CN109783492A - A kind of data referencing divided based on WBS and the method and apparatus summarized - Google Patents

A kind of data referencing divided based on WBS and the method and apparatus summarized Download PDF

Info

Publication number
CN109783492A
CN109783492A CN201811636605.4A CN201811636605A CN109783492A CN 109783492 A CN109783492 A CN 109783492A CN 201811636605 A CN201811636605 A CN 201811636605A CN 109783492 A CN109783492 A CN 109783492A
Authority
CN
China
Prior art keywords
report
node
subitem
evaluation form
evaluation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811636605.4A
Other languages
Chinese (zh)
Inventor
曾智敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Hua Min Tongda Information Technology Co Ltd
Original Assignee
Fujian Hua Min Tongda Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Hua Min Tongda Information Technology Co Ltd filed Critical Fujian Hua Min Tongda Information Technology Co Ltd
Priority to CN201811636605.4A priority Critical patent/CN109783492A/en
Publication of CN109783492A publication Critical patent/CN109783492A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention provides a kind of data referencing divided based on WBS and the method that summarizes, and 1, be associated subitem evaluation form and report;2, subitem evaluation subordinate list and report are associated;3, it selectes subdivisional work node according to WBS structure tree and is used as and summarize node;4, according to the adduction relationship of subdivisional work node and concerned process steps engineering node, the detection points of inspection item each in report and qualified points are referred in subitem evaluation form, the measured data of report is referred in subitem evaluation subordinate list;5, public field table is established, by the common data content quotation in every evaluation form of itemizing into public field table;6, it selectes partitioned project node according to WBS structure tree and is used as and summarize node;7, from public field table by the common data content aggregation of related subitem evaluation form into corresponding branch's evaluation form.The present invention also provides a kind of computer equipments, greatly improve work efficiency.

Description

A kind of data referencing divided based on WBS and the method and apparatus summarized
Technical field
The present invention relates to communication technique field more particularly to a kind of data referencing divided based on WBS and the methods summarized And equipment.
Background technique
With the development of economy, engineering project is more and more, is itemized to engineering project, branch, unit summarizes all is By manually carrying out the statistics of data and summarizing, manual operation need to devote a tremendous amount of time and manpower, and statistic processes has Many mistakes will cause the inaccuracy or missing of data.
Summary of the invention
One of the technical problem to be solved in the present invention is to provide a kind of data referencing divided based on WBS and summarized Method reduces error rate, greatly improves work efficiency.
One of problem of the invention is achieved in that
A method of based on the WBS data referencing divided and summarize, comprising the following steps:
Step S1, subitem evaluation form is associated with report in project management system, itemize evaluation form and Report corresponds;
Step S2, subitem evaluation subordinate list is associated with report in project management system, subitem evaluation is attached Table and report correspond;
Step S3, different engineering nodes is established according to WBS structure tree, select subdivisional work node as with the subitem work The same each process engineering node of the engineering project type of Cheng Jiedian summarizes node, and subitem evaluation form and subitem evaluation subordinate list are set In on subdivisional work node, report is set on process engineering node;
It step S4, will be in corresponding report according to the adduction relationship of subdivisional work node and concerned process steps engineering node The detection points and qualified points of each inspection item refer in corresponding subitem evaluation form, while will be in corresponding report All measured datas refer in corresponding subitem evaluation subordinate list;
Step S5, public field table is established in project management system, by the public field table and subitem evaluation form It is associated, and by the common data content quotation in every evaluation form of itemizing into the public field table;
Step S6, summarize relationship, branch according to what WBS structure tree established partitioned project node and related subdivisional work node Evaluation form is set to partitioned project node, and subitem evaluation form is set on subdivisional work node;
Step S7, the common data content aggregation of related subitem evaluation form is commented to corresponding branch from public field table Determine in table.
Further, subitem evaluation form or subitem evaluation subordinate list are closed with report in the step S1 and step S2 Connection specifically:
Open subitem evaluation form or subitem evaluation subordinate list, then click typing table after occur report single database, then from It reports and selectes the report to be bound in single database, by the number and title progress typing in this report list, complete the subitem Binding between evaluation form and corresponding report and between subitem evaluation subordinate list and corresponding report.
Further, the step S4 specifically:
Establishment WBS plan divides engineering project, and WBS plan is immediately performed after finishing, is divided in the works according to the WBS The adduction relationship of item engineering node and concerned process steps engineering node, selectes process engineering node, opens the process engineering node institute Corresponding quality inspection frequency control table fills in the numerical value for calculating detection points, so in quality inspection frequency control table Report corresponding to the process engineering node is opened afterwards, and inspection data, project management system root are filled in report It is calculated according to the numerical value and inspection data filled in and counts different inspection items in this report list and go out to examine points and qualified points, Then go out to examine points and qualified points to carry out inspection items different in the report under all process steps engineering node of selection It calculates one by one, the detection points of inspection item each in corresponding report and qualified points is then referred into subdivisional work section In subitem evaluation form under point;Measured data all in corresponding report is referred to point under subdivisional work node simultaneously In item evaluation subordinate list.
Further, the step S5 specifically:
The public field table includes public field Virtual table and introducing table field, the public field Virtual table it is interior Appearance includes public field title common in every subitem evaluation form, which is the rule according to subitem evaluation form What model defined in the common field Virtual table;The content being introduced into table field includes drawing from every subitem evaluation form The position of the common data content corresponding with public field title entered, the public field title and common data content is one by one It is corresponding.
Further, the step S7 specifically:
WBS plan is executed, subdivisional work node is selected, opens subitem evaluation form corresponding to the subdivisional work node, Common data content is write in the subitem evaluation form, includes at least subdivisional work title, subdivisional work number and construction quality etc. Grade, fills in the subitem evaluation form under all subdivisional work nodes of selection, one by one in the common data that then will fill in Appearance is saved on the corresponding position of introducing table field;Then branch's evaluation form under partitioned project node is selected, from public word In segment table by the common data content aggregation of related subitem evaluation form into corresponding branch's evaluation form.
The second technical problem to be solved by the present invention is to provide a kind of computer equipment, reduces error rate, mention significantly High working efficiency.
The two of problem of the invention, are achieved in that
A kind of computer equipment can be run on a memory and on a processor including memory, processor and storage Computer program, the processor perform the steps of when executing described program
Step S1, subitem evaluation form is associated with report in project management system, itemize evaluation form and Report corresponds;
Step S2, subitem evaluation subordinate list is associated with report in project management system, subitem evaluation is attached Table and report correspond;
Step S3, different engineering nodes is established according to WBS structure tree, select subdivisional work node as with the subitem work The same each process engineering node of the engineering project type of Cheng Jiedian summarizes node, and subitem evaluation form and subitem evaluation subordinate list are set In on subdivisional work node, report is set on process engineering node;
It step S4, will be in corresponding report according to the adduction relationship of subdivisional work node and concerned process steps engineering node The detection points and qualified points of each inspection item refer in corresponding subitem evaluation form, while will be in corresponding report All measured datas refer in corresponding subitem evaluation subordinate list;
Step S5, public field table is established in project management system, by the public field table and subitem evaluation form It is associated, and by the common data content quotation in every evaluation form of itemizing into the public field table;
Step S6, summarize relationship, branch according to what WBS structure tree established partitioned project node and related subdivisional work node Evaluation form is set to partitioned project node, and subitem evaluation form is set on subdivisional work node;
Step S7, the common data content aggregation of related subitem evaluation form is commented to corresponding branch from public field table Determine in table.
Further, subitem evaluation form or subitem evaluation subordinate list are closed with report in the step S1 and step S2 Connection specifically:
Open subitem evaluation form or subitem evaluation subordinate list, then click typing table after occur report single database, then from It reports and selectes the report to be bound in single database, by the number and title progress typing in this report list, complete the subitem Binding between evaluation form and corresponding report and between subitem evaluation subordinate list and corresponding report.
Further, the step S4 specifically:
Establishment WBS plan divides engineering project, and WBS plan is immediately performed after finishing, is divided in the works according to the WBS The adduction relationship of item engineering node and concerned process steps engineering node, selectes process engineering node, opens the process engineering node institute Corresponding quality inspection frequency control table fills in the numerical value for calculating detection points, so in quality inspection frequency control table Report corresponding to the process engineering node is opened afterwards, and inspection data, project management system root are filled in report It is calculated according to the numerical value and inspection data filled in and counts different inspection items in this report list and go out to examine points and qualified points, Then go out to examine points and qualified points to carry out inspection items different in the report under all process steps engineering node of selection It calculates one by one, the detection points of inspection item each in corresponding report and qualified points is then referred into subdivisional work section In subitem evaluation form under point;Measured data all in corresponding report is referred to point under subdivisional work node simultaneously In item evaluation subordinate list.
Further, the step S5 specifically:
The public field table includes public field Virtual table and introducing table field, the public field Virtual table it is interior Appearance includes public field title common in every subitem evaluation form, which is the rule according to subitem evaluation form What model defined in the common field Virtual table;The content being introduced into table field includes drawing from every subitem evaluation form The position of the common data content corresponding with public field title entered, the public field title and common data content is one by one It is corresponding.
Further, the step S7 specifically:
WBS plan is executed, subdivisional work node is selected, opens subitem evaluation form corresponding to the subdivisional work node, Common data content is write in the subitem evaluation form, includes at least subdivisional work title, subdivisional work number and construction quality etc. Grade, fills in the subitem evaluation form under all subdivisional work nodes of selection, one by one in the common data that then will fill in Appearance is saved on the corresponding position of introducing table field;Then branch's evaluation form under partitioned project node is selected, from public word In segment table by the common data content aggregation of related subitem evaluation form into corresponding branch's evaluation form.
The present invention has the advantage that the present invention formulates in formwork structure tree data summarization rule, and being summarized Data field forms virtual field table, all has and formwork structure tree in the exemplary construction tree that project is established according to formwork structure tree Identical data summarization and calling function realize different list datas and call statistics and multinode data summarization, have saved big Amount identical data repeats the time filled in, and artificial data statistics time, and personnel is avoided to copy and the mistake in statistic processes, drop Low error rate, greatly improves work efficiency.
Detailed description of the invention
The present invention is further illustrated in conjunction with the embodiments with reference to the accompanying drawings.
Fig. 1 is a kind of data referencing divided based on WBS of the present invention and the method execution flow chart summarized.
Fig. 2 is the selected schematic diagram of evaluation form in the present invention.
Fig. 3 is the page schematic diagram of evaluation form in the present invention.
Fig. 4 is associated with schematic diagram with report for evaluation form in the present invention.
Fig. 5 is the reference data schematic diagram of evaluation form in the present invention.
Fig. 6 is that evaluation form fills in data setting schematic diagram in the present invention.
Fig. 7 is the selected schematic diagram that subordinate list is evaluated in the present invention.
Fig. 8 is the page schematic diagram that subordinate list is evaluated in the present invention.
Fig. 9 is to evaluate subordinate list in the present invention to be associated with schematic diagram with report.
Figure 10 is the reference data schematic diagram that subordinate list is evaluated in the present invention.
Figure 11 is the selected schematic diagram that subdivisional work is delivered for a check in the present invention.
Figure 12 is the selected schematic diagram of subdivisional work node and process engineering node in the present invention.
Figure 13 is the relation schematic diagram of subdivisional work node and evaluation form and evaluation subordinate list in the present invention.
Figure 14 is the relation schematic diagram of process engineering node and report in the present invention.
Figure 15 is the schematic diagram of establishment WBS plan in the present invention.
Figure 16 is the schematic diagram (111 sand (sandstone) setting cushion (back-up sand)) that WBS plan is executed in the present invention.
Figure 17 is that (111 sand (sandstone) setting cushion (is filled out for the schematic diagram of sand bedding course quality inspection frequency control table in the present invention Sand)).
Figure 18 is the schematic diagram (222 sand (sandstone) setting cushion (back-up sand)) that WBS plan is executed in the present invention.
Figure 19 is that (222 sand (sandstone) setting cushion (is filled out for the schematic diagram of sand bedding course quality inspection frequency control table in the present invention Sand)).
Figure 20 is the schematic diagram that WBS plan is executed in the present invention (subdivisional work is delivered for a check).
Figure 21 is that first part of sand bedding course quality in site inspection report schematic diagram is selected in the present invention.
Figure 22 is that the data of first part of sand bedding course quality in site inspection report in the present invention fill in schematic diagram.
Figure 23 is the testing result schematic diagram of first part of sand bedding course quality in site inspection report in the present invention.
Figure 24 is that first part of sand bedding course quality in site inspection report schematic diagram is selected in the present invention.
Figure 25 is that the data of first part of sand bedding course quality in site inspection report in the present invention fill in schematic diagram.
Figure 26 is the testing result schematic diagram of first part of sand bedding course quality in site inspection report in the present invention.
Figure 27 is the schematic diagram that sand bedding course quality inspection and evaluation table is selected in the present invention.
Figure 28 is the schematic diagram that sand bedding course quality inspection and evaluation table is filled in the present invention.
Figure 29 is the schematic diagram that sand bedding course quality inspection and evaluation subordinate list is filled in the present invention.
Figure 30 is associated with schematic diagram with evaluation form for public field table in the present invention.
Figure 31 is common data content schematic diagram in sand bedding course quality inspection and evaluation table in the present invention.
Figure 32 is the schematic diagram that common data content introduces public field table in the present invention.
Figure 33 is the schematic diagram that distribution assessment of project node is selected in the present invention.
Figure 34 is to execute WBS in the present invention to plan (first subitem delivers for a check node).
Figure 35 is the evaluation form schematic diagram that first subitem delivers for a check under node in the present invention.
Figure 36 is that first part of aggregate pile quality inspection and evaluation table fills in schematic diagram in the present invention.
Figure 37 is the evaluation form schematic diagram that second subitem delivers for a check under node in invention.
Figure 38 is that first part of aggregate pile quality inspection and evaluation table fills in schematic diagram in the present invention.
Figure 39 is the evaluation form schematic diagram that partitioned project evaluates under node in the present invention.
Figure 40 is partitioned project quality inspection and evaluation table in the present invention.
Specific embodiment
To be clearer and more comprehensible the present invention, now with a preferred embodiment, and attached drawing is cooperated to be described in detail below.
As shown in Figure 1, a kind of data referencing divided based on WBS of the invention and the method summarized, comprising the following steps:
Step S1, subitem evaluation form is associated with report in project management system, itemize evaluation form and Report corresponds;Specifically: open subitem evaluation form, then click typing table after occur report single database, then from It reports and selectes the report to be bound in single database, by the number and title progress typing in this report list, complete the subitem Binding between evaluation form and corresponding report;
Step S2, subitem evaluation subordinate list is associated with report in project management system, subitem evaluation is attached Table and report correspond;Specifically: subitem evaluation subordinate list is opened, report single database occurs after then clicking typing table, Then the report to be bound is selected from report single database, the number and title progress typing in this report list is completed The subitem evaluates the binding between subordinate list and corresponding report;
Step S3, different engineering nodes is established according to WBS structure tree, select subdivisional work node as with the subitem work The same each process engineering node of the engineering project type of Cheng Jiedian summarizes node, and subitem evaluation form and subitem evaluation subordinate list are set In on subdivisional work node, report is set on process engineering node;
It step S4, will be in corresponding report according to the adduction relationship of subdivisional work node and concerned process steps engineering node The detection points and qualified points of each inspection item refer in corresponding subitem evaluation form, while will be in corresponding report All measured datas refer in corresponding subitem evaluation subordinate list;Specifically:
Establishment WBS plan divides engineering project, and WBS plan is immediately performed after finishing, is divided in the works according to the WBS The adduction relationship of item engineering node and concerned process steps engineering node, selectes process engineering node, opens the process engineering node institute Corresponding quality inspection frequency control table fills in the numerical value for calculating detection points, so in quality inspection frequency control table Report corresponding to the process engineering node is opened afterwards, and inspection data, project management system root are filled in report It is calculated according to the numerical value and inspection data filled in and counts different inspection items in this report list and go out to examine points and qualified points, Then go out to examine points and qualified points to carry out inspection items different in the report under all process steps engineering node of selection It calculates one by one, the detection points of inspection item each in corresponding report and qualified points is then referred into subdivisional work section In subitem evaluation form under point;Measured data all in corresponding report is referred to point under subdivisional work node simultaneously In item evaluation subordinate list.
Step S5, public field table is established in project management system, by the public field table and subitem evaluation form It is associated, and by the common data content quotation in every evaluation form of itemizing into the public field table;Specifically: the public affairs Field list includes public field Virtual table and introducing table field altogether, and the content of the public field Virtual table includes every subitem Public field title common in evaluation form, the public field title are the specifications according to subitem evaluation form in the common field It is defined in Virtual table;The content being introduced into table field include from every itemize evaluation form in introduce and public field The position of the corresponding common data content of title, the public field title and common data content corresponds;
Step S6, summarize relationship according to what WBS structure tree established partitioned project node and related subdivisional work node, that is, divide Portion's engineering node summarizes node as each subdivisional work node as the engineering project type of the partitioned project node, point Portion's evaluation form is set to partitioned project node, and subitem evaluation form is set on subdivisional work node;
Step S7, the common data content aggregation of related subitem evaluation form is commented to corresponding branch from public field table Determine in table, specifically: WBS plan is executed, subdivisional work node is selected, opens the evaluation of subitem corresponding to the subdivisional work node Table writes common data content in the subitem evaluation form, includes at least subdivisional work title, subdivisional work number and engineering matter Grade is measured, the subitem evaluation form under all subdivisional work nodes of selection is filled in one by one, the public number that then will fill in It is saved on the corresponding position of introducing table field according to content;Then branch's evaluation form under partitioned project node is selected, from public affairs In total field list by the common data content aggregation of related subitem evaluation form into corresponding branch's evaluation form.
As shown in Figure 1, a kind of computer equipment of the invention, including memory, processor and storage are on a memory simultaneously The computer program that can be run on a processor, the processor perform the steps of when executing described program
Step S1, subitem evaluation form is associated with report in project management system, itemize evaluation form and Report corresponds;Specifically: open subitem evaluation form, then click typing table after occur report single database, then from It reports and selectes the report to be bound in single database, by the number and title progress typing in this report list, complete the subitem Binding between evaluation form and corresponding report;
Step S2, subitem evaluation subordinate list is associated with report in project management system, subitem evaluation is attached Table and report correspond;Specifically: subitem evaluation subordinate list is opened, report single database occurs after then clicking typing table, Then the report to be bound is selected from report single database, the number and title progress typing in this report list is completed The subitem evaluates the binding between subordinate list and corresponding report;
Step S3, different engineering nodes is established according to WBS structure tree, select subdivisional work node as with the subitem work The same each process engineering node of the engineering project type of Cheng Jiedian summarizes node, and subitem evaluation form and subitem evaluation subordinate list are set In on subdivisional work node, report is set on process engineering node;
It step S4, will be in corresponding report according to the adduction relationship of subdivisional work node and concerned process steps engineering node The detection points and qualified points of each inspection item refer in corresponding subitem evaluation form, while will be in corresponding report All measured datas refer in corresponding subitem evaluation subordinate list;Specifically:
Establishment WBS plan divides engineering project, and WBS plan is immediately performed after finishing, is divided in the works according to the WBS The adduction relationship of item engineering node and concerned process steps engineering node, selectes process engineering node, opens the process engineering node institute Corresponding quality inspection frequency control table fills in the numerical value for calculating detection points, so in quality inspection frequency control table Report corresponding to the process engineering node is opened afterwards, and inspection data, project management system root are filled in report It is calculated according to the numerical value and inspection data filled in and counts different inspection items in this report list and go out to examine points and qualified points, Then go out to examine points and qualified points to carry out inspection items different in the report under all process steps engineering node of selection It calculates one by one, the detection points of inspection item each in corresponding report and qualified points is then referred into subdivisional work section In subitem evaluation form under point;Measured data all in corresponding report is referred to point under subdivisional work node simultaneously In item evaluation subordinate list;
Step S5, public field table is established in project management system, by the public field table and subitem evaluation form It is associated, and by the common data content quotation in every evaluation form of itemizing into the public field table;Specifically: the public affairs Field list includes public field Virtual table and introducing table field altogether, and the content of the public field Virtual table includes every subitem Public field title common in evaluation form, the public field title are the specifications according to subitem evaluation form in the common field It is defined in Virtual table;The content being introduced into table field include from every itemize evaluation form in introduce and public field The position of the corresponding common data content of title, the public field title and common data content corresponds;
Step S6, summarize relationship according to what WBS structure tree established partitioned project node and related subdivisional work node, that is, divide Portion's engineering node summarizes node as each subdivisional work node as the engineering project type of the partitioned project node, point Portion's evaluation form is set to partitioned project node, and subitem evaluation form is set on subdivisional work node;
Step S7, the common data content aggregation of related subitem evaluation form is commented to corresponding branch from public field table Determine in table, specifically: WBS plan is executed, subdivisional work node is selected, opens the evaluation of subitem corresponding to the subdivisional work node Table writes common data content in the subitem evaluation form, includes at least subdivisional work title, subdivisional work number and engineering matter Grade is measured, the subitem evaluation form under all subdivisional work nodes of selection is filled in one by one, the public number that then will fill in It is saved on the corresponding position of introducing table field according to content;Then branch's evaluation form under partitioned project node is selected, from public affairs In total field list by the common data content aggregation of related subitem evaluation form into corresponding branch's evaluation form.
Embodiment:
1, subitem delivers for a check data referencing:
(1) list adduction relationship defines:
Evaluation form, evaluation subordinate list need to quote the data of quality in site inspection report, because evaluation form and report are Correspondingly, it evaluates subordinate list and report is also one-to-one, so evaluation form and evaluation subordinate list directly quote report Data.
By taking sand bedding course evaluation form as an example:
1, " sand bedding course quality inspection and evaluation table " needs to call " sand bedding course quality in site inspection report " each check item Purpose detection points and qualified points.Subitem evaluation form is associated with report in project management system, affiliated party Method operation as shown in Figures 2 to 6: opening subitem evaluation form (" sand bedding course quality inspection and evaluation table "), then clicks typing table Occurs report single database afterwards, then selecting the report to be bound from report single database, (" sand bedding course quality in site is examined Report "), by the number and title progress typing in this report list, such as: by the number in report: applying inspection table 3, title: sand Bed course quality in site inspection report carries out typing one by one, completes the binding between the subitem evaluation form and corresponding report.
2, " sand bedding course quality inspection and evaluation table (subordinate list) " needs to call the reality of " sand bedding course quality in site inspection report " Measured data, correlating method operation as shown in Figure 7 to 10: opening subitem evaluation form, (" sand bedding course quality inspection and evaluation table is (attached Table) "), there is report single database after then clicking typing table, then selectes the report to be bound from report single database (" sand bedding course quality in site inspection report "), by the number and title progress typing in this report list, such as: will be in report Number: apply inspection table 3, title: sand bedding course quality in site inspection report carries out typing one by one, complete the subitem evaluation form with it is corresponding Report between binding.
3, because engineering in practice list be it is shared, in order to which data referencing is clear, system be provided with according to WBS structure tree It sets the reference of data and summarizes relationship, data summarization rule: after establishing Virtual table, all kinds of comment is chosen in WBS template Fixed summarizes rule.As is illustrated by figs. 11 and 12: the data relationship of some subdivisional work of engineering project and procedure-node is chosen.? Subdivisional work node is selected in WBS template definition as the node summarized, i.e., relevant data is all pooled on the node, Here it (can be subitem that related data, which refers to as the engineering project type of the subdivisional work node and has selected node, Engineering node, process engineering node, partitioned project node etc.) in the corresponding data for having bound corresponding report, such as Figure 11 Shown, entitled → subdivisional work of subdivisional work node is delivered for a check, in title → indicate that data will uniformly come together in herein, point Column can be chosen by hitting subdivisional work and delivering for a check rear each engineering node and will appear, and the engineering section to be summarized is chosen according to engineering project demand Point summarizes relation data and can be aggregated into the subdivisional work of selection and deliver for a check in node if having chosen and when engineering project type is consistent. When not choosing, the data of filling in for summarizing relationship are that the subdivisional work that will not be aggregated into above is delivered for a check on node, such evaluation form, Evaluation subordinate list is just and report establishes adduction relationship, and case effect is as shown in Figure 11 to 14;Such as chosen with this → subitem The same process engineering node of the engineering project type that engineering is delivered for a check: it is laid with (back-up sand) and is laid with (rockfilling), → subdivisional work is handed over It (is compiled in testing with an evaluation form (number: evaluation form 3, title: sand bedding course quality inspection and evaluation table) and an evaluation subordinate list Number: evaluation subordinate list 3, title: sand bedding course quality inspection and evaluation subordinate list), it is laid in (back-up sand) and (number: is applied with a report Examine table 3, title: sand bedding course quality in site inspection report), it is laid in (rockfilling) with other reports, due to work of itemizing Journey deliver for a check in evaluation form and evaluation subordinate list correspondingly only be laid with (back-up sand) in report, so will be laid with (back-up sand) In report each inspection item detection points and qualified points refer in the evaluation form that subdivisional work is delivered for a check, simultaneously All measured datas of the report being laid in (back-up sand) are referred in the evaluation subordinate list that subdivisional work is delivered for a check.Establish example knot The data of each process node can be aggregated into automatically when paper mulberry has chosen in the subitem node for summarizing rule.It is automatic to calculate qualification rate root Require determine whether each detection is qualified according to evaluation criteria.Specifically have: establishment WBS plan divides engineering project, finishes After be immediately performed WBS plan, according to the adduction relationship of the WBS subdivisional work node and concerned process steps engineering node in the works, choosing Determine process engineering node, quality inspection frequency control table corresponding to the process engineering node is opened, in quality inspection frequency control The numerical value for calculating detection points is filled in tabulation, is then opened report corresponding to the process engineering node, is being reported Inspection data is filled in list, project management system calculates according to the numerical value and inspection data filled in and counts this report list Middle difference inspection item goes out to examine points and qualified points, then in the report under all process steps engineering node of selection not Go out to examine points and qualified points to be calculated one by one with inspection item, then by inspection item each in corresponding report Detection points and qualified points refer in the subitem evaluation form under subdivisional work node;To own in corresponding report simultaneously Measured data refer to the subitem under subdivisional work node evaluation subordinate list in;As shown in Figure 15 to Figure 29.
5, public field table is established, which includes public field Virtual table and introducing table field, public word Section Virtual table includes needing to summarize the public field title of every subitem evaluation form of evaluation, and public field title includes at least work Journey number, project content and credit rating, are additionally provided with field type and length;Introducing table field includes extracting every subitem With the one-to-one common data content of the public field title in evaluation form, it is additionally provided with field type and length;Thus will Each subitem evaluation form and public field table establish incidence relation, and as shown in Figure 30 to Figure 32: the field of public field table establishes With the data correlation of subitem evaluation form, effect is as shown in figure 32.The public field title is including at least in job number, engineering Hold and credit rating, from subitem evaluation form the common data content that introduces it is corresponding include table number, subdivisional work title and Class of construction quality evaluation.
6, all analyzing evaluation tables are filled in data and can be all saved in evaluation, and Practical Project, which summarizes, to be summarized by position , so here also to set data summarization relationship, as shown in figure 33, the evaluation of earth work partitioned project need to only summarize box The data of the evaluation form in region, defining the relationship of summarizing is the subitem that need to only choose relevant range.
7, by the common data content aggregation of related subitem evaluation form to corresponding branch's evaluation form from public field table In, specifically: WBS plan is executed, subdivisional work node is selected, opens subitem evaluation form corresponding to the subdivisional work node, Common data content is write in the subitem evaluation form, includes at least subdivisional work title, subdivisional work number and construction quality Grade fills in the subitem evaluation form under all subdivisional work nodes of selection, the common data that then will fill in one by one Content is saved on the corresponding position of introducing table field;Then branch's evaluation form under partitioned project node is selected, from public In field list by the common data content aggregation of related subitem evaluation form into corresponding branch's evaluation form, such as Figure 34 to Figure 40 institute Show.
Although specific embodiments of the present invention have been described above, those familiar with the art should be managed Solution, we are merely exemplary described specific embodiment, rather than for the restriction to the scope of the present invention, it is familiar with this The technical staff in field should be covered of the invention according to modification and variation equivalent made by spirit of the invention In scope of the claimed protection.

Claims (10)

1. a kind of data referencing divided based on WBS and the method summarized, it is characterised in that: the following steps are included:
Step S1, subitem evaluation form is associated with report in project management system, subitem evaluation form and report It is single to correspond;
Step S2, subitem evaluation subordinate list is associated with report in project management system, subitem evaluation subordinate list and Report corresponds;
Step S3, different engineering nodes is established according to WBS structure tree, select subdivisional work node as with the subdivisional work section The same each process engineering node of the engineering project type of point summarizes node, and evaluation form of itemizing is set to subitem evaluation subordinate list to be divided On item engineering node, report is set on process engineering node;
It step S4, will be each in corresponding report according to the adduction relationship of subdivisional work node and concerned process steps engineering node The detection points and qualified points of inspection item refer in corresponding subitem evaluation form, while will own in corresponding report Measured data refer in corresponding subitem evaluation subordinate list;
Step S5, public field table is established in project management system, and the public field table and subitem evaluation form are carried out Association, and by the common data content quotation in every evaluation form of itemizing into the public field table;
Step S6, summarize relationship, branch's evaluation according to what WBS structure tree established partitioned project node and related subdivisional work node Table is set to partitioned project node, and subitem evaluation form is set on subdivisional work node;
Step S7, from public field table by the common data content aggregation of related subitem evaluation form to corresponding branch's evaluation form In.
2. a kind of data referencing divided based on WBS according to claim 1 and the method summarized, it is characterised in that: institute It states in step S1 and step S2 and is associated subitem evaluation form or subitem evaluation subordinate list with report specifically:
Subitem evaluation form or subitem evaluation subordinate list are opened, report single database occurs after then clicking typing table, then from report The report to be bound is selected in single database, by the number and title progress typing in this report list, completes subitem evaluation Binding between table and corresponding report and between subitem evaluation subordinate list and corresponding report.
3. a kind of data referencing divided based on WBS according to claim 1 and the method summarized, it is characterised in that: institute State step S4 specifically:
Establishment WBS plan divides engineering project, and WBS plan is immediately performed after finishing, is itemized in the works work according to the WBS The adduction relationship of Cheng Jiedian and concerned process steps engineering node are selected process engineering node, are opened corresponding to the process engineering node Quality inspection frequency control table, filled in quality inspection frequency control table for calculate detection points numerical value, then beat Report corresponding to the process engineering node is opened, fills in inspection data in report, project management system is according to filling out The numerical value and inspection data write, which calculate and counts different inspection items in this report list, goes out to examine points and qualified points, then Go out to examine points and qualified points to carry out one by one inspection items different in the report under all process steps engineering node of selection It calculates, then refers to the detection points of inspection item each in corresponding report and qualified points under subdivisional work node Subitem evaluation form in;The subitem that measured data all in corresponding report refers under subdivisional work node is commented simultaneously Determine in subordinate list.
4. a kind of data referencing divided based on WBS according to claim 1 and the method summarized, it is characterised in that: institute State step S5 specifically:
The public field table includes public field Virtual table and introducing table field, the content packet of the public field Virtual table Public field title common to including in every subitem evaluation form, the public field title are existed according to the specification of subitem evaluation form It is defined in the common field Virtual table;The content being introduced into table field includes introducing from every subitem evaluation form The position one of common data content corresponding with public field title, the public field title and common data content is a pair of It answers.
5. a kind of data referencing divided based on WBS according to claim 1 and the method summarized, it is characterised in that: institute State step S7 specifically:
WBS plan is executed, subdivisional work node is selected, subitem evaluation form corresponding to the subdivisional work node is opened, in this point Common data content is write in item evaluation form, includes at least subdivisional work title, subdivisional work number and class of construction quality, it is right Subitem evaluation form under all subdivisional work nodes chosen is filled in one by one, and the common data content that then will fill in saves Onto the corresponding position of introducing table field;Then branch's evaluation form under partitioned project node is selected, from public field table By the common data content aggregation of related subitem evaluation form into corresponding branch's evaluation form.
6. a kind of computer equipment including memory, processor and stores the meter that can be run on a memory and on a processor Calculation machine program, which is characterized in that the processor performs the steps of when executing described program
Step S1, subitem evaluation form is associated with report in project management system, subitem evaluation form and report It is single to correspond;
Step S2, subitem evaluation subordinate list is associated with report in project management system, subitem evaluation subordinate list and Report corresponds;
Step S3, different engineering nodes is established according to WBS structure tree, select subdivisional work node as with the subdivisional work section The same each process engineering node of the engineering project type of point summarizes node, and evaluation form of itemizing is set to subitem evaluation subordinate list to be divided On item engineering node, report is set on process engineering node;
It step S4, will be each in corresponding report according to the adduction relationship of subdivisional work node and concerned process steps engineering node The detection points and qualified points of inspection item refer in corresponding subitem evaluation form, while will own in corresponding report Measured data refer in corresponding subitem evaluation subordinate list;
Step S5, public field table is established in project management system, and the public field table and subitem evaluation form are carried out Association, and by the common data content quotation in every evaluation form of itemizing into the public field table;
Step S6, summarize relationship, branch's evaluation according to what WBS structure tree established partitioned project node and related subdivisional work node Table is set to partitioned project node, and subitem evaluation form is set on subdivisional work node;
Step S7, from public field table by the common data content aggregation of related subitem evaluation form to corresponding branch's evaluation form In.
7. a kind of computer equipment according to claim 6, it is characterised in that: will subitem in the step S1 and step S2 Evaluation form or subitem evaluation subordinate list are associated with report specifically:
Subitem evaluation form or subitem evaluation subordinate list are opened, report single database occurs after then clicking typing table, then from report The report to be bound is selected in single database, by the number and title progress typing in this report list, completes subitem evaluation Binding between table and corresponding report and between subitem evaluation subordinate list and corresponding report.
8. a kind of computer equipment according to claim 6, it is characterised in that: the step S4 specifically:
Establishment WBS plan divides engineering project, and WBS plan is immediately performed after finishing, is itemized in the works work according to the WBS The adduction relationship of Cheng Jiedian and concerned process steps engineering node are selected process engineering node, are opened corresponding to the process engineering node Quality inspection frequency control table, filled in quality inspection frequency control table for calculate detection points numerical value, then beat Report corresponding to the process engineering node is opened, fills in inspection data in report, project management system is according to filling out The numerical value and inspection data write, which calculate and counts different inspection items in this report list, goes out to examine points and qualified points, then Go out to examine points and qualified points to carry out one by one inspection items different in the report under all process steps engineering node of selection It calculates, then refers to the detection points of inspection item each in corresponding report and qualified points under subdivisional work node Subitem evaluation form in;The subitem that measured data all in corresponding report refers under subdivisional work node is commented simultaneously Determine in subordinate list.
9. a kind of computer equipment according to claim 6, it is characterised in that: the step S5 specifically:
The public field table includes public field Virtual table and introducing table field, the content packet of the public field Virtual table Public field title common to including in every subitem evaluation form, the public field title are existed according to the specification of subitem evaluation form It is defined in the common field Virtual table;The content being introduced into table field includes introducing from every subitem evaluation form The position one of common data content corresponding with public field title, the public field title and common data content is a pair of It answers.
10. a kind of computer equipment according to claim 6, it is characterised in that: the step S7 specifically:
WBS plan is executed, subdivisional work node is selected, subitem evaluation form corresponding to the subdivisional work node is opened, in this point Common data content is write in item evaluation form, includes at least subdivisional work title, subdivisional work number and class of construction quality, it is right Subitem evaluation form under all subdivisional work nodes chosen is filled in one by one, and the common data content that then will fill in saves Onto the corresponding position of introducing table field;Then branch's evaluation form under partitioned project node is selected, from public field table By the common data content aggregation of related subitem evaluation form into corresponding branch's evaluation form.
CN201811636605.4A 2018-12-29 2018-12-29 A kind of data referencing divided based on WBS and the method and apparatus summarized Pending CN109783492A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811636605.4A CN109783492A (en) 2018-12-29 2018-12-29 A kind of data referencing divided based on WBS and the method and apparatus summarized

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811636605.4A CN109783492A (en) 2018-12-29 2018-12-29 A kind of data referencing divided based on WBS and the method and apparatus summarized

Publications (1)

Publication Number Publication Date
CN109783492A true CN109783492A (en) 2019-05-21

Family

ID=66498946

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811636605.4A Pending CN109783492A (en) 2018-12-29 2018-12-29 A kind of data referencing divided based on WBS and the method and apparatus summarized

Country Status (1)

Country Link
CN (1) CN109783492A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110223190A (en) * 2019-06-06 2019-09-10 衡水云翼信息技术有限公司 Agricultural data management method, device, equipment and storage medium
CN113095631A (en) * 2021-03-22 2021-07-09 同望科技股份有限公司 Engineering enterprise group basic data control platform based on componentization
CN115774986A (en) * 2022-11-15 2023-03-10 蜀道投资集团有限责任公司 Highway quality evaluation table generation method, electronic device, and computer-readable medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1439137A (en) * 2000-03-07 2003-08-27 普莱斯沃特豪斯库珀公司 Method, process and system for optimized outcome driven workflow synthesis and reduction
CN106940839A (en) * 2017-03-13 2017-07-11 中国南方电网有限责任公司超高压输电公司 A kind of project of transmitting and converting electricity qualitative data managing and control system and method
US20180046959A1 (en) * 2016-08-10 2018-02-15 International Business Machines Corporation Similar project identification
CN107818427A (en) * 2017-11-24 2018-03-20 国网内蒙古东部电力有限公司 A kind of bill of quantities information for power network technological transformation overhaul engineering and WBS information coupling process and its system
CN108537440A (en) * 2018-04-09 2018-09-14 四川交通职业技术学院 A kind of building scheme project management system based on BIM

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1439137A (en) * 2000-03-07 2003-08-27 普莱斯沃特豪斯库珀公司 Method, process and system for optimized outcome driven workflow synthesis and reduction
US20180046959A1 (en) * 2016-08-10 2018-02-15 International Business Machines Corporation Similar project identification
CN106940839A (en) * 2017-03-13 2017-07-11 中国南方电网有限责任公司超高压输电公司 A kind of project of transmitting and converting electricity qualitative data managing and control system and method
CN107818427A (en) * 2017-11-24 2018-03-20 国网内蒙古东部电力有限公司 A kind of bill of quantities information for power network technological transformation overhaul engineering and WBS information coupling process and its system
CN108537440A (en) * 2018-04-09 2018-09-14 四川交通职业技术学院 A kind of building scheme project management system based on BIM

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110223190A (en) * 2019-06-06 2019-09-10 衡水云翼信息技术有限公司 Agricultural data management method, device, equipment and storage medium
CN113095631A (en) * 2021-03-22 2021-07-09 同望科技股份有限公司 Engineering enterprise group basic data control platform based on componentization
CN115774986A (en) * 2022-11-15 2023-03-10 蜀道投资集团有限责任公司 Highway quality evaluation table generation method, electronic device, and computer-readable medium
CN115774986B (en) * 2022-11-15 2023-10-20 蜀道投资集团有限责任公司 Highway quality evaluation table generation method, electronic device, and computer-readable medium

Similar Documents

Publication Publication Date Title
Kallal et al. ICT diffusion and economic growth: Evidence from the sectorial analysis of a periphery country
CN109783492A (en) A kind of data referencing divided based on WBS and the method and apparatus summarized
Li et al. Architectural technical debt identification based on architecture decisions and change scenarios
US8930918B2 (en) System and method for SQL performance assurance services
CN108509344B (en) Daily cutting batch test method, equipment and readable storage medium
Ebert et al. Improving validation activities in a global software development
CN110245409B (en) Software reliability simulation analysis method based on virtual reality and complex network
CN107908542A (en) Test case creation method, apparatus, computer equipment and storage medium
CN102117444A (en) System for comprehensive arrangement and execution management of production equipment maintenance plan
CN103793778B (en) The real-time auditing method and device of report data
De Bassi et al. Measuring developers' contribution in source code using quality metrics
Lipke Earned schedule application to small projects
CN107908538A (en) A kind of automated testing method and system of server system performance
CN107423223A (en) Test and management system
CN110149241A (en) A kind of automated testing method and storage medium based on IMS equipment
CN105868956A (en) Data processing method and device
CN109903008B (en) Visual management and control system and method for subway construction project progress
CN110968751A (en) Dynamic display method and device for engineering project capital curve
CN100562037C (en) A kind of method that realizes customer definition statistical function
CN110334018A (en) A kind of big data introduction method and relevant device
CN109947642A (en) Automated hierarchical test method based on case classification, apparatus and system
Akca et al. Run-time measurement of cosmic functional size for java business applications: Initial results
CN111078527B (en) Auxiliary system and method for pressure testing of server
CN201974848U (en) Management system for comprehensively arranging and executing maintenance plan of production equipment
CN109766381A (en) A kind of method that assessment of project data are quoted automatically

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190521

RJ01 Rejection of invention patent application after publication