CN109797894A - A kind of vertical gradual change angle unit curtain wall system of Super High - Google Patents

A kind of vertical gradual change angle unit curtain wall system of Super High Download PDF

Info

Publication number
CN109797894A
CN109797894A CN201910185287.2A CN201910185287A CN109797894A CN 109797894 A CN109797894 A CN 109797894A CN 201910185287 A CN201910185287 A CN 201910185287A CN 109797894 A CN109797894 A CN 109797894A
Authority
CN
China
Prior art keywords
unit
curtain wall
profile
vertical
angle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910185287.2A
Other languages
Chinese (zh)
Other versions
CN109797894B (en
Inventor
杨坤
叶聪
王华清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUHAN LINGYUN ARCHITECTURAL DECORATION ENGINEERING Co Ltd
Original Assignee
WUHAN LINGYUN ARCHITECTURAL DECORATION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUHAN LINGYUN ARCHITECTURAL DECORATION ENGINEERING Co Ltd filed Critical WUHAN LINGYUN ARCHITECTURAL DECORATION ENGINEERING Co Ltd
Priority to CN201910185287.2A priority Critical patent/CN109797894B/en
Publication of CN109797894A publication Critical patent/CN109797894A/en
Application granted granted Critical
Publication of CN109797894B publication Critical patent/CN109797894B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/24Structural elements or technologies for improving thermal insulation
    • Y02A30/244Structural elements or technologies for improving thermal insulation using natural or recycled building materials, e.g. straw, wool, clay or used tires

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The embodiment of the invention discloses a kind of vertical gradual change angle unit curtain wall systems of Super High, including multilevel-cell curtain wall, cell curtain wall includes galvanized steel plain sheet, its surface is equipped with fire prevention rock wool and heat preservation rock, the surface of fire prevention rock wool and heat preservation rock is provided with aluminium backboard, horizontal profile and unit Lower transverse section on unit are separately installed at the top and bottom of galvanized steel plain sheet and aluminium backboard, there are two unit transom profiles for the middle part surface interval installation of aluminium backboard, ox horn pedestal section is installed between two unit transom profiles, the surface of ox horn pedestal section is installed by ox horn moulding profile, unit transom profile is fixed on the vertical male material of unit and the vertical parent form material of unit, the vertical male material of unit and the vertical parent form material of unit are connect with steel hanging seat, galvanized steel plain sheet and steel hanging seat are connect with construction wall.The vertical gradual change angle unit curtain wall system of Super High of the invention solves cell curtain wall assembling, the installation adaptability problem of various different angles using standard block system.

Description

A kind of vertical gradual change angle unit curtain wall system of Super High
Technical field
The present invention relates to vertical gradual change angle curtain wall field more particularly to a kind of vertical gradual change angle cell curtain walls of Super High System.
Background technique
Diverse designs or desirability during building high-rise, because of building, it is sometimes desirable to will surpass High-rise curtain wall system builds into the inconsistent gradual change moulding of lower angle, this moulding is not only adapted to the needs of every floor, And it is beautiful and generous, but because each floor alien invasion curtain wall angle is different when building, cause that the assembly process is complicated, installation effectiveness is low Under, and material cost is higher, constructional difficulties.
Therefore, it is necessary to propose a kind of vertical gradual change angle unit curtain wall system of standardized Super High, it is above-mentioned to overcome Disadvantage.
Summary of the invention
The technical problem to be solved by the embodiment of the invention is that causing group for the curtain wall system for building gradual change moulding The problem of dress complex process, installation effectiveness is low, and material cost is higher, constructional difficulties, it is vertical to propose a kind of Super High Gradual change angle unit curtain wall system.
In order to solve the above-mentioned technical problem, the embodiment of the invention provides a kind of vertical gradual change angle cell curtain walls of Super High System, the vertical gradual change angle unit curtain wall system of the Super High includes multilevel-cell curtain wall, and cell curtain wall includes galvanized steel plain sheet, Surface is equipped with fire prevention rock wool and heat preservation rock, and the surface of prevent fires rock wool and heat preservation rock is provided with aluminium backboard, galvanized steel plain sheet and Horizontal profile and unit Lower transverse section on unit, the middle part surface interval peace of aluminium backboard are separately installed at the top and bottom of aluminium backboard Dress is horizontal under horizontal profile and unit transom profile, unit transom profile and unit on unit there are two unit transom profile Tempered glass is mounted between profile, the end of tempered glass is individually fixed on unit horizontal by unit transverse gusset plate profile On profile, unit transom profile and unit Lower transverse section, ox horn pedestal section is installed between two unit transom profiles, Ox horn moulding profile is installed on the surface of ox horn pedestal section, and screw is connected to list to two adjacent ox horn pedestal sections of left and right respectively On first transom profile, unit transom profile is fixed on the vertical male material of unit and the vertical parent form material of unit, and unit is vertical Male material and the vertical parent form material plug connection of unit, and the vertical male material of unit and the vertical parent form material of unit are vertical by aluminium alloy Column adapter and aluminium alloy hook are connect with steel hanging seat, and galvanized steel plain sheet and steel hanging seat are connect with construction wall respectively.
Further, multiple rock wool nails are installed in the fire prevention rock wool between aluminium backboard and galvanized steel plain sheet.
Further, multiple backboard reinforcing ribs are installed in the one side of aluminium backboard direction fire prevention rock wool.
Further, steel hanging seat is connect by T-bolt with the construction wall, and the galvanized steel plain sheet passes through stainless steel lag screws It is connect with the construction wall.
Further, connection is mounted on the unit of adjacent cells curtain wall between horizontal profile and unit Lower transverse section, and is connected Locate encapsulation process, and the top and bottom for the adjacent tempered glass that horizontal profile and unit Lower transverse section outside are installed on unit pass through The fastening of unit transverse gusset plate profile.
Further, the angle between cell curtain wall and construction wall has acute angle, right angle and obtuse angle, and angle changing exists Between 81.7 ° to 91.6 °.
Further, the angle determination method of every layer unit curtain wall is as follows: choose specific 4 angles: 85.8 °, 88 °, 90 °, 91.6 °, the die sinking angle as profile horizontal on unit and unit Lower transverse section;The angle for determining vertical curtain wall face is 90 °; The range that 90 ° of < makes 1.1 ° of adaptation angle=of horizontal profile and unit Lower transverse section on unit;The range that 90 ° of > makes every set list 0.8 ° of adaptation angle=of horizontal profile and unit Lower transverse section in member;It determines datum mark, eliminates the nonstandard angle list of above-mentioned determination Horizontal profile and unit Lower transverse section side generates indoors " horizontal departure " in member;Horizontal profile downside and unit transom on unit The mode vertical with glass surface is taken on the upside of profile, and on the downside of unit transom profile then with hang either flush;Interlayer nose of an ox Sub- moulding position, horizontal profile and unit Lower transverse section ensure vertical with glass surface on internal element, and outside ox muzzle moulding Main system is then corresponded to using four kinds of different angle die sinkings, reduces the outdoor collimation error.
Further, it is the vision height difference for avoiding horizontal profile and unit Lower transverse section and windowsill on unit, considers curtain wall Horizontal profile and unit Lower transverse section and indoor window platen join on unit, select horizontal material tail point as datum mark.
The implementation of the embodiments of the present invention has the following beneficial effects: the vertical gradual change angle cell curtain wall of Super High of the invention System is solved cell curtain wall assembling, the installation adaptability problem of various different angles using standard block system, not only reduced Die sinking quantity, improves processing, packaging efficiency, and economic benefit is obvious.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with It obtains other drawings based on these drawings.
Fig. 1 is that a kind of exterior walls of buildings structure of the vertical gradual change angle unit curtain wall system of Super High provided by the invention is shown It is intended to;
Fig. 2 be cell curtain wall angle in Fig. 1 less than 90 degree when perpendicular cut open node structure schematic diagram;
Fig. 3 is that perpendicular when cell curtain wall angle in Fig. 1 is equal to 90 degree cuts open node structure schematic diagram;
Fig. 4 is the cross-sectional node structure schematic diagram of the cell curtain wall in Fig. 3;
Fig. 5 is that perpendicular when cell curtain wall angle in Fig. 1 is greater than 90 degree cuts open node structure schematic diagram;
Fig. 6 is the schematic diagram for eliminating the nonstandard horizontal material of the angle horizontal departure that side generates indoors;
Fig. 7 is the schematic diagram for selecting horizontal material tail point as datum mark;
Fig. 8 is schematic diagram vertical with glass surface on the downside of horizontal profile and on the upside of unit Lower transverse section on unit;
Fig. 9 is the schematic diagram of four kinds of angles die sinking mode of ox horn moulding profile.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Referring to Figure 1, Fig. 2, Fig. 3, Fig. 4 and Fig. 5, Fig. 1 are the vertical gradual change angles of a kind of Super High provided by the invention The exterior walls of buildings structural schematic diagram of unit curtain wall system;Fig. 2 be cell curtain wall angle in Fig. 1 less than 90 degree when perpendicular cut open section Point structure schematic diagram;Fig. 3 is that perpendicular when cell curtain wall angle in Fig. 1 is equal to 90 degree cuts open node structure schematic diagram;Fig. 4 is Fig. 3 In cell curtain wall cross-sectional node structure schematic diagram;Fig. 5 is that perpendicular when cell curtain wall angle in Fig. 1 is greater than 90 degree cuts open node Structural schematic diagram.
The present invention provides a kind of vertical gradual change angle unit curtain wall system of Super High, the vertical gradual change angle lists of the Super High First curtain wall system includes: cell curtain wall 10, galvanized steel plain sheet 11, fire prevention rock wool 12, aluminium backboard 13, horizontal profile 14, unit on unit Lower transverse section 15, unit transom profile 16, tempered glass 17, unit transverse gusset plate profile 18, ox horn pedestal section 19, ox horn The vertical male material 21 of moulding profile 20, unit, the vertical parent form material 22 of unit, Aluminum alloy column adapter 23, aluminium alloy hook 24, Steel hanging seat 25, rock wool nail 26, backboard reinforcing rib 27, T-bolt 28, stainless steel lag screws 29 and heat preservation rock 33.
The vertical gradual change angle unit curtain wall system of the Super High includes multilevel-cell curtain wall 10, and cell curtain wall 10 includes zinc-plated Steel plate 11, surface are equipped with fire prevention rock wool 12 and heat preservation rock 33, and the surface of prevent fires rock wool 12 and heat preservation rock 33 is provided with Aluminium backboard 13, is equipped with multiple rock wools nail 26 in rock wool 12 of preventing fires, and aluminium backboard 13 is towards being equipped in the one side of fire prevention rock wool 12 Multiple backboard reinforcing ribs 27.The top and bottom of galvanized steel plain sheet 11 and aluminium backboard 13 are separately installed with horizontal profile 14 and list on unit First Lower transverse section 15, the middle part surface interval installation of aluminium backboard 13 is there are two unit transom profile 16, horizontal profile 14 on unit Tempered glass 17, steel are mounted between unit transom profile 16, unit transom profile 16 and unit Lower transverse section 15 The end for changing glass 17 is individually fixed in horizontal profile 14 on unit, unit transom profile 16 by unit transverse gusset plate profile 18 And on unit Lower transverse section 15.
Ox horn pedestal section 19 is installed, ox is installed on the surface of ox horn pedestal section 19 between two unit transom profiles 16 Angle moulding profile 20, screw is connected on unit transom profile 16 two adjacent ox horn pedestal sections 19 of left and right respectively, single First transom profile 16 is fixed on the vertical male material 21 of unit and the vertical parent form material 22 of unit, the vertical male material 21 of unit and list First vertical 22 plug connection of parent form material, and the vertical male material 21 of unit and the vertical parent form material 22 of unit are turned by Aluminum alloy column Fitting 23 and aluminium alloy hook 24 are connect with steel hanging seat 25, and steel hanging seat 25 is connect by T-bolt 28 with construction wall 30, zinc-plated Steel plate 11 is connect by stainless steel lag screws 29 with construction wall 30.
Connection is mounted on the unit of adjacent cells curtain wall 10 between horizontal profile 14 and unit Lower transverse section 15, and junction is close Envelope processing, and the top and bottom for the adjacent tempered glass 17 installed on the outside of horizontal profile 14 and unit Lower transverse section 15 on unit are logical The fastening of unit transverse gusset plate profile 18 is crossed, unit Lower transverse section 15 is fastened by interior decoration buckle 31 and indoor heat insulating layer 32.
Angle between cell curtain wall 10 and construction wall 30 has acute angle, right angle and obtuse angle, and angle changing is arrived at 81.7 ° 91.6 between °.
The angle determination method of every layer unit curtain wall 10 is as follows:
Specific 4 angles: 85.8 °, 88 °, 90 °, 91.6 ° are chosen, as profile horizontal on unit and unit Lower transverse section Die sinking angle;
The angle for determining vertical curtain wall face is 90 °;
90 ° of angle < of range of die sinking makes 1.1 ° of adaptation angle=of horizontal profile and unit Lower transverse section on unit;
90 ° of angle > of range of die sinking makes 0.8 ° of adaptation angle=of horizontal profile and unit Lower transverse section on every set unit;
Determine datum mark, eliminating horizontal profile and unit Lower transverse section in the nonstandard angle-unit of above-mentioned determination, is produced from side indoors Raw " horizontal departure ", refers to Fig. 6.For the vision height difference for avoiding horizontal profile and unit Lower transverse section and windowsill on unit, Consider that horizontal profile and unit Lower transverse section and indoor window platen join on curtain wall unit, selectes horizontal material (horizontal profile and list on unit First Lower transverse section) tail point as datum mark, refers to Fig. 7, from figure 7 it can be seen that the horizontal material using 85.8 ° installs 84.7 ° Floor, 86.9 ° of floor is installed using 88 ° of horizontal material, guarantees that horizontal material tail end is concordant with indoor window platen, horizontal material front end " horizontal departure " is only 3.2mm;
The mode vertical with glass surface is taken on the upside of unit Lower transverse section on the downside of horizontal profile on unit, and it is horizontal in unit On the downside of frame section then with hang either flush, see Fig. 8;
Interlayer ox muzzle moulding position, horizontal profile and unit Lower transverse section ensure vertical with glass surface on internal element, And outside ox muzzle moulding is then corresponded to main system and is opened using four kinds of different angles (85.5 °, 88.0 °, 90.0 degree and 91.5 degree) Mould reduces the outdoor collimation error, sees Fig. 9.
The vertical gradual change angle unit curtain wall system of Super High of the invention, in the base of existing ripeness standard unit curtain wall system On plinth, the horizontal material of several special angles is designed, every horizontal material of set adapts to a certain range of curtain wall inclination angle, it can solve above-mentioned all Problem, and by arrangement and method for construction evaluate, be operationally it is feasible, for occurring more similar units curtain wall in recent years Design provides certain reference value.
Super High of the invention vertical gradual change angle unit curtain wall system will be horizontal under profile horizontal on unit, unit before installation Profile, unit transom profile, tempered glass, unit transverse gusset plate profile, ox horn pedestal section, ox horn moulding profile, unit Vertical male material and the vertical parent form material of unit etc. inside factory overall processing, organize the unit frame of one entirety of frame section, then It is transported to on-site hoisting (mounting with steel hanging seat), lateral interlayer fire prevention iron sheet and fire prevention rock wool are finally installed and blocked.
By the implementation of the embodiments of the present invention has the following beneficial effects: the vertical gradual change angle unit of Super High of the invention Curtain wall system solves cell curtain wall assembling, the installation adaptability problem of various different angles using standard block system, not only Reduce die sinking quantity, improves processing, packaging efficiency, and economic benefit is obvious.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Within mind and principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (8)

1. a kind of vertical gradual change angle unit curtain wall system of Super High, which is characterized in that the vertical gradual change angle list of Super High First curtain wall system includes multilevel-cell curtain wall, and the cell curtain wall includes galvanized steel plain sheet, and surface is equipped with fire prevention rock wool and guarantor The surface of warm rock wool, the fire prevention rock wool and heat preservation rock is provided with aluminium backboard, the top of the galvanized steel plain sheet and the aluminium backboard Portion and bottom are separately installed with horizontal profile and unit Lower transverse section on unit, and the middle part surface interval of the aluminium backboard is equipped with two A unit transom profile, horizontal profile and the unit transom profile, the unit transom profile and institute on the unit It states and is mounted on tempered glass between unit Lower transverse section, the end of the tempered glass is distinguished by unit transverse gusset plate profile It is fixed on horizontal profile on the unit, the unit transom profile and the unit Lower transverse section, two units Ox horn pedestal section is installed, ox horn moulding profile, left and right phase are installed in the surface of the ox horn pedestal section between transom profile Screw is connected on unit transom profile two adjacent ox horn pedestal sections respectively, and the unit transom profile is fixed In on the vertical male material of unit and the vertical parent form material of unit, the vertical male material of unit and the vertical parent form material grafting of the unit Connection, and the vertical male material of the unit and the vertical parent form material of the unit pass through Aluminum alloy column adapter and aluminium alloy is hung Hook is connect with steel hanging seat, and the galvanized steel plain sheet and steel hanging seat are connect with construction wall respectively.
2. the vertical gradual change angle unit curtain wall system of Super High according to claim 1, which is characterized in that the aluminium backboard Multiple rock wool nails are installed in the fire prevention rock wool between the galvanized steel plain sheet.
3. the vertical gradual change angle unit curtain wall system of Super High according to claim 1, which is characterized in that the aluminium backboard Multiple backboard reinforcing ribs are installed on towards the one side of the fire prevention rock wool.
4. the vertical gradual change angle unit curtain wall system of Super High according to claim 1, which is characterized in that the steel hanging seat It is connect by T-bolt with the construction wall, the galvanized steel plain sheet is connect by stainless steel lag screws with the construction wall.
The galvanized steel plain sheet and steel hanging seat are connect by T-bolt and stainless steel lag screws with the construction wall.
5. the vertical gradual change angle unit curtain wall system of Super High according to claim 1, which is characterized in that the adjacent list Connection, and junction encapsulation process are mounted on the unit of first curtain wall between horizontal profile and unit Lower transverse section, and on the unit The top and bottom for the adjacent tempered glass installed on the outside of horizontal profile and the unit Lower transverse section pass through the unit transverse button Profile material fastening.
6. the vertical gradual change angle unit curtain wall system of Super High according to claim 1, which is characterized in that the unit curtain Angle between wall and construction wall has acute angle, right angle and obtuse angle, and angle changing is between 81.7 ° to 91.6 °.
7. the vertical gradual change angle unit curtain wall system of Super High according to claim 6, which is characterized in that every layer of list The angle determination method of first curtain wall is as follows: specific 4 angles: 85.8 °, 88 °, 90 °, 91.6 ° is chosen, as type horizontal on unit The die sinking angle of material and unit Lower transverse section;The angle for determining vertical curtain wall face is 90 °;The range that 90 ° of < makes horizontal type on unit 1.1 ° of adaptation angle=of material and unit Lower transverse section;The range that 90 ° of > makes horizontal profile and unit Lower transverse section on every set unit 0.8 ° of adaptation angle=;It determines datum mark, eliminates horizontal profile and unit Lower transverse section in the nonstandard angle-unit of above-mentioned determination " horizontal departure " that side generates indoors;It takes on the downside of horizontal profile with unit transom profile upside on unit and hangs down with glass surface Straight mode, and on the downside of unit transom profile then with hang either flush;Interlayer ox muzzle moulding position, horizontal type on internal element Material and unit Lower transverse section ensure vertical with glass surface, and outside ox muzzle moulding then corresponds to main system using four kinds of different angles Degree die sinking reduces the outdoor collimation error.
8. the vertical gradual change angle unit curtain wall system of Super High according to claim 7, which is characterized in that avoid unit The vision height difference of upper horizontal profile and unit Lower transverse section and windowsill, consider on curtain wall unit horizontal profile and unit Lower transverse section with The handover of indoor window platen, selectes horizontal material tail point as datum mark.
CN201910185287.2A 2019-03-12 2019-03-12 Vertical gradual change angle unit curtain system of superelevation layer Active CN109797894B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910185287.2A CN109797894B (en) 2019-03-12 2019-03-12 Vertical gradual change angle unit curtain system of superelevation layer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910185287.2A CN109797894B (en) 2019-03-12 2019-03-12 Vertical gradual change angle unit curtain system of superelevation layer

Publications (2)

Publication Number Publication Date
CN109797894A true CN109797894A (en) 2019-05-24
CN109797894B CN109797894B (en) 2021-05-11

Family

ID=66562819

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910185287.2A Active CN109797894B (en) 2019-03-12 2019-03-12 Vertical gradual change angle unit curtain system of superelevation layer

Country Status (1)

Country Link
CN (1) CN109797894B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114351915A (en) * 2022-01-21 2022-04-15 武汉凌云建筑装饰工程有限公司 Ultra-thick gradual change surface unit curtain wall system and construction method

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0860772A (en) * 1994-08-18 1996-03-05 Nippon Alum Co Ltd Fitting structure for window stool for fittings
DE9421586U1 (en) * 1994-09-13 1996-08-14 Kloss, Angelika, 44892 Bochum Front facade with climate chamber
CN202248410U (en) * 2011-09-16 2012-05-30 中山盛兴股份有限公司 Unit-type curtain wall with tilt facade
CN102505783A (en) * 2011-10-10 2012-06-20 苏州柯利达装饰股份有限公司 Adjacent panel misplacement unit glass wall system
CN202611040U (en) * 2012-05-14 2012-12-19 沈阳远大铝业工程有限公司 Angle-adjustable unit curtain wall corner connecting frame
CN103321434A (en) * 2013-06-03 2013-09-25 深圳海外装饰工程有限公司 Arc surface unit type curtain wall construction method and structure
CN206941918U (en) * 2017-07-05 2018-01-30 中建不二幕墙装饰有限公司 Pierced Aluminum Plank inclined curtain wall
CN206941915U (en) * 2017-06-20 2018-01-30 北京江河幕墙系统工程有限公司 A kind of bridge insulation thermal resistance type curtain wall unit body entablature
CN207878718U (en) * 2017-12-20 2018-09-18 北京江河幕墙系统工程有限公司 A kind of unit plate of non-coplanar type unitized curtain wall
CN108756029A (en) * 2018-05-29 2018-11-06 上海宝冶集团有限公司 Obtuse shape glass curtain wall and its construction method

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0860772A (en) * 1994-08-18 1996-03-05 Nippon Alum Co Ltd Fitting structure for window stool for fittings
DE9421586U1 (en) * 1994-09-13 1996-08-14 Kloss, Angelika, 44892 Bochum Front facade with climate chamber
CN202248410U (en) * 2011-09-16 2012-05-30 中山盛兴股份有限公司 Unit-type curtain wall with tilt facade
CN102505783A (en) * 2011-10-10 2012-06-20 苏州柯利达装饰股份有限公司 Adjacent panel misplacement unit glass wall system
CN202611040U (en) * 2012-05-14 2012-12-19 沈阳远大铝业工程有限公司 Angle-adjustable unit curtain wall corner connecting frame
CN103321434A (en) * 2013-06-03 2013-09-25 深圳海外装饰工程有限公司 Arc surface unit type curtain wall construction method and structure
CN206941915U (en) * 2017-06-20 2018-01-30 北京江河幕墙系统工程有限公司 A kind of bridge insulation thermal resistance type curtain wall unit body entablature
CN206941918U (en) * 2017-07-05 2018-01-30 中建不二幕墙装饰有限公司 Pierced Aluminum Plank inclined curtain wall
CN207878718U (en) * 2017-12-20 2018-09-18 北京江河幕墙系统工程有限公司 A kind of unit plate of non-coplanar type unitized curtain wall
CN108756029A (en) * 2018-05-29 2018-11-06 上海宝冶集团有限公司 Obtuse shape glass curtain wall and its construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
高树鹏: "超高层建筑直纹渐变扭曲单元式幕墙的设计", 《建筑设计》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114351915A (en) * 2022-01-21 2022-04-15 武汉凌云建筑装饰工程有限公司 Ultra-thick gradual change surface unit curtain wall system and construction method
CN114351915B (en) * 2022-01-21 2023-11-28 武汉凌云建筑装饰工程有限公司 Super-thick gradual change surface unit curtain wall system and construction method

Also Published As

Publication number Publication date
CN109797894B (en) 2021-05-11

Similar Documents

Publication Publication Date Title
US7827746B2 (en) Hybrid window wall/curtain wall system and method of installation
KR101045648B1 (en) Combination structure of steel curtain wall
KR101172391B1 (en) Eco-Friendly Insulation Curtain Wall
CN107503458B (en) Curtain wall hanging piece mounting structure
CN109797894A (en) A kind of vertical gradual change angle unit curtain wall system of Super High
KR101121149B1 (en) Combination structure for steel curtain wall
EP4183965A2 (en) Pre-glazed window wall system
KR200314547Y1 (en) Window and Door Prepared by Synthetic Resin Having high Adiabatic and Airtight property
CA2510989C (en) Hybrid window wall/curtain wall system and method of installation
CN210003117U (en) Frame-type glass curtain wall structure based on through-shaft method
CN107119838B (en) Tower curtain wall floor fire prevention node structure
CN213642900U (en) Gravity type smoke-blocking vertical wall manual control device
CN217896900U (en) Partial built-in unit curtain wall system
CN220353691U (en) Assembled unit window system
CN214145282U (en) Clean room fire window
CN221181442U (en) Two-section type smoke blocking vertical wall assembly
CN209958582U (en) Decorative oblique riding seam back bolt type stone curtain wall
CN213477159U (en) Assembling structure of toilet
KR200496622Y1 (en) Curtain wall
CN216740288U (en) Curtain wall system
JP2000038792A (en) Curtain wall
JP3897243B2 (en) Watertight structure of curtain wall
JP2018123541A (en) curtain wall
JP2019120062A (en) Combination structure of window device
CN212118811U (en) Novel movable smoke-blocking vertical wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant