CN109800481A - A kind of method of intelligent substation 110kV prepared auto restart SCD file Quadratic Imaginary circuit Correctness checking - Google Patents

A kind of method of intelligent substation 110kV prepared auto restart SCD file Quadratic Imaginary circuit Correctness checking Download PDF

Info

Publication number
CN109800481A
CN109800481A CN201811643316.7A CN201811643316A CN109800481A CN 109800481 A CN109800481 A CN 109800481A CN 201811643316 A CN201811643316 A CN 201811643316A CN 109800481 A CN109800481 A CN 109800481A
Authority
CN
China
Prior art keywords
flow direction
activating device
judged
information flow
route
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811643316.7A
Other languages
Chinese (zh)
Other versions
CN109800481B (en
Inventor
宗志亚
宁楠
杨鹏
戴堃
杨旭
杜林�
李玉芬
燕候智
狄睿
王师国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Power Grid Co Ltd
Original Assignee
Guizhou Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Power Grid Co Ltd filed Critical Guizhou Power Grid Co Ltd
Priority to CN201811643316.7A priority Critical patent/CN109800481B/en
Publication of CN109800481A publication Critical patent/CN109800481A/en
Application granted granted Critical
Publication of CN109800481B publication Critical patent/CN109800481B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The present invention relates to a kind of methods of intelligent substation 110kV prepared auto restart SCD file Quadratic Imaginary circuit Correctness checking, belong to electric power network field.Method includes the following steps: method includes the following steps: checking the integrality of configuration;Check SV, GOOSE information flow direction correctness;Check the information between prepared auto restart and route, bus combining unit;Check the information between backup auto-activating device and intelligent terminal;Check the information between backup auto-activating device and other protective devices;When being respectively completed inspection and all correct result according to step 3 to step 5, judge that the 110kV backup auto-activating device SCD file Quadratic Imaginary circuit is correct.Method of the invention makes to check that 110kV prepared auto restart SCD file Quadratic Imaginary circuit correctness reaches standardization and standardization, relieves the hidden danger of electric power netting safe running.

Description

A kind of intelligent substation 110kV prepared auto restart SCD file Quadratic Imaginary circuit Correctness checking Method
Technical field
The invention belongs to electric power network fields, are related to a kind of intelligent substation 110kV prepared auto restart SCD file Quadratic Imaginary circuit The method of Correctness checking.
Background technique
Intelligent Substation System configuration file (SCD) abbreviation whole station system configuration file, describes the exemplary configuration of all IED Communication configuration and transforming plant primary system structure between messaging parameter, IED, wherein exemplary configuration, i.e. Quadratic Imaginary circuit, It is the core of configuration file including Current Voltage channel, closing loop, signal circuit and alarm signal etc., SCD file is secondary The correctness of empty loop configuration is particularly significant for the safe operation of substation.
Currently, this document is usually completed by designing unit and system integration manufacturer, lacks unified technical method and check SCD The correctness in file secondary void circuit brings difficulty to intelligent substation 110kV line segregation O&M, enlarging etc., pacifies to power grid Row for the national games leaves hidden danger.
For above-mentioned Current Situation, a kind of inspection 110kV backup auto-activating device SCD file Quadratic Imaginary circuit correctness need to be studied Method, make its standardize and standardization.
Summary of the invention
In view of this, the purpose of the present invention is to provide a kind of intelligent substation 110kV prepared auto restart SCD file Quadratic Imaginaries to return The method of road Correctness checking.
In order to achieve the above objectives, the invention provides the following technical scheme:
A kind of method of intelligent substation 110kV prepared auto restart SCD file Quadratic Imaginary circuit Correctness checking, this method include Following steps:
Step 1: checking the integrality of configuration;
Step 2: checking SV, GOOSE information flow direction correctness;
Step 3: checking the information between prepared auto restart and route, bus combining unit;
Step 4: checking the information between backup auto-activating device and intelligent terminal;
Step 5: checking the information between backup auto-activating device and other protective devices;
Step 6: judging the 110kV prepared auto restart when being respectively completed inspection and all correct result according to step 3 to step 5 Device SCD file Quadratic Imaginary circuit is correct.
Further, the step 1 specifically: check to include prepared auto restart, combining unit, intelligent terminal, if lacking any intelligence Energy electronic equipment IED, then be judged as mistake, conversely, being then judged as correct.
Further, the step 2 specifically: the input/output information flow direction of SV, GOOSE need correct, root between each IED According to the mutual logical relation between backup auto-activating device, combining unit and intelligent terminal, is checked and judged respectively.
Further, the step 3 specifically:
S31: SV information flow direction is checked;When the information flow direction of backup auto-activating device and route, bus combining unit meet table 1 and When the requirement of table 2, then it is judged as correct, conversely, being then judged as mistake;
SV information flow direction table between 1 110kV backup auto-activating device of table and route combining unit
Route combining unit, i.e. transmitting terminal Backup power automatic switching protection device, i.e. receiving end
Specified delay Specified delay
Protect A phase current 1 XX route protection A phase current 1
Protect A phase current 2 XX route protection A phase current 2
Protect B phase current 1 XX route protection B phase current 1
Protect B phase current 2 XX route protection B phase current 2
Protect C phase current 1 XX route protection C phase current 1
Protect C phase current 2 XX route protection C phase current 2
Route extracts voltage 1 XX route line voltage distribution 1
Route extracts voltage 2 XX route line voltage distribution 2
SV information flow direction table between 2 110kV backup auto-activating device of table and bus combining unit
Bus combining unit, i.e. transmitting terminal Backup power automatic switching protection device, i.e. receiving end
Specified delay Specified delay
Mother I protects A phase voltage 1, that is, after switching Mother I protects A phase voltage 1
Mother I protects A phase voltage 2, that is, after switching Mother I protects A phase voltage 2
Mother I protects B phase voltage 1, that is, after switching Mother I protects B phase voltage 1
Mother I protects B phase voltage 2, that is, after switching Mother I protects B phase voltage 2
Mother I protects C phase voltage 1, that is, after switching Mother I protects C phase voltage 1
Mother I protects C phase voltage 2, that is, after switching Mother I protects C phase voltage 2
Mother II protects A phase voltage 1, that is, after switching Mother II protects A phase voltage 1
Mother II protects A phase voltage 2, that is, after switching Mother II protects A phase voltage 2
Mother II protects B phase voltage 1, that is, after switching Mother II protects B phase voltage 1
Mother II protects B phase voltage 2, that is, after switching Mother II protects B phase voltage 2
Mother II protects C phase voltage 1, that is, after switching Mother II protects C phase voltage 1
Mother II protects C phase voltage 2, that is, after switching Mother II protects C phase voltage 2
S32: checking GOOSE information flow direction, believes between backup auto-activating device and route, bus combining unit without GOOSE when working as Breath is then judged as correct, conversely, being then judged as mistake.
Further, the step 4 specifically:
S41: checking SV information flow direction, correct when without SV information, being then judged as between backup auto-activating device and intelligent terminal, instead It, then be judged as mistake;
S42: GOOSE information flow direction is checked;When the information flow direction of backup auto-activating device and intelligent terminal, which meets table 3, to be required, Then it is judged as correct, conversely, being then judged as mistake;
GOOSE information flow direction table between 3 110kV backup auto-activating device of table and intelligent terminal
Route/segmentation intelligent terminal, i.e. transmitting terminal Backup power automatic switching protection device, i.e. receiving end
Circuit breaker position is two point XX breaker jump position open into
STJ signal XX breaker hand separately enters
Backup auto-activating device, i.e. transmitting terminal Route/segmentation intelligent terminal, i.e. receiving end
Jump XX breaker Circuit breaker trip TJR
Close XX breaker Breaker closing
Further, the step 5 specifically:
S51: checking SV information flow direction, when without SV information, then judgement is positive between backup auto-activating device and other protective devices Really, conversely, being then judged as mistake;
S52: GOOSE information flow direction is checked, when the information flow direction of backup auto-activating device and other protective devices meets wanting for table 4 When asking, then it is judged as correct, conversely, being then judged as mistake;
GOOSE information flow direction table between 4 110kV backup auto-activating device of table and other protective devices
Busbar protective device, i.e. transmitting terminal Line protective devices, i.e. receiving end
Jump XX line-breaker Lock-reclosing lock is outputed
Busbar protective device, i.e. transmitting terminal Backup auto-activating device, i.e. receiving end
Jump XX line-breaker Locking prepared auto restart open into
Close section switch Locking prepared auto restart open into
The beneficial effects of the present invention are: method of the invention makes checking 110kV prepared auto restart SCD file Quadratic Imaginary circuit just True property reaches standardization and standardization, relieves the hidden danger of electric power netting safe running.
Detailed description of the invention
In order to keep the purpose of the present invention, technical scheme and beneficial effects clearer, the present invention provides following attached drawing and carries out Illustrate:
Fig. 1 SV information flow direction schematic diagram between 110kV backup auto-activating device and route combining unit;
Fig. 2 SV information flow direction schematic diagram between 110kV backup auto-activating device and bus combining unit;
Fig. 3 GOOSE information flow direction schematic diagram between 110kV backup auto-activating device and intelligent terminal;
Fig. 4 GOOSE information flow direction schematic diagram between 110kV backup auto-activating device and other protective devices.
Specific embodiment
Below in conjunction with attached drawing, a preferred embodiment of the present invention will be described in detail.
The invention proposes a kind of sides of intelligent substation 110kV prepared auto restart SCD file Quadratic Imaginary circuit Correctness checking Method, implementation method the following steps are included:
To achieve the goals above, the invention proposes a kind of intelligent substation 110kV backup auto-activating device SCD file is secondary The method of empty circuit Correctness checking, implementation method the following steps are included:
Step 1: checking the integrality of configuration.It should include prepared auto restart, combining unit, intelligent terminal, if lacking any IED, Then it is judged as mistake, conversely, correctly.
Step 2: checking SV, GOOSE information flow direction correctness.The input/output information flow of SV, GOOSE between each IED It is correct to answering, according to the mutual logical relation between backup auto-activating device, combining unit and intelligent terminal, it be checked and be sentenced respectively It is disconnected.
Step 3: checking the information between prepared auto restart and route, bus combining unit.
(1) SV information flow direction, as shown in Figure 1, 2.When the information flow direction of backup auto-activating device and route, bus combining unit accords with When closing claimed below, then it is judged as correct, conversely, mistake.
(2) without GOOSE information between GOOSE information flow direction, backup auto-activating device and route, bus combining unit.When for certainly It throws between device and route, bus combining unit without GOOSE information, is then judged as correct, conversely, mistake.
Step 4: checking the information between backup auto-activating device and intelligent terminal.
(1) SV information flow direction, without SV information between backup auto-activating device and intelligent terminal.When backup auto-activating device and intelligent terminal Between without SV information, then be judged as correct, conversely, mistake.
(2) GOOSE information flow direction, as shown in Figure 3.When the information flow direction of backup auto-activating device and intelligent terminal meets following want When asking, then it is judged as correct, conversely, mistake.
Step 5: checking the information between backup auto-activating device and other protective devices.
(1) SV information flow direction, without SV information between backup auto-activating device and other protective devices.When backup auto-activating device and other Without SV information between protective device, then it is judged as correct, conversely, mistake.
(2) GOOSE information flow direction, as shown in Figure 4.When the information flow direction of backup auto-activating device and other protective devices meet with Under when requiring, then be judged as correct, conversely, mistake.
Step 6: when being respectively completed inspection and all correct result according to step 3 to step 5 the method, it can be determined that The 110kV backup auto-activating device SCD file Quadratic Imaginary circuit is correct.
Finally, it is stated that preferred embodiment above is only used to illustrate the technical scheme of the present invention and not to limit it, although logical It crosses above preferred embodiment the present invention is described in detail, however, those skilled in the art should understand that, can be Various changes are made to it in form and in details, without departing from claims of the present invention limited range.

Claims (6)

1. a kind of method of intelligent substation 110kV prepared auto restart SCD file Quadratic Imaginary circuit Correctness checking, it is characterised in that: Method includes the following steps:
Step 1: checking the integrality of configuration;
Step 2: checking SV, GOOSE information flow direction correctness;
Step 3: checking the information between prepared auto restart and route, bus combining unit;
Step 4: checking the information between backup auto-activating device and intelligent terminal;
Step 5: checking the information between backup auto-activating device and other protective devices;
Step 6: judging the 110kV backup auto-activating device when being respectively completed inspection and all correct result according to step 3 to step 5 SCD file Quadratic Imaginary circuit is correct.
2. a kind of intelligent substation 110kV prepared auto restart SCD file Quadratic Imaginary circuit Correctness checking according to claim 1 Method, it is characterised in that: the step 1 specifically: check include prepared auto restart, combining unit, intelligent terminal, if lack appoint One intelligent electronic device IED, then be judged as mistake, conversely, being then judged as correct.
3. a kind of intelligent substation 110kV prepared auto restart SCD file Quadratic Imaginary circuit Correctness checking according to claim 1 Method, it is characterised in that: the step 2 specifically: between each IED SV, GOOSE input/output information flow direction need just Really, it according to the mutual logical relation between backup auto-activating device, combining unit and intelligent terminal, is checked and is judged respectively.
4. a kind of intelligent substation 110kV prepared auto restart SCD file Quadratic Imaginary circuit Correctness checking according to claim 1 Method, it is characterised in that: the step 3 specifically:
S31: SV information flow direction is checked;When the information flow direction of backup auto-activating device and route, bus combining unit meets Tables 1 and 2 Requirement when, then be judged as correct, conversely, being then judged as mistake;
SV information flow direction table between 1 110kV backup auto-activating device of table and route combining unit
Route combining unit, i.e. transmitting terminal Backup power automatic switching protection device, i.e. receiving end Specified delay Specified delay Protect A phase current 1 XX route protection A phase current 1 Protect A phase current 2 XX route protection A phase current 2 Protect B phase current 1 XX route protection B phase current 1 Protect B phase current 2 XX route protection B phase current 2 Protect C phase current 1 XX route protection C phase current 1 Protect C phase current 2 XX route protection C phase current 2 Route extracts voltage 1 XX route line voltage distribution 1 Route extracts voltage 2 XX route line voltage distribution 2
SV information flow direction table between 2 110kV backup auto-activating device of table and bus combining unit
S32: check GOOSE information flow direction, when between backup auto-activating device and route, bus combining unit without GOOSE information, then It is judged as correct, conversely, being then judged as mistake.
5. a kind of intelligent substation 110kV prepared auto restart SCD file Quadratic Imaginary circuit Correctness checking according to claim 1 Method, it is characterised in that: the step 4 specifically:
S41: checking SV information flow direction, correct when without SV information, being then judged as between backup auto-activating device and intelligent terminal, conversely, Then it is judged as mistake;
S42: GOOSE information flow direction is checked;When the information flow direction of backup auto-activating device and intelligent terminal, which meets table 3, to be required, then sentence Break to be correct, conversely, being then judged as mistake;
GOOSE information flow direction table between 3 110kV backup auto-activating device of table and intelligent terminal
6. a kind of intelligent substation 110kV prepared auto restart SCD file Quadratic Imaginary circuit Correctness checking according to claim 1 Method, it is characterised in that: the step 5 specifically:
S51: checking SV information flow direction, correct when without SV information, being then judged as between backup auto-activating device and other protective devices, instead It, then be judged as mistake;
S52: checking GOOSE information flow direction, when the information flow direction of backup auto-activating device and other protective devices meets the requirement of table 4 When, then it is judged as correct, conversely, being then judged as mistake;
GOOSE information flow direction table between 4 110kV backup auto-activating device of table and other protective devices
Busbar protective device, i.e. transmitting terminal Line protective devices, i.e. receiving end Jump XX line-breaker Lock-reclosing lock is outputed Busbar protective device, i.e. transmitting terminal Backup auto-activating device, i.e. receiving end Jump XX line-breaker Locking prepared auto restart open into Close section switch Locking prepared auto restart open into
CN201811643316.7A 2018-12-29 2018-12-29 Method for checking correctness of secondary virtual loop of 110kV backup power automatic switching SCD (substation configuration description) file of intelligent substation Active CN109800481B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811643316.7A CN109800481B (en) 2018-12-29 2018-12-29 Method for checking correctness of secondary virtual loop of 110kV backup power automatic switching SCD (substation configuration description) file of intelligent substation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811643316.7A CN109800481B (en) 2018-12-29 2018-12-29 Method for checking correctness of secondary virtual loop of 110kV backup power automatic switching SCD (substation configuration description) file of intelligent substation

Publications (2)

Publication Number Publication Date
CN109800481A true CN109800481A (en) 2019-05-24
CN109800481B CN109800481B (en) 2023-04-07

Family

ID=66558321

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811643316.7A Active CN109800481B (en) 2018-12-29 2018-12-29 Method for checking correctness of secondary virtual loop of 110kV backup power automatic switching SCD (substation configuration description) file of intelligent substation

Country Status (1)

Country Link
CN (1) CN109800481B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110571808A (en) * 2019-10-25 2019-12-13 广东电网有限责任公司 Remote spare power automatic switching line association setting verification method and spare power automatic switching device

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102879662A (en) * 2011-09-15 2013-01-16 湖北省电力公司电力科学研究院 Device and method for detecting secondary virtual loop of intelligent transformer substation
CN103593742A (en) * 2013-11-29 2014-02-19 国家电网公司 Secondary circuit configuration controlling method and system for intelligent substation
CN104426757A (en) * 2013-09-09 2015-03-18 贵州电网公司六盘水供电局 Special data interaction method and device for intelligent substation
CN104617670A (en) * 2015-02-05 2015-05-13 贵州电网公司六盘水供电局 Method for detecting virtual secondary circuit of intelligent substation
CN104715035A (en) * 2015-03-17 2015-06-17 广东电网有限责任公司电力调度控制中心 Checking method and device for correctness of virtual terminator association configuration of intelligent substation
CN104868596A (en) * 2015-05-19 2015-08-26 中国南方电网有限责任公司 Method for rapid positioning variation influence scope of secondary virtual loop of intelligent transformer station
CN204732970U (en) * 2015-07-08 2015-10-28 贵州电网公司六盘水供电局 A kind of intelligent substation virtual secondary circuit checkout gear
CN105242164A (en) * 2015-08-21 2016-01-13 国电南瑞科技股份有限公司 Automatic detection system and method of secondary virtual loop of intelligent transformer station
CN106445718A (en) * 2016-09-23 2017-02-22 国网江苏省电力公司 Automatic checking method for SCD file virtual loop

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102879662A (en) * 2011-09-15 2013-01-16 湖北省电力公司电力科学研究院 Device and method for detecting secondary virtual loop of intelligent transformer substation
CN104426757A (en) * 2013-09-09 2015-03-18 贵州电网公司六盘水供电局 Special data interaction method and device for intelligent substation
CN103593742A (en) * 2013-11-29 2014-02-19 国家电网公司 Secondary circuit configuration controlling method and system for intelligent substation
CN104617670A (en) * 2015-02-05 2015-05-13 贵州电网公司六盘水供电局 Method for detecting virtual secondary circuit of intelligent substation
CN104715035A (en) * 2015-03-17 2015-06-17 广东电网有限责任公司电力调度控制中心 Checking method and device for correctness of virtual terminator association configuration of intelligent substation
CN104868596A (en) * 2015-05-19 2015-08-26 中国南方电网有限责任公司 Method for rapid positioning variation influence scope of secondary virtual loop of intelligent transformer station
CN204732970U (en) * 2015-07-08 2015-10-28 贵州电网公司六盘水供电局 A kind of intelligent substation virtual secondary circuit checkout gear
CN105242164A (en) * 2015-08-21 2016-01-13 国电南瑞科技股份有限公司 Automatic detection system and method of secondary virtual loop of intelligent transformer station
CN106445718A (en) * 2016-09-23 2017-02-22 国网江苏省电力公司 Automatic checking method for SCD file virtual loop

Non-Patent Citations (8)

* Cited by examiner, † Cited by third party
Title
LIU HONGJUN等: "Solutions to Support Smart Substation Project", 《ELECTRICITY》 *
宁楠: "网络报文记录分析仪在数字化变电站中的应用", 《华电技术》 *
宁楠等: "SV/GOOSE合并组网继电保护测试数据交互方法", 《机械与电子》 *
王冬霞等: "智能变电站二次虚回路运行维护管理系统的设计与实现", 《华电技术》 *
肖永立等: "智能变电站配置文件全过程校核方法研究", 《电工技术》 *
蔡玉朋等: "基于智能变电站SCD文件的二次虚回路的检测方案及应用", 《电气应用》 *
赵晓东等: "智能变电站虚拟二次回路在线监测设计", 《科技风》 *
马恒等: "基于SCD文件的智能变电站自动化配置通信设备应用研究", 《电力信息与通信技术》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110571808A (en) * 2019-10-25 2019-12-13 广东电网有限责任公司 Remote spare power automatic switching line association setting verification method and spare power automatic switching device
CN110571808B (en) * 2019-10-25 2021-09-14 广东电网有限责任公司 Remote spare power automatic switching line association setting verification method and spare power automatic switching device

Also Published As

Publication number Publication date
CN109800481B (en) 2023-04-07

Similar Documents

Publication Publication Date Title
CN106169740B (en) 110kV single-trunk segmental wiring incoming relay-protections are latched prepared auto restart relay protecting method
CN104715035B (en) Checking method and device for correctness of virtual terminator association configuration of intelligent substation
CN101425682B (en) Electric grid relay protection constant value on-line check integrated data processing method
CN100442623C (en) Protecting method for short-circuit between wire coils of parallel reactor of ultrahigh voltage transmission line
CN101860007B (en) Remote intelligent residual current monitoring and protection system
CN101673965A (en) Automatic switching control method for wide-area emergency power source of electric power system
CN101917064A (en) Back-up protection processing method of digital substation transformer based on GOOSE mode
CN112234587B (en) Method and system for checking and evaluating relay protection setting value of power distribution network
CN111582702A (en) Power grid risk assessment method based on weather factors
CN105119251A (en) Method suitable for determining grounding resistance scheme of flexible direct-current power distribution system
CN109980616A (en) The guard method of 110kV single-trunk segmental wiring integration protective device
CN109800481A (en) A kind of method of intelligent substation 110kV prepared auto restart SCD file Quadratic Imaginary circuit Correctness checking
Chaves et al. Development of an Automated Distribution Grid With the Application of New Technologies
CN105024356A (en) Ratio braking type protection method for bus with voltage class of 35 kV or below
CN109784699A (en) A kind of method of intelligent substation 110kV line segregation SCD file Correctness checking
CN109800970A (en) A kind of method of intelligent substation 110kV bus interval SCD file Quadratic Imaginary circuit Correctness checking
CN106469905A (en) Distribution network protection method based on distribution " three lines of defence "
CN110489729A (en) The automatic switching method and system of disaster-ridden kind of the power grid of D5000-matpower coupling cascading failure model
CN106099869B (en) A kind of intelligent substation integrated protection computational methods with fault freedom
CN113889985B (en) Relay protection system of diamond type power grid
CN109193608A (en) A kind of capacitance-resistance type blended learning suitable for DC grid
CN201860172U (en) Automatic looped network type distribution network based on reclosers
CN113013877B (en) Method for providing loop closing and transferring between 35kV lines under phase difference condition
CN104753171B (en) Determine the method for 220/110 kilovolt of electromagnetic looped network operational mode
CN207069699U (en) A kind of hard pressing plate Long-Range Surveillance Unit of transforming plant protecting

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant