CN109783158A - Using starting task processing method and device - Google Patents
Using starting task processing method and device Download PDFInfo
- Publication number
- CN109783158A CN109783158A CN201910032056.8A CN201910032056A CN109783158A CN 109783158 A CN109783158 A CN 109783158A CN 201910032056 A CN201910032056 A CN 201910032056A CN 109783158 A CN109783158 A CN 109783158A
- Authority
- CN
- China
- Prior art keywords
- task
- starting
- dependence
- key
- opportunity
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Stored Programmes (AREA)
Abstract
The disclosure proposes that a kind of application starts task processing method and device, belongs to computer application technology.Wherein, which comprises obtain the attribute information of each starting task in the current Starting mode of target application;The effect for the task that attribute information according to each starting task always includes and the dependence between other tasks determine each dependence task that each key task and each key task in each starting task rely on;According to each key task and each dependence task dependence between other tasks respectively, each key task and each dependence task corresponding starting opportunity are determined;According to each key task and each dependence task corresponding starting opportunity, the updated Starting mode of target application is determined.Task processing method is started by this application as a result, the effect of optimization using starting speed is not only improved, but also can quantify to the process of application starting, effectively measures the effect of optimization of application starting speed.
Description
Technical field
This disclosure relates to computer application technology more particularly to a kind of application starting task processing method and device.
Background technique
With the continuous development of science and technology, the function of application program is also more and more in electronic equipment, to adapt to people's multiplicity
The use demand of change.However, the complication of function of application, so that application program needs to be implemented more during startup
Task influences the usage experience of user so as to cause the starting overlong time of application program.
In the related technology, the rendering of the page in such a way that the UI for simplifying application program is laid out, can be reduced and draw consumption
When, to reduce the starting duration of application program.But the optimization method of this application program launching, optimization process it is excessive according to
Rely the summary in experience, the optimization of application starting speed can not be quantified, so as to cause the optimization to application starting speed
Effect is poor.
Summary of the invention
Application starting task processing method, device, electronic equipment and the storage medium that the disclosure proposes, for solving correlation
In technology, to the method that application starting speed optimizes, the excessive summary dependent on experience can not start speed to application
Optimization quantified, so as to cause the poor problem of effect of optimization to application starting speed.
Application starting task processing method that disclosure one side embodiment proposes, comprising: it is current to obtain target application
The attribute information of each starting task in Starting mode, wherein the attribute information of the task, effect including task and and its
Dependence between his task;According to the effect of each starting task and the dependence between other tasks, determine described each
Each dependence task that each key task and each key task in starting task rely on;According to each key task and each
The dependence task dependence between other tasks respectively determines each key task and each dependence task is corresponding opens
Dynamic opportunity;According to each key task and each dependence task corresponding starting opportunity, the target application is determined
Updated Starting mode.
The application starting Task Processing Unit that disclosure another aspect embodiment proposes, comprising: module is obtained, for obtaining
The attribute information of each starting task in the current Starting mode of target application, wherein the attribute information of the task, including appoint
The effect of business and the dependence between other tasks;First determining module, for according to the effect of each starting task and with
It is each to determine that each key task in each starting task and each key task rely on for dependence between other tasks
Dependence task;Second determining module, for according to each key task and each dependence task respectively between other tasks according to
The relationship of relying, determines each key task and each dependence task corresponding starting opportunity;Third determining module is used for basis
Each key task and each dependence task corresponding starting opportunity, determine the updated starting of the target application
Mode.
The electronic equipment that disclosure another further aspect embodiment proposes comprising: processor and memory;Wherein, the place
Reason device is corresponding with the executable program code to run by reading the executable program code stored in the memory
Program, for realizing foregoing application starting task processing method.
The non-transient computer readable storage medium that the another aspect embodiment of the disclosure proposes, is stored thereon with computer journey
Sequence, which is characterized in that application starting task processing method as previously described is realized when described program is executed by processor.
The computer program that the another aspect embodiment of the disclosure proposes is realized as previously described when the program is executed by processor
Application starting task processing method.
Application the starting task processing method, device, electronic equipment, computer-readable storage medium that the embodiment of the present disclosure provides
Matter and computer program, the effect for task of can include in the attribute information according to each starting task and between other tasks
Dependence, determine each dependence task that each key task in each starting task and each key task rely on, and each
Key task and each dependence task corresponding starting opportunity, and then according to each key task and each dependence task point
On not corresponding starting opportunity, determine the updated Starting mode of target application.As a result, by according to each in current Starting mode
The effect of starting task and the dependence between other tasks, effectively adjustment is using each in start-up course in global scope
Task corresponding starting opportunity improves to not only reduce the duration using starting using starting speed-optimization
Effect, and the process of application starting can be quantified, effectively measure the effect of optimization of application starting speed.
The additional aspect of the disclosure and advantage will be set forth in part in the description, and will partially become from the following description
It obtains obviously, or recognized by the practice of the disclosure.
Detailed description of the invention
The disclosure is above-mentioned and/or additional aspect and advantage will become from the following description of the accompanying drawings of embodiments
Obviously and it is readily appreciated that, in which:
Fig. 1 is a kind of flow diagram of application starting task processing method provided by the embodiment of the present disclosure;
Fig. 2-1 is a kind of schematic diagram that the digraph using start-up course indicates provided by the embodiment of the present disclosure;
Fig. 2-2 is the schematic diagram of exemplary tool class application start-up course;
Fig. 2-3 is typical information/communication class application start-up course schematic diagram;
Fig. 2-4 is the schematic diagram of camera-type application start-up course;
Fig. 3 is the flow diagram of the application starting task processing method of another kind provided by the embodiment of the present disclosure;
A kind of structural schematic diagram of application starting Task Processing Unit provided by Fig. 4 embodiment of the present disclosure;
Fig. 5 is the structural schematic diagram of a kind of electronic equipment provided by open embodiment;
A kind of structural schematic diagram of non-transient computer readable storage medium provided by Fig. 6 embodiment of the present disclosure.
Specific embodiment
Embodiment of the disclosure is described below in detail, examples of the embodiments are shown in the accompanying drawings, wherein from beginning to end
Same or similar label indicates same or similar element.The embodiments described below with reference to the accompanying drawings are exemplary,
It is intended for explaining the disclosure, and should not be understood as the limitation to the disclosure.
The embodiment of the present disclosure is in the related technology, and to the method that application starting speed optimizes, excessive is depended on
The summary of experience can not quantify the optimization of application starting speed, so as to cause the effect of optimization to application starting speed
Poor problem proposes a kind of application starting task processing method.
The application starting task processing method that the embodiment of the present disclosure provides, can be according to the attribute information of each starting task
In include task effect and the dependence between other tasks, determine each key task in each starting task and each close
Each dependence task and each key task and each dependence task corresponding starting opportunity that key task relies on, in turn
According to each key task and each dependence task corresponding starting opportunity, the updated starting side of target application is determined
Formula.As a result, by according to the effect and the dependence between other tasks for respectively starting task in current Starting mode,
Effectively adjustment is opened using task each in start-up course corresponding starting opportunity to not only reduce and apply in global scope
Dynamic duration improves the effect using starting speed-optimization, and can quantify to the process of application starting, effectively weighs
The effect of optimization of amount application starting speed.
Below with reference to the accompanying drawings application the starting task processing method, device, electronic equipment, the storage medium disclosure provided
And computer program is described in detail.
Fig. 1 is a kind of flow diagram of application starting task processing method provided by the embodiment of the present disclosure.
As shown in Figure 1, the application starting task processing method, comprising the following steps:
Step 101, the attribute information of each starting task in the current Starting mode of target application is obtained, wherein described appoint
The attribute information of business, the effect including task and the dependence between other tasks.
Wherein, start task, refer to using needing to be implemented during startup for task.
It should be noted that application starting speed, i.e. application starting is time-consuming, logical to refer to the application clicked in terminal from user
Icon, entering to application start completion can time loss between interaction mode.In general, three kinds of moulds can be divided into using starting
Formula: starting for the first time, cold start-up and thermal starting.In the case that cold start speed refers to that application process is not survived, clicks and answer from user
With icon to enter can interaction mode time-consuming;Thermal starting speed refers in the case where application process backstage is survived, from user
Click application icon to entrance can interaction mode time-consuming;Starting for the first time belongs to one of cold start-up special circumstances, refers to and answers
Cold start-up when being opened for the first time after completely new installation (or after cleaning data) is time-consuming.Due to applying when starting for the first time one
As will do it a large amount of initialization, the time-consuming operations such as resource pulls, therefore generally it is individually calculated.
It is understood that need to run multiple tasks using during startup, be loaded into can interaction mode institute
Resource, data for needing etc..The quantity of starting task and the opportunity of starting will affect the speed using starting.Therefore, in this public affairs
It opens in a kind of possible way of realization of embodiment, can be first in the current Starting mode of goal task, included each starting
Task, and according to the attribute information of each starting task, each starting application is performed corresponding processing, with the starting to target application
Speed optimizes.
Wherein, the effect of task refers to starting task effect played in application start-up course, according to the work of task
With can determine whether the starting task has to carry out in the start-up course of application.It should be noted that target application
Respectively start task in Starting mode not to be independent from each other, for example, the execution of some tasks depends on other starting tasks
It executes, therefore, starts in the attribute information of task, can also include the dependence pass between starting task and other starting tasks
System.
Step 102, according to the effect of each starting task and the dependence between other tasks, each starting is determined
Each dependence task that each key task and each key task in task rely on.
In the embodiments of the present disclosure, it after the attribute information for getting each starting task, can be wrapped according in attribute information
The task effect included, determines each key task in application start-up course.Wherein, each key task can be in application
Each starting task in the critical path of starting.Due to key task may not be it is independent, key task may be with other
Business has successive dependence, accordingly, it is determined that out after each key task, it can according to each key task and other tasks
Dependence, determines each dependence task that each key task relies on, i.e. the execution of key task depends on its corresponding dependence
Task is first carried out.
Further, referring to that the application icon clicked in terminal from user enters to application using starting can interaction mode
Process.Wherein, into can interaction mode can refer to that application success shows homepage frame picture.I.e. in embodiment of the present disclosure one kind
In possible way of realization, above-mentioned steps 102 may include:
According to the effect of each starting task, the determining homepage frame picture with the target application shows that associated task is
Key task;
According to the dependence between each key task and other tasks, determine task that each key task relies on be according to
Rely task.
It should be noted that, that is, it is believed that being completed using start-up course, being answered after application success shows homepage frame picture
With enter can interaction mode, therefore, can by the associated starting task of display of the homepage frame picture with target application, determine
For key task, for example, key task can be each starting task in the critical path in application starting.It later can root
According to the dependence between each key task and other starting tasks, by the starting task that each key task relies on be determined as according to
Rely task.
It can be a Zhang Youxiang by the procedural abstraction of application starting in a kind of possible way of realization of the embodiment of the present disclosure
Figure, the digraph can image represent using the starting task needed to be implemented in start-up course, and each starting task it
Between dependence.
For example, as shown in Fig. 2-1, for a kind of schematic diagram that the digraph using start-up course indicates.Fig. 2-1 institute
In the digraph shown, each node indicates that, using the various types of starting tasks triggered in start-up course, arrow indicates each starting
Dependence between task.For example, there are the arrows that task V1, task V2 are directed toward task V5, then it represents that task V5 and task
There are logic dependences between V1, task V2, and Yao Zhihang task V5 is firstly the need of execution task V1 and task V2.Assuming that by task V0
After being defined as user's click icon (Icon click), using the internal first called starting task executed, V11 is defined
For the starting task that the homepage frame picture (First frame) of application is completed, then can according to the effect of each starting task,
Task V0, V2, V5, V9, V11 are determined as key task, and the task that key task V2 is relied on is key task V0, key is appointed
The task that V5 is relied on of being engaged in is V1 and key task V2, and the task that key task V9 is relied on is key task V5 and task V6, crucial
The task that task V11 is relied on is key task V9 and task V10, hence, it can be determined that each dependence task that key task relies on
For task V1, task V6 and task V10.
It should be noted that being usually the message response function applied using the key task in start-up course
The methods of (onCreate), but it is not limited only to this;Closely related, the different shape using the process of starting and the product form of application
Application, starting when " critical path " be different, i.e., the key task in start-up course is different, such as Fig. 2-2, figure
Shown in 2-3 and Fig. 2-4, the respectively schematic diagram, typical information of exemplary tool class application start-up course/communication class application starting
The schematic diagram of process and the schematic diagram of camera-type application start-up course, can intuitively find out the starting of the application of different shape
Process is different.Therefore, in actual use, due to different froms such as the type of application, functions, the key task determined can also be with
It is different.Dependence task can be data preloading, certain submodules, Software Development Kit (Software
Development Kit, SDK) pre-initialize, public bottom functional module (network, statistics etc.) etc., but be not limited only to this.
Step 103, it according to each key task and each dependence task dependence between other tasks respectively, determines
Each key task and each dependence task corresponding starting opportunity.
In the embodiments of the present disclosure, determine that target application is currently up each key task in mode, and each pass
It, can be according between each key task and each dependence task and other tasks after each dependence task that key task relies on
Dependence determines each key task corresponding starting opportunity and each dependence task corresponding starting opportunity.
Specifically, the starting of each key task can be determined first according to the dependence between each key task
Opportunity, and then closed according to the dependence between the starting opportunity of each key task and each key task and each dependence task
System, determines the starting opportunity of each dependence task.I.e. in a kind of possible way of realization of the embodiment of the present disclosure, above-mentioned steps
103, may include:
According to the dependence between each key task, each key task corresponding first starting opportunity is determined;
According to the corresponding dependence task of each key task and each key task corresponding first starting opportunity, determine every
A dependence task corresponding second starts opportunity, wherein the first dependence task corresponding second starting opportunity is earlier than described in dependence
First starting opportunity of the first key task of the first dependence task.
It should be noted that after the task execution being relied on, relying on the task there are two tasks of dependence
Task can just execute, that is, there is dependence of the task must be executed sequentially;Task of dependence may be not present can be
It executes parallel.For example, there are logic dependences between the task V5 in Fig. 2-1 and task V1, task V2, therefore, task is executed
V5 is necessary between task V5 and task V1 and between task V5 and task V2 firstly the need of task V1 and task V2 is executed
What sequence executed;Oriented arrow is not present between task V5 and task V4 for another example, is i.e. is not have between task V5 and task V4
Dependence, therefore the execution sequence of task V5 and task V4 can be parallel.
In a kind of possible way of realization of the embodiment of the present disclosure, it can be closed first according to the dependence between each key task
System determines the sequence that executes of each key task, i.e., the first starting opportunity of each key task.Wherein, key task is usually
Serial.
For example, as shown in Fig. 2-1, determining key task is task V0, task V2, task V5, task V9, task
V11, since task V2 depends on task V0, task V5 to depend on task V2, task V9 that task V5, task V11 is depended on to rely on
In task V9, therefore each key task corresponding first starts opportunity, that is, executes the sequencing of each key task are as follows: task
V0, task V2, task V5, task V9, task V11.
It is understood that the dependence task that the key task relies on must execute before executing key task
Finish.Therefore, in a kind of possible way of realization of the embodiment of the present disclosure, when determining that each key task corresponding first starts
Machine, can be according to each key task corresponding first starting opportunity, and the dependence task for determining that each key task relies on is corresponding
Second starting opportunity.For example, the dependence task that the first key task relies on is the first dependence task, then the first dependence task is corresponding
Second starting opportunity it is corresponding earlier than the first key task first starting opportunity.
Specifically, can be executed not influence key task when determining that each dependence task corresponding second starts opportunity
In the case where, the execution time of each dependence task is shifted to an earlier date as far as possible, to ensure the dependence relied on when key task executes
Task has executed completion.
For example, as shown in Fig. 2-1, determining key task is task V0, task V2, task V5, task V9, task
V11, each key task corresponding first start the sequencing on opportunity are as follows: task V0, task V2, task V5, task V9, task
V11, dependence task are task V1, task V6 and task V10.Since task V1 depends on task V0, task V5 to depend on task
V1, and dependence is not present between other key tasks, therefore, task V1 corresponding second starting opportunity should be at task
It between the first starting opportunity corresponding with task V5 on V0 corresponding first starting opportunity, and executes, appoints for example, can determine as early as possible
When business V1 corresponding second starting opportunity is the first starting corresponding with task V2 in task V0 corresponding first starting opportunity
Between machine, or the first starting opportunity corresponding with task V2 is identical, i.e. task V1 can be executed parallel with task V2;Due to appointing
V6 be engaged in dependent on task V2, task V9 is dependent on task V6, and therefore, task V6 corresponding second starting opportunity should be at task V2
Corresponding first started between the first starting opportunity corresponding with task V9 on opportunity, and executed as early as possible, for example, task can be determined
V6 corresponding second starting opportunity is the first starting opportunity corresponding with task V5 in task V2 corresponding first starting opportunity
Between, or it is corresponding with task V5 first starting opportunity it is identical, i.e. task V6 can be executed parallel with task V5, in addition, by
In the first starting opportunity corresponding earlier than task V9 on task V5 corresponding first starting opportunity, therefore, task V6 corresponding second
Starting opportunity can be later than task V1 corresponding second starting opportunity;Since task V10 depends on task V6, task V11 to rely on
In task V10, therefore, task V10 corresponding second starting opportunity should be at task V6 corresponding second starting opportunity and task
It between V11 corresponding first starting opportunity, and executes as early as possible, for example, can determine that task V10 corresponding second starting opportunity is
Between the first starting opportunity corresponding with task V9 on task V6 corresponding second starting opportunity, or it is corresponding with task V9
First starting opportunity is identical, i.e. task V6 can execute with task V9 parallel
It should be noted that the example above is exemplary only, the limitation to the disclosure cannot be considered as.In actual use,
It can be determined every according to the dependence between each key task and each dependence task and other tasks, and actual needs
A key task corresponding first starting opportunity and each dependence task corresponding second starting opportunity, the embodiment of the present disclosure
It does not limit this.
Step 104, according to each key task and each dependence task corresponding starting opportunity, determine described in
The updated Starting mode of target application.
In the embodiments of the present disclosure, each key task for including in determining the current Starting mode of target application and each
Dependence task and each key task corresponding first starting opportunity and each dependence task corresponding second starting opportunity
Later, when can be started according to each key task corresponding first starting opportunity and each dependence task corresponding second
Machine determines the updated Starting mode of target application, is updated with the Starting mode to target application that optimization aim application is opened
Dynamic speed.
Specifically, each key task determined and each dependence can be only carried out during target application starts
Task, and according to determining each key task corresponding first starting opportunity and corresponding second starting of each dependence task
Opportunity successively executes each key task and each dependence task.
The application starting task processing method that the embodiment of the present disclosure provides, can be according to the attribute information of each starting task
In include task effect and the dependence between other tasks, determine each key task in each starting task and each close
Each dependence task and each key task and each dependence task corresponding starting opportunity that key task relies on, in turn
According to each key task and each dependence task corresponding starting opportunity, the updated starting side of target application is determined
Formula.As a result, by according to the effect and the dependence between other tasks for respectively starting task in current Starting mode,
Effectively adjustment is opened using task each in start-up course corresponding starting opportunity to not only reduce and apply in global scope
Dynamic duration improves the effect using starting speed-optimization, and can quantify to the process of application starting, effectively weighs
The effect of optimization of amount application starting speed.
In a kind of possible way of realization of the disclosure, the sound code file of target application can be parsed, or according to
The current start-up course of target application, determines the attribute information of each starting task being currently up in mode, and then according to respectively opening
The attribute information of dynamic task is determined each key task, each dependence task and each nonproductive task in starting task, and is determined
Out various types of tasks corresponding starting opportunity, it is updated with the Starting mode to target application.
Below with reference to Fig. 3, the application starting task processing method that the embodiment of the present disclosure provides is further described.
Fig. 3 is the flow diagram of the application starting task processing method of another kind provided by the embodiment of the present disclosure.
As shown in figure 3, the application starting task processing method, comprising the following steps:
Step 301, the sound code file of the target application is parsed, determines that each starting being currently up in mode is appointed
The attribute information of business, the effect including task and the dependence between other tasks.
In a kind of possible way of realization of the disclosure, it can be parsed, be obtained by the sound code file to target application
Take the attribute information for being currently up each starting task for including in mode of target application.Specifically, can use Systrace,
The tools such as Traceview, the operation data of acquisition system are simultaneously analyzed, the operation information of key subsystem in acquisition system,
To determine each starting task for including in the current Starting mode of target application, and the effect of each starting task, and by dividing
The call relation for analysing code, determines the dependence between each starting task and other tasks.
Step 302, according to the effect of each starting task and the dependence between other tasks, each starting is determined
Each dependence task that each key task and each key task in task rely on.
The specific implementation process and principle of above-mentioned steps 302, are referred to the detailed description of above-described embodiment, herein no longer
It repeats.
Step 303, according to the effect of each starting task and the dependence between other tasks, each starting is determined
Each nonproductive task in task.
Wherein, nonproductive task, refer to include in the current Starting mode of target application will not be to the starting of target application
The starting task impacted.
It should be noted that in each starting task for including in the current Starting mode of target application, in addition to being answered with target
Except each dependence task that the associated each key task of homepage frame picture and each key task rely on, it can also wrap
Nonproductive task is included, nonproductive task can execute during target application starts, still, during target application starting
Nonproductive task is not executed, the normal starting of target application will not be impacted.Therefore, in the embodiments of the present disclosure, determine
After each dependence task that each key task in the current Starting mode of target application and each key task rely on out, also
Can the effect according to each starting task for including in current Starting mode and the dependence between other tasks, determine
Nonproductive task in each starting task out, i.e., be both not belonging to key task, is also not belonging to the dependence task that key task is relied on
Starting task.
For example, as shown in Fig. 2-1, task V3, task V4, task V7, task V8, task V12, task V13 belong to
In nonproductive task.
Step 304, it according to each key task and each dependence task dependence between other tasks respectively, determines
Each key task and each dependence task corresponding starting opportunity.
The specific implementation process and principle of above-mentioned steps 304, are referred to the detailed description of above-described embodiment, herein no longer
It repeats.
Step 305, according to each key task and each dependence task corresponding starting opportunity, determine described in
Each nonproductive task corresponding starting opportunity, wherein any nonproductive task corresponding starting opportunity is later than whole key tasks and complete
Portion's dependence task corresponding starting opportunity.
It should be noted that since nonproductive task will not impact the normal starting of application, it can be in not shadow
The execution of key task and dependence task is rung, and in the case where not influencing subsequent logic, delays execution nonproductive task as far as possible, because
This can all execute end in all key tasks and dependence task and then execute each nonproductive task, i.e., all auxiliary
Task corresponding starting opportunity is later than whole key tasks corresponding starting opportunity, and when the corresponding starting of whole dependence task
Machine.And then according to the dependence between each nonproductive task, each nonproductive task corresponding starting opportunity is determined.
For example, as shown in Fig. 2-1, each key task determined is task V0, task V2, task V5, task V9, appoints
Be engaged in V11, and each dependence task is task V1, task V6 and task V10, the elder generation on key task starting opportunity corresponding with dependence task
Sequence is task V0, task V1, task V2, task V6, task V5, task V10, task V9, task V11 afterwards, and nonproductive task is
Task V3, task V4, task V7, task V8, task V12, task V13.Hence, it can be determined that nonproductive task V3, V4, V7, V8,
V12, V13 corresponding starting opportunity were in after key task V11 corresponding starting opportunity;Since task V7 depends on task
V3, task V13 depend on task V7, therefore are Serial Relation between task V3, task V7 and task V13, and V3 pairs of task
On starting opportunity corresponding earlier than task V7 on the starting opportunity answered, task V7 corresponding starting opportunity is corresponding earlier than task V13 to open
Dynamic opportunity;Since task V8 depends on task V4, task V12 to depend on task V8, therefore task V4, task V8 and task V12
Between be Serial Relation, and starting opportunity corresponding earlier than task V8 on task V4 corresponding starting opportunity, task V8 are corresponding
Starting opportunity corresponding earlier than task V12 on starting opportunity;Again due between task V3 and task V4, task V8, task V12 not
There are dependences, and therefore, task V3 and either one or two of task V4, task V8, task V12 can be concurrency relation;Similarly,
Task V7 and either one or two of task V4, task V8, task V12, can be concurrency relation, task V13 and task V4, task V8,
Either one or two of task V12, is also possible to concurrency relation.
It should be noted that the example above is exemplary only, the limitation to the disclosure cannot be considered as.In actual use,
Can task type and actual needs according to belonging to each starting task, determine each key task, dependence task and auxiliary
Task corresponding starting opportunity, the embodiment of the present disclosure do not limit this.
In the alternatively possible way of realization of the disclosure, each auxiliary can not be executed in the start-up course of application and is appointed
Business can execute corresponding nonproductive task when corresponding functional module is called, to further decrease the consumption using starting
When.
Step 306, according to each key task and each dependence task corresponding starting opportunity, determine described in
The updated Starting mode of target application.
In the embodiments of the present disclosure, each key task for including in determining the current Starting mode of target application and each
Dependence task and each key task corresponding first starting opportunity and each dependence task corresponding second starting opportunity
Later, when can be started according to each key task corresponding first starting opportunity and each dependence task corresponding second
Machine determines the updated Starting mode of target application, is updated with the Starting mode to target application that optimization aim application is opened
Dynamic speed.
Specifically, each key task determined and each dependence can be only carried out during target application starts
Task, and according to determining each key task corresponding first starting opportunity and corresponding second starting of each dependence task
Opportunity successively executes each key task and each dependence task.
It further, can be with if including nonproductive task in each starting task in the current Starting mode of target application
According to each key task, each dependence task and each nonproductive task corresponding starting opportunity, after determining that target application updates
Starting mode, i.e., during target application starts, according to determining each key task, each dependence task and each
On nonproductive task corresponding starting opportunity, successively execute each key task, each dependence task and each nonproductive task.
Step 307, the updated Starting mode of the target application is handed down to each terminal, so that each terminal is according to certainly
The attribute information of body is updated each key task and each dependence task corresponding starting opportunity.
In the embodiments of the present disclosure, according to each key task for including in the current Starting mode of target application, each
Dependence task and each nonproductive task corresponding starting opportunity, determine the updated Starting mode of target application it
Afterwards, the updated Starting mode of target application can be handed down to each terminal for being equipped with target application, so that each terminal can
Carried out more to each key task and each dependence task corresponding starting opportunity according to the attribute information of itself
Newly.
In a kind of possible way of realization of the embodiment of the present disclosure, the attribute information of terminal may include the processing in terminal
The number of device, the processor number that terminal includes is more, and the process that can be run simultaneously is more, and the speed for opening application is got over
Fastly.For example, the mobile phone of four cores can run four processes simultaneously, the mobile phone of eight cores can run eight processes simultaneously.Therefore, eventually
End can according to each key task for including in the updated Starting mode issued starting opportunity corresponding with each dependence task,
And the processor quantity of itself, the task quantity that determination can be run simultaneously, so to each key task and each according to
Task corresponding starting opportunity is relied to be updated.
Further, if including nonproductive task in each starting task in the current Starting mode of target application, terminal is also
It can be right respectively according to each key task, each dependence task and each nonproductive task that include in the updated Starting mode issued
The starting opportunity answered and the processor quantity of itself, the task quantity that determination can be run simultaneously, and then to each crucial
Business, each dependence task and each nonproductive task corresponding starting opportunity are updated.
The application starting task processing method that the embodiment of the present disclosure provides, can solve the sound code file of target application
Analysis, determines the attribute information for each starting task being currently up in mode, and wraps according in the attribute information of each starting task
The effect of including for task and the dependence between other tasks determine that each key task in each starting task, each rely on are appointed
Business and each nonproductive task and each key task, each dependence task and each nonproductive task corresponding starting opportunity,
It later will be according to each key task, each dependence task and each nonproductive task corresponding starting opportunity, determining mesh
Mark is handed down to each terminal using updated Starting mode.As a result, by respectively starting task according in current Starting mode
Effect and the dependence between other tasks, effectively adjustment is right respectively using each task in start-up course in global scope
The starting opportunity answered improves the effect using starting speed-optimization, Er Qieke to not only reduce the duration using starting
To quantify to the process of application starting, the effect of optimization of application starting speed is effectively measured.
In order to realize above-described embodiment, the disclosure also proposes a kind of application starting Task Processing Unit.
Fig. 4 is the structural schematic diagram that a kind of application that the embodiment of the present disclosure provides starts Task Processing Unit.
As shown in figure 4, the application starting Task Processing Unit 40, comprising:
Module 41 is obtained, for obtaining the attribute information of each starting task in the current Starting mode of target application,
Described in task attribute information, the effect including task and the dependence between other tasks;
First determining module 42, for the effect according to each starting task and the dependence between other tasks, really
Each dependence task that each key task and each key task in fixed each starting task rely on;
Second determining module 43, for according to each key task and each dependence task respectively between other tasks according to
The relationship of relying, determines each key task and each dependence task corresponding starting opportunity;
Third determining module 44, when for according to each key task and the corresponding starting of each dependence task
Machine determines the updated Starting mode of the target application.
In actual use, the application starting Task Processing Unit that the embodiment of the present disclosure provides, can be configured in any
In electronic equipment, to execute aforementioned applications starting task processing method.
The application starting Task Processing Unit that the embodiment of the present disclosure provides, can be according to the attribute information of each starting task
In include task effect and the dependence between other tasks, determine each key task in each starting task and each close
Each dependence task and each key task and each dependence task corresponding starting opportunity that key task relies on, in turn
According to each key task and each dependence task corresponding starting opportunity, the updated starting side of target application is determined
Formula.As a result, by according to the effect and the dependence between other tasks for respectively starting task in current Starting mode,
Effectively adjustment is opened using task each in start-up course corresponding starting opportunity to not only reduce and apply in global scope
Dynamic duration improves the effect using starting speed-optimization, and can quantify to the process of application starting, effectively weighs
The effect of optimization of amount application starting speed.
In a kind of possible way of realization of the disclosure, above-mentioned acquisition module 41 is specifically used for:
The sound code file of the target application is parsed, determines the attribute for each starting task being currently up in mode
Information;
Alternatively,
According to the current start-up course of the target application, the attribute letter for each starting task being currently up in mode is determined
Breath.
In a kind of possible way of realization of the disclosure, above-mentioned first determining module 42 is specifically used for:
According to the effect of each starting task, the determining homepage frame picture with the target application shows that associated task is
Key task;
According to the dependence between each key task and other tasks, determine task that each key task relies on be according to
Rely task.
In a kind of possible way of realization of the disclosure, above-mentioned second determining module 43 is specifically used for:
According to the dependence between each key task, each key task corresponding first starting opportunity is determined;
According to the corresponding dependence task of each key task and each key task corresponding first starting opportunity, determine every
A dependence task corresponding second starts opportunity, wherein the first dependence task corresponding second starting opportunity is earlier than described in dependence
First starting opportunity of the first key task of the first dependence task.
In a kind of possible way of realization of the disclosure, above-mentioned application starts Task Processing Unit 40, further includes:
Module is issued, for the updated Starting mode of the target application to be handed down to each terminal, so that each terminal
According to the attribute information of itself, each key task and each dependence task corresponding starting opportunity are carried out more
Newly.
Further, in the alternatively possible way of realization of the disclosure, above-mentioned application starts Task Processing Unit 40, also
Include:
4th determining module is determined for the effect according to each starting task and the dependence between other tasks
Each nonproductive task in each starting task;
5th determining module, when for according to each key task and the corresponding starting of each dependence task
Machine determines each nonproductive task corresponding starting opportunity, wherein any nonproductive task corresponding starting opportunity is later than whole passes
Key task and whole dependence task corresponding starting opportunity.
It should be noted that the aforementioned explanation to Fig. 1, application shown in Fig. 3 starting task processing method embodiment
It is also applied for the pushed information display device 40 of the embodiment, details are not described herein again.
The application starting Task Processing Unit that the embodiment of the present disclosure provides, can solve the sound code file of target application
Analysis, determines the attribute information for each starting task being currently up in mode, and wraps according in the attribute information of each starting task
The effect of including for task and the dependence between other tasks determine that each key task in each starting task, each rely on are appointed
Business and each nonproductive task and each key task, each dependence task and each nonproductive task corresponding starting opportunity,
It later will be according to each key task, each dependence task and each nonproductive task corresponding starting opportunity, determining mesh
Mark is handed down to each terminal using updated Starting mode.As a result, by respectively starting task according in current Starting mode
Effect and the dependence between other tasks, effectively adjustment is right respectively using each task in start-up course in global scope
The starting opportunity answered improves the effect using starting speed-optimization, Er Qieke to not only reduce the duration using starting
To quantify to the process of application starting, the effect of optimization of application starting speed is effectively measured.
In order to realize above-described embodiment, the disclosure also proposes a kind of electronic equipment.
Fig. 5 is the structural schematic diagram for the electronic equipment that the embodiment of the present disclosure provides.
Below with reference to Fig. 5, it illustrates the structural representations for the electronic equipment 700 for being suitable for being used to realize the embodiment of the present disclosure
Figure.Terminal device in the embodiment of the present disclosure can include but is not limited to such as mobile phone, laptop, digital broadcasting and connect
Receive device, PDA (personal digital assistant), PAD (tablet computer), PMP (portable media player), car-mounted terminal (such as vehicle
Carry navigation terminal) etc. mobile terminal and such as number TV, desktop computer etc. fixed terminal.Electricity shown in Fig. 5
Sub- equipment is only an example, should not function to the embodiment of the present disclosure and use scope bring any restrictions.
As shown in figure 5, electronic equipment 700 may include processing unit (such as central processing unit, graphics processor etc.)
701, random access can be loaded into according to the program being stored in read-only memory (ROM) 702 or from storage device 708
Program in memory (RAM) 703 and execute various movements appropriate and processing.In RAM 703, it is also stored with electronic equipment
Various programs and data needed for 700 operations.Processing unit 701, ROM 702 and RAM 703 pass through the phase each other of bus 704
Even.Input/output (I/O) interface 705 is also connected to bus 704.
In general, following device can connect to I/O interface 705: including such as touch screen, touch tablet, keyboard, mouse, taking the photograph
As the input unit 706 of head, microphone, accelerometer, gyroscope etc.;Including such as liquid crystal display (LCD), loudspeaker, vibration
The output device 707 of dynamic device etc.;Storage device 708 including such as tape, hard disk etc.;And communication device 709.Communication device
709, which can permit electronic equipment 700, is wirelessly or non-wirelessly communicated with other equipment to exchange data.Although Fig. 5 shows tool
There is the electronic equipment 700 of various devices, it should be understood that being not required for implementing or having all devices shown.It can be with
Alternatively implement or have more or fewer devices.
Particularly, in accordance with an embodiment of the present disclosure, it may be implemented as computer above with reference to the process of flow chart description
Software program.For example, embodiment of the disclosure includes a kind of computer program product comprising be carried on computer-readable medium
On computer program, which includes the program code for method shown in execution flow chart.In such reality
It applies in example, which can be downloaded and installed from network by communication device 709, or from storage device 708
It is mounted, or is mounted from ROM 702.When the computer program is executed by processing unit 701, the embodiment of the present disclosure is executed
Method in the above-mentioned function that limits.
It should be noted that the above-mentioned computer-readable medium of the disclosure can be computer-readable signal media or meter
Calculation machine readable storage medium storing program for executing either the two any combination.Computer readable storage medium for example can be --- but not
Be limited to --- electricity, magnetic, optical, electromagnetic, infrared ray or semiconductor system, device or device, or any above combination.Meter
The more specific example of calculation machine readable storage medium storing program for executing can include but is not limited to: have the electrical connection, just of one or more conducting wires
Taking formula computer disk, hard disk, random access storage device (RAM), read-only memory (ROM), erasable type may be programmed read-only storage
Device (EPROM or flash memory), optical fiber, portable compact disc read-only memory (CD-ROM), light storage device, magnetic memory device,
Or above-mentioned any appropriate combination.In the disclosure, computer readable storage medium can be it is any include or storage journey
The tangible medium of sequence, the program can be commanded execution system, device or device use or in connection.And at this
In open, computer-readable signal media may include in a base band or as the data-signal that carrier wave a part is propagated,
In carry computer-readable program code.The data-signal of this propagation can take various forms, including but not limited to
Electromagnetic signal, optical signal or above-mentioned any appropriate combination.Computer-readable signal media can also be computer-readable and deposit
Any computer-readable medium other than storage media, the computer-readable signal media can send, propagate or transmit and be used for
By the use of instruction execution system, device or device or program in connection.Include on computer-readable medium
Program code can transmit with any suitable medium, including but not limited to: electric wire, optical cable, RF (radio frequency) etc. are above-mentioned
Any appropriate combination.
Above-mentioned computer-readable medium can be included in above-mentioned electronic equipment;It is also possible to individualism, and not
It is fitted into the electronic equipment.
Above-mentioned computer-readable medium carries one or more program, when said one or multiple programs are by the electricity
When sub- equipment executes, so that the electronic equipment: obtaining at least two internet protocol addresses;Send to Node evaluation equipment includes institute
State the Node evaluation request of at least two internet protocol addresses, wherein the Node evaluation equipment is internet from described at least two
In protocol address, chooses internet protocol address and return;Receive the internet protocol address that the Node evaluation equipment returns;Its
In, the fringe node in acquired internet protocol address instruction content distributing network.
Alternatively, above-mentioned computer-readable medium carries one or more program, when said one or multiple programs
When being executed by the electronic equipment, so that the electronic equipment: receiving the Node evaluation including at least two internet protocol addresses and request;
From at least two internet protocol address, internet protocol address is chosen;Return to the internet protocol address selected;Wherein,
The fringe node in internet protocol address instruction content distributing network received.
The calculating of the operation for executing the disclosure can be write with one or more programming languages or combinations thereof
Machine program code, above procedure design language include object oriented program language-such as Java, Smalltalk, C+
+, it further include conventional procedural programming language-such as " C " language or similar programming language.Program code can
Fully to execute, partly execute on the user computer on the user computer, be executed as an independent software package,
Part executes on the remote computer or executes on a remote computer or server completely on the user computer for part.
In situations involving remote computers, remote computer can pass through the network of any kind --- including local area network (LAN)
Or wide area network (WAN)-is connected to subscriber computer, or, it may be connected to outer computer (such as utilize Internet service
Provider is connected by internet).
Flow chart and block diagram in attached drawing are illustrated according to the system of the various embodiments of the disclosure, method and computer journey
The architecture, function and operation in the cards of sequence product.In this regard, each box in flowchart or block diagram can generation
A part of one module, program segment or code of table, a part of the module, program segment or code include one or more use
The executable instruction of the logic function as defined in realizing.It should also be noted that in some implementations as replacements, being marked in box
The function of note can also occur in a different order than that indicated in the drawings.For example, two boxes succeedingly indicated are actually
It can be basically executed in parallel, they can also be executed in the opposite order sometimes, and this depends on the function involved.Also it to infuse
Meaning, the combination of each box in block diagram and or flow chart and the box in block diagram and or flow chart can be with holding
The dedicated hardware based system of functions or operations as defined in row is realized, or can use specialized hardware and computer instruction
Combination realize.
Being described in unit involved in the embodiment of the present disclosure can be realized by way of software, can also be by hard
The mode of part is realized.Wherein, the title of unit does not constitute the restriction to the unit itself under certain conditions, for example, the
One acquiring unit is also described as " obtaining the unit of at least two internet protocol addresses ".
It should be noted that the implementation process and technical principle of the electronic equipment of the present embodiment are referring to aforementioned to disclosure reality
The explanation of the application starting task processing method of example is applied, details are not described herein again.
The electronic equipment that the embodiment of the present disclosure provides can execute foregoing application starting task processing method, root
The effect for task of including in the attribute information according to each starting task and the dependence between other tasks, determine each starting
Each dependence task and each key task and each dependence task that each key task and each key task in task rely on
Corresponding starting opportunity, and then according to each key task and each dependence task corresponding starting opportunity, it determines
The updated Starting mode of target application.As a result, by according to the effect for respectively starting task in current Starting mode and with
Dependence between other tasks, when effectively adjusting starting corresponding using task each in start-up course in global scope
Machine improves the effect using starting speed-optimization, and can open application to not only reduce the duration using starting
Dynamic process is quantified, and the effect of optimization of application starting speed is effectively measured.
In order to realize above-described embodiment, the disclosure also proposes a kind of non-transient computer readable storage medium, stores thereon
There is computer program, application starting task processing method as in the foregoing embodiment is realized when which is executed by processor.
Fig. 6 is the schematic diagram for illustrating computer readable storage medium according to an embodiment of the present disclosure.As shown in fig. 6, root
According to the computer readable storage medium 800 of the embodiment of the present disclosure, it is stored thereon with non-transient computer readable instruction 810.When this
When non-transient computer readable instruction 810 is run by processor, execute each embodiment of the disclosure above-mentioned applies starting task
The all or part of the steps of processing method.
In order to realize above-described embodiment, disclosure another further aspect embodiment provides a kind of computer program, which is located
When managing device execution, to realize application starting task processing method described in the embodiment of the present disclosure.
In the description of this specification, reference term " one embodiment ", " some embodiments ", " example ", " specifically show
The description of example " or " some examples " etc. means specific features, structure, material or spy described in conjunction with this embodiment or example
Point is contained at least one embodiment or example of the disclosure.In the present specification, schematic expression of the above terms are not
It must be directed to identical embodiment or example.Moreover, particular features, structures, materials, or characteristics described can be in office
It can be combined in any suitable manner in one or more embodiment or examples.In addition, without conflicting with each other, the skill of this field
Art personnel can tie the feature of different embodiments or examples described in this specification and different embodiments or examples
It closes and combines.
In addition, term " first ", " second " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance
Or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or
Implicitly include at least one this feature.In the description of the disclosure, the meaning of " plurality " is at least two, such as two, three
It is a etc., unless otherwise specifically defined.
Any process described otherwise above or method description are construed as in flow chart or herein, and expression includes
It is one or more for realizing custom logic function or process the step of executable instruction code module, segment or portion
Point, and the range of the preferred embodiment of the disclosure includes other realization, wherein can not press shown or discussed suitable
Sequence, including according to related function by it is basic simultaneously in the way of or in the opposite order, Lai Zhihang function, this should be by the disclosure
Embodiment person of ordinary skill in the field understood.
Expression or logic and/or step described otherwise above herein in flow charts, for example, being considered use
In the order list for the executable instruction for realizing logic function, may be embodied in any computer-readable medium, for
Instruction execution system, device or equipment (such as computer based system, including the system of processor or other can be held from instruction
The instruction fetch of row system, device or equipment and the system executed instruction) it uses, or combine these instruction execution systems, device or set
It is standby and use.For the purpose of this specification, " computer-readable medium ", which can be, any may include, stores, communicates, propagates or pass
Defeated program is for instruction execution system, device or equipment or the dress used in conjunction with these instruction execution systems, device or equipment
It sets.The more specific example (non-exhaustive list) of computer-readable medium include the following: there is the electricity of one or more wirings
Interconnecting piece (electronic device), portable computer diskette box (magnetic device), random access memory (RAM), read-only memory
(ROM), erasable edit read-only storage (EPROM or flash memory), fiber device and portable optic disk is read-only deposits
Reservoir (CDROM).In addition, computer-readable medium can even is that the paper that can print described program on it or other are suitable
Medium, because can then be edited, be interpreted or when necessary with it for example by carrying out optical scanner to paper or other media
His suitable method is handled electronically to obtain described program, is then stored in computer storage.
It should be appreciated that each section of the disclosure can be realized with hardware, software, firmware or their combination.Above-mentioned
In embodiment, software that multiple steps or method can be executed in memory and by suitable instruction execution system with storage
Or firmware is realized.Such as, if realized with hardware in another embodiment, following skill well known in the art can be used
Any one of art or their combination are realized: have for data-signal is realized the logic gates of logic function from
Logic circuit is dissipated, the specific integrated circuit with suitable combinational logic gate circuit, programmable gate array (PGA), scene can compile
Journey gate array (FPGA) etc..
Those skilled in the art are understood that realize all or part of step that above-described embodiment method carries
It suddenly is that relevant hardware can be instructed to complete by program, the program can store in a kind of computer-readable storage medium
In matter, which when being executed, includes the steps that one or a combination set of embodiment of the method.
It, can also be in addition, can integrate in a processing module in each functional unit in each embodiment of the disclosure
It is that each unit physically exists alone, can also be integrated in two or more units in a module.Above-mentioned integrated mould
Block both can take the form of hardware realization, can also be realized in the form of software function module.The integrated module is such as
Fruit is realized and when sold or used as an independent product in the form of software function module, also can store in a computer
In read/write memory medium.
Storage medium mentioned above can be read-only memory, disk or CD etc..Although having been shown and retouching above
Embodiment of the disclosure is stated, it is to be understood that above-described embodiment is exemplary, and should not be understood as the limit to the disclosure
System, those skilled in the art can be changed above-described embodiment, modify, replace and become within the scope of this disclosure
Type.
Claims (10)
1. a kind of application starts task processing method characterized by comprising
The attribute information for obtaining each starting task in the current Starting mode of target application, wherein the attribute of the task is believed
Breath, the effect including task and the dependence between other tasks;
According to the effect of each starting task and the dependence between other tasks, each pass in each starting task is determined
Each dependence task that key task and each key task rely on;
According to each key task and each dependence task dependence between other tasks respectively, each key task is determined
And each dependence task corresponding starting opportunity;
According to each key task and each dependence task corresponding starting opportunity, determine that the target application updates
Starting mode afterwards.
2. the method as described in claim 1, which is characterized in that the acquisition target application is currently up each starting in mode
The attribute information of task, comprising:
The sound code file of the target application is parsed, determines the attribute letter for each starting task being currently up in mode
Breath;
Alternatively,
According to the current start-up course of the target application, the attribute information for each starting task being currently up in mode is determined.
3. the method as described in claim 1, which is characterized in that each key task in each starting task of determination and with institute
State each dependence task that each key task relies on, comprising:
According to the effect of each starting task, the determining homepage frame picture with the target application shows associated task for key
Task;
According to the dependence between each key task and other tasks, determine that the task that each key task relies on is appointed to rely on
Business.
4. the method as described in claim 1, which is characterized in that each key task of determination and each dependence task difference
Corresponding starting opportunity, comprising:
According to the dependence between each key task, each key task corresponding first starting opportunity is determined;
According to the corresponding dependence task of each key task and each key task it is corresponding first starting opportunity, determine each according to
Rely task corresponding second starting opportunity, wherein the first dependence task corresponding second starting opportunity is earlier than dependence described first
First starting opportunity of the first key task of dependence task.
5. the method as described in claim 1-4 is any, which is characterized in that the updated starting of the determination target application
After mode, further includes:
The updated Starting mode of the target application is handed down to each terminal, so that each terminal is believed according to the attribute of itself
Breath, is updated each key task and each dependence task corresponding starting opportunity.
6. the method as described in claim 1-4 is any, which is characterized in that described to obtain in the current Starting mode of target application
Each starting task attribute information after, further includes:
According to the effect of each starting task and the dependence between other tasks, determine each auxiliary in each starting task
Help task;
According to each key task and each dependence task corresponding starting opportunity, each nonproductive task pair is determined
The starting opportunity answered, wherein any nonproductive task corresponding starting opportunity is later than whole key tasks and whole dependence task pair
The starting opportunity answered.
7. a kind of application starts Task Processing Unit characterized by comprising
Module is obtained, for obtaining the attribute information of each starting task in the current Starting mode of target application, wherein described
The attribute information of task, the effect including task and the dependence between other tasks;
First determining module, for the effect according to each starting task and the dependence between other tasks, determine described in
Each dependence task that each key task and each key task in each starting task rely on;
Second determining module, for the dependence between other tasks to be closed respectively according to each key task and each dependence task
System, determines each key task and each dependence task corresponding starting opportunity;
Third determining module is used for according to each key task and each dependence task corresponding starting opportunity, really
The fixed updated Starting mode of target application.
8. device as claimed in claim 7, which is characterized in that the acquisition module, comprising:
First determination unit is parsed for the sound code file to the target application, and determination is currently up each in mode
The attribute information of starting task;
Alternatively,
Second determination unit, for the start-up course current according to the target application, determination is currently up respectively opening in mode
The attribute information of dynamic task.
9. a kind of electronic equipment, which is characterized in that including processor and memory;
Wherein, the processor is run by reading the executable program code stored in the memory can be performed with described
The corresponding program of program code, to start task processing method for realizing application such as claimed in any one of claims 1 to 6.
10. a kind of non-transient computer readable storage medium, is stored thereon with computer program, which is characterized in that the program quilt
When processor executes, realize that application as claimed in any one of claims 1 to 6 such as starts task processing method.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910032056.8A CN109783158A (en) | 2019-01-14 | 2019-01-14 | Using starting task processing method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910032056.8A CN109783158A (en) | 2019-01-14 | 2019-01-14 | Using starting task processing method and device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109783158A true CN109783158A (en) | 2019-05-21 |
Family
ID=66500436
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910032056.8A Pending CN109783158A (en) | 2019-01-14 | 2019-01-14 | Using starting task processing method and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109783158A (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110365538A (en) * | 2019-07-18 | 2019-10-22 | 北京百度网讯科技有限公司 | Port status control method, device, equipment and computer readable storage medium |
CN110489219A (en) * | 2019-08-05 | 2019-11-22 | 北京字节跳动网络技术有限公司 | A kind of method, apparatus, medium and the electronic equipment of scheduling feature object |
CN110531985A (en) * | 2019-08-09 | 2019-12-03 | 浙江大搜车软件技术有限公司 | SDK initial method and system, electronic equipment, storage medium |
CN110673887A (en) * | 2019-08-15 | 2020-01-10 | 华为技术有限公司 | Application program starting method and device, terminal equipment and readable storage medium |
CN110750346A (en) * | 2019-10-17 | 2020-02-04 | Oppo(重庆)智能科技有限公司 | Task operation optimization method, device, terminal and storage medium |
CN110928653A (en) * | 2019-10-24 | 2020-03-27 | 浙江大搜车软件技术有限公司 | Cross-cluster task execution method and device, computer equipment and storage medium |
CN111258740A (en) * | 2020-02-03 | 2020-06-09 | 北京无限光场科技有限公司 | Method and device for starting application program and electronic equipment |
CN113098960A (en) * | 2021-03-31 | 2021-07-09 | 北京三快在线科技有限公司 | Service operation method, device, server and storage medium |
CN113449142A (en) * | 2021-06-30 | 2021-09-28 | 北京百度网讯科技有限公司 | Information processing method and device, electronic equipment, storage medium and product |
CN114968395A (en) * | 2022-05-10 | 2022-08-30 | 上海淇玥信息技术有限公司 | Starting optimization method and device based on Spring framework and computer equipment |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102650943A (en) * | 2011-02-28 | 2012-08-29 | 深圳富泰宏精密工业有限公司 | Application program startup management system and method |
CN105511874A (en) * | 2015-12-02 | 2016-04-20 | 海信集团有限公司 | Embedded system starting method and intelligent terminal |
CN106874086A (en) * | 2017-01-25 | 2017-06-20 | 北京奇虎科技有限公司 | A kind of processing method of application program self-starting, device and mobile terminal |
CN107015820A (en) * | 2016-01-27 | 2017-08-04 | 阿里巴巴集团控股有限公司 | Using startup method, device and server |
CN107766101A (en) * | 2017-09-30 | 2018-03-06 | 五八有限公司 | App starts processing method, device and the equipment of event |
CN108132832A (en) * | 2016-12-01 | 2018-06-08 | 腾讯科技(深圳)有限公司 | Application program launching method and device |
CN108958808A (en) * | 2017-05-22 | 2018-12-07 | 中兴通讯股份有限公司 | Method for starting terminal and device, terminal and storage medium |
CN109144695A (en) * | 2018-08-30 | 2019-01-04 | 百度在线网络技术(北京)有限公司 | A kind of processing method, device, equipment and the medium of task topological relation |
-
2019
- 2019-01-14 CN CN201910032056.8A patent/CN109783158A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102650943A (en) * | 2011-02-28 | 2012-08-29 | 深圳富泰宏精密工业有限公司 | Application program startup management system and method |
CN105511874A (en) * | 2015-12-02 | 2016-04-20 | 海信集团有限公司 | Embedded system starting method and intelligent terminal |
CN107015820A (en) * | 2016-01-27 | 2017-08-04 | 阿里巴巴集团控股有限公司 | Using startup method, device and server |
CN108132832A (en) * | 2016-12-01 | 2018-06-08 | 腾讯科技(深圳)有限公司 | Application program launching method and device |
CN106874086A (en) * | 2017-01-25 | 2017-06-20 | 北京奇虎科技有限公司 | A kind of processing method of application program self-starting, device and mobile terminal |
CN108958808A (en) * | 2017-05-22 | 2018-12-07 | 中兴通讯股份有限公司 | Method for starting terminal and device, terminal and storage medium |
CN107766101A (en) * | 2017-09-30 | 2018-03-06 | 五八有限公司 | App starts processing method, device and the equipment of event |
CN109144695A (en) * | 2018-08-30 | 2019-01-04 | 百度在线网络技术(北京)有限公司 | A kind of processing method, device, equipment and the medium of task topological relation |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110365538A (en) * | 2019-07-18 | 2019-10-22 | 北京百度网讯科技有限公司 | Port status control method, device, equipment and computer readable storage medium |
CN110489219B (en) * | 2019-08-05 | 2022-05-03 | 北京字节跳动网络技术有限公司 | Method, device, medium and electronic equipment for scheduling functional objects |
CN110489219A (en) * | 2019-08-05 | 2019-11-22 | 北京字节跳动网络技术有限公司 | A kind of method, apparatus, medium and the electronic equipment of scheduling feature object |
CN110531985A (en) * | 2019-08-09 | 2019-12-03 | 浙江大搜车软件技术有限公司 | SDK initial method and system, electronic equipment, storage medium |
CN110673887A (en) * | 2019-08-15 | 2020-01-10 | 华为技术有限公司 | Application program starting method and device, terminal equipment and readable storage medium |
CN110673887B (en) * | 2019-08-15 | 2021-05-04 | 华为技术有限公司 | Application program starting method and device, terminal equipment and readable storage medium |
CN110750346A (en) * | 2019-10-17 | 2020-02-04 | Oppo(重庆)智能科技有限公司 | Task operation optimization method, device, terminal and storage medium |
CN110750346B (en) * | 2019-10-17 | 2022-11-15 | Oppo(重庆)智能科技有限公司 | Task operation optimization method, device, terminal and storage medium |
CN110928653A (en) * | 2019-10-24 | 2020-03-27 | 浙江大搜车软件技术有限公司 | Cross-cluster task execution method and device, computer equipment and storage medium |
CN110928653B (en) * | 2019-10-24 | 2022-10-21 | 浙江大搜车软件技术有限公司 | Cross-cluster task execution method and device, computer equipment and storage medium |
CN111258740A (en) * | 2020-02-03 | 2020-06-09 | 北京无限光场科技有限公司 | Method and device for starting application program and electronic equipment |
CN113098960A (en) * | 2021-03-31 | 2021-07-09 | 北京三快在线科技有限公司 | Service operation method, device, server and storage medium |
CN113449142A (en) * | 2021-06-30 | 2021-09-28 | 北京百度网讯科技有限公司 | Information processing method and device, electronic equipment, storage medium and product |
CN114968395A (en) * | 2022-05-10 | 2022-08-30 | 上海淇玥信息技术有限公司 | Starting optimization method and device based on Spring framework and computer equipment |
CN114968395B (en) * | 2022-05-10 | 2023-09-26 | 上海淇玥信息技术有限公司 | Starting optimization method and device based on Spring framework and computer equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109783158A (en) | Using starting task processing method and device | |
CN109871388A (en) | Data cache method, device, whole electronic equipment and storage medium | |
CN105426508B (en) | Webpage generating method and device | |
CN109885314A (en) | Small routine autoplacement method and device | |
CN110019949A (en) | Video recommendation method, device, terminal, server and readable medium | |
CN109800101A (en) | Report method, device, terminal device and the storage medium of small routine abnormal conditions | |
CN110213614A (en) | The method and apparatus of key frame are extracted from video file | |
CN109960801A (en) | Data processing method and device | |
CN108549568A (en) | Using entrance processing method, apparatus, storage medium and electronic equipment | |
CN109996125A (en) | Generate method, apparatus, electronic equipment and the storage medium of video list | |
CN109446025A (en) | A kind of back method of operation behavior, device, electronic equipment and readable medium | |
CN110471738A (en) | Method for switching theme, device, electronic equipment and the storage medium of application program | |
CN109977026A (en) | Test webpage rollback method and device | |
CN109828980A (en) | Data cache method, device, terminal and storage medium | |
CN110286928A (en) | Interface element update method, device, electronic equipment and the storage medium of application program | |
CN109683728A (en) | Group member adding method and device | |
CN110046155A (en) | The update of property data base, data characteristics determination method, device and equipment | |
CN109246181A (en) | Information-pushing method and Related product based on vehicle identification | |
CN105277830B (en) | Power consumption testing method and device for electronic equipment | |
CN107506494A (en) | Document handling method, mobile terminal and computer-readable recording medium | |
CN109240899A (en) | Information acquisition method and device | |
CN110135903A (en) | Advertisement position ranks method, system, medium and electronic equipment | |
CN109165077A (en) | A kind of web page processing method, device, electronic equipment and storage medium | |
CN109492039A (en) | A kind of recording method of daily record data, device, electronic equipment and readable medium | |
CN109462648A (en) | A kind of user behavior tracking, device, equipment and storage medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190521 |