn is coated between steel plate and shear wall, distribution is provided with split bolt on shear wall, split bolt runs through wall and steel plate along the width direction of shear wall, and the steel plate of shear wall opposite sides is strained and fixed by split bolt.To solve traditional construction increasing section method for strengthening or affixing steel plate reinforcement method, the problems such as complex procedures, long construction period.Belong to technical field of building construction.
Description
Technical field
The present invention relates to one kind to pull-type steel plate shear force wall strengthening construction structure and method, belongs to building construction technology neck
Domain.
Background technique
According to national compulsory code requirement, concrete structure detection must be qualified, is unsatisfactory for bearing capacity for detection and wants
The wall column asked need to carry out structural strengthening to corresponding construction element structure, and traditional construction increasing section method for strengthening or affixing steel plate add
Gu method, complex procedures, long construction period, increasing section method for strengthening will also from basic reinforce to detection and do not conform to compartment, sternly
Indoor effective usable floor area is reduced again, affixing steel plate reinforcement method maximum age is shorter, and only 30 years.
Summary of the invention
It is an object of the invention to: one kind is provided to pull-type steel plate shear force wall strengthening construction structure and method, on solving
State the problems of prior art.
To solve the above problems, proposed adoption is such a to pull-type steel plate shear force wall strengthening construction structure, shear wall it is outer
Surface is laid with one layer of steel plate, sealing welding between steel plate, and modified epoxy resin gluing is coated between steel plate and shear wall
Agent, distribution is provided with split bolt on shear wall, and split bolt runs through wall and steel plate along the width direction of shear wall, and shears
The steel plate of wall opposite sides is strained and fixed by split bolt.
In aforementioned shear-wall strengthening constructing structure, batten plate is welded on the outside of steel plate, batten plate is transversely arranged, and
Batten plate is distributed along the short transverse of shear wall;
In aforementioned shear-wall strengthening constructing structure, the split bolt is equidistantly uniformly distributed setting on shear wall.
To pull-type steel plate shear force wall strengthening construction, the specific method is as follows:
Former shear wall surface rendering layer and weaker zone are cut first, until being completely exposed solid base, for table
The biggish column surface of face convex-concave, convex surface are tied with hand hammer, and recess is smoothed out with cement mortar, and corner grinds fillet, and uses wire brush
Surface dust is brushed away with hair dryer and is blown off;It is polished with angle grinder and removes corrosion and the dirt of surface of steel plate, expose metallic luster,
It is clean with cotton yarn erasing before pasting;It is positioned by Design of Reinforcement position unwrapping wire, is accurately marked in concrete surface and paste position wheel
Profile and batten plate position;Steel part is first fabricated to the dimensions of design requirement, and steel plate and shear wall are positioned
Then drilling pours into modified epoxyn in reserved grout hole, and uses split bolt by steel plate and shear wall
Reinforce connection, guarantees that there is good bonding between the steel plate of outsourcing and shear wall faying face, make the new and old two parts of ruggedized construction
It can cooperation.
Compared with prior art, the four story shear walls reinforcing that the present invention uses is surface-treated, and shear-wall strengthening only needs
It is reinforced at four layers, does not need to reinforce always from basis to 4 layers, significantly reduce construction period and reduce residential usage face
Product, and do not interfere with other floors;Shear-wall strengthening is positioned by Design of Reinforcement position unwrapping wire, is accurately marked in concrete surface
Paste position contour line and batten plate position;Steel plate and shear wall are subjected to positioning drilling, guarantee that structural strengthening load is uniform;
Covered with Angles grouting liquid guarantees its excellent cementability using modified epoxyn;Steel will be reinforced using split bolt
Part and shear wall are reinforced connecting, and guarantee there is good bonding between encased steel plate and component faying face, keep ruggedized construction new and old
Two parts energy cooperation;Structural stability is good, long service life, and the Design of Reinforcement subsequent service life meets structure 50
Year time limit requirement;Covered with Angles steel piece surface carries out anti-corrosion fire prevention processing, polishes steel piece surface, removes the rust of steel piece surface
Erosion, dirt etc. make steel piece surface without attachments such as visible grease, dirt, oxide skin, iron rust, then brush antirust on surface
Paint is not less than the protective layers such as 25mm solid cement mortar, mineral wool mortar, and structure fire safety is effectively ensured.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention.
Specific embodiment
To make the object, technical solutions and advantages of the present invention clearer, the present invention will be made below further detailed
Explanation.
Embodiment:
Referring to attached drawing 1, the present embodiment provides one kind to pull-type steel plate shear force wall strengthening construction structure, the appearance of shear wall 1
Face is laid with one layer of steel plate 2, and steel plate 2 uses Q345 steel, sealing welding between steel plate 2, and coats between steel plate 2 and shear wall 1
There is modified epoxyn 5, be equidistantly uniformly distributed on shear wall 1 and be provided with split bolt 4, split bolt 4 is M12
Split bolt, split bolt 4 run through wall and steel plate 2, and the steel plate 2 of 1 opposite sides of shear wall along the width direction of shear wall 1
It is strained and fixed by split bolt 4, the outside of steel plate 2 is welded with batten plate 3, and batten plate 3 is transversely arranged, and 3 edge of batten plate
The short transverse of shear wall 1 is distributed.
To pull-type steel plate shear force wall strengthening construction, the specific method is as follows:
Former 1 surface rendering layer of shear wall and weaker zone are cut first, until being completely exposed solid base, for table
The biggish column surface of face convex-concave, convex surface are tied with hand hammer, and recess is smoothed out with high-grade cement mortar, and corner grinds fillet, is used in combination
Wire brush and hair dryer, which brush away surface dust, to be blown off;It is polished with angle grinder and removes corrosion and the dirt on 2 surface of steel plate, expose gold
Belong to gloss, it is clean with cotton yarn erasing before pasting;It is positioned by Design of Reinforcement position unwrapping wire, accurately marks stickup in concrete surface
3 position of position contour line and batten plate;Steel part is first fabricated to the dimensions of design requirement, and by steel plate 2 and shear wall 1
Positioning drilling is carried out, then pours into modified epoxyn 5 in reserved grout hole, and use split bolt 4 by steel
Plate 2 and shear wall 1 are reinforced connecting, and guarantee there is good bonding between 1 faying face of steel plate 2 and shear wall of outsourcing, make to reinforce
The new and old two parts energy cooperation of structure.
Covered with Angles steel piece surface should carry out anti-corrosion fire prevention processing, and steel part minimum thickness used in encased steel plate is no less than 5mm,
Beam and the long no less than 50mm of truss outsourcing angle bar limb, column outsourcing angle bar limb is long to be no less than 75mm, uses in the middle part of shear wall 1
Split bolt 4 and steel plate 2 are reinforced, and are anchored at corner or structure interface using angle steel and bolt, outsourcing angle bar both ends Ying Youke
By anchoring.For column, angle bar lower end should extend to basic top surface, and be anchored in basis with " reinforced concrete fortifield village set+bar planting " method,
Centre passes through each floor plate, and upper end extends to the next level plate plate face of reinforcing layer and with Reinforced Hoop plate soldering and sealing.
The above embodiments are only used to illustrate and not limit the technical solutions of the present invention, although referring to above-described embodiment to this hair
It is bright to be described in detail, it will be apparent to an ordinarily skilled person in the art that: still the present invention can be modified or be waited
With replacement, without departing from the spirit or scope of the invention, or any substitutions, should all cover in power of the invention
In sharp claimed range.
Claims (4)
1. one kind is to pull-type steel plate shear force wall strengthening construction structure, it is characterised in that: the outer surface of shear wall (1) is laid with one layer of steel
Plate (2), sealing welding between steel plate (2), and modified epoxyn is coated between steel plate (2) and shear wall (1)
(5), distribution is provided with split bolt (4) on shear wall (1), and split bolt (4) runs through wall along the width direction of shear wall (1)
And steel plate (2), and the steel plate (2) of shear wall (1) opposite sides is strained and fixed by split bolt (4).
2. one kind is to pull-type steel plate shear force wall strengthening construction structure according to claim 1, it is characterised in that: steel plate (2)
Outside is welded with batten plate (3), and batten plate (3) is transversely arranged, and batten plate (3) is distributed along the short transverse of shear wall (1).
3. one kind is to pull-type steel plate shear force wall strengthening construction structure according to claim 1, it is characterised in that: described pair of drawing spiral shell
Bolt (4) is equidistantly uniformly distributed setting on shear wall (1).
4. if to the construction party of pull-type steel plate shear force wall strengthening construction structure described in any claim in claims 1 to 3
Method, which is characterized in that specific as follows:
Former shear wall (1) surface rendering layer and weaker zone are cut first, until being completely exposed solid base, for surface
The biggish column surface of convex-concave, convex surface are tied with hand hammer, and recess is smoothed out with cement mortar, and corner grinds fillet, and with wire brush with
Surface dust is brushed away and is blown off by hair dryer;It is polished with angle grinder and removes corrosion and the dirt on steel plate (2) surface, expose metal light
Pool is clean with cotton yarn erasing before pasting;It is positioned by Design of Reinforcement position unwrapping wire, is accurately marked in concrete surface and paste position
Contour line and batten plate (3) position;Steel part is first fabricated to the dimensions of design requirement, and by steel plate (2) and shear wall
(1) positioning drilling is carried out, is then poured into modified epoxyn (5) in reserved grout hole, and use split bolt
(4) steel plate (2) and shear wall (1) are reinforced connecting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910237196.9A CN109812046A (en) | 2019-03-27 | 2019-03-27 | One kind is to pull-type steel plate shear force wall strengthening construction structure and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910237196.9A CN109812046A (en) | 2019-03-27 | 2019-03-27 | One kind is to pull-type steel plate shear force wall strengthening construction structure and method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109812046A true CN109812046A (en) | 2019-05-28 |
Family
ID=66610475
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910237196.9A Pending CN109812046A (en) | 2019-03-27 | 2019-03-27 | One kind is to pull-type steel plate shear force wall strengthening construction structure and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109812046A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112282407A (en) * | 2020-09-03 | 2021-01-29 | 海洋石油工程股份有限公司 | Method for reinforcing industrial anti-explosion wall structure |
CN112854803A (en) * | 2021-01-11 | 2021-05-28 | 张东林 | Reinforced concrete building bonded steel repairing and reinforcing robot |
CN112878723A (en) * | 2021-01-11 | 2021-06-01 | 张东林 | Bonded steel repairing and reinforcing method for reinforced concrete building |
CN114319924A (en) * | 2021-12-31 | 2022-04-12 | 四川省第四建筑有限公司 | Method for reinforcing rear bonded steel of unloading column replacement shear wall |
CN114439266A (en) * | 2022-01-27 | 2022-05-06 | 四川省第四建筑有限公司 | Reinforcing device for reinforcing shear wall by adhering steel plates and construction method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105781143A (en) * | 2016-04-29 | 2016-07-20 | 华北水利水电大学 | Device and method for reinforcing concrete shear wall by FRP (fiber reinforced plastics) |
WO2017211107A1 (en) * | 2016-06-07 | 2017-12-14 | 东南大学 | Pre-stressed steel wire rope-based flexure- and shear-strengthening concrete t beam, and strengthening method thereof |
CN109812047A (en) * | 2019-03-26 | 2019-05-28 | 中建四局第一建筑工程有限公司 | One kind is to pull-type steel plate shear force wall strengthening construction structure and method |
CN211286754U (en) * | 2019-03-26 | 2020-08-18 | 中建四局第一建筑工程有限公司 | Opposite-pulling type steel plate shear wall reinforcing construction structure |
-
2019
- 2019-03-27 CN CN201910237196.9A patent/CN109812046A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105781143A (en) * | 2016-04-29 | 2016-07-20 | 华北水利水电大学 | Device and method for reinforcing concrete shear wall by FRP (fiber reinforced plastics) |
WO2017211107A1 (en) * | 2016-06-07 | 2017-12-14 | 东南大学 | Pre-stressed steel wire rope-based flexure- and shear-strengthening concrete t beam, and strengthening method thereof |
CN109812047A (en) * | 2019-03-26 | 2019-05-28 | 中建四局第一建筑工程有限公司 | One kind is to pull-type steel plate shear force wall strengthening construction structure and method |
CN211286754U (en) * | 2019-03-26 | 2020-08-18 | 中建四局第一建筑工程有限公司 | Opposite-pulling type steel plate shear wall reinforcing construction structure |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112282407A (en) * | 2020-09-03 | 2021-01-29 | 海洋石油工程股份有限公司 | Method for reinforcing industrial anti-explosion wall structure |
CN112854803A (en) * | 2021-01-11 | 2021-05-28 | 张东林 | Reinforced concrete building bonded steel repairing and reinforcing robot |
CN112878723A (en) * | 2021-01-11 | 2021-06-01 | 张东林 | Bonded steel repairing and reinforcing method for reinforced concrete building |
CN112854803B (en) * | 2021-01-11 | 2022-11-08 | 贵州华亿建材有限公司 | Reinforced concrete building bonded steel repairing and reinforcing robot |
CN114319924A (en) * | 2021-12-31 | 2022-04-12 | 四川省第四建筑有限公司 | Method for reinforcing rear bonded steel of unloading column replacement shear wall |
CN114439266A (en) * | 2022-01-27 | 2022-05-06 | 四川省第四建筑有限公司 | Reinforcing device for reinforcing shear wall by adhering steel plates and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109812046A (en) | One kind is to pull-type steel plate shear force wall strengthening construction structure and method | |
WO2020186757A1 (en) | Ultra-high-performance concrete combined permanent template and application thereof | |
CN103061270B (en) | Renovate method is reinforced in the whitewashing of a kind of carbon fibre bar bridge tunnel | |
CN103603509A (en) | Carbon fiber fabric reinforced concrete beam and reinforcing method thereof | |
CN109812047A (en) | One kind is to pull-type steel plate shear force wall strengthening construction structure and method | |
CN211286754U (en) | Opposite-pulling type steel plate shear wall reinforcing construction structure | |
CN207673041U (en) | A kind of existing reinforced concrete chainless drives increase the ruggedized construction of stealthy beam | |
CN202519978U (en) | Template supporting structure for post-poured belt serving as construction joint | |
CN202007422U (en) | Advanced water-stop steel plate structure for post-pouring zone of underground construction | |
CN101899887B (en) | Composite anti-explosion post of reinforced concrete with encased steel plate and construction method thereof | |
CN103352578A (en) | Construction method of carbon fiber cloth steel member combination strengthening beam | |
CN106759955A (en) | The construction method of waterproof system is laid in a kind of toilet and toilet with waterproof system | |
CN210685019U (en) | Anti-bank structure with stagnant water steel sheet | |
CN110397180A (en) | A kind of construction technology of exterior wall | |
CN201254693Y (en) | Guarding system for railway steel bridge deck | |
CN208363688U (en) | A kind of masonry panel carbon fiber mesh fabric ruggedized construction | |
CN204252572U (en) | A kind of ruggedized construction of outer side bar concrete structure | |
CN110863670A (en) | Method for repairing corrosion of tower foot of transmission steel tower | |
CN2583229Y (en) | Steel holding hoop fastening structure of added storey new and old point pitch of high rise building | |
KR102026864B1 (en) | Stainless steel lining panel installed on concrete water purification plant and water tank | |
CN210216147U (en) | Steel bridge deck and steel bridge | |
CN205062855U (en) | Stagnant water piece | |
CN210177710U (en) | Noise-reduction bearing type floor expansion device | |
CN202706238U (en) | Waterstop for building deformation joint | |
CN110805241A (en) | Construction method of continuous strip-shaped plastic stone structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190528 |