CN109809339A - Underwater moving hanging basket - Google Patents

Underwater moving hanging basket Download PDF

Info

Publication number
CN109809339A
CN109809339A CN201811610677.1A CN201811610677A CN109809339A CN 109809339 A CN109809339 A CN 109809339A CN 201811610677 A CN201811610677 A CN 201811610677A CN 109809339 A CN109809339 A CN 109809339A
Authority
CN
China
Prior art keywords
hanging basket
fixedly connected
fixed
track girder
shoulder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811610677.1A
Other languages
Chinese (zh)
Other versions
CN109809339B (en
Inventor
张云
赵红卫
李建华
王文胜
唐力
余灿林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Huaneng Engineering Safety Polytron Technologies Inc
Datang Guanyinyan Hydropower Development Co Ltd
PowerChina Kunming Engineering Corp Ltd
Original Assignee
Hangzhou Huaneng Engineering Safety Polytron Technologies Inc
Datang Guanyinyan Hydropower Development Co Ltd
PowerChina Kunming Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Huaneng Engineering Safety Polytron Technologies Inc, Datang Guanyinyan Hydropower Development Co Ltd, PowerChina Kunming Engineering Corp Ltd filed Critical Hangzhou Huaneng Engineering Safety Polytron Technologies Inc
Priority to CN201811610677.1A priority Critical patent/CN109809339B/en
Publication of CN109809339A publication Critical patent/CN109809339A/en
Application granted granted Critical
Publication of CN109809339B publication Critical patent/CN109809339B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses underwater moving hanging baskets, including suspension mechanism, walking track girder, sliding rail trolley, hydraulic winch and hanging basket, suspension mechanism is fixedly connected with walking track girder, sliding rail trolley is movably connected on walking track girder, hydraulic winch is fixedly connected on the bottom of sliding rail trolley, hydraulic winch controls hanging basket, the top of walking track girder is equipped at least three suspension centres, suspension mechanism is fixedly connected with suspension centre, sliding rail trolley is equipped with driving device, driving device controls sliding rail trolley, and hanging basket is equipped with body restraints.The design that the present invention passes through hydraulic winch and sliding rail trolley, diver is provided under water in processing facade defect movement platform, the platform is reliable and stable at work, movement is convenient, body restraints are installed at hanging basket, the underwater construction operation of construction personnel can be will not influence after preferably stable body carries out underwater construction operation, and construction personnel's body is fixed in water by realizing construction personnel.

Description

Underwater moving hanging basket
Technical field
The invention belongs to underwater construction technical fields, and in particular to underwater moving hanging basket.
Background technique
Underwater moving hanging basket is that one kind is used for diver's job platform when underwater construction, is mainly used for underwater concrete facade Cutting, elevation constructions diver's platform such as polish, cut.
Diver's underwater construction body is suspended state, no operation platform underwater operation effect pole in diving operation construction It is low;And when handling some big depth sides, facade crack or defect under water, complicated construction technique, and process face is not hung down at one On face, it is the convenience and raising underwater operation efficiency in underwater construction portion, needs a underwater travelling cradle.
Summary of the invention
Above-mentioned technical problem present in present invention aims to solve the prior art provides underwater moving hanging basket, passes through The design of hydraulic winch and sliding rail trolley provides diver under water in processing facade defect movement platform, which is working When it is reliable and stable, movement it is convenient, at hanging basket install body restraints, allow diving operation construct in diver fix It in hanging basket, then constructs, realizing construction personnel can preferably stable body progress underwater construction operation in water.
In order to solve the above-mentioned technical problem, the present invention adopts the following technical scheme:
Underwater moving hanging basket, including suspension mechanism, walking track girder, sliding rail trolley, hydraulic winch and hanging basket, hang machine Structure is fixedly connected with walking track girder, and sliding rail trolley is movably connected on walking track girder, and hydraulic winch is fixedly connected on sliding rail The bottom of trolley, hydraulic winch control hanging basket, it is characterised in that: the top for track girder of walking is equipped at least three suspension centres, hangs Suspension mechanism is fixedly connected with suspension centre, and sliding rail trolley is equipped with driving device, and driving device controls sliding rail trolley, and hanging basket is solid equipped with body Determine device.The present invention provides diver under water in processing facade defect movement by the design of hydraulic winch and sliding rail trolley Platform, the platform is reliable and stable at work, and movement is convenient, body restraints is installed at hanging basket, so that diving operation is applied Diver can be fixed in hanging basket in work, then construct, realize construction personnel can preferably in water stable body into After row underwater construction operates, and construction personnel's body is fixed, the underwater construction operation of construction personnel will not influence.
Further, suspension mechanism includes fixed bracket and cantilever, and fixed bracket is fixedly connected on the vertical of bulkhead wall waterborne On the vertical plane of face or structures, cantilever is fixedly connected on support bracket fastened top, is welded to connect between fixed bracket and cantilever There is ribs, fixing seat is fixedly connected at the top of track girder of walking, fixing seat is equipped with the first threaded rod, in fixing seat activity It connects, hanging ring is fixedly connected at the top of cantilever, the first threaded rod passes through hanging ring, and the bottom of cantilever is close in the end of the first threaded rod Portion.After the completion of fixed bracket is fixed, cantilever is installed on fixed bracket, then weld ribs, improves fixed bracket and hanged Hanging ring is installed on the top of cantilever, then the mounting-fixing base at the suspension centre of walking track girder by the stability connected between arm, will The first threaded rod in fixing seat is screwed into hanging ring, and the first threaded rod is made to hold out against the bottom of cantilever, enable walking track girder It is enough stable to be fixed on cantilever, it will not rock.
Further, walking track girder is steel I-beam, and sliding rail trolley includes pulley and positioning plate, and pulley is located at walking track The two sides of beam, positioning plate are located at the outside of pulley, and bearing is connected between positioning plate and pulley, and driving device is installed on fixed The outside of position plate.Driving device driving pulley is realized, pulley is slided in the inner sidewall of walking track girder, realizes and hang Basket can carry out transverse moving left and right.
Further, driving device includes reduction gearing motor, and the end of reduction gearing motor is equipped with first gear, pulley packet Sliding part and driving section are included, the diameter of driving section is bigger than the diameter of sliding part, and sliding part is close to the inner sidewall of walking track girder Bottom surface, driving section are equipped with second gear, and first gear is meshed with institute's second gear, and fast gear motor controls pulley.Reducing gear Turbin generator drives first gear rotation, and first gear drives the second gear on driving section, to realize pulley in walking rail The inner sidewall of road beam is slided.
Further, suspension centre includes the first suspension centre and the second suspension centre, and the first suspension centre is located at the two sides on walking track girder top, the Two suspension centres are located at the centre on the top of walking track girder, and the bottom of the corresponding walking track girder of the first suspension centre is equipped with the first cable Rope, the first end for pulling rope are connect with fixed bracket.It is steady further to strengthen connecting in suspension mechanism for walking track girder It is qualitative.
