CN109797863A - Structure is built in the quick detachable interim room of one kind - Google Patents
Structure is built in the quick detachable interim room of one kind Download PDFInfo
- Publication number
- CN109797863A CN109797863A CN201910069680.5A CN201910069680A CN109797863A CN 109797863 A CN109797863 A CN 109797863A CN 201910069680 A CN201910069680 A CN 201910069680A CN 109797863 A CN109797863 A CN 109797863A
- Authority
- CN
- China
- Prior art keywords
- roofing board
- wallboard
- built
- oblique top
- room
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Abstract
The invention discloses a kind of quick detachable interim rooms to build structure, it is related to a kind of building structure, its key points of the technical solution are that: including roofing board, floor and multiple wallboards, the roofing board bottom surface is fixed with upper supporting column, the upper supporting column is threaded with lower supporting rod, the floor is equipped with the pedestal being rotatablely connected for lower supporting rod, and rotating the lower supporting rod can make roofing board far from lower supporting rod, and the wallboard is circumferentially articulated with roofing board along roofing board;When the roofing board is far from ground, the wallboard makes wall panel assemblies form frame shape and is connected to floor side wall because gravity is adaptively rotated around hinged place.The installation for the roofing board that structure is built in this interim room is more convenient, ascends a height without lifting equipment or personnel and installs roofing board, safer;Each component that structure is built in this interim room can be dismounted easily, and oblique top plate can be carried out folding, and the transport that structure is built in this room is more convenient;The oblique top plate that structure is built in this room is easy for installation, and stability is good.
Description
Technical field
The present invention relates to a kind of building structure, in particular to structure is built in a kind of quick detachable interim room.
Background technique
Interim room is also temporary building or makeshift house, is to be easy to build, removably live or office building.Interim room
It is widely used in cell, construction site, the ground such as gate sentry in factory.
Existing Authorization Notice No. is that the Chinese utility model patent of CN2386118Y discloses a kind of Combined light convenience
Room, including wallboard, door and window and roof, each sections such as roof, door and window, wallboard are prefabricated component, and there is metal framework on roof and is embedded with
The reinforcing rib of metal joist, wallboard, door and window using two sides laminated structure and have metal hemming edge, and each component is with metal slot
Wall Zhou Zhu and wall beam assign and combine.
Prior art among the above has the following deficiencies: when the interim room is built in outdoor, due to roof it is liftoff compared with
Height, then the installation difficulty on roof is larger, generally requires lifting equipment cooperation and installs to roof;And personnel need to step on to eminence
Fixed roof is more dangerous.
Summary of the invention
In view of the deficiencies of the prior art, the present invention intends to provide the quick detachable interim room of one kind to build structure, room
The installation of top plate is more convenient, ascends a height without lifting equipment or personnel and installs roofing board, safer.
Above-mentioned technical purpose of the invention has the technical scheme that a kind of quick detachable interim Fang Jianjie
Structure, including roofing board, floor and multiple wallboards, the roofing board bottom surface are fixed with upper supporting column, and the upper supporting column is threaded with
Lower supporting rod, the floor are equipped with the pedestal being rotatablely connected for lower supporting rod, and rotating the lower supporting rod can make roofing board far from lower branch
Column, the wallboard are circumferentially articulated with roofing board along roofing board;When the roofing board is far from ground, the wallboard is because gravity is around hinged
The adaptive rotation in place, makes wall panel assemblies form frame shape and is connected to floor side wall.
Through the above technical solutions, needing to complete floor on the ground in advance when installing this room and building structure.Pacify on floor
It fills wallboard and when roofing board, is threadedly coupled upper supporting column with lower supporting rod, and by lower supporting rod insertion pedestal, lower supporting rod and pedestal
Assembling can be completed by multi agent cooperation, and roofing board is located at liftoff lower position at this time.Before rotating lower supporting rod, wallboard must be made in expansion
Shape is freely sagging, then wallboard is in heeling condition, and wallboard is away from the edge and ground face contact of roofing board.When personnel rotate lower supporting rod
When, the personnel that need help wallboard to limit roofing board rotation.When rotating lower supporting rod, roofing board is in upper supporting column, the spiral shell of lower supporting rod
It is moved along the vertical direction under line connection function;When roofing board is far from ground, wallboard because gravity is adaptively rotated around hinged place, when
When wallboard is turned to floor perpendicular, four blocks of wallboards, which just combine, forms frame shape, and the side on floor is connected to by plate face edge
Wall;Then by the fixed adjacent wall board of screw the assembling that structure is built in this room can be completed, assembling process is more laborsaving in personnel.This
Room is built structure and is installed without lifting equipment cooperation to roofing board, and personnel need not also step on to the fixed roofing board of eminence, constructs
Journey is safer.
Preferably, the outer edge of the roofing board is hinged with multiple connectors, and the connector and wallboard correspond, institute
It states length direction of the wallboard along its edge and is equipped with draw runner, offer the sliding slot being slidably connected for draw runner on the connector, it is described
Sliding slot is in shrink mouth shape.
Through the above technical solutions, draw runner can be packed into sliding slot by wallboard in such a way that direction along the chute is slided, thus
The hinged of wallboard and roofing board is completed, the dismounting of the two is more convenient;When transporting this room and building structure, wallboard and roofing board are separable
After stack to save transport space.
Preferably, the wallboard is equipped with the locating slot being embedded in for adjacent wall board.
Through the above technical solutions, after wall panel assemblies are at framework, adjacent wall board is abutted by locating slot, makes to determine between wallboard
Position is precisely.
Preferably, the fixation hole for wearing screw is offered on the wallboard, the fixation hole is connected to locating slot.
Through the above technical solutions, personnel are screwed into screw in fixation hole after wall panel assemblies are at framework, screw penetrates adjacent
In the side wall of wallboard, two blocks of wallboards are connected and fixed, prevent this room from building the spontaneous lodging of structure.
Preferably, the lower supporting rod is equipped with the force hole passed through for external extension bar.
Through the above technical solutions, personnel can penetrate extension bar in force hole, then the mode of rotation extension bar drives
Lower supporting rod rotation, it is more laborsaving;Lower supporting rod extracts extension bar after rotating.
It preferably, further include two blocks of oblique top plates being installed on above roofing board, two blocks of oblique top plates are connected by end
Forming V-shape;The V-arrangement tip that the oblique top plate is formed is vertically upward.
Through the above technical solutions, oblique top plate is used to make this room build structure to fall within the sleet of top and providing guiding role
Top is not easy to accumulate sleet, this room builds structure and is not easy to be collapsed by crushing by snow.
Preferably, support rod is equipped between two blocks of oblique top plates, the both ends of the support rod connect with two oblique top plates respectively
It connects;The side wall of the support rod is provided along its length fixed strip, and the roofing board is equipped with to be slidably connected for fixed strip
Fixing groove, the fixing groove are in shrink mouth shape.
Through the above technical solutions, two blocks of oblique top plates are connected and fixed by support rod, oblique top plate is made to be able to maintain firm
Open state.Before roofing board raising, personnel can be slid into fixed strip in fixing groove by way of sliding laterally oblique top plate, be completed
The assembling of oblique top plate and roofing board.When blowing weather, the fixing groove of shrink mouth shape can limit support rod and separate with roofing board, oblique top
The stability of plate is preferable.
Preferably, the oblique top plate can be rotated around V-arrangement intersection changes angle, and the support rod includes two and passes through end
Hinged sub bar, the end that the sub bar mutually deviates from are hingedly connected on two blocks of oblique top plates;The plane of rotation and room of the sub bar
The plate face of top plate is parallel, and when the oblique top plate folds, the sub bar is adaptively rotated.
Through the above technical solutions, the transport of oblique top plate can be facilitated after oblique top plate is by turning folding;When oblique top plate folds
When, also adaptively rotation is folded two root bars, and support rod will not influence the folding of oblique top plate.When fixed strip slides into fixing groove
Afterwards, fixing groove limits support rod, and support rod will not generate bending, then oblique top plate is able to maintain the shape of opening.
Preferably, the wallboard is equipped with gag lever post towards roofing board, and the roofing board is equipped with to be led to for what gag lever post passed through
Slot, the support rod are equipped with the limiting slot for abutting gag lever post;When the wallboard is turned to floor perpendicular, the limit
It is mobile to limit support rod in the bar insertion limiting slot of position.
Through the above technical solutions, gag lever post is turned into through slot with wallboard when wallboard is turned to floor perpendicular, and
It is further embedded in limiting slot, is slipped away fixing groove with limiting fixed strip, the stability after further increasing oblique mounting of roof plate.Limit
The movement of bar can be with the spontaneous completion of rotation of wallboard, without manually being operated.
In conclusion the present invention having the beneficial effect that in contrast to the prior art
1, the installation for the roofing board that structure is built in this interim room is more convenient, ascends a height without lifting equipment or personnel and installs roofing board,
It is safer;
2, each component that structure is built in this interim room can be dismounted easily, and oblique top plate can be carried out folding, and the fortune of structure is built in this room
It is defeated more convenient;
3, this room build structure oblique top plate it is easy for installation, and stability is good.
Detailed description of the invention
Fig. 1 is that the overall diagram of structure is built in the quick detachable interim room of one kind of embodiment;
Fig. 2 is that the construction working condition chart of structure is built in the quick detachable interim room of one kind of embodiment;
Fig. 3 is enlarged drawing at the A of Fig. 2, the structure of main prominent connector;
Fig. 4 is the oblique top plate of embodiment and the perspective view of support rod;
Fig. 5 is the partial sectional view of embodiment, mainly protrudes the structure of gag lever post, hinged block and support rod.
In figure, 1, roofing board;2, floor;3, wallboard;4, oblique top plate;5, connector;51, sliding slot;31, draw runner;61, upper branch
Column;62, lower supporting rod;21, pedestal;621, exert a force hole;32, locating slot;33, fixation hole;7, support rod;41, hinged block;71, solid
Determine item;11, fixing groove;34, gag lever post;12, through slot;72, limiting slot.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
Referring to Fig.1, structure, including roofing board 1, floor 2, oblique top plate are built for the quick detachable interim room of one kind disclosed by the invention
4 and four wallboards 3, each plate is rectangle, and four combinations of wallboards 3 form rectangular box, and roofing board 1 is placed on the formation of wallboard 3
At the top of framework, floor 2 is set to the framework bottom that wallboard 3 is formed.The quantity of oblique top plate 4 is two pieces, and two blocks of oblique top plates 4 are inverted V shaped
Combination settings are above roofing board 1, and the V-arrangement tip that oblique top plate 4 is formed is vertically upward.
Referring to Fig. 2 and Fig. 3, four wallboards 3 are hinged by plate face edge and four rectangular edges of roofing board 1 respectively, wallboard 3
It is established hingedly with roofing board 1 by connector 5 set between the two, connector 5 and wallboard 3 correspond.Connector 5 is length
Bar shaped, along the length direction of 1 corresponding edge of roofing board, connector 5 is articulated with roofing board 1 towards ground for the length direction of connector 5
The position at the plate face edge in the plate face of plate 2 and close to roofing board 1.Sliding slot 51 is provided along its length on connector 5, it is sliding
The oral area of slot 51 is in shrink mouth shape, length direction through-connections 5 of the sliding slot 51 along connector 5;The edge of wallboard 3, which is fixed with, to be used for
The draw runner 31 being slidably connected with sliding slot 51.Draw runner 31 can be packed into sliding slot 51 in such a way that 51 directions along the chute are slided by wallboard 3
Interior, to complete the hinged of wallboard 3 and roofing board 1, the dismounting of the two is more convenient;When transporting this room and building structure, wallboard 3 and room
It stacks after top plate 1 is separable to save transport space.
Referring to Figures 1 and 2, the plate face center on roofing board 1 towards floor 2 is fixed with upper supporting column 61, upper supporting column 61 perpendicular to
In the plate face of roofing board 1, the end sleeve of upper supporting column 61 is equipped with lower supporting rod 62, and lower supporting rod 62 is threadedly coupled with upper supporting column 61, floor 2
On be fixed with the pedestal 21 placed for lower supporting rod 62, pedestal 21 is cylindrical in shape, and pedestal 21 is sheathed on outside lower supporting rod 62,62 energy of lower supporting rod
It is freely rotated in pedestal 21.The force hole 621 that the external extension bar of confession passes through is offered on the side wall of lower supporting rod 62, personnel can incite somebody to action
Extension bar penetrates in force hole 621, then the mode of rotation extension bar drives lower supporting rod 62 to rotate, more laborsaving.Rotation lower
When column 62, personnel need to help wallboard 3 to limit the rotation of roofing board 1, then roofing board 1 connects in the screw thread of upper supporting column 61, lower supporting rod 62
It connects and is moved along the vertical direction under effect.
When this room being installed building structure, need to complete floor 2 on the ground in advance.Wallboard 3 and roofing board are installed on floor 2
It when 1, is threadedly coupled upper supporting column 61 with lower supporting rod 62, and lower supporting rod 62 is inserted into pedestal 21, lower supporting rod 62 and pedestal 21
Assembling can be completed by multi agent cooperation.Before rotating lower supporting rod 62, wallboard 3 must be installed on the connector 5 of roofing board 1, and make wall
Plate 3 is freely sagging in expansion shape, then wallboard 3 is in heeling condition, and wallboard 3 is away from the edge and ground face contact of connector 5.Work as people
When member's rotation lower supporting rod 62 makes roofing board 1 far from ground, wallboard 3 is because gravity is around the adaptively rotation of connector 5, when wallboard 3 rotates
When extremely vertical with floor 2, four blocks of wallboards 3 just combine and form frame shape, and the side wall on floor 2 is connected to by plate face edge.
Wallboard 3 is equipped with the locating slot 32 being embedded in for adjacent wall board 3, and the fixation for wearing screw is offered on wallboard 3
Hole 33, fixation hole 33 are located at wallboard 3 close to the lower section on floor 2, and fixation hole 33 is connected to locating slot 32.Wallboard 3 is combined into framework
Afterwards, adjacent wall board 3 is abutted by locating slot 32, makes the accurate positioning between wallboard 3, and the surface of wallboard 3 be able to maintain it is smooth.
After personnel tighten screw in fixation hole 33, screw is penetrated in adjacent wallboard 3, and two blocks of wallboards 3 are connected and fixed.
Referring to Fig.1 and Fig. 4, oblique top plate 4 are used to make this room build superstructure to fall within the sleet of top and providing guiding role
It is not easy to accumulate sleet.Two blocks of oblique top plates 4 can also be bent by single piece of sheet metal, and two blocks of oblique top plates 4 are connected simultaneously by edge
Rotation connection is established, two blocks of oblique top plates 4 can be rotated around V-arrangement intersection changes angle, after oblique top plate 4 is by turning folding, energy side
Just the transport of oblique top plate 4.
Referring to Fig. 4 and Fig. 5, support rod 7 is equipped between two blocks of oblique top plates 4, support rod 7 includes two sons hinged by end
Bar, the end that two root bars mutually deviate from are hingedly connected on two blocks of oblique top plates 4.Pass through setting hinge between support rod 7 and oblique top plate 4
It connects block 41 to establish hingedly, hinged block 41 is articulated on oblique top plate 4, and the plane of rotation of hinged block 41 is along vertical plane;Support rod 7 is articulated with
On hinged block 41, support rod 7 relative to hinged block 41 plane of rotation along the horizontal plane, wherein horizontal plane refers to the plate face with roofing board 1
Parallel face.Then when oblique top plate 4 folds, also adaptively rotation is folded two root bars;When oblique top plate 4 is expanded to two roots
When bar is parallel to each other, support rod 7 limits oblique top plate 4, and oblique top plate 4 can not continue to be unfolded.
The side wall of support rod 7 is fixed with fixed strip 71 along its length, and fixed strip 71 is towards roofing board 1, fixed strip 71
Cross sectional shape be swallow-tail form.The top surface of roofing board 1 is equipped with the fixing groove 11 being slidably connected for fixed strip 71, fixing groove 11
Notch forms dovetail groove in shrink mouth shape, and one end of fixing groove 11 and the side wall of roofing board 1 penetrate through, and the other end of fixing groove 11 does not pass through
Logical roofing board 1.Before the raising of roofing board 1, fixed strip 71 can be slid into fixing groove by way of sliding laterally oblique top plate 4 by personnel
In 11, the assembling of oblique top plate 4 and roofing board 1 is completed.After fixed strip 71 slides into fixing groove 11, fixing groove 11 limits support rod 7,
Support rod 7 will not generate bending, then oblique top plate 4 is able to maintain the shape of opening;When blowing weather, the fixing groove 11 of shrink mouth shape
Support rod 7 can be limited to separate with roofing board 1, the stability of oblique top plate 4 is preferable.
Wallboard 3 is towards being fixed with gag lever post 34 in the plate face on the inside of house, and the inclination of gag lever post 34 is towards roofing board 1.Roof
Plate 1 is equipped with the through slot 12 passed through for gag lever post 34, and support rod 7 is equipped with the limiting slot 72 for abutting gag lever post 34, limit
Slot 72 is formed in the end of fixed strip 71.When wallboard 3 is turned to it is vertical with floor 2 when, gag lever post 34 is turned into through slot with wallboard 3
It in 12, and is further embedded in limiting slot 72, is slipped away fixing groove 11 with limiting fixed strip 71, further increase the installation of oblique top plate 4
Stability afterwards.
To sum up, structure is built in this interim room can complete to assemble through the above way, and assembling process is more laborsaving, and is not necessarily to lifting
Roofing board 1 is installed in equipment cooperation, and personnel need not also step on to the fixed roofing board 1 of eminence and oblique top plate 4, and work progress is more
Safety.
When needing to remove this room and building structure, the screw at each fixation hole 33 is backed out, then personnel push out in house
Dynamic wallboard 3, then gag lever post 34 is detached from limiting slot 72, wallboard 3 is detached from floor 2, while other staff rotate lower supporting rod 62, can drop
Lower roofing board 1, then removing each component one by one can be completed the dismounting that structure is built in this room, and demolishing process is also more laborsaving.
The embodiment of present embodiment is presently preferred embodiments of the present invention, not limits protection of the invention according to this
Range, therefore: the equivalence changes that all structures under this invention, shape, principle are done, should all be covered by protection scope of the present invention it
It is interior.
Claims (9)
1. structure, including roofing board (1), floor (2) and multiple wallboards (3) are built in a kind of quick detachable interim room, it is characterized in that: described
Roofing board (1) bottom surface is fixed with upper supporting column (61), and the upper supporting column (61) is threaded with lower supporting rod (62), the floor (2)
It is equipped with the pedestal (21) being rotatablely connected for lower supporting rod (62), rotating the lower supporting rod (62) can make roofing board (1) far from lower branch
Column (62), the wallboard (3) are circumferentially articulated with roofing board (1) along roofing board (1);It is described when the roofing board (1) is far from ground
Wallboard (3) makes wallboard (3) combination form frame shape and be connected to floor (2) side wall because gravity is adaptively rotated around hinged place.
2. structure is built in the quick detachable interim room of one kind according to claim 1, it is characterized in that: the outside of the roofing board (1)
Edge is hinged with multiple connectors (5), and the connector (5) and wallboard (3) correspond, length of the wallboard (3) along its edge
It spends direction and is equipped with draw runner (31), offer the sliding slot (51) being slidably connected for draw runner (31), the sliding slot on the connector (5)
It (51) is in shrink mouth shape.
3. structure is built in the quick detachable interim room of one kind according to claim 1, supplied it is characterized in that: the wallboard (3) is equipped with
The locating slot (32) of adjacent wall board (3) insertion.
4. structure is built in the quick detachable interim room of one kind according to claim 3, it is characterized in that: offering on the wallboard (3)
For wearing the fixation hole (33) of screw, the fixation hole (33) is connected to locating slot (32).
5. structure is built in the quick detachable interim room of one kind according to claim 1, it is characterized in that: the lower supporting rod (62) is equipped with
The force hole (621) passed through for external extension bar.
6. structure is built in the quick detachable interim room of one kind according to claim 1, it is characterized in that: further including being installed on roofing board
(1) two pieces of oblique top plates (4) above, two pieces of oblique top plates (4) connect forming V-shape by end;What the oblique top plate (4) was formed
V-arrangement tip is vertically upward.
7. structure is built in the quick detachable interim room of one kind according to claim 6, it is characterized in that: between two pieces of oblique top plates (4)
Equipped with support rod (7), the both ends of the support rod (7) are connect with two oblique top plates (4) respectively;The side wall of the support rod (7)
It is provided along its length fixed strip (71), the roofing board (1) is equipped with the fixing groove being slidably connected for fixed strip (71)
(11), the fixing groove (11) is in shrink mouth shape.
8. structure is built in the quick detachable interim room of one kind according to claim 7, it is characterized in that: the oblique top plate (4) can be around V-arrangement
Intersection rotation changes angle, and the support rod (7) includes two sub bars hinged by end, what the sub bar mutually deviated from
End is hingedly connected on two pieces of oblique top plates (4);The plane of rotation of the sub bar is parallel with the plate face of roofing board (1), when described oblique
When top plate (4) folds, the sub bar is adaptively rotated.
9. structure is built in the quick detachable interim room of one kind according to claim 7, it is characterized in that: the wallboard (3) is towards roof
Plate (1) is equipped with gag lever post (34), and the roofing board (1) is equipped with the through slot (12) passed through for gag lever post (34), the support rod
(7) it is equipped with the limiting slot (72) for abutting gag lever post (34);When the wallboard (3) turns to vertical with floor (2), institute
It states mobile to limit support rod (7) in gag lever post (34) insertion limiting slot (72).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910069680.5A CN109797863B (en) | 2019-01-24 | 2019-01-24 | Structure is built in quick detachable interim room |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910069680.5A CN109797863B (en) | 2019-01-24 | 2019-01-24 | Structure is built in quick detachable interim room |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109797863A true CN109797863A (en) | 2019-05-24 |
CN109797863B CN109797863B (en) | 2020-07-31 |
Family
ID=66560378
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910069680.5A Active CN109797863B (en) | 2019-01-24 | 2019-01-24 | Structure is built in quick detachable interim room |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109797863B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110409866A (en) * | 2019-06-21 | 2019-11-05 | 中国矿业大学 | A kind of seashore chalet |
CN113062464A (en) * | 2021-04-06 | 2021-07-02 | 惠州亿安建筑工程有限公司 | Portable prefabricated house |
CN113356434A (en) * | 2021-06-16 | 2021-09-07 | 天一建设发展有限公司 | Construction site temporary house building structure easy to disassemble and construction method thereof |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103243934A (en) * | 2013-04-26 | 2013-08-14 | 上海魔立方新型房屋有限公司 | House system constructed by single independent foundation and erecting method of house system |
CN105735480A (en) * | 2016-04-16 | 2016-07-06 | 万华集成房屋(烟台)有限公司 | Foldable house and assembling and disassembling method thereof |
DE202017005058U1 (en) * | 2017-06-21 | 2017-10-23 | Christoph Schendera | Modular lightweight container system for the manufacture of construction, office, residential and material storage containers |
CN107700666A (en) * | 2017-10-31 | 2018-02-16 | 常州铝行舱集成房屋有限公司 | A kind of Collapsible house |
CN207376804U (en) * | 2017-09-25 | 2018-05-18 | 浙江昱美创新建筑科技有限公司 | A kind of prefabricated buildings |
CN207538219U (en) * | 2017-11-23 | 2018-06-26 | 天津檀英科技有限公司 | For the pedestal of movable building |
CN108301640A (en) * | 2018-01-23 | 2018-07-20 | 温州城建集团股份有限公司 | Movable board room |
-
2019
- 2019-01-24 CN CN201910069680.5A patent/CN109797863B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103243934A (en) * | 2013-04-26 | 2013-08-14 | 上海魔立方新型房屋有限公司 | House system constructed by single independent foundation and erecting method of house system |
CN105735480A (en) * | 2016-04-16 | 2016-07-06 | 万华集成房屋(烟台)有限公司 | Foldable house and assembling and disassembling method thereof |
DE202017005058U1 (en) * | 2017-06-21 | 2017-10-23 | Christoph Schendera | Modular lightweight container system for the manufacture of construction, office, residential and material storage containers |
CN207376804U (en) * | 2017-09-25 | 2018-05-18 | 浙江昱美创新建筑科技有限公司 | A kind of prefabricated buildings |
CN107700666A (en) * | 2017-10-31 | 2018-02-16 | 常州铝行舱集成房屋有限公司 | A kind of Collapsible house |
CN207538219U (en) * | 2017-11-23 | 2018-06-26 | 天津檀英科技有限公司 | For the pedestal of movable building |
CN108301640A (en) * | 2018-01-23 | 2018-07-20 | 温州城建集团股份有限公司 | Movable board room |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110409866A (en) * | 2019-06-21 | 2019-11-05 | 中国矿业大学 | A kind of seashore chalet |
CN113062464A (en) * | 2021-04-06 | 2021-07-02 | 惠州亿安建筑工程有限公司 | Portable prefabricated house |
CN113356434A (en) * | 2021-06-16 | 2021-09-07 | 天一建设发展有限公司 | Construction site temporary house building structure easy to disassemble and construction method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN109797863B (en) | 2020-07-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109797863A (en) | Structure is built in the quick detachable interim room of one kind | |
CN109826460B (en) | Interim room in building site of easy dismouting | |
CN111424949B (en) | Elevator shaft formwork erection working platform | |
CN111255271A (en) | Modular honeycomb building capable of being assembled quickly | |
CN110656701A (en) | Assembled steel construction building | |
CN114215385B (en) | Temporary support column system for demolishing high-rise building | |
CN212176813U (en) | Regularization 12 pieces of formula tower crane guardrails that piece together | |
CN211508493U (en) | Cable bridge mounting structure | |
CN214785811U (en) | Scaffold with inclined plane structure and high stability | |
CN112523491B (en) | Assembled steel construction building joins externally template | |
CN210597623U (en) | Modular combined house | |
CN210263827U (en) | Scaffold for building construction | |
CN206873987U (en) | A kind of prefabricated house | |
CN212984849U (en) | Fence connecting structure | |
CN218150042U (en) | Assembled case room | |
CN2545279Y (en) | Color steel sandwich plate movable dwellings | |
CN110757031B (en) | Novel portable windproof device for steel structure field welding and use method thereof | |
JPH0332571Y2 (en) | ||
CN113062464B (en) | Portable prefabricated house | |
CN217536724U (en) | Translation supporting device of split type left-right width bridge deck bridge girder erection machine | |
CN217871708U (en) | Construction platform for overhanging structural layer of high-rise building | |
CN219547533U (en) | Detachable steel structure overpass | |
CN212453355U (en) | Roof structure for green building | |
CN219451491U (en) | Horizontal reserved hole plugging template | |
CN214942401U (en) | Adjustable supporting structure of cast-in-place box girder template |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |