CN109778853A - Prestressed anchor injection forming construction method - Google Patents

Prestressed anchor injection forming construction method Download PDF

Info

Publication number
CN109778853A
CN109778853A CN201910174537.2A CN201910174537A CN109778853A CN 109778853 A CN109778853 A CN 109778853A CN 201910174537 A CN201910174537 A CN 201910174537A CN 109778853 A CN109778853 A CN 109778853A
Authority
CN
China
Prior art keywords
anchor
slip casting
grouting
hole
agent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910174537.2A
Other languages
Chinese (zh)
Inventor
张学彬
刘培伟
王焕强
王峻
张华武
杨怀奎
陈林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 7 Co Ltd
Original Assignee
Sinohydro Bureau 7 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 7 Co Ltd filed Critical Sinohydro Bureau 7 Co Ltd
Priority to CN201910174537.2A priority Critical patent/CN109778853A/en
Publication of CN109778853A publication Critical patent/CN109778853A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a kind of molding construction methods of prestressed anchor once grouting.It include: that a little pore-creating, anchor hole cleaning are put in measurement, anchor hole is examined, and anchor pole, installation supporting plate, washer and nut, tensioning fixation are assigned in rapid solidification anchor agent and retarding mortar preparation, slip casting;Wherein slip casting is divided to two sections to complete using the disposable continuous grouting of a slip casting machine, is initially injected rapid solidification anchor agent, after infuse retarding mortar immediately;Grouting Pipe is slowly released using grouting pressure when slip casting, stops slip casting when being pushed into advance in ready-made label in Grouting Pipe.The present invention uses once grouting mode, technique is faster, conveniently, construction speed can be greatly speeded up, only need to after rockbolt installation 5h to 8h with regard to achievable anchor pole tensioning, only Grouting Pipe the direct slip casting in bolthole bottom need to be inserted into using once grouting construction can and slowly release with slip casting, and Grouting Pipe is reusable, technique is faster, cost is lower.

Description

Prestressed anchor injection forming construction method
Technical field
The invention belongs to hydraulic and hydroelectric engineering construction technique fields, especially belong to large-sized concrete structures support technology neck Domain, and in particular to prestressed anchor injection forming construction technology.
Background technique
In the building course of large-sized concrete structures, it usually needs support anchoring construction is carried out, such as Large Underground hole The excavation supporting of room.In prestressed anchor uncased using free segment, art methods are usually adopted for support anchoring construction With secondary grouting technique.When first time slip casting, it is necessary to assure slip casting is filled in anchoring depth, but slurries must not flow into freedom Section, after prestressed anchor stretch-draw anchor, then second is carried out to free segment and is in the milk.
In secondary grouting construction, for the anchorage length and slip casting plumpness of accurate control anchoring section, anchoring section need to be installed The measures such as Grouting Pipe, return pipe, grout stop are constructed.According to " hydroelectric project prestress anchoraging design specification " DL/T5176's It is required that the grade of compressive strength of the grouted part cementing material in the prestressed anchor body of rod is not lower than M35.It is tried according to scene It tests.M35 mortar strength need to can be only achieved design strength 80% or so at 7 days or so, i.e., 7 talentes, which can be carried out, after anchoring section slip casting opens It draws.
According to the requirement of " Technical code for shotcrete rock bolts shore " GB50086-2001, prestressed anchor tensioning fixation 48 domestic demands check prestressing force afterwards, if discovery loss of prestress is greater than the 10% of axis force of anchor design value, should be mended Tensioning is repaid, is carrying out free segment grouting after qualification to be checked.Bolthole is blocked by backing plate at that time, need to fulfil free segment note ahead of schedule Slurry pipe, return pipe it is pre-buried.
Therefore, it is constructed using secondary grouting, the entire prestressed anchor construction time about 9 days+48 hours about 7 days or so;It is secondary The process of grouting process is more, long in time limit, and the discarded slurries that secondary grouting generates pollute environment, waste raw material, are unfavorable for environment Protection.
Summary of the invention
Deficiency discloses a kind of molding construction method of prestressed anchor once grouting to the present invention according to prior art.This Problems to be solved by the invention is to provide a kind of prestressed anchor injection forming construction method, and the method for the present invention can accelerate prestressing force Anchor pole includes free segment without casing construction speed, while avoiding secondary grouting and discarding influence of the slurries to environment.
The invention is realized by the following technical scheme:
Prestressed anchor injection forming construction method, comprising the following steps: a little pore-creating, anchor hole cleaning, anchor hole inspection are put in measurement It tests, anchor pole, installation supporting plate, washer and nut, tensioning fixation are assigned in rapid solidification anchor agent and retarding mortar preparation, slip casting;
The rapid solidification anchor agent and retarding mortar preparation are: progress retarding mortar mixing first, then carry out rapid solidification anchor agent Mixing, mixing time restriction is in 5min;
The slip casting is: after the completion of rapid solidification anchor agent and retarding mortar preparation, graduated Grouting Pipe will be marked to insert immediately Enter in hole to pumpback 5cm after bottom hole;Slip casting is divided to two sections to complete using the disposable continuous grouting of a slip casting machine, is initially injected rapid hardening Anchor Agent, after infuse retarding mortar immediately;Grouting Pipe is slowly released using grouting pressure when slip casting, wait be pushed into advance in Grouting Pipe Stop slip casting when upper ready-made label;
It is described to assign the anchor pole to be: carry out anchor pole after the completion of retarding mortar filling and assign, anchor pole assign before to silk mouth using twining It is protected around adhesive tape;Anchor pole slowly, is evenly assigned to bottom hole, and blocking anchor hole with cement anchor after the completion prevents slurries from flowing out.
The installation supporting plate, washer and nut are to start to install Supporting plate for anchor, washer and nut after the completion of anchor pole is assigned; It is required that supporting plate, washer and nut are vertical with anchor pole axis.
After the installation Supporting plate for anchor, washer and nut, carried out after rapid solidification anchor agent final set, and before retarding mortar initial set The tensioning of anchor pole.Before the formal tensioning of presstressed reinforcing steel, 20% design tensile load is taken, to its pre- tensioning 1~2 time, makes Qi Gebu Position contact is close;When the formal tensioning of presstressed reinforcing steel, it should be stretched to the 105%~110% of design load, then locked by specified value It is fixed;After presstressed reinforcing steel locking in 48h, when loss of prestress is greater than the 10% of axis force of anchor design value, tensioning is compensated.
When the method for the present invention slip casting, the rapid solidification anchor agent of preparation is all put into slip casting machine slip casting aperture, Anchor Agent is complete Covering slip casting aperture prevents air from entering, after rapid solidification anchor agent fully enters Grouting Pipe, immediately by the slow setting sand of prior mixing Slurry, which is put into slip casting slot, to be started to infuse slow setting anchor mortar, and retarding mortar will be in rapid solidification anchor agent whole press-in hole.
The measurement, which is put, accurately makes hole location using a total station, and makes mark with red paint.
The pore-creating is less than 200mm using multi-arm drilling, control hole location deviation, and hole depth is not less than anchor rod effective length, Hole depth 200mm is not larger than designed, bore angle deviation processed is less than 3 °.
The anchor hole cleaning is to rob flushing with high pressure geomantic omen after the completion of drilling, until there is no terminate punching after muddy water outflow It washes, and is blown out water outside hole with high pressure air pressure gun.
Prestressed anchor once grouting molding construction method of the present invention, effectively accelerates prestressed anchor construction speed, The construction time is saved, while avoiding secondary grouting and discarding influence of the slurries to environment;Present invention process changes molding construction Process reduces the use of material and its corollary equipment in work progress, and technique is faster, cost is lower.
Compared with prior art, the beneficial effects of the present invention are:
Existing conventional " secondary grouting construction " technique needs 7 days or so just to can be carried out tensioning after anchor pole once grouting, and It just can be carried out secondary grouting after 48h need to be waited again, complete whole prestressed anchor injection forming constructions and usually require 9 days or so. The present invention uses once grouting mode, and technique is faster, conveniently, can greatly speed up construction speed;The present invention only need to be in anchor pole 5h to 8h completes whole prestressed anchor injection forming constructions and usually requires 54 hours left sides with regard to achievable anchor pole tensioning after installation It is right.
Existing conventional " secondary grouting construction " technique is both needed to embedded Grouting Pipe and return pipe in free segment, anchor section section, and Seal ring, the not reproducible utilization of all material need to be set between anchoring section and free segment.The present invention is applied using once grouting Grouting Pipe need to be only inserted into the direct slip casting in bolthole bottom and can and slowly released with slip casting by work, and Grouting Pipe is reusable, Technique is faster, cost is lower.
Detailed description of the invention
Fig. 1 is construction method flow diagram of the present invention;
Fig. 2 is bolt grouting shaping schematic view of the present invention;
Fig. 3 is existing secondary grouting shaping schematic view.
In figure, 1 is anchor hole, and 2 be anchor pole, and 3 be anchor hole backing plate, and 4 be hemispherical washer, and 5 be nut, and 6 be centering bracket, 7 It is retarding mortar, 8 be rapid solidification anchor agent, and 9 be anchoring return pipe, and 10 be anchoring section Grouting Pipe, and 11 be grout stop, and 12 be free segment Grouting Pipe, 13 be free segment return pipe, and 14 be M35 mortar, and A is free segment, and B is anchoring section.
Specific embodiment
The present invention is further described With reference to embodiment, specific embodiment be to the principle of the invention into One step explanation, does not limit the invention in any way, and same or like technology is protected without departing from the present invention with the present invention Range.
In conjunction with attached drawing.
As illustrated in fig. 1 and 2, prestressed anchor injection forming construction method of the present invention, comprising the following steps:
(1) measurement is put a little, accurately makes hole location using total station, and make mark with red paint.
(2) pore-creating is drilled using multi-arm, and control hole location deviation is less than 200mm, and hole depth is not less than body of rod effective length, Hole depth 200mm is not larger than designed, circumferentor controls bore angle deviation less than 3 °.
(3) anchor hole is cleared up, and robs flushing with high pressure geomantic omen after the completion of drilling, until there is no terminating to rinse after muddy water outflow, Water is blown out outside hole with high pressure air pressure gun again.
(4) anchor hole is examined, and after anchor hole cleans out, carries out hole bit number.And the hole location to each hole, aperture, Kong Xiang, hole Deep, hole cleanliness makes a record.
(5) it weighs, mix and stir, the match ratio of tests determined rapid solidification anchor agent, retarding mortar, anchoring section rapid solidification anchor agent is adopted Anchor Agent can be made to reach higher consistency with the lower ratio of mud, be stacked to concentrate rapid solidification anchor agent in slip casting Slip casting nozzle guarantees that accelerator can fully enter in Grouting Pipe, and does not mix with slow solidification anchor agent.To ensure mixing quality, institute There are rapid solidification anchor agent, retarding mortar individually need to quantitatively carry out mix using small mechanical equipment.
(6) slip casting needs to carry out slip casting machine trial operation before slip casting, and with water lubrication pipeline.Grouting Pipe inserts in the hole part preferably It is managed using hard PE, and in grout outlet position overstriking to pore size, convenient for pushing Grouting Pipe outward under slurry pressure, simultaneously Graduated scale is carried out, in Grouting Pipe convenient for control grouting amount.
By pumpback 5cm after Grouting Pipe insertion bottom hole after Grouting Pipe insertion bolthole.Slip casting is divided to two sections of progress, has infused rapid hardening anchor Gu retarding mortar is infused after agent immediately.Slip casting uses a disposable continuous grouting of slip casting machine.The good rapid hardening of mixing is anchored first Agent is all put into slip casting machine slip casting aperture, and Anchor Agent, which is completely covered by slip casting aperture, prevents air from entering, to rapid solidification anchor agent whole Into after Grouting Pipe, the retarding mortar of prior mixing is put into slip casting slot starts to infuse slow setting anchor mortar immediately, retarding mortar will In rapid solidification anchor agent whole press-in hole, Grouting Pipe is slowly released using grouting pressure when slip casting, wait be pushed into advance in Grouting Pipe Stop slip casting when upper ready-made label.
(8) anchor pole is assigned, anchor pole is carried out after the completion of retarding mortar filling and assigns, it is to prevent anchor pole from assigning that anchor pole, which is assigned preceding, In journey due to silk mouth damage or pollute cause nut can not normal mounting, to silk mouth winding adhesive tape protect.
Anchor pole is assigned manually to be carried out using mechanical engagement, and worker before anchor pole is assigned to understand the hole in each hole to so as to one Secondary property is smoothly inserted into.Anchor pole slowly, at the uniform velocity assign completion after with cut-and-dried cement anchor block anchor hole prevent slurry stream Out.
(8) supporting plate, washer and nut are installed, after the completion of anchor pole is assigned, starts that Supporting plate for anchor, washer and nut are installed, adjusts The Board position that puts one's child in a boarding nursery is allowed to vertical with anchor pole axis.When scar using washer be also difficult to leveling nut it is parallel with supporting plate when, use hammer Local scar is cleared up, and smearing rapid solidification anchor agent is levelling in backing plate installation region.
(9) tensioning fixation carries out the tensioning of anchor pole after rapid solidification anchor agent final set, and before retarding mortar initial set.Prestressing force Before the formal tensioning of muscle, 20% design tensile load should be taken, to its pre- tensioning 1~2 time, keeps its each location contacts close.It answers in advance When the formal tensioning of power muscle, it should be stretched to the 105%~110% of design load, then locked by specified value.Presstressed reinforcing steel locking Afterwards in 48h, if discovery loss of prestress is greater than the 10% of axis force of anchor design value, tensioning should be compensated.
Illustrate bolt grouting molding construction method of the present invention by taking the construction of some hydropower station prestressed anchor as an example below.
Prestressed anchor diameter of phi 32, L=9m, T=12t, anchoring section B long 350mm, free segment A long 550mm.Anchoring is applied Steps are as follows for work:
1) it is determined by experiment the match ratio of rapid solidification anchor agent and retarding mortar, and determines rapid solidification anchor agent and retarding mortar Initial set and final setting time.
Measure through test: the rapid solidification anchor agent presetting period is 39min, and compression strength reaches after final setting time 57min, 5h 23.4Mpa, age compression strength reaches 45Mpa within 28 day, meets the quality standard.The retarding mortar presetting period is 11h31min, eventually The solidifying time is 17h28min.7 day age compression strength reaches 37.2Mpa, and age compression strength reaches 54Mpa within 28 day, meets matter Amount standard.
2) single prestressed anchor is gone out to the demand of a variety of materials by Conversion Calculation, and material is carried out using weighing tool The gage work of material.
3) the rapid solidification anchor agent presetting period is shorter, and consistency is higher, should carry out again speed after the completion of retarding mortar mixing Solidifying Anchor Agent mixing, mixing time restriction is in 5min;
4) it needs that the hydraulic pressure in Grouting Pipe is compeled discharge with slurries before Grouting Pipe insertion bolthole, by slip casting after water discharge Pipe is inserted into pumpback 5cm after bottom hole.Slip casting is divided to two sections of progress, infuses retarding mortar immediately after having infused rapid solidification anchor agent.Slip casting uses one The disposable continuous grouting of platform slip casting machine.
The rapid solidification anchor agent of mixing is all put into slip casting machine slip casting aperture first, it is anti-that Anchor Agent is completely covered by slip casting aperture Only air enters, and after rapid solidification anchor agent fully enters Grouting Pipe, the retarding mortar of prior mixing is put into slip casting slot immediately Start to infuse slow setting anchor mortar, retarding mortar is by rapid solidification anchor agent whole press-in hole, using grouting pressure by Grouting Pipe when slip casting It slowly releases, stops slip casting when being pushed into advance in ready-made label in Grouting Pipe.
5) retarding mortar filling is completed, immediately slowly, at the uniform velocity assign prestressed anchor, and with cut-and-dried cement anchor Blocking anchor hole prevents slurries from flowing out.
When the intensity of anchor pole induration reaches the 80% of predetermined strength and after more than 20MPa, the tensioning of anchor pole just can be carried out It locking, rapid solidification anchor agent intensity after 5h used in this example reaches 23.4Mpa, and retarding mortar is pre-hardening after 11h31min, because This tensioning time is scheduled on slip casting and completes in 5~11 hours.

Claims (8)

1. prestressed anchor injection forming construction method, it is characterised in that the following steps are included: a little pore-creating is put in measurement, anchor hole is clear Reason, anchor hole are examined, and anchor pole, installation supporting plate, washer and nut, tensioning lock are assigned in rapid solidification anchor agent and retarding mortar preparation, slip casting It is fixed;
The rapid solidification anchor agent and retarding mortar preparation are: progress retarding mortar mixing first, then carry out rapid solidification anchor agent mixing, Mixing time restriction is in 5min;
The slip casting is: after the completion of rapid solidification anchor agent and retarding mortar preparation, will mark graduated Grouting Pipe insertion hole immediately It is interior to pumpback 5cm after bottom hole;Slip casting is divided to two sections to complete using the disposable continuous grouting of a slip casting machine, is initially injected rapid hardening anchoring Agent, after infuse retarding mortar immediately;Grouting Pipe is slowly released when slip casting using grouting pressure, wait be pushed into advance in being done in Grouting Pipe Stop slip casting when the label got well;
It is described to assign the anchor pole to be: carry out anchor pole after the completion of retarding mortar filling and assign, anchor pole assign before to silk mouth using winding glue Band is protected;Anchor pole slowly, is evenly assigned to bottom hole, and blocking anchor hole with cement anchor after the completion prevents slurries from flowing out.
2. prestressed anchor injection forming construction method according to claim 1, it is characterised in that: the installation supporting plate, Washer and nut are to start to install Supporting plate for anchor, washer and nut after the completion of anchor pole is assigned;It is required that supporting plate, washer and nut with Anchor pole axis is vertical.
3. prestressed anchor injection forming construction method according to claim 2, it is characterised in that: installation Supporting plate for anchor, After washer and nut, the tensioning of anchor pole is carried out after rapid solidification anchor agent final set, and before retarding mortar initial set.
4. prestressed anchor injection forming construction method according to claim 3, it is characterised in that: presstressed reinforcing steel is formally opened Before drawing, 20% design tensile load is taken, to its pre- tensioning 1~2 time, keeps its each location contacts close;Presstressed reinforcing steel is formally opened When drawing, it should be stretched to the 105%~110% of design load, then locked by specified value;After presstressed reinforcing steel locking in 48h, in advance When stress loss is greater than the 10% of axis force of anchor design value, tensioning is compensated.
5. prestressed anchor injection forming construction method according to claim 3, it is characterised in that: when slip casting, will prepare Rapid solidification anchor agent be all put into slip casting machine slip casting aperture, Anchor Agent, which is completely covered by slip casting aperture, prevents air from entering, to rapid hardening After Anchor Agent fully enters Grouting Pipe, the retarding mortar of prior mixing is put into slip casting slot starts to infuse slow setting anchor mortar immediately, Retarding mortar will be in rapid solidification anchor agent whole press-in hole.
6. prestressed anchor injection forming construction method according to claim 3, it is characterised in that: the measurement, which is put, a little adopts Hole location is accurately made with total station, and makes mark with red paint.
7. prestressed anchor injection forming construction method according to claim 3, it is characterised in that: the pore-creating is using more Arm drilling, control hole location deviation are less than 200mm, and hole depth is not less than anchor rod effective length, not larger than design hole depth 200mm, Bore angle deviation processed is less than 3 °.
8. prestressed anchor injection forming construction method according to claim 3, it is characterised in that: the anchor hole, which is cleared up, is Flushing is robbed with high pressure geomantic omen after the completion of drilling, until there is no terminating to rinse after muddy water outflow, and blown water with high pressure air pressure gun Portal outer.
CN201910174537.2A 2019-03-08 2019-03-08 Prestressed anchor injection forming construction method Pending CN109778853A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910174537.2A CN109778853A (en) 2019-03-08 2019-03-08 Prestressed anchor injection forming construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910174537.2A CN109778853A (en) 2019-03-08 2019-03-08 Prestressed anchor injection forming construction method

Publications (1)

Publication Number Publication Date
CN109778853A true CN109778853A (en) 2019-05-21

Family

ID=66486840

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910174537.2A Pending CN109778853A (en) 2019-03-08 2019-03-08 Prestressed anchor injection forming construction method

Country Status (1)

Country Link
CN (1) CN109778853A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113445519A (en) * 2021-06-11 2021-09-28 中国水利水电第九工程局有限公司 Grouting anchor rod construction process for supporting side slope

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007211412A (en) * 2006-02-07 2007-08-23 Honma Giken Kk Anchor construction method
CN101413396A (en) * 2008-09-26 2009-04-22 中国水利水电第十四工程局有限公司 Injecting and mounting method of stretching anchor rod
CN102080377A (en) * 2010-12-13 2011-06-01 张继红 Composite anchor rod and guide construction method thereof

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007211412A (en) * 2006-02-07 2007-08-23 Honma Giken Kk Anchor construction method
CN101413396A (en) * 2008-09-26 2009-04-22 中国水利水电第十四工程局有限公司 Injecting and mounting method of stretching anchor rod
CN102080377A (en) * 2010-12-13 2011-06-01 张继红 Composite anchor rod and guide construction method thereof

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
宋尚荣等: "侧向预支护技术预防岩爆的应用", 《东北水利水电》 *
张兵: "软弱围岩小净距隧道中夹岩柱关键施工技术", 《科技视界》 *
杨建军: "向家坝水电站地下厂房预应力锚杆施工新技术浅谈", 《四川水利》 *
杨建军等: "向家坝水电站地下洞室预应力锚杆施工技术", 《四川水力发电》 *
罗玉明: "预应力锚杆在边坡治理中的应用", 《低碳世界》 *
莫文: "预应力锚杆在云南那邦水电站边坡支护中的应用", 《云南水力发电》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113445519A (en) * 2021-06-11 2021-09-28 中国水利水电第九工程局有限公司 Grouting anchor rod construction process for supporting side slope

Similar Documents

Publication Publication Date Title
CN101240662A (en) Inner binding outer cramping method architecture structural crack comprehensive processing method
CN109611102A (en) Construction of the flyover method is worn under a kind of cold excavation
CN112647498B (en) Construction method for anti-floating anchor cable penetrating through water-rich layer
CN101285309A (en) Compound support method for deep foundation pit of tall buildings
CN101435192A (en) New and old concrete combining construction method
CN106948374A (en) A kind of hot band tooth pre-buried channel flow construction method of pipe gallery
CN109208592A (en) A kind of anchor rod construction method
CN107989049A (en) A kind of construction method of frame bank protection
CN212837830U (en) Reinforcement system for reinforcing damaged segments of shield tunnel
CN109778853A (en) Prestressed anchor injection forming construction method
KR20020063401A (en) Panel for repairing, reinforcing con'c body, anchor for leveling and method of using the same
CN108005402B (en) A kind of operated subway station trough plate platform reinforced construction method
CN113550335A (en) Construction method for high slope concrete slope protection engineering
CN113756339A (en) Construction method of prestressed anchor cable frame beam structure
CN109882203B (en) Combined filling and reinforcing process
CN110985052A (en) Self-compacting concrete pouring construction process method
CN111251450A (en) Production process of subway segment with seepage prevention function
CN102787594A (en) Dry-boring rapid construction method for cast-in-place pile
CN110644447A (en) Construction device and construction method for filling annular prestressed concrete lining anchorage grooves of hydraulic tunnel
CN109339094B (en) Method for mounting vertical prestressed steel hoop concrete assembled retaining wall for road
CN109083666A (en) A kind of grouted anchor bar construction and its construction method
Goodfellow Concrete for underground structures: guidelines for design and construction
CN210977512U (en) Tunnel secondary lining anticreep is empty vertically to move back tubular area mould slip casting rotary device
Bayer Use of preplaced aggregate concrete for mass concrete applications
CN209195457U (en) A kind of grouted anchor bar structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190521

RJ01 Rejection of invention patent application after publication