CN109800481A - A kind of method of intelligent substation 110kV prepared auto restart SCD file Quadratic Imaginary circuit Correctness checking - Google Patents
A kind of method of intelligent substation 110kV prepared auto restart SCD file Quadratic Imaginary circuit Correctness checking Download PDFInfo
- Publication number
- CN109800481A CN109800481A CN201811643316.7A CN201811643316A CN109800481A CN 109800481 A CN109800481 A CN 109800481A CN 201811643316 A CN201811643316 A CN 201811643316A CN 109800481 A CN109800481 A CN 109800481A
- Authority
- CN
- China
- Prior art keywords
- flow direction
- activating device
- judged
- information flow
- route
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
The present invention relates to a kind of methods of intelligent substation 110kV prepared auto restart SCD file Quadratic Imaginary circuit Correctness checking, belong to electric power network field.Method includes the following steps: method includes the following steps: checking the integrality of configuration;Check SV, GOOSE information flow direction correctness;Check the information between prepared auto restart and route, bus combining unit;Check the information between backup auto-activating device and intelligent terminal;Check the information between backup auto-activating device and other protective devices;When being respectively completed inspection and all correct result according to step 3 to step 5, judge that the 110kV backup auto-activating device SCD file Quadratic Imaginary circuit is correct.Method of the invention makes to check that 110kV prepared auto restart SCD file Quadratic Imaginary circuit correctness reaches standardization and standardization, relieves the hidden danger of electric power netting safe running.
Description
Technical field
The invention belongs to electric power network fields, are related to a kind of intelligent substation 110kV prepared auto restart SCD file Quadratic Imaginary circuit
The method of Correctness checking.
Background technique
Intelligent Substation System configuration file (SCD) abbreviation whole station system configuration file, describes the exemplary configuration of all IED
Communication configuration and transforming plant primary system structure between messaging parameter, IED, wherein exemplary configuration, i.e. Quadratic Imaginary circuit,
It is the core of configuration file including Current Voltage channel, closing loop, signal circuit and alarm signal etc., SCD file is secondary
The correctness of empty loop configuration is particularly significant for the safe operation of substation.
Currently, this document is usually completed by designing unit and system integration manufacturer, lacks unified technical method and check SCD
The correctness in file secondary void circuit brings difficulty to intelligent substation 110kV line segregation O&M, enlarging etc., pacifies to power grid
Row for the national games leaves hidden danger.
For above-mentioned Current Situation, a kind of inspection 110kV backup auto-activating device SCD file Quadratic Imaginary circuit correctness need to be studied
Method, make its standardize and standardization.
Summary of the invention
In view of this, the purpose of the present invention is to provide a kind of intelligent substation 110kV prepared auto restart SCD file Quadratic Imaginaries to return
The method of road Correctness checking.
In order to achieve the above objectives, the invention provides the following technical scheme:
A kind of method of intelligent substation 110kV prepared auto restart SCD file Quadratic Imaginary circuit Correctness checking, this method include
Following steps:
Step 1: checking the integrality of configuration;
Step 2: checking SV, GOOSE information flow direction correctness;
Step 3: checking the information between prepared auto restart and route, bus combining unit;
Step 4: checking the information between backup auto-activating device and intelligent terminal;
Step 5: checking the information between backup auto-activating device and other protective devices;
Step 6: judging the 110kV prepared auto restart when being respectively completed inspection and all correct result according to step 3 to step 5
Device SCD file Quadratic Imaginary circuit is correct.
Further, the step 1 specifically: check to include prepared auto restart, combining unit, intelligent terminal, if lacking any intelligence
Energy electronic equipment IED, then be judged as mistake, conversely, being then judged as correct.
Further, the step 2 specifically: the input/output information flow direction of SV, GOOSE need correct, root between each IED
According to the mutual logical relation between backup auto-activating device, combining unit and intelligent terminal, is checked and judged respectively.
Further, the step 3 specifically:
S31: SV information flow direction is checked;When the information flow direction of backup auto-activating device and route, bus combining unit meet table 1 and
When the requirement of table 2, then it is judged as correct, conversely, being then judged as mistake;
SV information flow direction table between 1 110kV backup auto-activating device of table and route combining unit
Route combining unit, i.e. transmitting terminal | Backup power automatic switching protection device, i.e. receiving end |
Specified delay | Specified delay |
Protect A phase current 1 | XX route protection A phase current 1 |
Protect A phase current 2 | XX route protection A phase current 2 |
Protect B phase current 1 | XX route protection B phase current 1 |
Protect B phase current 2 | XX route protection B phase current 2 |
Protect C phase current 1 | XX route protection C phase current 1 |
Protect C phase current 2 | XX route protection C phase current 2 |
Route extracts voltage 1 | XX route line voltage distribution 1 |
Route extracts voltage 2 | XX route line voltage distribution 2 |
SV information flow direction table between 2 110kV backup auto-activating device of table and bus combining unit
Bus combining unit, i.e. transmitting terminal | Backup power automatic switching protection device, i.e. receiving end |
Specified delay | Specified delay |
Mother I protects A phase voltage 1, that is, after switching | Mother I protects A phase voltage 1 |
Mother I protects A phase voltage 2, that is, after switching | Mother I protects A phase voltage 2 |
Mother I protects B phase voltage 1, that is, after switching | Mother I protects B phase voltage 1 |
Mother I protects B phase voltage 2, that is, after switching | Mother I protects B phase voltage 2 |
Mother I protects C phase voltage 1, that is, after switching | Mother I protects C phase voltage 1 |
Mother I protects C phase voltage 2, that is, after switching | Mother I protects C phase voltage 2 |
Mother II protects A phase voltage 1, that is, after switching | Mother II protects A phase voltage 1 |
Mother II protects A phase voltage 2, that is, after switching | Mother II protects A phase voltage 2 |
Mother II protects B phase voltage 1, that is, after switching | Mother II protects B phase voltage 1 |
Mother II protects B phase voltage 2, that is, after switching | Mother II protects B phase voltage 2 |
Mother II protects C phase voltage 1, that is, after switching | Mother II protects C phase voltage 1 |
Mother II protects C phase voltage 2, that is, after switching | Mother II protects C phase voltage 2 |
S32: checking GOOSE information flow direction, believes between backup auto-activating device and route, bus combining unit without GOOSE when working as
Breath is then judged as correct, conversely, being then judged as mistake.
Further, the step 4 specifically:
S41: checking SV information flow direction, correct when without SV information, being then judged as between backup auto-activating device and intelligent terminal, instead
It, then be judged as mistake;
S42: GOOSE information flow direction is checked;When the information flow direction of backup auto-activating device and intelligent terminal, which meets table 3, to be required,
Then it is judged as correct, conversely, being then judged as mistake;
GOOSE information flow direction table between 3 110kV backup auto-activating device of table and intelligent terminal
Route/segmentation intelligent terminal, i.e. transmitting terminal | Backup power automatic switching protection device, i.e. receiving end |
Circuit breaker position is two point | XX breaker jump position open into |
STJ signal | XX breaker hand separately enters |
Backup auto-activating device, i.e. transmitting terminal | Route/segmentation intelligent terminal, i.e. receiving end |
Jump XX breaker | Circuit breaker trip TJR |
Close XX breaker | Breaker closing |
Further, the step 5 specifically:
S51: checking SV information flow direction, when without SV information, then judgement is positive between backup auto-activating device and other protective devices
Really, conversely, being then judged as mistake;
S52: GOOSE information flow direction is checked, when the information flow direction of backup auto-activating device and other protective devices meets wanting for table 4
When asking, then it is judged as correct, conversely, being then judged as mistake;
GOOSE information flow direction table between 4 110kV backup auto-activating device of table and other protective devices
Busbar protective device, i.e. transmitting terminal | Line protective devices, i.e. receiving end |
Jump XX line-breaker | Lock-reclosing lock is outputed |
Busbar protective device, i.e. transmitting terminal | Backup auto-activating device, i.e. receiving end |
Jump XX line-breaker | Locking prepared auto restart open into |
Close section switch | Locking prepared auto restart open into |
The beneficial effects of the present invention are: method of the invention makes checking 110kV prepared auto restart SCD file Quadratic Imaginary circuit just
True property reaches standardization and standardization, relieves the hidden danger of electric power netting safe running.
Detailed description of the invention
In order to keep the purpose of the present invention, technical scheme and beneficial effects clearer, the present invention provides following attached drawing and carries out
Illustrate:
Fig. 1 SV information flow direction schematic diagram between 110kV backup auto-activating device and route combining unit;
Fig. 2 SV information flow direction schematic diagram between 110kV backup auto-activating device and bus combining unit;
Fig. 3 GOOSE information flow direction schematic diagram between 110kV backup auto-activating device and intelligent terminal;
Fig. 4 GOOSE information flow direction schematic diagram between 110kV backup auto-activating device and other protective devices.
Specific embodiment
Below in conjunction with attached drawing, a preferred embodiment of the present invention will be described in detail.
The invention proposes a kind of sides of intelligent substation 110kV prepared auto restart SCD file Quadratic Imaginary circuit Correctness checking
Method, implementation method the following steps are included:
To achieve the goals above, the invention proposes a kind of intelligent substation 110kV backup auto-activating device SCD file is secondary
The method of empty circuit Correctness checking, implementation method the following steps are included:
Step 1: checking the integrality of configuration.It should include prepared auto restart, combining unit, intelligent terminal, if lacking any IED,
Then it is judged as mistake, conversely, correctly.
Step 2: checking SV, GOOSE information flow direction correctness.The input/output information flow of SV, GOOSE between each IED
It is correct to answering, according to the mutual logical relation between backup auto-activating device, combining unit and intelligent terminal, it be checked and be sentenced respectively
It is disconnected.
Step 3: checking the information between prepared auto restart and route, bus combining unit.
(1) SV information flow direction, as shown in Figure 1, 2.When the information flow direction of backup auto-activating device and route, bus combining unit accords with
When closing claimed below, then it is judged as correct, conversely, mistake.
(2) without GOOSE information between GOOSE information flow direction, backup auto-activating device and route, bus combining unit.When for certainly
It throws between device and route, bus combining unit without GOOSE information, is then judged as correct, conversely, mistake.
Step 4: checking the information between backup auto-activating device and intelligent terminal.
(1) SV information flow direction, without SV information between backup auto-activating device and intelligent terminal.When backup auto-activating device and intelligent terminal
Between without SV information, then be judged as correct, conversely, mistake.
(2) GOOSE information flow direction, as shown in Figure 3.When the information flow direction of backup auto-activating device and intelligent terminal meets following want
When asking, then it is judged as correct, conversely, mistake.
Step 5: checking the information between backup auto-activating device and other protective devices.
(1) SV information flow direction, without SV information between backup auto-activating device and other protective devices.When backup auto-activating device and other
Without SV information between protective device, then it is judged as correct, conversely, mistake.
(2) GOOSE information flow direction, as shown in Figure 4.When the information flow direction of backup auto-activating device and other protective devices meet with
Under when requiring, then be judged as correct, conversely, mistake.
Step 6: when being respectively completed inspection and all correct result according to step 3 to step 5 the method, it can be determined that
The 110kV backup auto-activating device SCD file Quadratic Imaginary circuit is correct.
Finally, it is stated that preferred embodiment above is only used to illustrate the technical scheme of the present invention and not to limit it, although logical
It crosses above preferred embodiment the present invention is described in detail, however, those skilled in the art should understand that, can be
Various changes are made to it in form and in details, without departing from claims of the present invention limited range.
Claims (6)
1. a kind of method of intelligent substation 110kV prepared auto restart SCD file Quadratic Imaginary circuit Correctness checking, it is characterised in that:
Method includes the following steps:
Step 1: checking the integrality of configuration;
Step 2: checking SV, GOOSE information flow direction correctness;
Step 3: checking the information between prepared auto restart and route, bus combining unit;
Step 4: checking the information between backup auto-activating device and intelligent terminal;
Step 5: checking the information between backup auto-activating device and other protective devices;
Step 6: judging the 110kV backup auto-activating device when being respectively completed inspection and all correct result according to step 3 to step 5
SCD file Quadratic Imaginary circuit is correct.
2. a kind of intelligent substation 110kV prepared auto restart SCD file Quadratic Imaginary circuit Correctness checking according to claim 1
Method, it is characterised in that: the step 1 specifically: check include prepared auto restart, combining unit, intelligent terminal, if lack appoint
One intelligent electronic device IED, then be judged as mistake, conversely, being then judged as correct.
3. a kind of intelligent substation 110kV prepared auto restart SCD file Quadratic Imaginary circuit Correctness checking according to claim 1
Method, it is characterised in that: the step 2 specifically: between each IED SV, GOOSE input/output information flow direction need just
Really, it according to the mutual logical relation between backup auto-activating device, combining unit and intelligent terminal, is checked and is judged respectively.
4. a kind of intelligent substation 110kV prepared auto restart SCD file Quadratic Imaginary circuit Correctness checking according to claim 1
Method, it is characterised in that: the step 3 specifically:
S31: SV information flow direction is checked;When the information flow direction of backup auto-activating device and route, bus combining unit meets Tables 1 and 2
Requirement when, then be judged as correct, conversely, being then judged as mistake;
SV information flow direction table between 1 110kV backup auto-activating device of table and route combining unit
SV information flow direction table between 2 110kV backup auto-activating device of table and bus combining unit
S32: check GOOSE information flow direction, when between backup auto-activating device and route, bus combining unit without GOOSE information, then
It is judged as correct, conversely, being then judged as mistake.
5. a kind of intelligent substation 110kV prepared auto restart SCD file Quadratic Imaginary circuit Correctness checking according to claim 1
Method, it is characterised in that: the step 4 specifically:
S41: checking SV information flow direction, correct when without SV information, being then judged as between backup auto-activating device and intelligent terminal, conversely,
Then it is judged as mistake;
S42: GOOSE information flow direction is checked;When the information flow direction of backup auto-activating device and intelligent terminal, which meets table 3, to be required, then sentence
Break to be correct, conversely, being then judged as mistake;
GOOSE information flow direction table between 3 110kV backup auto-activating device of table and intelligent terminal
6. a kind of intelligent substation 110kV prepared auto restart SCD file Quadratic Imaginary circuit Correctness checking according to claim 1
Method, it is characterised in that: the step 5 specifically:
S51: checking SV information flow direction, correct when without SV information, being then judged as between backup auto-activating device and other protective devices, instead
It, then be judged as mistake;
S52: checking GOOSE information flow direction, when the information flow direction of backup auto-activating device and other protective devices meets the requirement of table 4
When, then it is judged as correct, conversely, being then judged as mistake;
GOOSE information flow direction table between 4 110kV backup auto-activating device of table and other protective devices
。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811643316.7A CN109800481B (en) | 2018-12-29 | 2018-12-29 | Method for checking correctness of secondary virtual loop of 110kV backup power automatic switching SCD (substation configuration description) file of intelligent substation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811643316.7A CN109800481B (en) | 2018-12-29 | 2018-12-29 | Method for checking correctness of secondary virtual loop of 110kV backup power automatic switching SCD (substation configuration description) file of intelligent substation |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109800481A true CN109800481A (en) | 2019-05-24 |
CN109800481B CN109800481B (en) | 2023-04-07 |
Family
ID=66558321
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811643316.7A Active CN109800481B (en) | 2018-12-29 | 2018-12-29 | Method for checking correctness of secondary virtual loop of 110kV backup power automatic switching SCD (substation configuration description) file of intelligent substation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109800481B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110571808A (en) * | 2019-10-25 | 2019-12-13 | 广东电网有限责任公司 | Remote spare power automatic switching line association setting verification method and spare power automatic switching device |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102879662A (en) * | 2011-09-15 | 2013-01-16 | 湖北省电力公司电力科学研究院 | Device and method for detecting secondary virtual loop of intelligent transformer substation |
CN103593742A (en) * | 2013-11-29 | 2014-02-19 | 国家电网公司 | Secondary circuit configuration controlling method and system for intelligent substation |
CN104426757A (en) * | 2013-09-09 | 2015-03-18 | 贵州电网公司六盘水供电局 | Special data interaction method and device for intelligent substation |
CN104617670A (en) * | 2015-02-05 | 2015-05-13 | 贵州电网公司六盘水供电局 | Method for detecting virtual secondary circuit of intelligent substation |
CN104715035A (en) * | 2015-03-17 | 2015-06-17 | 广东电网有限责任公司电力调度控制中心 | Checking method and device for correctness of virtual terminator association configuration of intelligent substation |
CN104868596A (en) * | 2015-05-19 | 2015-08-26 | 中国南方电网有限责任公司 | Method for rapid positioning variation influence scope of secondary virtual loop of intelligent transformer station |
CN204732970U (en) * | 2015-07-08 | 2015-10-28 | 贵州电网公司六盘水供电局 | A kind of intelligent substation virtual secondary circuit checkout gear |
CN105242164A (en) * | 2015-08-21 | 2016-01-13 | 国电南瑞科技股份有限公司 | Automatic detection system and method of secondary virtual loop of intelligent transformer station |
CN106445718A (en) * | 2016-09-23 | 2017-02-22 | 国网江苏省电力公司 | Automatic checking method for SCD file virtual loop |
-
2018
- 2018-12-29 CN CN201811643316.7A patent/CN109800481B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102879662A (en) * | 2011-09-15 | 2013-01-16 | 湖北省电力公司电力科学研究院 | Device and method for detecting secondary virtual loop of intelligent transformer substation |
CN104426757A (en) * | 2013-09-09 | 2015-03-18 | 贵州电网公司六盘水供电局 | Special data interaction method and device for intelligent substation |
CN103593742A (en) * | 2013-11-29 | 2014-02-19 | 国家电网公司 | Secondary circuit configuration controlling method and system for intelligent substation |
CN104617670A (en) * | 2015-02-05 | 2015-05-13 | 贵州电网公司六盘水供电局 | Method for detecting virtual secondary circuit of intelligent substation |
CN104715035A (en) * | 2015-03-17 | 2015-06-17 | 广东电网有限责任公司电力调度控制中心 | Checking method and device for correctness of virtual terminator association configuration of intelligent substation |
CN104868596A (en) * | 2015-05-19 | 2015-08-26 | 中国南方电网有限责任公司 | Method for rapid positioning variation influence scope of secondary virtual loop of intelligent transformer station |
CN204732970U (en) * | 2015-07-08 | 2015-10-28 | 贵州电网公司六盘水供电局 | A kind of intelligent substation virtual secondary circuit checkout gear |
CN105242164A (en) * | 2015-08-21 | 2016-01-13 | 国电南瑞科技股份有限公司 | Automatic detection system and method of secondary virtual loop of intelligent transformer station |
CN106445718A (en) * | 2016-09-23 | 2017-02-22 | 国网江苏省电力公司 | Automatic checking method for SCD file virtual loop |
Non-Patent Citations (8)
Title |
---|
LIU HONGJUN等: "Solutions to Support Smart Substation Project", 《ELECTRICITY》 * |
宁楠: "网络报文记录分析仪在数字化变电站中的应用", 《华电技术》 * |
宁楠等: "SV/GOOSE合并组网继电保护测试数据交互方法", 《机械与电子》 * |
王冬霞等: "智能变电站二次虚回路运行维护管理系统的设计与实现", 《华电技术》 * |
肖永立等: "智能变电站配置文件全过程校核方法研究", 《电工技术》 * |
蔡玉朋等: "基于智能变电站SCD文件的二次虚回路的检测方案及应用", 《电气应用》 * |
赵晓东等: "智能变电站虚拟二次回路在线监测设计", 《科技风》 * |
马恒等: "基于SCD文件的智能变电站自动化配置通信设备应用研究", 《电力信息与通信技术》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110571808A (en) * | 2019-10-25 | 2019-12-13 | 广东电网有限责任公司 | Remote spare power automatic switching line association setting verification method and spare power automatic switching device |
CN110571808B (en) * | 2019-10-25 | 2021-09-14 | 广东电网有限责任公司 | Remote spare power automatic switching line association setting verification method and spare power automatic switching device |
Also Published As
Publication number | Publication date |
---|---|
CN109800481B (en) | 2023-04-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106169740B (en) | 110kV single-trunk segmental wiring incoming relay-protections are latched prepared auto restart relay protecting method | |
CN104715035B (en) | Checking method and device for correctness of virtual terminator association configuration of intelligent substation | |
CN101425682B (en) | Electric grid relay protection constant value on-line check integrated data processing method | |
CN100442623C (en) | Protecting method for short-circuit between wire coils of parallel reactor of ultrahigh voltage transmission line | |
CN101860007B (en) | Remote intelligent residual current monitoring and protection system | |
CN101673965A (en) | Automatic switching control method for wide-area emergency power source of electric power system | |
CN101917064A (en) | Back-up protection processing method of digital substation transformer based on GOOSE mode | |
CN112234587B (en) | Method and system for checking and evaluating relay protection setting value of power distribution network | |
CN111582702A (en) | Power grid risk assessment method based on weather factors | |
CN105119251A (en) | Method suitable for determining grounding resistance scheme of flexible direct-current power distribution system | |
CN109980616A (en) | The guard method of 110kV single-trunk segmental wiring integration protective device | |
CN109800481A (en) | A kind of method of intelligent substation 110kV prepared auto restart SCD file Quadratic Imaginary circuit Correctness checking | |
Chaves et al. | Development of an Automated Distribution Grid With the Application of New Technologies | |
CN105024356A (en) | Ratio braking type protection method for bus with voltage class of 35 kV or below | |
CN109784699A (en) | A kind of method of intelligent substation 110kV line segregation SCD file Correctness checking | |
CN109800970A (en) | A kind of method of intelligent substation 110kV bus interval SCD file Quadratic Imaginary circuit Correctness checking | |
CN106469905A (en) | Distribution network protection method based on distribution " three lines of defence " | |
CN110489729A (en) | The automatic switching method and system of disaster-ridden kind of the power grid of D5000-matpower coupling cascading failure model | |
CN106099869B (en) | A kind of intelligent substation integrated protection computational methods with fault freedom | |
CN113889985B (en) | Relay protection system of diamond type power grid | |
CN109193608A (en) | A kind of capacitance-resistance type blended learning suitable for DC grid | |
CN201860172U (en) | Automatic looped network type distribution network based on reclosers | |
CN113013877B (en) | Method for providing loop closing and transferring between 35kV lines under phase difference condition | |
CN104753171B (en) | Determine the method for 220/110 kilovolt of electromagnetic looped network operational mode | |
CN207069699U (en) | A kind of hard pressing plate Long-Range Surveillance Unit of transforming plant protecting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |