CN210263827U - Scaffold for building construction - Google Patents

Scaffold for building construction Download PDF

Info

Publication number
CN210263827U
CN210263827U CN201920795272.3U CN201920795272U CN210263827U CN 210263827 U CN210263827 U CN 210263827U CN 201920795272 U CN201920795272 U CN 201920795272U CN 210263827 U CN210263827 U CN 210263827U
Authority
CN
China
Prior art keywords
support body
scaffold
sleeve
support
construction according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920795272.3U
Other languages
Chinese (zh)
Inventor
俞思敏
饶慧
李玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Zhonghong Construction Co Ltd
Original Assignee
Zhejiang Zhonghong Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Zhonghong Construction Co Ltd filed Critical Zhejiang Zhonghong Construction Co Ltd
Priority to CN201920795272.3U priority Critical patent/CN210263827U/en
Application granted granted Critical
Publication of CN210263827U publication Critical patent/CN210263827U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model relates to a scaffold frame for construction belongs to scaffold frame technical field, and it includes the support body and lays the footboard in support body upper end, the support body divide into first support body and second support body, and its technical essential is: be equipped with the adapter sleeve between first support body and the second support body, the adapter sleeve rotates with first support body and second support body to set up, first support body and second support body pass through the mutual level of adapter sleeve and rotate. The utility model provides a scaffold frame for construction through setting up two relative pivoted first support body and second support body, through rotating first support body or second support body to make the length and the width of scaffold frame adjust according to the user demand, so that satisfy the installation and construction requirement.

Description

Scaffold for building construction
Technical Field
The utility model belongs to the technical field of scaffold technique and specifically relates to a scaffold frame for construction is related to.
Background
In engineering construction, the structure of the scaffold generally has a certain height, and the construction personnel cannot complete the operation due to the normal height, so that auxiliary equipment such as a scaffold is needed. The building scaffold is various supports which are erected for workers to operate and solve vertical and horizontal transportation on a building construction site, is a necessary support for building construction, and nowadays, the building scaffold is more and more in variety and more widely used.
General scaffold frame, its length and width are fixed, adaptation constructor's that can not be fine construction requirements in the use, too big scaffold frame also can cause the space waste simultaneously.
Therefore, a new technical solution is needed to solve the above technical problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a scaffold frame for construction through setting up two relative pivoted first support body and second support body, through rotating first support body or second support body to make the length and the width of scaffold frame adjust according to the user demand, so that satisfy the installation construction requirement.
The above utility model discloses an above-mentioned utility model purpose can realize through following technical scheme:
the utility model provides a scaffold frame for construction, includes the support body and lays the footboard in support body upper end, the support body divide into first support body and second support body, be equipped with the adapter sleeve between first support body and the second support body, the adapter sleeve rotates with first support body and second support body to set up, first support body and second support body pass through the mutual level rotation of adapter sleeve.
Through adopting above-mentioned technical scheme, form complete scaffold through setting up support body and footboard, be first support body and second support body through setting up the support body, utilize the adapter sleeve between first support body and the second support body to make first support body and second support body connect, make first support body and second support body can the level rotate through setting up the adapter sleeve simultaneously, make first support body and second support body set up side by side or set up side by side along its width direction along its length direction through rotating first support body or second support body, thereby reach the change of support body length and width, make things convenient for the scaffold to adjust according to the construction demand, satisfy the construction requirement.
The utility model discloses further set up to: the support body includes four vertical support columns that set up and four connecting axles that set up in the support column upper end, four the center line of support column is the rectangle, two adjacent support columns of both ends fixed connection of connecting axle, the connecting axle top is laid to the footboard.
Through adopting above-mentioned technical scheme, the support body comprises support column and connecting axle, utilizes the height of support column to make the footboard lift off ground, sets up the connecting axle and not only connects the support column and make the support body remain stable, makes things convenient for the installation of footboard on the support body through the connecting axle simultaneously.
The utility model discloses further set up to: the connecting axle includes the minor axis that sets up along support body length direction and the major axis that sets up along support body width direction, the footboard is equipped with a plurality of couples along its length direction, the couple articulates with the minor axis.
Through adopting above-mentioned technical scheme, through setting up minor axis and major axis for four spinal branch daggers are the rectangle and connect, through setting up a plurality of couples at footboard both ends, make the footboard articulate through couple and support body, thereby make things convenient for the footboard to lay and dismantle on the support body.
The utility model discloses further set up to: the long shaft is positioned below the short shaft, and the lower end face of the pedal is abutted against the upper end face of the long shaft.
Through adopting above-mentioned technical scheme, conflict with the major axis through the lower terminal surface that sets up the footboard to make the major axis support the footboard, guarantee the stability of footboard installation on the support body.
The utility model discloses further set up to: the connecting sleeve comprises a first sleeve rotatably sleeved on the supporting column of the first frame body and a second sleeve rotatably sleeved on the supporting column of the second frame body, and the first sleeve and the second sleeve are detachably connected.
Through adopting above-mentioned technical scheme, make first support body and second support body pass through the adapter sleeve rotation each other through setting up the adapter sleeve, set up first sleeve and second sleeve and can dismantle to make first support body and second support body can connect or separate according to the user demand.
The utility model discloses further set up to: the support body is located its length direction one side and is equipped with the foot ladder, the foot ladder sets up with the adapter sleeve homonymy, the foot ladder rotates with the support body to be connected, first support body and second support body are connected to the foot ladder rotation back.
Through adopting above-mentioned technical scheme, through setting up the foot ladder, make things convenient for constructor to climb to the footboard through climbing foot ladder from ground, through setting up foot ladder and adapter sleeve homonymy to set up the foot ladder and rotate with the support body and be connected, through pulling first support body or second support body, make first support body and second support body form certain angle each other, rotate the foot ladder again, make the foot ladder connect first support body and second support body, thereby guarantee constructor support body remain stable in climbing process.
The utility model discloses further set up to: the foot ladder comprises a rotating shaft and grab bars, wherein the rotating shaft is rotatably arranged on the support body, the grab bars are parallelly arranged on one side of the rotating shaft, a plurality of ladder boards are arranged between the rotating shaft and the grab bars at intervals, and the ladder boards are arranged along the length direction of the rotating shaft.
Through adopting above-mentioned technical scheme, through setting up the pivoted pivot for the axis that the foot ladder can be had good luck the positive pivot is rotated, sets up the step board and is used for constructor to scramble, through setting up the bar with pivot parallel arrangement, thereby guarantees the intensity of step board in the use, improves the security of climbing.
The utility model discloses further set up to: the support body still including fixed the stiffener that sets up in the support column lower extreme, the up end of stiffener is contradicted with the lower terminal surface of bar, the pivot rotates with the stiffener and sets up.
Through adopting above-mentioned technical scheme, through the stability that sets up the stiffener reinforcing support body at the support body lower extreme, contradict through bar and stiffener to make the stiffener support the foot ladder, avoid in the use because the pivot leads to the fact the pivot to damage and the foot ladder rotates the influence climbing as the side atress.
To sum up, the utility model discloses a beneficial technological effect does: the connecting sleeve is arranged between the first frame body and the second frame body, so that the first frame body and the second frame body horizontally rotate with each other by the connecting sleeve, and the length and the width of the frame body can be changed along with the rotation of the first frame body or the second frame body; the hooks are arranged at the two ends of the pedal, the pedal is convenient to mount on the frame body by utilizing the hooking of the hooks and the short shaft, and the pedal is enabled to be in contact with the long shaft by arranging the long shaft below the short shaft, so that the mounting stability of the pedal on the frame body is ensured; through setting up the foot ladder in one side of support body, make things convenient for constructor climbing scaffold frame, rotate through setting up the foot ladder and be connected with the support body to when making first support body or second support body rotate, rotate the foot ladder and make the foot ladder connect first support body and second support body, improve the security of climbing.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a schematic view of the overall structure of the present invention, which mainly shows the situation that the first frame and the second frame are mutually opened and the foot ladder is used;
FIG. 3 is an enlarged view of portion A of FIG. 2;
fig. 4 is a schematic view of a part of the structure of the present invention, which mainly shows the composition relationship of the connecting sleeve.
In the figure, 1, a frame body; 11. a support pillar; 111. connecting holes; 12. a connecting shaft; 121. a long axis; 122. a minor axis; 13. a reinforcing bar; 2. a pedal; 21. lightening holes; 22. hooking; 3. connecting sleeves; 31. a first sleeve; 32. a second sleeve; 33. a connecting hoop; 331. connecting sheets; 332. a through hole; 333. a screw; 334. fixing a nut; 4. a connecting assembly; 41. a connecting bridge; 42. a sliding sleeve; 421. an external thread; 422. a force application rod; 5. a foot ladder; 51. a rotating shaft; 52. a grab rail; 53. a step plate.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1, for the utility model discloses a scaffold for construction, including support body 1 and the footboard 2 of laying in support body 1 upper end, wherein support body 1 divide into first support body and second support body. Be equipped with adapter sleeve 3 between first support body and the second support body, adapter sleeve 3 rotates with first support body and second support body and sets up for first support body and second support body pass through adapter sleeve 3 and rotate horizontally each other, thereby make the length and the width of scaffold frame adjust according to the user demand, so that satisfy the installation and construction requirement.
Referring to fig. 1 and 2, the frame body 1 includes four vertically arranged support columns 11 and four connecting shafts 12 arranged at the upper ends of the support columns 11, the center connecting line of the four support columns 11 is rectangular, two ends of the connecting shaft 12 are fixedly connected with two adjacent support columns 11, the pedal 2 is laid above the connecting shaft 12, and the pedal 2 is provided with a plurality of lightening holes 21 at intervals, so that the strength of the pedal 2 is ensured, and the weight of the pedal 2 is reduced. Utilize the height of support column 11 to make footboard 2 lift off ground, set up connecting axle 12 and not only can connect support column 11 and make support body 1 remain stable, make things convenient for the installation of footboard 2 on support body 1 through connecting axle 12 simultaneously.
Referring to fig. 2, the connecting shaft 12 includes a short shaft 122 disposed along the length direction of the frame body 1 and a long shaft 121 disposed along the width direction of the frame body 1, the pedal 2 is provided with a plurality of hooks 22 (two hooks are shown) along the length direction thereof, and the hooks 22 are hooked with the short shaft 122; major axis 121 is located minor axis 122 below, and the lower terminal surface of footboard 2 contradicts with major axis 121 up end to make major axis 121 support footboard 2, guarantee the stability of footboard 2 installation on support body 1.
Referring to fig. 2 and 3, since the first frame body and the second frame body are rotatably connected, in order to ensure the stability of the connection of the first frame body and the second frame body after rotation, a connection assembly 4 is arranged between the first frame body and the second frame body, the connection assembly 4 comprises a connection bridge 41 connecting two adjacent support columns 11 of the first frame body and the second frame body and a sliding sleeve 42 slidably arranged at two ends of the connection bridge 41, the tops of two support columns 11 adjacent to the support column 11 provided with the connecting sleeve 3 are vertically provided with connecting holes 111 corresponding to the connecting bridge 41, internal threads are arranged inside the connecting holes 111, the outer side of the lower end of the sliding sleeve 42 is provided with external threads 421 corresponding to the internal threads, the upper end of the sliding sleeve 42 is provided with a force application rod 422, the sliding sleeve 42 is driven to rotate by rotating the force application rod 422, thereby make coupling assembling 4 connect first support body and second support body through sliding sleeve 42 and connecting hole 111 fixed connection, guarantee the stability of connecting between first support body and the second support body.
Referring to fig. 2 and 4, in order to facilitate the first frame body and the second frame body to be connected or separated according to the use requirement, the connecting sleeve 3 comprises a first sleeve 31 rotatably sleeved on the supporting column 11 of the first frame body and a second sleeve 32 rotatably sleeved on the supporting column 11 of the second frame body, and the first sleeve 31 and the second sleeve 32 are detachably connected. The connecting hoops 33 are arranged at two ends of the first sleeve 31 and the second sleeve 32, connecting sheets 331 are arranged at two ends of an opening of each connecting hoop 33, the distance between the two connecting sheets 331 is slightly larger than the thickness of the connecting sheets 331, through holes 332 are horizontally formed in the two connecting sheets 331, screw rods 333 penetrate through the through holes 332, and the screw rods 333 are in threaded connection with fixing nuts 334.
Referring to fig. 2, in order to ensure the stability of the first frame and the second frame, the frame 1 further includes a reinforcing rod 13 fixedly disposed at the lower end of the supporting column 11, and the cross section of the reinforcing rod 13 is rectangular and hollow inside, so as to reduce the weight of the frame 1 and facilitate the rotation and movement of the frame 1. The support body 1 is located its length direction one side and is equipped with and support body 1 rotates the foot ladder 5 of being connected, and foot ladder 5 sets up with adapter sleeve 3 homonymy, and foot ladder 5 includes and rotates the pivot 51 that sets up and parallel arrangement in the grab bar 52 of pivot 51 one side with support body 1, and the interval is equipped with a plurality of terraces 53 between pivot 51 and the grab bar 52, and terraces 53 sets up along pivot 51 length direction, makes things convenient for constructor to scramble through setting up foot ladder 5.
Referring to fig. 2, foot ladder 5 rotates with support body 1 to be connected, connects first support body and second support body after foot ladder 5 rotates, when constructor needs the climbing, through pulling first support body or second support body for first support body and second support body form certain angle each other, rotate foot ladder 5 again, make foot ladder 5 connect first support body and second support body, thereby guarantee that constructor is at climbing in-process support body 1 remain stable. The up end of stiffener 13 is contradicted with the lower terminal surface of bar 52, and pivot 51 rotates with stiffener 13 to be set up, contradicts with stiffener 13 through bar 52 to make stiffener 13 support foot ladder 5, avoid in the use because pivot 51 causes the pivot 51 to damage and foot ladder 5 rotates the influence climbing when the side atress.
The implementation process of the embodiment is as follows: during the use, earlier through first support body of pulling or second support body for first support body and second support body form certain angle each other, rotate foot ladder 5 again, make foot ladder 5 connect first support body and second support body, when constructor climbed footboard 2 on, rotate first support body or second support body again and make first support body and second support body set up side by side along its length direction or width direction. After the first frame body or the second frame body is rotated, the two ends of the connecting bridge 41 are aligned to the connecting holes 111, the two ends of the connecting bridge 41 drive the sliding sleeve 42 to be inserted into the connecting holes 111, and then the sliding sleeve 42 is rotated to enable the sliding sleeve 42 to be in threaded connection with the connecting holes 111.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (8)

1. The utility model provides a scaffold frame for construction, includes support body (1) and lays footboard (2) in support body (1) upper end, support body (1) divide into first support body and second support body, its characterized in that: be equipped with adapter sleeve (3) between first support body and the second support body, adapter sleeve (3) rotate with first support body and second support body and set up, first support body and second support body pass through adapter sleeve (3) mutual level and rotate.
2. A scaffold for construction according to claim 1, wherein: support body (1) includes support column (11) and four connecting axle (12) that set up in support column (11) upper end of four vertical settings, four the center line of support column (11) is the rectangle, two adjacent support column (11) of both ends fixed connection of connecting axle (12), connecting axle (12) top is laid in footboard (2).
3. A scaffold for construction according to claim 2, wherein: connecting axle (12) are including minor axis (122) and major axis (121) that set up along support body (1) width direction along support body (1) length direction setting, footboard (2) are equipped with a plurality of couples (22) along its length direction, couple (22) articulate with minor axis (122).
4. A scaffold for construction according to claim 3, wherein: the long shaft (121) is positioned below the short shaft (122), and the lower end face of the pedal (2) is abutted against the upper end face of the long shaft (121).
5. A scaffold for construction according to claim 2, wherein: the connecting sleeve (3) comprises a first sleeve (31) which is rotatably sleeved on the supporting column (11) of the first frame body and a second sleeve (32) which is rotatably sleeved on the supporting column (11) of the second frame body, and the first sleeve (31) and the second sleeve (32) are detachably connected.
6. A scaffold for construction according to claim 1, wherein: support body (1) are located its length direction one side and are equipped with foot ladder (5), foot ladder (5) and adapter sleeve (3) homonymy set up, foot ladder (5) rotate with support body (1) and are connected, first support body and second support body are connected to foot ladder (5) rotation back.
7. The scaffold for construction according to claim 6, wherein: the foot ladder (5) comprises a rotating shaft (51) and a grab rail (52), wherein the rotating shaft (51) is arranged by rotating the support body (1), the grab rail (52) is arranged on one side of the rotating shaft (51) in parallel, a plurality of ladder boards (53) are arranged between the rotating shaft (51) and the grab rail (52) at intervals, and the ladder boards (53) are arranged along the length direction of the rotating shaft (51).
8. A scaffold for construction according to claim 7, wherein: the support body (1) is still including fixed stiffener (13) that sets up in support column (11) lower extreme, the up end of stiffener (13) is contradicted with the lower terminal surface of bar (52), pivot (51) rotate with stiffener (13) and set up.
CN201920795272.3U 2019-05-29 2019-05-29 Scaffold for building construction Expired - Fee Related CN210263827U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920795272.3U CN210263827U (en) 2019-05-29 2019-05-29 Scaffold for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920795272.3U CN210263827U (en) 2019-05-29 2019-05-29 Scaffold for building construction

Publications (1)

Publication Number Publication Date
CN210263827U true CN210263827U (en) 2020-04-07

Family

ID=70039367

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920795272.3U Expired - Fee Related CN210263827U (en) 2019-05-29 2019-05-29 Scaffold for building construction

Country Status (1)

Country Link
CN (1) CN210263827U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112160570A (en) * 2020-09-16 2021-01-01 徐团团 Green building supporting platform convenient to quick construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112160570A (en) * 2020-09-16 2021-01-01 徐团团 Green building supporting platform convenient to quick construction

Similar Documents

Publication Publication Date Title
CN111424952B (en) Climb a corner connecting device and climb a assembly
CN105781100A (en) Template component for sidewall of subway station
CN206418587U (en) A kind of easy-to-dismount prefabricated balcony
CN210263827U (en) Scaffold for building construction
DE202022102656U1 (en) Support structure for constructing the platform canopy
CN213626572U (en) Tool type external cantilever operation platform
CN206971692U (en) The mounting platform of tower crane
CN203113845U (en) Protective shed of distribution box
CN212358012U (en) Widening platform device of hydraulic creeping formwork for quickly constructing double-limb cable tower
CN220565647U (en) Bearing frame for building construction
CN107806242A (en) A kind of high intensity scaffold fastenings for building
CN207484941U (en) A kind of closed cover of the outer builder's jack of architectural engineering
CN217680429U (en) Support device for climbing frame
CN217326481U (en) I-steel subassembly fast combination construction structures
CN210459915U (en) Combined operation platform
CN108678366A (en) From the huge column form frame system of angle
CN211143684U (en) A remove scaffold frame for building engineering
CN210918172U (en) Combined type aluminum alloy climbing frame
CN208966001U (en) A kind of outdoor architecture and the general construction tripod platform of interior decoration
CN114562099A (en) High scaffold frame for building engineering construction of security
CN214834511U (en) Construction frame reinforcing apparatus
CN208329612U (en) From the huge column form frame system of angle
CN218346754U (en) Safe operation platform for tile hanging of inclined roof
CN207044363U (en) A kind of new precast beam protection and operating platform
CN207143751U (en) Splice pier top block Support bracket in upstriker section

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200407