CN109779155A - Prefabricated cylinder, building structure and the construction method of the building structure - Google Patents

Prefabricated cylinder, building structure and the construction method of the building structure Download PDF

Info

Publication number
CN109779155A
CN109779155A CN201910092318.XA CN201910092318A CN109779155A CN 109779155 A CN109779155 A CN 109779155A CN 201910092318 A CN201910092318 A CN 201910092318A CN 109779155 A CN109779155 A CN 109779155A
Authority
CN
China
Prior art keywords
cylinder
connecting portion
prefabricated
floor
filling part
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910092318.XA
Other languages
Chinese (zh)
Other versions
CN109779155B (en
Inventor
王宁
孙占琦
王洪欣
叶福相
王�义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Science and Technology Group Co Ltd Shenzhen Branch
Original Assignee
China Construction Science and Technology Co Ltd Shenzhen Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Science and Technology Co Ltd Shenzhen Branch filed Critical China Construction Science and Technology Co Ltd Shenzhen Branch
Priority to CN201910092318.XA priority Critical patent/CN109779155B/en
Publication of CN109779155A publication Critical patent/CN109779155A/en
Application granted granted Critical
Publication of CN109779155B publication Critical patent/CN109779155B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The present invention is suitable for technical field of building construction, provides the construction method of a kind of prefabricated cylinder, building structure and the building structure.Prefabricated cylinder includes the first cylinder, the second cylinder and several reinforcing bars, and the first cylinder is fixedly connected with each other with the second cylinder, and the periphery of the second cylinder forms filling part;Several reinforcing bars run through the first cylinder along the axis direction of the first cylinder, reinforcing bar includes the first connecting portion, second connecting portion and middle interconnecting piece being molded as one, middle interconnecting piece is between first connecting portion and second connecting portion, middle interconnecting piece is fixedly arranged in the first cylinder, first connecting portion protrudes from the one end of the first cylinder far from the second cylinder, second connecting portion protrudes from the first cylinder close to one end of the second cylinder, and second connecting portion is enclosed around the second cylinder, and is located in filling part.Building structure includes floor, mixed mud layer and several prefabricated cylinders.The present invention has the advantages that strong operability, construction technology are simple and construction efficiency is high.

Description

Prefabricated cylinder, building structure and the construction method of the building structure
Technical field
The invention belongs to technical field of building construction more particularly to a kind of prefabricated cylinder, building structure and this build The construction method of building structure.
Background technique
The reinforcing bar connection of traditional cast-in-place steel concrete column is most common welded connecting, binding connection, mechanical connection, Middle mechanical connection can be applied to the component by dynamic load and the component by pulling force, and the scope of application is most wide.It is either any Connection type is all first to connect reinforcing bar, and after-pouring concrete belongs to positive operation.
In current widely used assembly concrete column connection structure, the reinforcing bar connection of upper and lower level precast concrete column is more Both connection types are connected using sleeve grouting connection or anchor slurry overlap joint, and all there is some ask in both connection types Topic.The sleeve that example sleeve is in the milk in interconnection technique is at high cost, machining accuracy is not high, leads to reinforcing bar contraposition inaccuracy, be easy to cause Concrete leakiness at node, grout pipe are easy blocking, and grouting quality is difficult to ensure and inconvenient the problems such as detecting, and influences construction effect Rate.And anchor slurry overlap joint interconnection technique is there are the vertical reinforcement lap of splice is long, easy bar splicing is eccentric, and it is multiple that there are site construction technologies Miscellaneous, the problems such as difficulty of construction is big, and either sleeve grouting connection or anchor slurry overlap joint connection, belong to contrary operation work It is complicated to check and accept inconvenient and program for journey.
Summary of the invention
The technical problem to be solved by the embodiment of the invention is that providing a kind of prefabricated cylinder, building structure and should The construction method of building structure, it is intended to solve construction technology present in assembly concrete column connection structure in the prior art It is complicated and difficulty of construction is big and the problem that causes construction efficiency low.
The embodiments of the present invention are implemented as follows, provides a kind of prefabricated cylinder comprising the first cylinder, the second column Body and several reinforcing bars, first cylinder are fixedly connected with each other with the second cylinder, and are filled out in the formation of the periphery of second cylinder Fill portion;Several reinforcing bars run through first cylinder along the axis direction of first cylinder, and the reinforcing bar includes molding First connecting portion, second connecting portion and the middle interconnecting piece being integrated, the middle interconnecting piece are located at the first connecting portion Between second connecting portion, the middle interconnecting piece is fixedly arranged in first cylinder, and the first connecting portion protrudes from described The one end of first cylinder far from the second cylinder, the second connecting portion protrude from first cylinder close to second cylinder One end, the second connecting portion are enclosed around second cylinder, and are located in the filling part, second connection Axial length of the length in portion less than the second cylinder.
Further, first cylinder and second cylinder are integral by concreting.
Further, first cylinder and second cylinder are in rectangle, and the cross-sectional area of first cylinder is big In the cross-sectional area of the second cylinder.
Further, several reinforcing bars are uniformly distributed in the surrounding of first cylinder.
The present invention also provides a kind of assembled arthitecutral structures comprising floor, mixed mud layer and above-mentioned several described Prefabricated cylinder, several prefabricated cylinders are sequentially connected, and first cylinder is far from second cylinder The floor is installed on one end;
When two adjacent prefabricated cylinders are connected with each other, second cylinder is resisted against the floor On, the end of the first connecting portion and the end of second connecting portion are mutually permanently connected, and filling is described mixed in the filling part Solidifying soil layer, the first connecting portion and second connecting portion are embedded in the concrete layer.
Further, the end of the first connecting portion and the end of second connecting portion are mutual by steel concrete supporting sleeve Connection.
The present invention also provides a kind of construction method of assembled arthitecutral structure, which includes the following steps:
S1, several prefabricated cylinders by the prefabricated reserved filling part of concrete and reinforcing bar;
S2, the bottom end of first prefabricated cylinder is installed on the basis of after, in the upper of first cylinder Build floor is poured at end, and the first connecting portion is exposed to the floor;
S3, the second cylinder on second prefabricated cylinder is resisted against on the floor, and by second Second connecting portion on a prefabricated cylinder and the first connecting portion phase on first prefabricated cylinder Mutually it is fixedly connected;
S4, the concrete layer is poured in the filling part on second prefabricated cylinder, makes the coagulation Soil layer coats the first connecting portion and second connecting portion.
Further, in the step S3: the second connecting portion and first on second prefabricated cylinder First connecting portion on a prefabricated cylinder is mutually permanently connected by steel concrete supporting sleeve.
Compared with prior art, beneficial effect is the embodiment of the present invention: prefabricated cylinder of the invention is mutual When connection installation, after the first cylinder upper surface installation floor on the prefabricated cylinder of lower layer, by the assembled on upper layer The second cylinder lower surface on prefabricated cylinder is resisted against on floor, and by the second connecting portion on the prefabricated cylinder on upper layer After first connecting portion end on the prefabricated cylinder of end and lower layer is mutually permanently connected, the prefabricated column on upper layer The second cylinder on body is placed in the space between first connecting portion and second connecting portion, then in the peripheral region of the second cylinder Fill concrete layer in filling part is embedded in first connecting portion and second connecting portion in concrete layer, makes prefabricated column It is formed and is stably connected between body.Steel bar connecting joints between prefabricated cylinder of the invention in pre-buried preceding naked eyes as it can be seen that Convenient for operation, belong to positive operation, i.e., first connects reinforcing bar casting concrete layer again, avoid conventionally employed grout sleeve and connect this The mode bring hidden danger of kind contrary operation, strong operability simplify construction technology, improve construction efficiency, and energy Enough guarantee the reliability of component connection.
Detailed description of the invention
Fig. 1 is prefabricated column structure schematic diagram provided in an embodiment of the present invention;
Fig. 2 is the structural schematic diagram that assembled arthitecutral structure provided in an embodiment of the present invention is not filled by before concrete layer;
Fig. 3 is the schematic cross-sectional view in the direction A-A in Fig. 2;
Fig. 4 is that the longitudinal section sectional structure after assembled arthitecutral structure fill concrete layer provided in an embodiment of the present invention shows It is intended to.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.
It as shown in Figure 1 to Figure 3, is a kind of prefabricated cylinder provided in an embodiment of the present invention.The prefabricated column Body 10 includes the first cylinder 11, the second cylinder 12 and several reinforcing bars 13, and the first cylinder 11 is fixedly connected with each other with the second cylinder 12, and And filling part 14 is formed in the periphery of the second cylinder 12.Specifically, the first cylinder 11 and the second cylinder 12 by concreting at One, the middle part of several reinforcing bars 13 are embedded in the first cylinder 11, and the cross-sectional area of the first cylinder 11 is greater than the second cylinder 12 Cross-sectional area so that the periphery in the second cylinder 12 forms a groove, which constitutes above-mentioned filling part 14.Reinforcing bar 13 Axis direction along the first cylinder 11 runs through the first cylinder 11, stretches out in the both ends of reinforcing bar 13 outside first cylinder 11, reinforcing bar 13 Wherein one end be located in filling part 14, can be connected with each other by reinforcing bar 13 between prefabricated cylinder 10.
In above-described embodiment, several reinforcing bars 13 are uniformly distributed in the surrounding of the first cylinder 11.Reinforcing bar 13 includes being shaped to one First connecting portion 131, second connecting portion 132 and the middle interconnecting piece 133 of body, middle interconnecting piece 133 are located at first connecting portion Between 131 and second connecting portion 132, middle interconnecting piece 133 is fixedly arranged in the first cylinder 11, and first connecting portion 131 protrudes from The one end of one cylinder 11 far from the second cylinder 12, second connecting portion 132 protrude from the first cylinder 11 close to the one of the second cylinder 12 End, second connecting portion 132 are enclosed around the second cylinder 12, and are located in filling part 14, the length of second connecting portion 132 Less than the axial length of the second cylinder 12.In this way, when needing two prefabricated cylinders 10 being attached integral, it will The first cylinder on one prefabricated cylinder 10 is abutted each other with the second cylinder 12 on another prefabricated cylinder 10, utilizes wherein one The second connecting portion 132 of first connecting portion 131 and another prefabricated cylinder 10 on a prefabricated cylinder 10 is mutually butted, and utilizes steel The both ends that muscle is mechanically connected sleeve 15 carry out screw-threaded coupling with first connecting portion 131 and second connecting portion 132 respectively, finally the Fill concrete layer 30 in the filling part 14 of two cylinders, 12 peripheral region connects the first connecting portion 131 and second after interconnection Socket part 132 covers, and makes to form stable connection between two prefabricated cylinders 10.
In the present embodiment, the first cylinder 11 and the second cylinder 12 are in rectangle, in other embodiments, the first cylinder 11 and second cylinder 12 can also rounded and polygon etc., concrete shape is depending on construction requirement.
The embodiment of the invention also provides a kind of assembled arthitecutral structures.The building structure includes floor 20, mixed mud layer 30 and above-mentioned several prefabricated cylinders 10, several prefabricated cylinders 10 be sequentially connected, the first cylinder 11 is separate Floor 20 is installed on one end of second cylinder 12.When two adjacent prefabricated cylinders 10 are connected with each other, by the second column Body 12 is resisted against on floor 20, and the end of the end of first connecting portion 131 and second connecting portion 132 is passed through steel concrete supporting Sleeve 15 is mutually permanently connected, and the fill concrete layer 30 in filling part 14, first connecting portion 131 is buried with second connecting portion 132 In concrete layer 30, to prefabricated cylinder 10, floor 20 and concrete layer 30 are integrally fixed, in composition The assembled arthitecutral structure stated.
The embodiment of the present invention also provides a kind of construction method of above-mentioned assembled arthitecutral structure, which includes such as Lower step:
S1, pass through several prefabricated cylinders 10 of the prefabricated reserved filling part 14 of concrete and reinforcing bar 13;I.e. prefabricated Concrete lower end support shuttering reserves filling part 14, forms the prefabricated cylinder 10 with filling part 14.
S2, the bottom end of first prefabricated cylinder 10 is installed on the basis of after, poured in the upper end of the first cylinder 11 Build floor 20, first connecting portion 131 are exposed to floor 20;
S3, the second cylinder 12 on second prefabricated cylinder 10 is resisted against on floor 20, and by second The first connecting portion 131 in second connecting portion 132 and first prefabricated cylinder 10 on prefabricated cylinder 10 is logical Steel concrete supporting sleeve 15 is crossed to be mutually permanently connected;
S4, the casting concrete layer 30 in the filling part 14 on second prefabricated cylinder 10, make concrete layer 30 First connecting portion 131 and second connecting portion 132 are coated, prefabricated cylinder 10, floor 20 and concrete layer 30 is made to be integrally fixed, To complete the construction of assembled arthitecutral structure.
In conclusion assembled assembled arthitecutral structure of the invention has the advantages that the steel between prefabricated cylinder 10 Muscle connecting node, as it can be seen that convenient for operation, belongs to positive operation in pre-buried preceding naked eyes, i.e., first connects the casting concrete layer again of reinforcing bar 13 30, the mode bring hidden danger that conventionally employed grout sleeve connects this contrary operation is avoided, strong operability is simplified and applied Work technique improves construction efficiency, and can guarantee the reliability that prefabricated cylinder 10 connects.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.

Claims (8)

1. a kind of prefabricated cylinder, which is characterized in that including the first cylinder, the second cylinder and several reinforcing bars, described One cylinder is fixedly connected with each other with the second cylinder, and forms filling part in the periphery of second cylinder;Several reinforcing bar edges The axis direction of first cylinder runs through first cylinder, and the reinforcing bar includes the first connecting portion being molded as one, the Two interconnecting pieces and middle interconnecting piece, the middle interconnecting piece are described between the first connecting portion and second connecting portion Middle interconnecting piece is fixedly arranged in first cylinder, and the first connecting portion protrudes from first cylinder far from the second cylinder One end, the second connecting portion protrude from first cylinder close to one end of second cylinder, and the second connecting portion is enclosed Around second cylinder, and it is located in the filling part, the length of the second connecting portion is less than the second cylinder Axial length.
2. prefabricated cylinder as described in claim 1, which is characterized in that first cylinder and second cylinder by Concreting is integral.
3. prefabricated cylinder as described in claim 1, which is characterized in that first cylinder and second cylinder are equal In rectangle, the cross-sectional area of first cylinder is greater than the cross-sectional area of the second cylinder.
4. prefabricated cylinder as claimed in claim 3, which is characterized in that several reinforcing bars are uniformly distributed in described The surrounding of first cylinder.
5. a kind of assembled arthitecutral structure, which is characterized in that including any in floor, mixed mud layer and such as Claims 1-4 One several prefabricated cylinder, several prefabricated cylinders are sequentially connected, and first cylinder is separate The floor is installed on one end of second cylinder;
When two adjacent prefabricated cylinders are connected with each other, second cylinder is resisted against on the floor, institute The end of the end and second connecting portion of stating first connecting portion is mutually permanently connected, the filling concrete in the filling part Layer, the first connecting portion and second connecting portion are embedded in the concrete layer.
6. assembled arthitecutral structure as claimed in claim 5, which is characterized in that the end of the first connecting portion and second connects The end of socket part is connected with each other by steel concrete supporting sleeve.
7. a kind of construction method of assembled arthitecutral structure as claimed in claim 5, which comprises the steps of:
S1, several prefabricated cylinders by the prefabricated reserved filling part of concrete and reinforcing bar;
S2, the bottom end of first prefabricated cylinder is installed on the basis of after, poured in the upper end of first cylinder Build floor, the first connecting portion are exposed to the floor;
S3, the second cylinder on second prefabricated cylinder is resisted against on the floor, and by second institute It states the second connecting portion on prefabricated cylinder and the first connecting portion on first prefabricated cylinder is mutually solid Fixed connection;
S4, the concrete layer is poured in the filling part on second prefabricated cylinder, makes the concrete layer Coat the first connecting portion and second connecting portion.
8. the construction method of assembled arthitecutral structure as claimed in claim 7, it is characterised in that:
In the step S3, the second connecting portion on second prefabricated cylinder and first assembled are pre- First connecting portion on cylinder processed is mutually permanently connected by steel concrete supporting sleeve.
CN201910092318.XA 2019-01-30 2019-01-30 Prefabricated assembled column, building structure and construction method of building structure Active CN109779155B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910092318.XA CN109779155B (en) 2019-01-30 2019-01-30 Prefabricated assembled column, building structure and construction method of building structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910092318.XA CN109779155B (en) 2019-01-30 2019-01-30 Prefabricated assembled column, building structure and construction method of building structure

Publications (2)

Publication Number Publication Date
CN109779155A true CN109779155A (en) 2019-05-21
CN109779155B CN109779155B (en) 2020-10-20

Family

ID=66503740

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910092318.XA Active CN109779155B (en) 2019-01-30 2019-01-30 Prefabricated assembled column, building structure and construction method of building structure

Country Status (1)

Country Link
CN (1) CN109779155B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111648469A (en) * 2020-04-24 2020-09-11 金点石(北京)建筑设计咨询服务有限责任公司 Column-beam connector and building body
CN112681529A (en) * 2020-12-16 2021-04-20 广州天行建筑设计事务所有限公司 Construction method of fabricated building structure

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101787733A (en) * 2010-03-03 2010-07-28 管乃彦 Prefabricated vertical member
CN206769051U (en) * 2017-04-14 2017-12-19 陈思萍 A kind of assembled integral column connected node
CN207436254U (en) * 2017-09-26 2018-06-01 中建科技有限公司深圳分公司 Assembly of shear wall structure
CN207469430U (en) * 2017-10-13 2018-06-08 湖南标迪夫节能科技有限公司 A kind of assembled arthitecutral structure
CN208251460U (en) * 2018-05-28 2018-12-18 西京学院 A kind of assembly concrete column
CN109208823A (en) * 2018-11-12 2019-01-15 安徽工程大学 It is a kind of can quick assembling built-in steel-case formula steel core concrete column and its production technology

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101787733A (en) * 2010-03-03 2010-07-28 管乃彦 Prefabricated vertical member
CN206769051U (en) * 2017-04-14 2017-12-19 陈思萍 A kind of assembled integral column connected node
CN207436254U (en) * 2017-09-26 2018-06-01 中建科技有限公司深圳分公司 Assembly of shear wall structure
CN207469430U (en) * 2017-10-13 2018-06-08 湖南标迪夫节能科技有限公司 A kind of assembled arthitecutral structure
CN208251460U (en) * 2018-05-28 2018-12-18 西京学院 A kind of assembly concrete column
CN109208823A (en) * 2018-11-12 2019-01-15 安徽工程大学 It is a kind of can quick assembling built-in steel-case formula steel core concrete column and its production technology

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111648469A (en) * 2020-04-24 2020-09-11 金点石(北京)建筑设计咨询服务有限责任公司 Column-beam connector and building body
CN112681529A (en) * 2020-12-16 2021-04-20 广州天行建筑设计事务所有限公司 Construction method of fabricated building structure

Also Published As

Publication number Publication date
CN109779155B (en) 2020-10-20

Similar Documents

Publication Publication Date Title
CN108978449B (en) Socket type structure prefabricated assembly pier with joint adopting grouting sleeve
AU2019303060B2 (en) Prefabricated wall and assembly structure for prefabricated building, and construction method therefor
CN108560544B (en) Sleeve connection assembled pile foundation and construction method thereof
CN106049506B (en) A kind of APS assembleds supporting pile structure and construction method
JP5023219B2 (en) Precast temporary structure and construction method thereof
CN107190635B (en) Dumbbell type steel pipe concrete combined bridge pier and connecting structure and method of dumbbell type steel pipe concrete combined bridge pier and bearing platform
CN111042439A (en) Prefabricated column of assembled concrete building structure and beam column node thereof
CN109779155A (en) Prefabricated cylinder, building structure and the construction method of the building structure
CN105986621B (en) Prefabrication beam column built from concrete shaped steel combination connecting node constructs and method
RU51639U1 (en) ASSEMBLY ASSEMBLY NODE OF CENTRALLY COMPRESSED REINFORCED CONCRETE ELEMENTS
CN114135000A (en) Assembled beam-column connecting joint partially wrapped with U-shaped steel and construction method thereof
CN112030723A (en) Bridge pier column and pier column joint structure thereof
CN110685215A (en) Semi-assembled combined pier and construction method thereof
CN216893135U (en) Assembled concrete connection structure through segmentation rebar connection
CN109779090A (en) Prefabricated shear wall, building structure and the construction method of the building structure
CN216893133U (en) Prefabricated assembled reinforced concrete beam structure connected through sleeve
JP2016075149A (en) Pile reinforcement structure for existing building, and construction method for the pile reinforcement structure
CN211622270U (en) Prefabricated column of assembled concrete building structure and beam column node thereof
CN111456283A (en) Prefabricated assembly type shear wall component and construction method thereof
CN209817222U (en) Connection node of coincide floor and wall body
KR200365986Y1 (en) prefabricated pc culvert with welding connecting structure
CN111321658A (en) Prefabricated assembled box type pier and construction method thereof
JP3948809B2 (en) Joining structure and joining method between concrete member and steel pipe member, and concrete / steel composite truss bridge
CN109797889A (en) A kind of precast concrete shear wall splicing node and construction method
KR102629212B1 (en) Precast Composite Pile Structure and its Construction Method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant