CN109783492A - A kind of data referencing divided based on WBS and the method and apparatus summarized - Google Patents
A kind of data referencing divided based on WBS and the method and apparatus summarized Download PDFInfo
- Publication number
- CN109783492A CN109783492A CN201811636605.4A CN201811636605A CN109783492A CN 109783492 A CN109783492 A CN 109783492A CN 201811636605 A CN201811636605 A CN 201811636605A CN 109783492 A CN109783492 A CN 109783492A
- Authority
- CN
- China
- Prior art keywords
- report
- node
- subitem
- evaluation form
- evaluation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 41
- 238000011156 evaluation Methods 0.000 claims abstract description 247
- 238000007689 inspection Methods 0.000 claims abstract description 87
- 238000001514 detection method Methods 0.000 claims abstract description 24
- 230000002776 aggregation Effects 0.000 claims abstract description 15
- 238000004220 aggregation Methods 0.000 claims abstract description 15
- 238000010327 methods by industry Methods 0.000 claims description 37
- 238000010276 construction Methods 0.000 claims description 7
- 239000004576 sand Substances 0.000 description 39
- 238000010586 diagram Methods 0.000 description 37
- 241001269238 Data Species 0.000 description 6
- 238000009415 formwork Methods 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 238000012360 testing method Methods 0.000 description 3
- 238000004590 computer program Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000003860 storage Methods 0.000 description 2
- 240000006248 Broussonetia kazinoki Species 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012797 qualification Methods 0.000 description 1
- 238000013441 quality evaluation Methods 0.000 description 1
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention provides a kind of data referencing divided based on WBS and the method that summarizes, and 1, be associated subitem evaluation form and report;2, subitem evaluation subordinate list and report are associated;3, it selectes subdivisional work node according to WBS structure tree and is used as and summarize node;4, according to the adduction relationship of subdivisional work node and concerned process steps engineering node, the detection points of inspection item each in report and qualified points are referred in subitem evaluation form, the measured data of report is referred in subitem evaluation subordinate list;5, public field table is established, by the common data content quotation in every evaluation form of itemizing into public field table;6, it selectes partitioned project node according to WBS structure tree and is used as and summarize node;7, from public field table by the common data content aggregation of related subitem evaluation form into corresponding branch's evaluation form.The present invention also provides a kind of computer equipments, greatly improve work efficiency.
Description
Technical field
The present invention relates to communication technique field more particularly to a kind of data referencing divided based on WBS and the methods summarized
And equipment.
Background technique
With the development of economy, engineering project is more and more, is itemized to engineering project, branch, unit summarizes all is
By manually carrying out the statistics of data and summarizing, manual operation need to devote a tremendous amount of time and manpower, and statistic processes has
Many mistakes will cause the inaccuracy or missing of data.
Summary of the invention
One of the technical problem to be solved in the present invention is to provide a kind of data referencing divided based on WBS and summarized
Method reduces error rate, greatly improves work efficiency.
One of problem of the invention is achieved in that
A method of based on the WBS data referencing divided and summarize, comprising the following steps:
Step S1, subitem evaluation form is associated with report in project management system, itemize evaluation form and
Report corresponds;
Step S2, subitem evaluation subordinate list is associated with report in project management system, subitem evaluation is attached
Table and report correspond;
Step S3, different engineering nodes is established according to WBS structure tree, select subdivisional work node as with the subitem work
The same each process engineering node of the engineering project type of Cheng Jiedian summarizes node, and subitem evaluation form and subitem evaluation subordinate list are set
In on subdivisional work node, report is set on process engineering node;
It step S4, will be in corresponding report according to the adduction relationship of subdivisional work node and concerned process steps engineering node
The detection points and qualified points of each inspection item refer in corresponding subitem evaluation form, while will be in corresponding report
All measured datas refer in corresponding subitem evaluation subordinate list;
Step S5, public field table is established in project management system, by the public field table and subitem evaluation form
It is associated, and by the common data content quotation in every evaluation form of itemizing into the public field table;
Step S6, summarize relationship, branch according to what WBS structure tree established partitioned project node and related subdivisional work node
Evaluation form is set to partitioned project node, and subitem evaluation form is set on subdivisional work node;
Step S7, the common data content aggregation of related subitem evaluation form is commented to corresponding branch from public field table
Determine in table.
Further, subitem evaluation form or subitem evaluation subordinate list are closed with report in the step S1 and step S2
Connection specifically:
Open subitem evaluation form or subitem evaluation subordinate list, then click typing table after occur report single database, then from
It reports and selectes the report to be bound in single database, by the number and title progress typing in this report list, complete the subitem
Binding between evaluation form and corresponding report and between subitem evaluation subordinate list and corresponding report.
Further, the step S4 specifically:
Establishment WBS plan divides engineering project, and WBS plan is immediately performed after finishing, is divided in the works according to the WBS
The adduction relationship of item engineering node and concerned process steps engineering node, selectes process engineering node, opens the process engineering node institute
Corresponding quality inspection frequency control table fills in the numerical value for calculating detection points, so in quality inspection frequency control table
Report corresponding to the process engineering node is opened afterwards, and inspection data, project management system root are filled in report
It is calculated according to the numerical value and inspection data filled in and counts different inspection items in this report list and go out to examine points and qualified points,
Then go out to examine points and qualified points to carry out inspection items different in the report under all process steps engineering node of selection
It calculates one by one, the detection points of inspection item each in corresponding report and qualified points is then referred into subdivisional work section
In subitem evaluation form under point;Measured data all in corresponding report is referred to point under subdivisional work node simultaneously
In item evaluation subordinate list.
Further, the step S5 specifically:
The public field table includes public field Virtual table and introducing table field, the public field Virtual table it is interior
Appearance includes public field title common in every subitem evaluation form, which is the rule according to subitem evaluation form
What model defined in the common field Virtual table;The content being introduced into table field includes drawing from every subitem evaluation form
The position of the common data content corresponding with public field title entered, the public field title and common data content is one by one
It is corresponding.
Further, the step S7 specifically:
WBS plan is executed, subdivisional work node is selected, opens subitem evaluation form corresponding to the subdivisional work node,
Common data content is write in the subitem evaluation form, includes at least subdivisional work title, subdivisional work number and construction quality etc.
Grade, fills in the subitem evaluation form under all subdivisional work nodes of selection, one by one in the common data that then will fill in
Appearance is saved on the corresponding position of introducing table field;Then branch's evaluation form under partitioned project node is selected, from public word
In segment table by the common data content aggregation of related subitem evaluation form into corresponding branch's evaluation form.
The second technical problem to be solved by the present invention is to provide a kind of computer equipment, reduces error rate, mention significantly
High working efficiency.
The two of problem of the invention, are achieved in that
A kind of computer equipment can be run on a memory and on a processor including memory, processor and storage
Computer program, the processor perform the steps of when executing described program
Step S1, subitem evaluation form is associated with report in project management system, itemize evaluation form and
Report corresponds;
Step S2, subitem evaluation subordinate list is associated with report in project management system, subitem evaluation is attached
Table and report correspond;
Step S3, different engineering nodes is established according to WBS structure tree, select subdivisional work node as with the subitem work
The same each process engineering node of the engineering project type of Cheng Jiedian summarizes node, and subitem evaluation form and subitem evaluation subordinate list are set
In on subdivisional work node, report is set on process engineering node;
It step S4, will be in corresponding report according to the adduction relationship of subdivisional work node and concerned process steps engineering node
The detection points and qualified points of each inspection item refer in corresponding subitem evaluation form, while will be in corresponding report
All measured datas refer in corresponding subitem evaluation subordinate list;
Step S5, public field table is established in project management system, by the public field table and subitem evaluation form
It is associated, and by the common data content quotation in every evaluation form of itemizing into the public field table;
Step S6, summarize relationship, branch according to what WBS structure tree established partitioned project node and related subdivisional work node
Evaluation form is set to partitioned project node, and subitem evaluation form is set on subdivisional work node;
Step S7, the common data content aggregation of related subitem evaluation form is commented to corresponding branch from public field table
Determine in table.
Further, subitem evaluation form or subitem evaluation subordinate list are closed with report in the step S1 and step S2
Connection specifically:
Open subitem evaluation form or subitem evaluation subordinate list, then click typing table after occur report single database, then from
It reports and selectes the report to be bound in single database, by the number and title progress typing in this report list, complete the subitem
Binding between evaluation form and corresponding report and between subitem evaluation subordinate list and corresponding report.
Further, the step S4 specifically:
Establishment WBS plan divides engineering project, and WBS plan is immediately performed after finishing, is divided in the works according to the WBS
The adduction relationship of item engineering node and concerned process steps engineering node, selectes process engineering node, opens the process engineering node institute
Corresponding quality inspection frequency control table fills in the numerical value for calculating detection points, so in quality inspection frequency control table
Report corresponding to the process engineering node is opened afterwards, and inspection data, project management system root are filled in report
It is calculated according to the numerical value and inspection data filled in and counts different inspection items in this report list and go out to examine points and qualified points,
Then go out to examine points and qualified points to carry out inspection items different in the report under all process steps engineering node of selection
It calculates one by one, the detection points of inspection item each in corresponding report and qualified points is then referred into subdivisional work section
In subitem evaluation form under point;Measured data all in corresponding report is referred to point under subdivisional work node simultaneously
In item evaluation subordinate list.
Further, the step S5 specifically:
The public field table includes public field Virtual table and introducing table field, the public field Virtual table it is interior
Appearance includes public field title common in every subitem evaluation form, which is the rule according to subitem evaluation form
What model defined in the common field Virtual table;The content being introduced into table field includes drawing from every subitem evaluation form
The position of the common data content corresponding with public field title entered, the public field title and common data content is one by one
It is corresponding.
Further, the step S7 specifically:
WBS plan is executed, subdivisional work node is selected, opens subitem evaluation form corresponding to the subdivisional work node,
Common data content is write in the subitem evaluation form, includes at least subdivisional work title, subdivisional work number and construction quality etc.
Grade, fills in the subitem evaluation form under all subdivisional work nodes of selection, one by one in the common data that then will fill in
Appearance is saved on the corresponding position of introducing table field;Then branch's evaluation form under partitioned project node is selected, from public word
In segment table by the common data content aggregation of related subitem evaluation form into corresponding branch's evaluation form.
The present invention has the advantage that the present invention formulates in formwork structure tree data summarization rule, and being summarized
Data field forms virtual field table, all has and formwork structure tree in the exemplary construction tree that project is established according to formwork structure tree
Identical data summarization and calling function realize different list datas and call statistics and multinode data summarization, have saved big
Amount identical data repeats the time filled in, and artificial data statistics time, and personnel is avoided to copy and the mistake in statistic processes, drop
Low error rate, greatly improves work efficiency.
Detailed description of the invention
The present invention is further illustrated in conjunction with the embodiments with reference to the accompanying drawings.
Fig. 1 is a kind of data referencing divided based on WBS of the present invention and the method execution flow chart summarized.
Fig. 2 is the selected schematic diagram of evaluation form in the present invention.
Fig. 3 is the page schematic diagram of evaluation form in the present invention.
Fig. 4 is associated with schematic diagram with report for evaluation form in the present invention.
Fig. 5 is the reference data schematic diagram of evaluation form in the present invention.
Fig. 6 is that evaluation form fills in data setting schematic diagram in the present invention.
Fig. 7 is the selected schematic diagram that subordinate list is evaluated in the present invention.
Fig. 8 is the page schematic diagram that subordinate list is evaluated in the present invention.
Fig. 9 is to evaluate subordinate list in the present invention to be associated with schematic diagram with report.
Figure 10 is the reference data schematic diagram that subordinate list is evaluated in the present invention.
Figure 11 is the selected schematic diagram that subdivisional work is delivered for a check in the present invention.
Figure 12 is the selected schematic diagram of subdivisional work node and process engineering node in the present invention.
Figure 13 is the relation schematic diagram of subdivisional work node and evaluation form and evaluation subordinate list in the present invention.
Figure 14 is the relation schematic diagram of process engineering node and report in the present invention.
Figure 15 is the schematic diagram of establishment WBS plan in the present invention.
Figure 16 is the schematic diagram (111 sand (sandstone) setting cushion (back-up sand)) that WBS plan is executed in the present invention.
Figure 17 is that (111 sand (sandstone) setting cushion (is filled out for the schematic diagram of sand bedding course quality inspection frequency control table in the present invention
Sand)).
Figure 18 is the schematic diagram (222 sand (sandstone) setting cushion (back-up sand)) that WBS plan is executed in the present invention.
Figure 19 is that (222 sand (sandstone) setting cushion (is filled out for the schematic diagram of sand bedding course quality inspection frequency control table in the present invention
Sand)).
Figure 20 is the schematic diagram that WBS plan is executed in the present invention (subdivisional work is delivered for a check).
Figure 21 is that first part of sand bedding course quality in site inspection report schematic diagram is selected in the present invention.
Figure 22 is that the data of first part of sand bedding course quality in site inspection report in the present invention fill in schematic diagram.
Figure 23 is the testing result schematic diagram of first part of sand bedding course quality in site inspection report in the present invention.
Figure 24 is that first part of sand bedding course quality in site inspection report schematic diagram is selected in the present invention.
Figure 25 is that the data of first part of sand bedding course quality in site inspection report in the present invention fill in schematic diagram.
Figure 26 is the testing result schematic diagram of first part of sand bedding course quality in site inspection report in the present invention.
Figure 27 is the schematic diagram that sand bedding course quality inspection and evaluation table is selected in the present invention.
Figure 28 is the schematic diagram that sand bedding course quality inspection and evaluation table is filled in the present invention.
Figure 29 is the schematic diagram that sand bedding course quality inspection and evaluation subordinate list is filled in the present invention.
Figure 30 is associated with schematic diagram with evaluation form for public field table in the present invention.
Figure 31 is common data content schematic diagram in sand bedding course quality inspection and evaluation table in the present invention.
Figure 32 is the schematic diagram that common data content introduces public field table in the present invention.
Figure 33 is the schematic diagram that distribution assessment of project node is selected in the present invention.
Figure 34 is to execute WBS in the present invention to plan (first subitem delivers for a check node).
Figure 35 is the evaluation form schematic diagram that first subitem delivers for a check under node in the present invention.
Figure 36 is that first part of aggregate pile quality inspection and evaluation table fills in schematic diagram in the present invention.
Figure 37 is the evaluation form schematic diagram that second subitem delivers for a check under node in invention.
Figure 38 is that first part of aggregate pile quality inspection and evaluation table fills in schematic diagram in the present invention.
Figure 39 is the evaluation form schematic diagram that partitioned project evaluates under node in the present invention.
Figure 40 is partitioned project quality inspection and evaluation table in the present invention.
Specific embodiment
To be clearer and more comprehensible the present invention, now with a preferred embodiment, and attached drawing is cooperated to be described in detail below.
As shown in Figure 1, a kind of data referencing divided based on WBS of the invention and the method summarized, comprising the following steps:
Step S1, subitem evaluation form is associated with report in project management system, itemize evaluation form and
Report corresponds;Specifically: open subitem evaluation form, then click typing table after occur report single database, then from
It reports and selectes the report to be bound in single database, by the number and title progress typing in this report list, complete the subitem
Binding between evaluation form and corresponding report;
Step S2, subitem evaluation subordinate list is associated with report in project management system, subitem evaluation is attached
Table and report correspond;Specifically: subitem evaluation subordinate list is opened, report single database occurs after then clicking typing table,
Then the report to be bound is selected from report single database, the number and title progress typing in this report list is completed
The subitem evaluates the binding between subordinate list and corresponding report;
Step S3, different engineering nodes is established according to WBS structure tree, select subdivisional work node as with the subitem work
The same each process engineering node of the engineering project type of Cheng Jiedian summarizes node, and subitem evaluation form and subitem evaluation subordinate list are set
In on subdivisional work node, report is set on process engineering node;
It step S4, will be in corresponding report according to the adduction relationship of subdivisional work node and concerned process steps engineering node
The detection points and qualified points of each inspection item refer in corresponding subitem evaluation form, while will be in corresponding report
All measured datas refer in corresponding subitem evaluation subordinate list;Specifically:
Establishment WBS plan divides engineering project, and WBS plan is immediately performed after finishing, is divided in the works according to the WBS
The adduction relationship of item engineering node and concerned process steps engineering node, selectes process engineering node, opens the process engineering node institute
Corresponding quality inspection frequency control table fills in the numerical value for calculating detection points, so in quality inspection frequency control table
Report corresponding to the process engineering node is opened afterwards, and inspection data, project management system root are filled in report
It is calculated according to the numerical value and inspection data filled in and counts different inspection items in this report list and go out to examine points and qualified points,
Then go out to examine points and qualified points to carry out inspection items different in the report under all process steps engineering node of selection
It calculates one by one, the detection points of inspection item each in corresponding report and qualified points is then referred into subdivisional work section
In subitem evaluation form under point;Measured data all in corresponding report is referred to point under subdivisional work node simultaneously
In item evaluation subordinate list.
Step S5, public field table is established in project management system, by the public field table and subitem evaluation form
It is associated, and by the common data content quotation in every evaluation form of itemizing into the public field table;Specifically: the public affairs
Field list includes public field Virtual table and introducing table field altogether, and the content of the public field Virtual table includes every subitem
Public field title common in evaluation form, the public field title are the specifications according to subitem evaluation form in the common field
It is defined in Virtual table;The content being introduced into table field include from every itemize evaluation form in introduce and public field
The position of the corresponding common data content of title, the public field title and common data content corresponds;
Step S6, summarize relationship according to what WBS structure tree established partitioned project node and related subdivisional work node, that is, divide
Portion's engineering node summarizes node as each subdivisional work node as the engineering project type of the partitioned project node, point
Portion's evaluation form is set to partitioned project node, and subitem evaluation form is set on subdivisional work node;
Step S7, the common data content aggregation of related subitem evaluation form is commented to corresponding branch from public field table
Determine in table, specifically: WBS plan is executed, subdivisional work node is selected, opens the evaluation of subitem corresponding to the subdivisional work node
Table writes common data content in the subitem evaluation form, includes at least subdivisional work title, subdivisional work number and engineering matter
Grade is measured, the subitem evaluation form under all subdivisional work nodes of selection is filled in one by one, the public number that then will fill in
It is saved on the corresponding position of introducing table field according to content;Then branch's evaluation form under partitioned project node is selected, from public affairs
In total field list by the common data content aggregation of related subitem evaluation form into corresponding branch's evaluation form.
As shown in Figure 1, a kind of computer equipment of the invention, including memory, processor and storage are on a memory simultaneously
The computer program that can be run on a processor, the processor perform the steps of when executing described program
Step S1, subitem evaluation form is associated with report in project management system, itemize evaluation form and
Report corresponds;Specifically: open subitem evaluation form, then click typing table after occur report single database, then from
It reports and selectes the report to be bound in single database, by the number and title progress typing in this report list, complete the subitem
Binding between evaluation form and corresponding report;
Step S2, subitem evaluation subordinate list is associated with report in project management system, subitem evaluation is attached
Table and report correspond;Specifically: subitem evaluation subordinate list is opened, report single database occurs after then clicking typing table,
Then the report to be bound is selected from report single database, the number and title progress typing in this report list is completed
The subitem evaluates the binding between subordinate list and corresponding report;
Step S3, different engineering nodes is established according to WBS structure tree, select subdivisional work node as with the subitem work
The same each process engineering node of the engineering project type of Cheng Jiedian summarizes node, and subitem evaluation form and subitem evaluation subordinate list are set
In on subdivisional work node, report is set on process engineering node;
It step S4, will be in corresponding report according to the adduction relationship of subdivisional work node and concerned process steps engineering node
The detection points and qualified points of each inspection item refer in corresponding subitem evaluation form, while will be in corresponding report
All measured datas refer in corresponding subitem evaluation subordinate list;Specifically:
Establishment WBS plan divides engineering project, and WBS plan is immediately performed after finishing, is divided in the works according to the WBS
The adduction relationship of item engineering node and concerned process steps engineering node, selectes process engineering node, opens the process engineering node institute
Corresponding quality inspection frequency control table fills in the numerical value for calculating detection points, so in quality inspection frequency control table
Report corresponding to the process engineering node is opened afterwards, and inspection data, project management system root are filled in report
It is calculated according to the numerical value and inspection data filled in and counts different inspection items in this report list and go out to examine points and qualified points,
Then go out to examine points and qualified points to carry out inspection items different in the report under all process steps engineering node of selection
It calculates one by one, the detection points of inspection item each in corresponding report and qualified points is then referred into subdivisional work section
In subitem evaluation form under point;Measured data all in corresponding report is referred to point under subdivisional work node simultaneously
In item evaluation subordinate list;
Step S5, public field table is established in project management system, by the public field table and subitem evaluation form
It is associated, and by the common data content quotation in every evaluation form of itemizing into the public field table;Specifically: the public affairs
Field list includes public field Virtual table and introducing table field altogether, and the content of the public field Virtual table includes every subitem
Public field title common in evaluation form, the public field title are the specifications according to subitem evaluation form in the common field
It is defined in Virtual table;The content being introduced into table field include from every itemize evaluation form in introduce and public field
The position of the corresponding common data content of title, the public field title and common data content corresponds;
Step S6, summarize relationship according to what WBS structure tree established partitioned project node and related subdivisional work node, that is, divide
Portion's engineering node summarizes node as each subdivisional work node as the engineering project type of the partitioned project node, point
Portion's evaluation form is set to partitioned project node, and subitem evaluation form is set on subdivisional work node;
Step S7, the common data content aggregation of related subitem evaluation form is commented to corresponding branch from public field table
Determine in table, specifically: WBS plan is executed, subdivisional work node is selected, opens the evaluation of subitem corresponding to the subdivisional work node
Table writes common data content in the subitem evaluation form, includes at least subdivisional work title, subdivisional work number and engineering matter
Grade is measured, the subitem evaluation form under all subdivisional work nodes of selection is filled in one by one, the public number that then will fill in
It is saved on the corresponding position of introducing table field according to content;Then branch's evaluation form under partitioned project node is selected, from public affairs
In total field list by the common data content aggregation of related subitem evaluation form into corresponding branch's evaluation form.
Embodiment:
1, subitem delivers for a check data referencing:
(1) list adduction relationship defines:
Evaluation form, evaluation subordinate list need to quote the data of quality in site inspection report, because evaluation form and report are
Correspondingly, it evaluates subordinate list and report is also one-to-one, so evaluation form and evaluation subordinate list directly quote report
Data.
By taking sand bedding course evaluation form as an example:
1, " sand bedding course quality inspection and evaluation table " needs to call " sand bedding course quality in site inspection report " each check item
Purpose detection points and qualified points.Subitem evaluation form is associated with report in project management system, affiliated party
Method operation as shown in Figures 2 to 6: opening subitem evaluation form (" sand bedding course quality inspection and evaluation table "), then clicks typing table
Occurs report single database afterwards, then selecting the report to be bound from report single database, (" sand bedding course quality in site is examined
Report "), by the number and title progress typing in this report list, such as: by the number in report: applying inspection table 3, title: sand
Bed course quality in site inspection report carries out typing one by one, completes the binding between the subitem evaluation form and corresponding report.
2, " sand bedding course quality inspection and evaluation table (subordinate list) " needs to call the reality of " sand bedding course quality in site inspection report "
Measured data, correlating method operation as shown in Figure 7 to 10: opening subitem evaluation form, (" sand bedding course quality inspection and evaluation table is (attached
Table) "), there is report single database after then clicking typing table, then selectes the report to be bound from report single database
(" sand bedding course quality in site inspection report "), by the number and title progress typing in this report list, such as: will be in report
Number: apply inspection table 3, title: sand bedding course quality in site inspection report carries out typing one by one, complete the subitem evaluation form with it is corresponding
Report between binding.
3, because engineering in practice list be it is shared, in order to which data referencing is clear, system be provided with according to WBS structure tree
It sets the reference of data and summarizes relationship, data summarization rule: after establishing Virtual table, all kinds of comment is chosen in WBS template
Fixed summarizes rule.As is illustrated by figs. 11 and 12: the data relationship of some subdivisional work of engineering project and procedure-node is chosen.?
Subdivisional work node is selected in WBS template definition as the node summarized, i.e., relevant data is all pooled on the node,
Here it (can be subitem that related data, which refers to as the engineering project type of the subdivisional work node and has selected node,
Engineering node, process engineering node, partitioned project node etc.) in the corresponding data for having bound corresponding report, such as Figure 11
Shown, entitled → subdivisional work of subdivisional work node is delivered for a check, in title → indicate that data will uniformly come together in herein, point
Column can be chosen by hitting subdivisional work and delivering for a check rear each engineering node and will appear, and the engineering section to be summarized is chosen according to engineering project demand
Point summarizes relation data and can be aggregated into the subdivisional work of selection and deliver for a check in node if having chosen and when engineering project type is consistent.
When not choosing, the data of filling in for summarizing relationship are that the subdivisional work that will not be aggregated into above is delivered for a check on node, such evaluation form,
Evaluation subordinate list is just and report establishes adduction relationship, and case effect is as shown in Figure 11 to 14;Such as chosen with this → subitem
The same process engineering node of the engineering project type that engineering is delivered for a check: it is laid with (back-up sand) and is laid with (rockfilling), → subdivisional work is handed over
It (is compiled in testing with an evaluation form (number: evaluation form 3, title: sand bedding course quality inspection and evaluation table) and an evaluation subordinate list
Number: evaluation subordinate list 3, title: sand bedding course quality inspection and evaluation subordinate list), it is laid in (back-up sand) and (number: is applied with a report
Examine table 3, title: sand bedding course quality in site inspection report), it is laid in (rockfilling) with other reports, due to work of itemizing
Journey deliver for a check in evaluation form and evaluation subordinate list correspondingly only be laid with (back-up sand) in report, so will be laid with (back-up sand)
In report each inspection item detection points and qualified points refer in the evaluation form that subdivisional work is delivered for a check, simultaneously
All measured datas of the report being laid in (back-up sand) are referred in the evaluation subordinate list that subdivisional work is delivered for a check.Establish example knot
The data of each process node can be aggregated into automatically when paper mulberry has chosen in the subitem node for summarizing rule.It is automatic to calculate qualification rate root
Require determine whether each detection is qualified according to evaluation criteria.Specifically have: establishment WBS plan divides engineering project, finishes
After be immediately performed WBS plan, according to the adduction relationship of the WBS subdivisional work node and concerned process steps engineering node in the works, choosing
Determine process engineering node, quality inspection frequency control table corresponding to the process engineering node is opened, in quality inspection frequency control
The numerical value for calculating detection points is filled in tabulation, is then opened report corresponding to the process engineering node, is being reported
Inspection data is filled in list, project management system calculates according to the numerical value and inspection data filled in and counts this report list
Middle difference inspection item goes out to examine points and qualified points, then in the report under all process steps engineering node of selection not
Go out to examine points and qualified points to be calculated one by one with inspection item, then by inspection item each in corresponding report
Detection points and qualified points refer in the subitem evaluation form under subdivisional work node;To own in corresponding report simultaneously
Measured data refer to the subitem under subdivisional work node evaluation subordinate list in;As shown in Figure 15 to Figure 29.
5, public field table is established, which includes public field Virtual table and introducing table field, public word
Section Virtual table includes needing to summarize the public field title of every subitem evaluation form of evaluation, and public field title includes at least work
Journey number, project content and credit rating, are additionally provided with field type and length;Introducing table field includes extracting every subitem
With the one-to-one common data content of the public field title in evaluation form, it is additionally provided with field type and length;Thus will
Each subitem evaluation form and public field table establish incidence relation, and as shown in Figure 30 to Figure 32: the field of public field table establishes
With the data correlation of subitem evaluation form, effect is as shown in figure 32.The public field title is including at least in job number, engineering
Hold and credit rating, from subitem evaluation form the common data content that introduces it is corresponding include table number, subdivisional work title and
Class of construction quality evaluation.
6, all analyzing evaluation tables are filled in data and can be all saved in evaluation, and Practical Project, which summarizes, to be summarized by position
, so here also to set data summarization relationship, as shown in figure 33, the evaluation of earth work partitioned project need to only summarize box
The data of the evaluation form in region, defining the relationship of summarizing is the subitem that need to only choose relevant range.
7, by the common data content aggregation of related subitem evaluation form to corresponding branch's evaluation form from public field table
In, specifically: WBS plan is executed, subdivisional work node is selected, opens subitem evaluation form corresponding to the subdivisional work node,
Common data content is write in the subitem evaluation form, includes at least subdivisional work title, subdivisional work number and construction quality
Grade fills in the subitem evaluation form under all subdivisional work nodes of selection, the common data that then will fill in one by one
Content is saved on the corresponding position of introducing table field;Then branch's evaluation form under partitioned project node is selected, from public
In field list by the common data content aggregation of related subitem evaluation form into corresponding branch's evaluation form, such as Figure 34 to Figure 40 institute
Show.
Although specific embodiments of the present invention have been described above, those familiar with the art should be managed
Solution, we are merely exemplary described specific embodiment, rather than for the restriction to the scope of the present invention, it is familiar with this
The technical staff in field should be covered of the invention according to modification and variation equivalent made by spirit of the invention
In scope of the claimed protection.
Claims (10)
1. a kind of data referencing divided based on WBS and the method summarized, it is characterised in that: the following steps are included:
Step S1, subitem evaluation form is associated with report in project management system, subitem evaluation form and report
It is single to correspond;
Step S2, subitem evaluation subordinate list is associated with report in project management system, subitem evaluation subordinate list and
Report corresponds;
Step S3, different engineering nodes is established according to WBS structure tree, select subdivisional work node as with the subdivisional work section
The same each process engineering node of the engineering project type of point summarizes node, and evaluation form of itemizing is set to subitem evaluation subordinate list to be divided
On item engineering node, report is set on process engineering node;
It step S4, will be each in corresponding report according to the adduction relationship of subdivisional work node and concerned process steps engineering node
The detection points and qualified points of inspection item refer in corresponding subitem evaluation form, while will own in corresponding report
Measured data refer in corresponding subitem evaluation subordinate list;
Step S5, public field table is established in project management system, and the public field table and subitem evaluation form are carried out
Association, and by the common data content quotation in every evaluation form of itemizing into the public field table;
Step S6, summarize relationship, branch's evaluation according to what WBS structure tree established partitioned project node and related subdivisional work node
Table is set to partitioned project node, and subitem evaluation form is set on subdivisional work node;
Step S7, from public field table by the common data content aggregation of related subitem evaluation form to corresponding branch's evaluation form
In.
2. a kind of data referencing divided based on WBS according to claim 1 and the method summarized, it is characterised in that: institute
It states in step S1 and step S2 and is associated subitem evaluation form or subitem evaluation subordinate list with report specifically:
Subitem evaluation form or subitem evaluation subordinate list are opened, report single database occurs after then clicking typing table, then from report
The report to be bound is selected in single database, by the number and title progress typing in this report list, completes subitem evaluation
Binding between table and corresponding report and between subitem evaluation subordinate list and corresponding report.
3. a kind of data referencing divided based on WBS according to claim 1 and the method summarized, it is characterised in that: institute
State step S4 specifically:
Establishment WBS plan divides engineering project, and WBS plan is immediately performed after finishing, is itemized in the works work according to the WBS
The adduction relationship of Cheng Jiedian and concerned process steps engineering node are selected process engineering node, are opened corresponding to the process engineering node
Quality inspection frequency control table, filled in quality inspection frequency control table for calculate detection points numerical value, then beat
Report corresponding to the process engineering node is opened, fills in inspection data in report, project management system is according to filling out
The numerical value and inspection data write, which calculate and counts different inspection items in this report list, goes out to examine points and qualified points, then
Go out to examine points and qualified points to carry out one by one inspection items different in the report under all process steps engineering node of selection
It calculates, then refers to the detection points of inspection item each in corresponding report and qualified points under subdivisional work node
Subitem evaluation form in;The subitem that measured data all in corresponding report refers under subdivisional work node is commented simultaneously
Determine in subordinate list.
4. a kind of data referencing divided based on WBS according to claim 1 and the method summarized, it is characterised in that: institute
State step S5 specifically:
The public field table includes public field Virtual table and introducing table field, the content packet of the public field Virtual table
Public field title common to including in every subitem evaluation form, the public field title are existed according to the specification of subitem evaluation form
It is defined in the common field Virtual table;The content being introduced into table field includes introducing from every subitem evaluation form
The position one of common data content corresponding with public field title, the public field title and common data content is a pair of
It answers.
5. a kind of data referencing divided based on WBS according to claim 1 and the method summarized, it is characterised in that: institute
State step S7 specifically:
WBS plan is executed, subdivisional work node is selected, subitem evaluation form corresponding to the subdivisional work node is opened, in this point
Common data content is write in item evaluation form, includes at least subdivisional work title, subdivisional work number and class of construction quality, it is right
Subitem evaluation form under all subdivisional work nodes chosen is filled in one by one, and the common data content that then will fill in saves
Onto the corresponding position of introducing table field;Then branch's evaluation form under partitioned project node is selected, from public field table
By the common data content aggregation of related subitem evaluation form into corresponding branch's evaluation form.
6. a kind of computer equipment including memory, processor and stores the meter that can be run on a memory and on a processor
Calculation machine program, which is characterized in that the processor performs the steps of when executing described program
Step S1, subitem evaluation form is associated with report in project management system, subitem evaluation form and report
It is single to correspond;
Step S2, subitem evaluation subordinate list is associated with report in project management system, subitem evaluation subordinate list and
Report corresponds;
Step S3, different engineering nodes is established according to WBS structure tree, select subdivisional work node as with the subdivisional work section
The same each process engineering node of the engineering project type of point summarizes node, and evaluation form of itemizing is set to subitem evaluation subordinate list to be divided
On item engineering node, report is set on process engineering node;
It step S4, will be each in corresponding report according to the adduction relationship of subdivisional work node and concerned process steps engineering node
The detection points and qualified points of inspection item refer in corresponding subitem evaluation form, while will own in corresponding report
Measured data refer in corresponding subitem evaluation subordinate list;
Step S5, public field table is established in project management system, and the public field table and subitem evaluation form are carried out
Association, and by the common data content quotation in every evaluation form of itemizing into the public field table;
Step S6, summarize relationship, branch's evaluation according to what WBS structure tree established partitioned project node and related subdivisional work node
Table is set to partitioned project node, and subitem evaluation form is set on subdivisional work node;
Step S7, from public field table by the common data content aggregation of related subitem evaluation form to corresponding branch's evaluation form
In.
7. a kind of computer equipment according to claim 6, it is characterised in that: will subitem in the step S1 and step S2
Evaluation form or subitem evaluation subordinate list are associated with report specifically:
Subitem evaluation form or subitem evaluation subordinate list are opened, report single database occurs after then clicking typing table, then from report
The report to be bound is selected in single database, by the number and title progress typing in this report list, completes subitem evaluation
Binding between table and corresponding report and between subitem evaluation subordinate list and corresponding report.
8. a kind of computer equipment according to claim 6, it is characterised in that: the step S4 specifically:
Establishment WBS plan divides engineering project, and WBS plan is immediately performed after finishing, is itemized in the works work according to the WBS
The adduction relationship of Cheng Jiedian and concerned process steps engineering node are selected process engineering node, are opened corresponding to the process engineering node
Quality inspection frequency control table, filled in quality inspection frequency control table for calculate detection points numerical value, then beat
Report corresponding to the process engineering node is opened, fills in inspection data in report, project management system is according to filling out
The numerical value and inspection data write, which calculate and counts different inspection items in this report list, goes out to examine points and qualified points, then
Go out to examine points and qualified points to carry out one by one inspection items different in the report under all process steps engineering node of selection
It calculates, then refers to the detection points of inspection item each in corresponding report and qualified points under subdivisional work node
Subitem evaluation form in;The subitem that measured data all in corresponding report refers under subdivisional work node is commented simultaneously
Determine in subordinate list.
9. a kind of computer equipment according to claim 6, it is characterised in that: the step S5 specifically:
The public field table includes public field Virtual table and introducing table field, the content packet of the public field Virtual table
Public field title common to including in every subitem evaluation form, the public field title are existed according to the specification of subitem evaluation form
It is defined in the common field Virtual table;The content being introduced into table field includes introducing from every subitem evaluation form
The position one of common data content corresponding with public field title, the public field title and common data content is a pair of
It answers.
10. a kind of computer equipment according to claim 6, it is characterised in that: the step S7 specifically:
WBS plan is executed, subdivisional work node is selected, subitem evaluation form corresponding to the subdivisional work node is opened, in this point
Common data content is write in item evaluation form, includes at least subdivisional work title, subdivisional work number and class of construction quality, it is right
Subitem evaluation form under all subdivisional work nodes chosen is filled in one by one, and the common data content that then will fill in saves
Onto the corresponding position of introducing table field;Then branch's evaluation form under partitioned project node is selected, from public field table
By the common data content aggregation of related subitem evaluation form into corresponding branch's evaluation form.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811636605.4A CN109783492A (en) | 2018-12-29 | 2018-12-29 | A kind of data referencing divided based on WBS and the method and apparatus summarized |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811636605.4A CN109783492A (en) | 2018-12-29 | 2018-12-29 | A kind of data referencing divided based on WBS and the method and apparatus summarized |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109783492A true CN109783492A (en) | 2019-05-21 |
Family
ID=66498946
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811636605.4A Pending CN109783492A (en) | 2018-12-29 | 2018-12-29 | A kind of data referencing divided based on WBS and the method and apparatus summarized |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109783492A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110223190A (en) * | 2019-06-06 | 2019-09-10 | 衡水云翼信息技术有限公司 | Agricultural data management method, device, equipment and storage medium |
CN113095631A (en) * | 2021-03-22 | 2021-07-09 | 同望科技股份有限公司 | Engineering enterprise group basic data control platform based on componentization |
CN115774986A (en) * | 2022-11-15 | 2023-03-10 | 蜀道投资集团有限责任公司 | Highway quality evaluation table generation method, electronic device, and computer-readable medium |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1439137A (en) * | 2000-03-07 | 2003-08-27 | 普莱斯沃特豪斯库珀公司 | Method, process and system for optimized outcome driven workflow synthesis and reduction |
CN106940839A (en) * | 2017-03-13 | 2017-07-11 | 中国南方电网有限责任公司超高压输电公司 | A kind of project of transmitting and converting electricity qualitative data managing and control system and method |
US20180046959A1 (en) * | 2016-08-10 | 2018-02-15 | International Business Machines Corporation | Similar project identification |
CN107818427A (en) * | 2017-11-24 | 2018-03-20 | 国网内蒙古东部电力有限公司 | A kind of bill of quantities information for power network technological transformation overhaul engineering and WBS information coupling process and its system |
CN108537440A (en) * | 2018-04-09 | 2018-09-14 | 四川交通职业技术学院 | A kind of building scheme project management system based on BIM |
-
2018
- 2018-12-29 CN CN201811636605.4A patent/CN109783492A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1439137A (en) * | 2000-03-07 | 2003-08-27 | 普莱斯沃特豪斯库珀公司 | Method, process and system for optimized outcome driven workflow synthesis and reduction |
US20180046959A1 (en) * | 2016-08-10 | 2018-02-15 | International Business Machines Corporation | Similar project identification |
CN106940839A (en) * | 2017-03-13 | 2017-07-11 | 中国南方电网有限责任公司超高压输电公司 | A kind of project of transmitting and converting electricity qualitative data managing and control system and method |
CN107818427A (en) * | 2017-11-24 | 2018-03-20 | 国网内蒙古东部电力有限公司 | A kind of bill of quantities information for power network technological transformation overhaul engineering and WBS information coupling process and its system |
CN108537440A (en) * | 2018-04-09 | 2018-09-14 | 四川交通职业技术学院 | A kind of building scheme project management system based on BIM |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110223190A (en) * | 2019-06-06 | 2019-09-10 | 衡水云翼信息技术有限公司 | Agricultural data management method, device, equipment and storage medium |
CN113095631A (en) * | 2021-03-22 | 2021-07-09 | 同望科技股份有限公司 | Engineering enterprise group basic data control platform based on componentization |
CN115774986A (en) * | 2022-11-15 | 2023-03-10 | 蜀道投资集团有限责任公司 | Highway quality evaluation table generation method, electronic device, and computer-readable medium |
CN115774986B (en) * | 2022-11-15 | 2023-10-20 | 蜀道投资集团有限责任公司 | Highway quality evaluation table generation method, electronic device, and computer-readable medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Kallal et al. | ICT diffusion and economic growth: Evidence from the sectorial analysis of a periphery country | |
CN109783492A (en) | A kind of data referencing divided based on WBS and the method and apparatus summarized | |
Li et al. | Architectural technical debt identification based on architecture decisions and change scenarios | |
US8930918B2 (en) | System and method for SQL performance assurance services | |
CN108509344B (en) | Daily cutting batch test method, equipment and readable storage medium | |
Ebert et al. | Improving validation activities in a global software development | |
CN110245409B (en) | Software reliability simulation analysis method based on virtual reality and complex network | |
CN107908542A (en) | Test case creation method, apparatus, computer equipment and storage medium | |
CN102117444A (en) | System for comprehensive arrangement and execution management of production equipment maintenance plan | |
CN103793778B (en) | The real-time auditing method and device of report data | |
De Bassi et al. | Measuring developers' contribution in source code using quality metrics | |
Lipke | Earned schedule application to small projects | |
CN107908538A (en) | A kind of automated testing method and system of server system performance | |
CN107423223A (en) | Test and management system | |
CN110149241A (en) | A kind of automated testing method and storage medium based on IMS equipment | |
CN105868956A (en) | Data processing method and device | |
CN109903008B (en) | Visual management and control system and method for subway construction project progress | |
CN110968751A (en) | Dynamic display method and device for engineering project capital curve | |
CN100562037C (en) | A kind of method that realizes customer definition statistical function | |
CN110334018A (en) | A kind of big data introduction method and relevant device | |
CN109947642A (en) | Automated hierarchical test method based on case classification, apparatus and system | |
Akca et al. | Run-time measurement of cosmic functional size for java business applications: Initial results | |
CN111078527B (en) | Auxiliary system and method for pressure testing of server | |
CN201974848U (en) | Management system for comprehensively arranging and executing maintenance plan of production equipment | |
CN109766381A (en) | A kind of method that assessment of project data are quoted automatically |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190521 |
|
RJ01 | Rejection of invention patent application after publication |