Further, counter weight device is equipped at the first suspension centre, configuration device includes the second hawser and clump weight, the second hawser One end connect with the bottom of walking track girder, and the other end of the second hawser is fixedly connected with clump weight, the second hawser and hanging basket it Between be connected with third hawser.When hanging basket carries out transverse moving left and right, clump weight is driven to be moved, ensure that walking track beam stress Equilibrium increases the stability of hanging basket.
Further, hydraulic winch is equipped with the 4th hawser, and the end of the 4th hawser is equipped with the first hook, and the first hook is fixed It is connected with the 5th hawser, the two sides of hanging basket are equipped with the second hook, and one end of the 5th hawser is fixedly connected with the second hook.First Hook is connect with the two sides of hanging basket respectively, is increased the stability of hanging basket, is realized hanging basket and be fixedly connected with hydraulic winch.
Further, hanging basket is equipped with protection outline border, and body restraints include shoulder fixing device, the fixed device of waist, adjust Regulating device, locking piece and foot's fixing piece, foot's fixing piece are fixedly connected on the bottom of hanging basket, and regulating device is set to the bottom of hanging basket Portion, shoulder fixing device are fixedly connected in regulating device, and locking piece is set on protection outline border, and locking piece is in shoulder fixing device Match, the fixed device of waist is between foot's fixing piece and shoulder fixing device.Pass through foot's fixing piece, lumbar mount With the cooperation of shoulder fixing device, fix the body of underwater construction personnel, it will not buoyancy body because of construction personnel by water In suspended state, construction personnel can be enable to stand in hanging basket, construction personnel can preferably carry out underwater construction, pass through tune After the adjusting of regulating device can adapt to the construction personnel of various statures, and construction personnel's body is fixed, construction personnel will not influence Underwater construction operation.
Further, regulating device includes the second threaded rod and adjustment seat, and the bottom of hanging basket is equipped with sliding slot, the bottom of adjustment seat Equipped with limited block, limited block is located in sliding slot, and the second threaded rod is equipped in sliding slot, and the second threaded rod passes through sliding block, the second screw thread Bar is equipped with nut, and nut is tightened against the two sides of limited block, and shoulder fixing device is fixed in adjustment seat, and protection outline border is equipped with Waist fixed pedestal, waist fixed pedestal are equipped with the first groove, and the outside portion of adjustment seat is equipped with the second groove, the first groove and the Two grooves match, and the first cylinder is equipped in the first groove, is equipped with the second cylinder in the second groove, the first cylinder is connected with First slipping block, slipping block are fixedly connected with the first cutting ferrule, and the second cylinder is connected with the second slipping block, the second slipping block It is fixedly connected with elastic telescopic loop bar, the end of elastic telescopic loop bar is fixedly connected with the second cutting ferrule, the first cutting ferrule and the second card Set matches.When construction personnel needs underwater construction, construction personnel fixes foot on the water surface, then by unscrewing nut, Mobile adjustment seat, when it being made to reach suitable position, then pulls out elastic telescopic loop bar, and waist is passed through the first cutting ferrule and the second cutting ferrule Cooperation is to be fixed, and then by the shoulder of the fixed construction personnel of shoulder fixing device, the body of construction personnel has been fixed Cheng Houzai puts down hanging basket and enters in water;When needing transverse shifting in single construction personnel under water hanging basket, it is solid first to unclamp foot Determine device, unclamps again shoulder fixing device, the waist of the fixed construction personnel of the fixed device of waist, by the first slipping block first It is slid on cylinder, the second slipping block slides on the second cylinder, and transverse moving left and right can be carried out by realizing construction personnel.
Further, shoulder fixing device includes shoulder fixed pedestal, shaft and shoulder compression column with fixed, and shoulder fixed pedestal is solid Surely it is connected to the top of regulating device, shaft passes through shoulder fixed pedestal, and the both ends of shoulder compression column with fixed and the both ends of shaft are solid Fixed connection, locking piece include lock and locking pedestal, protect the top of outline border to be equipped with third groove, locking base runner is connected to In third groove, lock is fixedly connected on locking pedestal, and lock matches with shoulder compression column with fixed.It can be rotated shoulder by shaft Portion's compression column with fixed, after fixing the shoulder of construction personnel, mobile locking pedestal makes lock locking shoulder compression column with fixed, realizes and apply The shoulder of worker person is fixed.
The present invention is by adopting the above-described technical solution, have the advantages that
The present invention provides diver under water in processing facade defect movement by the design of hydraulic winch and sliding rail trolley Platform, the platform is reliable and stable at work, and movement is convenient, body restraints is installed at hanging basket, so that diving operation is applied Diver can be fixed in hanging basket in work, then construct, realize construction personnel can preferably in water stable body into After row underwater construction operates, and construction personnel's body is fixed, the underwater construction operation of construction personnel will not influence.
Suspension mechanism includes fixed bracket and cantilever in the present invention, and fixed bracket is fixedly connected on the vertical of bulkhead wall waterborne On the vertical plane of face or structures, cantilever is fixedly connected on support bracket fastened top, is welded to connect between fixed bracket and cantilever Have ribs, be fixedly connected with fixing seat at the top of track girder of walking, fixing seat is equipped with the first threaded rod, the first threaded rod in Fixing seat is flexibly connected, and hanging ring is fixedly connected at the top of cantilever, and the first threaded rod passes through hanging ring, and the end of the first threaded rod is tight Paste the bottom of cantilever.After the completion of fixed bracket is fixed, cantilever is installed on fixed bracket, then weld ribs, is improved solid Hanging ring is installed on the top of cantilever, then pacified at the suspension centre of walking track girder by the stability connected between fixed rack and cantilever Fixing seat is filled, the first threaded rod in fixing seat is screwed into hanging ring, the first threaded rod is made to hold out against the bottom of cantilever, so that row That walks that track girder can be stable is fixed on cantilever, will not rock.
Hanging basket is equipped with protection outline border in the present invention, and body restraints include shoulder fixing device, the fixed device of waist, adjust Regulating device, locking piece and foot's fixing piece, foot's fixing piece are fixedly connected on the bottom of hanging basket, and regulating device is set to the bottom of hanging basket Portion, shoulder fixing device are fixedly connected in regulating device, and locking piece is set on protection outline border, and locking piece is in shoulder fixing device Match, the fixed device of waist is between foot's fixing piece and shoulder fixing device.Pass through foot's fixing piece, lumbar mount With the cooperation of shoulder fixing device, fix the body of underwater construction personnel, it will not buoyancy body because of construction personnel by water In suspended state, construction personnel can be enable to stand in hanging basket, construction personnel can preferably carry out underwater construction, pass through tune After the adjusting of regulating device can adapt to the construction personnel of various statures, and construction personnel's body is fixed, construction personnel will not influence Underwater construction operation.Regulating device includes the second threaded rod and adjustment seat, and the bottom of hanging basket is equipped with sliding slot, the bottom of adjustment seat Equipped with limited block, limited block is located in sliding slot, and the second threaded rod is equipped in sliding slot, and the second threaded rod passes through sliding block, the second screw thread Bar is equipped with nut, and nut is tightened against the two sides of limited block, and shoulder fixing device is fixed in adjustment seat, and protection outline border is equipped with Waist fixed pedestal, waist fixed pedestal are equipped with the first groove, and the outside portion of adjustment seat is equipped with the second groove, the first groove and the Two grooves match, and the first cylinder is equipped in the first groove, is equipped with the second cylinder in the second groove, the first cylinder is connected with First slipping block, slipping block are fixedly connected with the first cutting ferrule, and the second cylinder is connected with the second slipping block, the second slipping block It is fixedly connected with elastic telescopic loop bar, the end of elastic telescopic loop bar is fixedly connected with the second cutting ferrule, the first cutting ferrule and the second card Set matches.When construction personnel needs underwater construction, construction personnel fixes foot on the water surface, then by unscrewing nut, Mobile adjustment seat, when it being made to reach suitable position, then pulls out elastic telescopic loop bar, and waist is passed through the first cutting ferrule and the second cutting ferrule Cooperation is to be fixed, and then by the shoulder of the fixed construction personnel of shoulder fixing device, the body of construction personnel has been fixed Cheng Houzai puts down hanging basket and enters in water.
Detailed description of the invention
The present invention will be further explained below with reference to the attached drawings:
Fig. 1 is the structural schematic diagram of the underwater moving hanging basket of the present invention;
Fig. 2 is the structural schematic diagram of suspension mechanism in the present invention;
Fig. 3 is the structural schematic diagram of walking track girder in the present invention;
Fig. 4 is the structural schematic diagram that sliding rail trolley is connect with hydraulic winch in the present invention;
Fig. 5 is the structural schematic diagram of hanging basket in the present invention;
Fig. 6 is the structural schematic diagram that hanging basket is connect with regulating device in the present invention;
Fig. 7 is the structural schematic diagram of waist fixed pedestal in the present invention;
Fig. 8 is the structural schematic diagram of shoulder fixing device in the present invention;
Fig. 9 is the structural schematic diagram amplified at A in Fig. 4;
Figure 10 is the structural schematic diagram amplified at B in Fig. 4;
Figure 11 is the structural schematic diagram amplified at C in Fig. 5;
Figure 12 is the structural schematic diagram amplified at D in Fig. 6.
In figure, 1- suspension mechanism;2- walking track girder;3- sliding rail trolley;4- hydraulic winch;5- hanging basket;6- shoulder is solid Determine pedestal;7- driving device;8- body restraints;9- fixes bracket;10- third groove;11- cantilever;12- ribs;13- Fixing seat;The first threaded rod of 14-;15- hanging ring;16- pulley;17- positioning plate;18- bearing;19- reduction gearing motor;20- One gear;21- sliding part;The driving section 22-;23- second gear;The first suspension centre of 24-;The second suspension centre of 25-;The first hawser of 26-; 27- counter weight device;The second hawser of 28-;29- clump weight;30- third hawser;The 4th hawser of 31-;32- first is linked up with;33- the 5th Hawser;34- protects outline border;35- shoulder fixing device;36- waist fixes device;37- regulating device;38- locking piece;39- foot Portion's fixing piece;The second threaded rod of 40-;41- adjustment seat;42- sliding slot;43- limited block;44- nut;45- waist fixed pedestal; The first groove of 46-;The second groove of 47-;The first cylinder of 48-;The second cylinder of 49-;The first slipping block of 50-;The first cutting ferrule of 51-;52- Second slipping block;53- elastic telescopic loop bar;The second cutting ferrule of 54-;55- shaft;56- shoulder compression column with fixed;57- lock;58- lock Determine pedestal;59- second is linked up with.
Specific embodiment
It as shown in Figures 1 to 12, is the underwater moving hanging basket of the present invention, including suspension mechanism 1, walking track girder 2, sliding rail are small Vehicle 3, hydraulic winch 4 and hanging basket 5, suspension mechanism 1 are fixedly connected with walking track girder 2, and sliding rail trolley 3 is movably connected on walking Track girder 2, hydraulic winch 4 are fixedly connected on the bottom of sliding rail trolley 3, and hydraulic winch 4 controls hanging basket 5.
The top of walking track girder 2 is equipped at least three suspension centres, and suspension mechanism 1 is fixedly connected with suspension centre, and sliding rail trolley 3 is set There is driving device 7, driving device 7 controls sliding rail trolley 3, and hanging basket 5 is equipped with body restraints 8.
Suspension mechanism 1 includes fixed bracket 9 and cantilever 11, and fixed bracket 9 is fixedly connected on the vertical plane of bulkhead wall waterborne Or on the vertical plane of structures, cantilever 11 is fixedly connected on the top of fixed bracket 9, welds between fixed bracket 9 and cantilever 11 It is connected with ribs 12, the top of walking track girder 2 is fixedly connected with fixing seat 13, and fixing seat 13 is equipped with the first threaded rod 14, the first threaded rod 14 is flexibly connected in fixing seat 13, and the top of cantilever 11 is fixedly connected with hanging ring 15, and the first threaded rod 14 is worn Hanging ring 15 is crossed, the bottom of cantilever 11 is close in the end of the first threaded rod 14.After the completion of fixed bracket 9 is fixed, cantilever 11 is installed In on fixed bracket 9, then ribs 12 is welded, the stability connected between fixed bracket 9 and cantilever 11 is improved, by hanging ring 15 It is installed on the top of cantilever 11, then the mounting-fixing base 13 at the suspension centre of walking track girder 2, by the first screw thread in fixing seat 13 Bar 14 is screwed into hanging ring 15, and the first threaded rod 14 is made to hold out against the bottom of cantilever 11, and enabling walking, track girder 2 is stable consolidates Due on cantilever 11, will not rock.
Walking track girder 2 is steel I-beam, and sliding rail trolley 3 includes pulley 16 and positioning plate 17, and pulley 16 is located at walking rail The two sides of road beam 2, positioning plate 17 are located at the outside of pulley 16, and bearing 18 is connected between positioning plate 17 and pulley 16, drive Dynamic device 7 is installed on the outside of positioning plate 17.7 driving pulley 16 of driving device is realized, makes pulley 16 in walking track girder 2 Inner sidewall is slided, and transverse moving left and right can be carried out by realizing hanging basket 5.
Driving device 7 includes reduction gearing motor 19, and the end of reduction gearing motor 19 is equipped with first gear 20, pulley 16 Including sliding part 21 and driving section 22, the diameter of driving section 22 is bigger than the diameter of sliding part 21, and sliding part 21 is close to walking track The bottom surface of the inner sidewall of beam 2, driving section 22 are equipped with second gear 23, and first gear 20 is meshed with institute second gear 23, fast tooth Turbin generator controls pulley 16.Reduction gearing motor 19 drives first gear 20 to rotate, and first gear 20 drives on driving section 22 Second gear 23, so that the inner sidewall for realizing pulley 16 in walking track girder 2 is slided.
Suspension centre includes the first suspension centre 24 and the second suspension centre 25, and the first suspension centre 24 is located at the two sides on walking 2 top of track girder, the Two suspension centres 25 are located at the centre on the top of walking track girder 2, and the bottom of the corresponding walking track girder 2 of the first suspension centre 24 is equipped with the One hawser 26, the first end for pulling rope are connect with fixed bracket 9.Further strengthen walking track girder 2 in suspension mechanism 1 The stability of connection.
Counter weight device 27 is equipped at first suspension centre 24, configuration device includes the second hawser 28 and clump weight 29, the second hawser 28 one end is connect with the bottom of walking track girder 2, and the other end of the second hawser 28 is fixedly connected with clump weight 29, the second hawser Third hawser 30 is connected between 28 and hanging basket 5.When hanging basket 5 carries out transverse moving left and right, clump weight 29 is driven to be moved, guaranteed Walking track girder 2 stress equalization, increases the stability of hanging basket 5.
Hydraulic winch 4 is equipped with the 4th hawser 31, and the end of the 4th hawser 31 is equipped with the first hook 32, and the first hook 32 is solid Surely it is connected with the 5th hawser 33, the two sides of hanging basket 5 are equipped with the second hook 59, and one end of the 5th hawser 33 and the second hook 59 are solid Fixed connection.First hook 32 is connect with the two sides of hanging basket 5 respectively, increases the stability of hanging basket 5, realize hanging basket 5 with it is hydraulic Hoist engine 4 is fixedly connected.
Hanging basket 5 is equipped with protection outline border 34, and body restraints 8 include shoulder fixing device 35, the fixed device 36 of waist, adjust Regulating device 37, locking piece 38 and foot's fixing piece 39, foot's fixing piece 39 are fixedly connected on the bottom of hanging basket 5, regulating device 37 Set on the bottom of hanging basket 5, shoulder fixing device 35 is fixedly connected in regulating device 37, and locking piece 38 is set to protection outline border 34 On, locking piece 38 matches in shoulder fixing device 35, and the fixed device 36 of waist is located at foot's fixing piece 39 and the fixed dress of shoulder It sets between 35.By foot's fixing piece 39, the cooperation of lumbar mount and shoulder fixing device 35, make the body of underwater construction personnel Body is fixed, will not because construction personnel by water buoyancy body be in suspended state, construction personnel can be enable to stand in hanging basket 5 Interior, construction personnel can preferably carry out underwater construction, by the adjusting of regulating device 37, can adapt to the construction of various statures Personnel, and after the fixation of construction personnel's body, it will not influence the underwater construction operation of construction personnel.
Regulating device 37 includes the second threaded rod 40 and adjustment seat 41, and the bottom of hanging basket 5 is equipped with sliding slot 42, adjustment seat 41 Bottom is equipped with limited block 43, and limited block 43 is located in sliding slot 42, and the second threaded rod 40 is equipped in sliding slot 42, and the second threaded rod 40 is worn Sliding block is crossed, the second threaded rod 40 is equipped with nut 44, and nut 44 is tightened against the two sides of limited block 43, and shoulder fixing device 35 is fixed In adjustment seat 41, protection outline border 34 is equipped with waist fixed pedestal 45, and waist fixed pedestal 45 is equipped with the first groove 46, adjusts The outside portion of seat 41 is equipped with the second groove 47, and the first groove 46 matches with the second groove 47, is equipped with first in the first groove 46 Cylinder 48, the second groove 47 is interior equipped with the second cylinder 49, and the first cylinder 48 is connected with the first slipping block 50, and slipping block is fixed It is connected with the first cutting ferrule 51, the second cylinder 49 is connected with the second slipping block 52, and the second slipping block 52 is fixedly connected with bullet Property telescopic sleeving rod 53, the end of elastic telescopic loop bar 53 is fixedly connected with the second cutting ferrule 54, the first cutting ferrule 51 and the second cutting ferrule 54 Match.When construction personnel needs underwater construction, construction personnel fixes foot on the water surface, then by unscrewing nut 44, Mobile adjustment seat 41 when it being made to reach suitable position, then pulls out elastic telescopic loop bar 53, and waist is passed through the first cutting ferrule 51 and the Then the cooperation of two cutting ferrules 54 fixes the shoulder of construction personnel to be fixed by shoulder fixing device 35, construction personnel's Hanging basket 5 is put down again after the completion of body is fixed to enter in water;When needing transverse shifting in single construction personnel under water hanging basket 5, Foot fixing device is first unclamped, shoulder fixing device 35 is unclamped again, the waist of the fixed construction personnel of the fixed device 36 of waist passes through First slipping block 50 slides on the first cylinder 48, and the second slipping block 52 slides on the second cylinder 49, realizes construction personnel It can carry out transverse moving left and right.
Shoulder fixing device 35 includes shoulder fixed pedestal 6, shaft 55 and shoulder compression column with fixed 56, shoulder fixed pedestal 6 It is fixedly connected on the top of regulating device 37, shaft 55 passes through shoulder fixed pedestal 6, the both ends of shoulder compression column with fixed 56 and shaft 55 both ends are fixedly connected, and locking piece 38 includes lock 57 and locking pedestal 58, and the top of protection outline border 34 is equipped with third groove 10, locking pedestal 58 is movably connected in third groove 10, and lock 57 is fixedly connected on locking pedestal 58, lock 57 and shoulder Compression column with fixed 56 matches.It can be rotated shoulder compression column with fixed 56 by shaft 55, after fixing the shoulder of construction personnel, mobile locking Pedestal 58, makes 57 locking shoulder compression column with fixed 56 of lock, and the shoulder for realizing construction personnel is fixed.
The present invention is provided diver and is moved under water in processing facade defect by the design of hydraulic winch 4 and sliding rail trolley 3 Moving platform, the platform is reliable and stable at work, and movement is convenient, and body restraints 8 are installed at hanging basket 5, so that diving is made Diver can be fixed in hanging basket 5 in industry construction, then construct, and realizing construction personnel can better stable body in water After body carries out underwater construction operation, and construction personnel's body is fixed, the underwater construction operation of construction personnel will not influence.
The above is only specific embodiments of the present invention, but technical characteristic of the invention is not limited thereto.It is any with this hair Based on bright, to solve essentially identical technical problem, essentially identical technical effect is realized, made simple change, etc. With replacement or modification etc., all it is covered by among protection scope of the present invention.

Claims (10)

1. underwater moving hanging basket, including suspension mechanism, walking track girder, sliding rail trolley, hydraulic winch and hanging basket, the suspension Mechanism is fixedly connected with the walking track girder, and the sliding rail trolley is movably connected on the walking track girder, the hydraulic volume The machine of raising is fixedly connected on the bottom of the sliding rail trolley, and the hydraulic winch controls the hanging basket, it is characterised in that: the row The top for walking track girder is equipped at least three suspension centres, and the suspension mechanism is fixedly connected with the suspension centre, and the sliding rail trolley is set There is driving device, the driving device controls the sliding rail trolley, and the hanging basket is equipped with body restraints.
2. underwater moving hanging basket according to claim 1, it is characterised in that: the suspension mechanism includes fixed bracket and hangs Arm, the fixed bracket are fixedly connected on the vertical plane of bulkhead wall waterborne or the vertical plane of structures, and the cantilever is fixed to be connected It is connected to the support bracket fastened top, ribs, the walking rail are fixedly connected between the fixed bracket and the cantilever Fixing seat is fixedly connected at the top of road beam, the fixing seat is equipped with the first threaded rod, and first threaded rod is in described solid Reservation is flexibly connected, and is fixedly connected with hanging ring at the top of the cantilever, and first threaded rod passes through the hanging ring, and described first It is close to the bottom of the cantilever in the end of threaded rod.
3. underwater moving hanging basket according to claim 1, it is characterised in that: the walking track girder is steel I-beam, institute Stating sliding rail trolley includes pulley and positioning plate, and the pulley is located at the two sides of the walking track girder, and the positioning plate is located at institute The outside of pulley is stated, first bearing is connected between the positioning plate and the pulley, the driving device is installed on institute State the outside of positioning plate.
4. underwater moving hanging basket according to claim 3, it is characterised in that: the driving device includes reduction gearing electricity Machine, the end of the reduction gearing motor are equipped with first gear, and the pulley includes sliding part and driving section, the driving section Diameter is bigger than the diameter of the sliding part, and the sliding part is close to the bottom surface of the inner sidewall of the walking track girder, the transmission Portion is equipped with second gear, and the first gear is meshed with institute's second gear, and the speed gear motor controls the pulley.
5. underwater moving hanging basket according to claim 2, it is characterised in that: the suspension centre includes that the first suspension centre is hung with second Point, first suspension centre are located at the two sides on the walking track girder top, and second suspension centre is located at the walking track girder The bottom of the centre on top, the corresponding walking track girder of first suspension centre is equipped with the first hawser, and described first pulls rope End connect with the fixed bracket.
6. underwater moving hanging basket according to claim 5, it is characterised in that: counter weight device is equipped at first suspension centre, The counter weight device includes the second hawser and clump weight, the bottom company of one end of second hawser and the walking track girder It connects, the other end of second hawser is fixedly connected with the clump weight, is connected between second hawser and the hanging basket Third hawser.
7. underwater moving hanging basket according to claim 1, it is characterised in that: the hydraulic winch is equipped with the 4th hawser, The end of 4th hawser is equipped with the first hook, and first hook is fixedly connected with the 5th hawser, the two sides of the hanging basket It is equipped with the second hook, one end of the 5th hawser is fixedly connected with the hanging basket.
8. underwater moving hanging basket according to claim 1, it is characterised in that: the hanging basket is equipped with protection outline border, the body The fixed device of body includes shoulder fixing device, the fixed device of waist, regulating device, locking piece and foot's fixing piece, the foot Fixing piece is fixedly connected on the bottom of the hanging basket, and the regulating device is set to the bottom of the hanging basket, the fixed dress of the shoulder It sets and is fixedly connected in the regulating device, the locking piece is set on the protection outline border, and the locking piece is in the shoulder Fixed device matches, and the fixed device of the waist is between foot's fixing piece and the shoulder fixing device.
9. underwater moving hanging basket according to claim 8, it is characterised in that: the regulating device include the second threaded rod with Adjustment seat, the bottom of the hanging basket are equipped with sliding slot, and the bottom of the adjustment seat is equipped with limited block, and the limited block is located at the cunning In slot, the second threaded rod is equipped in the sliding slot, second threaded rod passes through the sliding block, and second threaded rod is equipped with Nut, the nut are tightened against the two sides of the limited block, and the shoulder fixing device is fixed in the adjustment seat, described Outline border is protected to be equipped with waist fixed pedestal, the waist fixed pedestal is equipped with the first groove, and the outside portion of the adjustment seat is equipped with Second groove, first groove match with second groove, are equipped with the first cylinder in first groove, and described second The second cylinder is equipped in groove, first cylinder is connected with the first slipping block, and the slipping block is fixedly connected with first Cutting ferrule, second cylinder are connected with the second slipping block, and second slipping block is fixedly connected with elastic telescopic loop bar, The end of the elastic telescopic loop bar is fixedly connected with the second cutting ferrule, and first cutting ferrule matches with second cutting ferrule.
10. underwater moving hanging basket according to claim 8, it is characterised in that: the shoulder fixing device includes that shoulder is solid Determine pedestal, shaft and shoulder compression column with fixed, the shoulder fixed pedestal is fixedly connected on the top of the regulating device, and described turn Axis passes through the shoulder fixed pedestal, and the both ends of the shoulder compression column with fixed are fixedly connected with the both ends of the shaft, the lock Determining part includes lock and locking pedestal, and the top of the protection outline border is equipped with third groove, and the locking base runner is connected to In the third groove, the lock is fixedly connected on the locking pedestal, the lock and the shoulder compression column with fixed phase Matching.
CN201811610677.1A 2018-12-27 2018-12-27 Underwater movable hanging basket Active CN109809339B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811610677.1A CN109809339B (en) 2018-12-27 2018-12-27 Underwater movable hanging basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811610677.1A CN109809339B (en) 2018-12-27 2018-12-27 Underwater movable hanging basket

Publications (2)

Publication Number Publication Date
CN109809339A true CN109809339A (en) 2019-05-28
CN109809339B CN109809339B (en) 2020-09-22

Family

ID=66602789

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811610677.1A Active CN109809339B (en) 2018-12-27 2018-12-27 Underwater movable hanging basket

Country Status (1)

Country Link
CN (1) CN109809339B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158979A (en) * 2019-06-19 2019-08-23 北京蓝天未来科技有限公司 A kind of self-balancing sunshade canopy of the heavens
CN110485698A (en) * 2019-08-28 2019-11-22 中国建筑第八工程局有限公司 Horizontally moveable hanging basket sliding system
CN110935111A (en) * 2019-12-31 2020-03-31 山东大学齐鲁医院 A mobile device for tumour radiotherapy
CN114703752A (en) * 2022-03-15 2022-07-05 聊城市交通发展有限公司 Highway bridge construction hanging flower basket

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5507596A (en) * 1993-10-15 1996-04-16 The United States Of America As Represented By The Secretary Of Commerce Underwater work platform support system
CN202754715U (en) * 2012-08-10 2013-02-27 北京英迈特矿山机械有限公司 Electric crane
CN203346037U (en) * 2013-07-19 2013-12-18 三峡大学 Hanging basket for spray seeding operation at very steep slope
CN103663168A (en) * 2013-12-27 2014-03-26 大连华锐重工集团股份有限公司 Special crane for transporting fan blade
CN205908004U (en) * 2016-08-22 2017-01-25 中国电建集团核电工程公司 Special hoist and mount fixing device of hanging flower basket
CN106430010A (en) * 2016-08-24 2017-02-22 无锡科通工程机械制造有限公司 Mobile hanging basket device for ship
CN108996444A (en) * 2018-06-26 2018-12-14 成都益睿信科技有限公司 A kind of power equipment repairing lifts equipment with safety protective

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5507596A (en) * 1993-10-15 1996-04-16 The United States Of America As Represented By The Secretary Of Commerce Underwater work platform support system
CN202754715U (en) * 2012-08-10 2013-02-27 北京英迈特矿山机械有限公司 Electric crane
CN203346037U (en) * 2013-07-19 2013-12-18 三峡大学 Hanging basket for spray seeding operation at very steep slope
CN103663168A (en) * 2013-12-27 2014-03-26 大连华锐重工集团股份有限公司 Special crane for transporting fan blade
CN205908004U (en) * 2016-08-22 2017-01-25 中国电建集团核电工程公司 Special hoist and mount fixing device of hanging flower basket
CN106430010A (en) * 2016-08-24 2017-02-22 无锡科通工程机械制造有限公司 Mobile hanging basket device for ship
CN108996444A (en) * 2018-06-26 2018-12-14 成都益睿信科技有限公司 A kind of power equipment repairing lifts equipment with safety protective

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158979A (en) * 2019-06-19 2019-08-23 北京蓝天未来科技有限公司 A kind of self-balancing sunshade canopy of the heavens
CN110485698A (en) * 2019-08-28 2019-11-22 中国建筑第八工程局有限公司 Horizontally moveable hanging basket sliding system
CN110485698B (en) * 2019-08-28 2021-07-09 中国建筑第八工程局有限公司 Sliding system capable of horizontally moving hanging basket
CN110935111A (en) * 2019-12-31 2020-03-31 山东大学齐鲁医院 A mobile device for tumour radiotherapy
CN114703752A (en) * 2022-03-15 2022-07-05 聊城市交通发展有限公司 Highway bridge construction hanging flower basket
CN114703752B (en) * 2022-03-15 2024-01-26 聊城市交通发展有限公司 Highway bridge construction hanging basket

Also Published As

Publication number Publication date
CN109809339B (en) 2020-09-22

Similar Documents

Publication Publication Date Title
CN109809339A (en) Underwater moving hanging basket
CN210163041U (en) Lifting device of gate type plate shearing machine
CN208869222U (en) Hanging apparatus
CN202449788U (en) Special crane device for wall bricks
CN113200439A (en) Conduit foundation tower turnover device for offshore wind power generation
CN113233344A (en) Novel hoisting device for bridge installation
CN209038922U (en) Large-span glass hanging device
CN216190477U (en) Pipeline welding hoist device
CN206798964U (en) Dismantle the gearbox fixed suspension bracket of auxiliary
CN214879754U (en) Wire suspension arm capable of improving traction effect
CN216072776U (en) Turbine hoisting device for ship machining
CN220564107U (en) Hanging assembly of hoisting equipment
CN212532030U (en) Ship deck weight lifting device
CN212426741U (en) Movable hanging basket suitable for high-altitude operation
CN208602647U (en) One kind being used for the laterally adjustable mobile device of dink
CN215048207U (en) Hoist engine fixed platform for construction
CN207375627U (en) It is a kind of to be singly driven through formula shot-blasting machine
CN216616765U (en) Suspension type vertical storage tank maintenance device
JP2004155538A (en) Suspension tool
CN216239637U (en) Movable hanging basket suitable for high-altitude construction operation
CN211590757U (en) Electric hanger rod for saw blade of mine stone cutter
CN216038301U (en) A hoisting accessory for hydraulic engineering pipeline
CN219669998U (en) Automatic accessory module lifts by crane installation frock
CN218371226U (en) Quick transfer device of angle steel tower assembly part
CN212740494U (en) Safe type single armed loop wheel machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant