CN109778847A - A kind of construction method and device of cast-in-place concrete pile - Google Patents

A kind of construction method and device of cast-in-place concrete pile Download PDF

Info

Publication number
CN109778847A
CN109778847A CN201910211363.2A CN201910211363A CN109778847A CN 109778847 A CN109778847 A CN 109778847A CN 201910211363 A CN201910211363 A CN 201910211363A CN 109778847 A CN109778847 A CN 109778847A
Authority
CN
China
Prior art keywords
stake
pile
soil
stake holes
shaped cavity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910211363.2A
Other languages
Chinese (zh)
Other versions
CN109778847B (en
Inventor
裴晓峰
祝波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pei Juanyi
Zhu Bo
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910211363.2A priority Critical patent/CN109778847B/en
Publication of CN109778847A publication Critical patent/CN109778847A/en
Application granted granted Critical
Publication of CN109778847B publication Critical patent/CN109778847B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a kind of construction method of cast-in-place concrete pile and devices, its technology characteristics is that preset ring cone-shaped cavity forming is carried out in drilling machine pore forming process, drilling itself and the ring cone-shaped cavity along the single or multiple intervals of stake holes are formed behind whole hole, borehole cleaning, after hanging steel reinforcement cage, secondary pile hole cleaning and concrete perfusion, stake holes becomes pile body, and cavity becomes disk body.Acyclic cone-shaped cavity is preset, stake holes becomes pile body after whole hole concrete perfusion.After concrete reaches predetermined strength, implement continuous multiple spot in the predetermined altitude range of disk body lower part and/or stake bottom and is overlapped mutually and/or is abound with high-pressure mortar spraying, whitewashing makes soil cement made of slurries and soil body mix be connected, the induration of an entirety is formed after hardening to hold in the palm tray body (containing multiple disk bodies) and/or stake bottom (bottom containing a clump of piles), to increase substantially bearing capacity of pile foundation, be substantially reduced settlement and differential settlement.

Description

A kind of construction method and device of cast-in-place concrete pile
[technical field]
The present invention relates to the construction method of the cast-in-place concrete pile of field of civil engineering, especially a kind of pile body is equipped with single Or multiple disk bodies and below disk body, without disk body when under stake just in a manner of high-pressure injection slip casting to form load platform Cast-in-place concrete pile.
[background technique]
In order to overcome conventional drilling cast-in-place concrete pile pile bottom sediment to be difficult to handle and pile body periphery mudcake interlayer frictional resistance There are the works such as expansion disk/support disk pile technique and stake bottom, stake week slip casing by pressure technique in civil engineering practice process in lower problem Skill.Compared with conventional cast-in-situ bored pile, process above is to raising bearing capacity of single pile and reduces settlement amount of pile foundation, reduction project cost Deng effective, but its there is also apparent defects, simple cutting is expanded for disk technique, cutting process has disturbed disk chamber week The undisturbed soil on side, Cheng Panhou easily makes disk body generate biggish sedimentation and deformation in disk stress, so as to cause the sedimentation and deformation of pile body. It is preferred for compacted bearing disk pile, branch and disk through multiple corner, superposition is squeezed forms, exist at second and when subsequent squeezed Soil is squeezed into a possibility that front and continued is completed in cavity, and it leaves a question open at the integrality and quality of disk, existing detection means The integrality and quality of disk can not effectively be detected into, moreover, for individually propping up and the testing result of disk, can not determine at all be At branch or at disk;Secondly, boring, squeezing two-step two sets of equipment of needs, there are difficulty of construction to increase, process efficiency is not low, squeezed The problems such as pile perimeter resistance at position cannot be reinforced.For stake bottom, cement paste around pile technique, practical poor controllability is not only starched The actual dispersion range of liquid and direction are unable to control and guarantee, the uniformity of slip casting result, which exists, to be fundamentally unable to control and guarantee The problem of, the result is that the bearing capacity of adjacent studs and sedimentation and deformation discreteness are larger.
[summary of the invention]
In view of the foregoing drawbacks, the present invention provides a kind of construction method of cast-in-place concrete pile and devices.
A kind of construction method of cast-in-place concrete pile, which is characterized in that the construction method of the cast-in-place concrete pile includes Following steps:
The construction of stake holes is carried out with drilling machine by the structure for the stake being pre-designed;
When the structure of the stake being pre-designed is preset with ring cone-shaped cavity, used simultaneously in the work progress of the stake holes Forming device is preset in the stake holes and carries out the forming of ring cone-shaped cavity at absolute altitude, then the drilling machine pore-forming to whole hole;
When the structure of the stake being pre-designed presets acyclic cone-shaped cavity, the drilling machine directly carries out pore-forming to whole hole;
Borehole cleaning is carried out to the stake holes, steel reinforcement cage and conduit is hung to the stake holes, the stake holes is carried out clear for the second time Hole makes the stake holes and/or the ring cone-shaped cavity fill concrete, institute the stake holes concrete perfusion to default absolute altitude The stake holes becomes pile body after stating concrete hardening, and the ring cone-shaped cavity becomes disk body;
After the concrete reaches predetermined strength, with high pressure jet grouting device to the disk body lower part and/or described The soil body in the predetermined elevation range in stake bottom of pile body carries out continuous multiple spot and the high-pressure mortar spraying that is overlapped mutually and/or is abound with height Pressure whitewashing.
It optionally, is to be communicated as one on the outside of the stake holes and with the stake holes presetting the ring cone-shaped cavity , continuous and uninterrupted or intermittent cavity, be coaxial relation with the stake holes;
Absolute altitude, cavity size and the quantity of the ring cone-shaped cavity are configured according to the design requirement of the stake holes.
Optionally, the generation type of the ring cone-shaped cavity is rotary cutting mode and/or fashion of extrusion.
Optionally, to setting or do not set reinforcing bar or fashioned iron in the ring cone-shaped cavity.
Optionally, the high-pressure mortar spraying using rotating-spray or vectored injection or swings the single pipe method sprayed or multitube method;
The gunite material of the high-pressure mortar spraying includes and is not limited to water, compressed gas, cement, cement additive or blending Agent;
Setting, whitewashing amount, injection pressure, whitewashing radius and the range of the high-pressure mortar spraying, are bored at whitewashing range superposition rate Bar promotion/decrease speed and rotation speed are default, or are adjusted according to the variations of the practical physical characteristics of the soil body.
Optionally, to the high-pressure mortar spraying implementing continuous multiple spot in the predetermined altitude range of the disk body lower part and being overlapped mutually, spray Starching setting is setting quantity 1 or more around the pile body and the predeterminated position other than the disk body perspective plane;Or Before the structure by the stake being pre-designed carries out the construction of stake holes with drilling machine, predetermined altitude at absolute altitude is preset to the stake holes The high-pressure mortar spraying implementing continuous multiple spot in advance in range and being overlapped mutually reaches preset strength to the soil cement in the altitude range The construction of stake holes is carried out with drilling machine by the structure for the stake being pre-designed again afterwards and ring taper is carried out in the predetermined altitude range Cavity forming;
High-pressure mortar spraying process is that setting successively continuously whitewash simultaneously by whitewashing or each setting, the whitewashing model of adjacent setting It encloses and is overlapped by preset superposition rate;The continuous multiple spot and high-pressure mortar spraying being overlapped mutually will be made of the mix of single disk body lower part Soil cement is connected, and becomes the whole induration that support holds single disk body after soil cement hardening.
Optionally, to the more pile bodies or a clump of piles with implementing within the scope of multiple disk body lower part preset heights of absolute altitude The continuous multiple spot of default setting and what is be overlapped mutually be abound with whitewashing, by the more pile bodies or a clump of piles with absolute altitude it is multiple described in The soil cement of disk body lower part is connected, and forms one and includes cement including multiple single-deck lower part soil cements and bigger The soil body becomes support after soil-cement body hardening and holds the more stakes or a clump of piles with the induration cushion cap of the multiple disk bodies of absolute altitude.
Optionally, when presetting acyclic cone-shaped cavity/disk body, to real in the stake bottom predetermined altitude range of the pile body The high-pressure mortar spraying applying continuous multiple spot and being overlapped mutually, spray operation point are the default position around pile body and other than pile body perspective plane It sets, setting quantity 1 or more, whitewashing process is that setting successively continuously whitewash simultaneously by whitewashing or each setting;
The whitewashing range of adjacent setting is overlapped by preset superposition rate;
The continuous multiple spot and soil cement of the stake bottom of the single pile body is connected by the high-pressure mortar spraying being overlapped mutually, Become the induration that support holds a bottom after soil cement hardening.
Optionally, when presetting acyclic cone-shaped cavity/disk body, to the same grade stake bottom of multiple pile bodies or a clump of piles Implement the continuous multiple spot of default setting in predetermined altitude range and what is be overlapped mutually be abound with high-pressure mortar spraying, by multiple pile bodies Or the soil cement of clump of piles stake bottom is connected, and forms one and exists comprising multiple pile bodies or clump of piles stake bottom soil cement Interior bigger soil-cement body becomes the induration cushion cap that support holds multiple pile bodies or clump of piles stake bottom after soil-cement body hardening.
In addition the present invention also proposes a kind of construction equipment of cast-in-place concrete pile, which is characterized in that the filling concrete The construction of stake is set including pore-forming drill, ring cone-shaped cavity former, high pressure jet grouting device;
The pore-forming drill is used for the structure construction for carrying out stake holes by the stake being pre-designed;
The ring cone-shaped cavity former, which is used to preset in the stake holes, carries out the forming of ring cone-shaped cavity at absolute altitude;
The high pressure jet grouting device is for the soil in the predetermined elevation range in stake bottom of disk body lower part and/or pile body Body carries out continuous multiple spot and the high-pressure mortar spraying that is overlapped mutually and/or is abound with high-pressure mortar spraying.
Beneficial effects of the present invention: Gu default disk body in the present invention and disk body or pile body lower part formed consolidation object/ Knot body cushion cap technique, especially disk body or pile body lower part form consolidation object/induration cushion cap technique, will be to field of civil engineering Pile foundation construction generates great technological innovation, not only can greatly high single pile, more or a clump of piles bearing capacity, but also can be with Significantly reduce the settlement difference and thus caused settlement issues, and cavity forming process and whitewashing process even removed in industry It is non-cross, work efficiency can be significantly improved.Whole set process will also significantly reduce project cost, more reasonably shorten the construction period.
[Detailed description of the invention]
Fig. 1 is the method flow diagram of the construction method embodiment one of cast-in-place concrete pile provided by the invention.
Fig. 2 is the method flow diagram of the construction method embodiment two of cast-in-place concrete pile provided by the invention.
Fig. 3 is the method flow diagram of the construction method embodiment three of cast-in-place concrete pile provided by the invention.
Fig. 4 is the method flow diagram of the construction method example IV of cast-in-place concrete pile provided by the invention.
Fig. 5 is the equipment structure chart of the construction equipment embodiment five of cast-in-place concrete pile provided by the invention.
Fig. 6 is the construction equipment drilling rotary-cut all-in-one machine schematic diagram of cast-in-place concrete pile provided by the invention.
Fig. 7 is single-deck body provided by the invention lower part high-pressure mortar spraying consolidation object schematic diagram.
Fig. 8 is polydisc body provided by the invention lower part high-pressure mortar spraying consolidation object schematic diagram.
[specific embodiment]
It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not intended to limit the present invention.
Embodiment one
With reference to Fig. 1, a kind of construction method of cast-in-place concrete pile, comprising:
S101, the construction for carrying out stake holes with drilling machine by the structure for the stake being pre-designed.
Before the construction for carrying out stake holes with drilling machine by the structure for the stake being pre-designed, stake holes is preset and makes a reservation for height at absolute altitude The high-pressure mortar spraying implementing continuous multiple spot in advance in degree range and being overlapped mutually reaches default strong to the soil cement in the altitude range Carry out the construction of stake holes after degree with drilling machine by the structure for the stake being pre-designed again.
According to the structure for the stake being pre-designed, the processes such as site localization, embedded casing and drilling machine before carrying out pore-forming are in place.
Drilling machine pore-forming technique is the non-mud off pore-forming of mud off pore-forming or other forms;Pore-forming drill be drilling machine or The integrated apparatus that drilling machine and stake holes ring cone-shaped cavity former are composed, as shown in Figure 6.It is controlled and the method for operation is certainly Dynamic or manually operation and control mode.
S102, the stake being pre-designed structure when being preset with ring cone-shaped cavity, in the work progress of the stake holes It is preset simultaneously with forming device in the stake holes and carries out ring cone-shaped cavity forming at absolute altitude, then the drilling machine pore-forming to whole hole.
Drilling machine drilling and forming hole is formed pre- when drilling is to default ring cone-shaped cavity position absolute altitude to stake holes lateral direction rotary-cut The ring cone-shaped cavity first designed after the completion of cavity rotary-cut, continues downward pore-forming;It can also use to stake holes lateral direction extruding side Formula forms the ring cone-shaped cavity being pre-designed.Stake holes rotary-cut all-in-one machine schematic diagram as shown in Figure 6.
Ring cone-shaped cavity is to surround being communicated as one on the outside of stake holes and with stake holes, continuous and uninterrupted or intermittent chamber Body is coaxial relation with stake holes.Absolute altitude, cavity size and the quantity of ring cone-shaped cavity are to be pre-designed.When ring cone-shaped cavity institute The practical physical characteristics of place's soil body are when changing, and simultaneously adjustment ring cone-shaped cavity should be recalculated according to its practical testing result Actual setting absolute altitude, cavity size and quantity.Wherein, the quantity of ring cone-shaped cavity is than or equal to 1, i.e., at least apart from stake holes It is basis quantity 1 that one ring cone-shaped cavity (partially be stake root below cavity) is arranged at a certain distance from bottom, along stake holes from upper Cavity under and is not necessarily at equal intervals.
While continuing downward pore-forming, it is sequentially completed the forming of each ring cone-shaped cavity, until being drilled into design stake bottom absolute altitude, eventually Hole.
S103, borehole cleaning is carried out to the stake holes, hangs steel reinforcement cage and conduit to the stake holes, second is carried out to the stake holes Secondary borehole cleaning makes the stake holes and the ring cone-shaped cavity fill concrete, institute the stake holes concrete perfusion to default absolute altitude The stake holes becomes pile body after stating concrete hardening, and the ring cone-shaped cavity becomes disk body.
Material, production processing and the quality requirement of steel reinforcement cage and ingredient, proportion, quality and the intensity of concrete are (containing predetermined Intensity) it requires to be to be pre-designed.
After borehole cleaning, drilling machine keeps rotation status but does not creep into, it is therefore an objective to blend the bulk soil body remaining in hole clearly Except clean and adjust mud balance;Drilling machine is promoted, stake holes is detected, hangs steel reinforcement cage and conduit after detection is qualified.In steel At muscle cage absolute altitude identical with hole inner ring cone-shaped cavity, it is arranged or is not provided with mobilizable reinforcing bar according to the disk body counter-force size Or fashioned iron.
Secondary pile hole cleaning is carried out, the sediment generated when hanging steel reinforcement cage is removed.A borehole cleaning is completed according to pre-set programs, is being hung Steel reinforcement cage is put to after setting absolute altitude, hang conduit and secondary pile hole cleaning, disposable concrete perfusion is being preset with ring to absolute altitude is set When cone-shaped cavity, concrete is made to fill entire stake holes and all ring cone-shaped cavities.
S104, after the concrete reaches predetermined strength, it is predetermined to the disk body lower part with high pressure jet grouting device The soil body in elevation range carries out continuous multiple spot and the high-pressure mortar spraying that is overlapped mutually and/or is abound with high-pressure mortar spraying.
When concrete strength of pile reaches predetermined strength or more, disk body lower part high-pressure mortar spraying can be carried out.
Whitewashing mode is preset as high pressure or superhigh pressure jetting slip casting, and rotating-spray or vectored injection can be used or swing injection Single pipe method or multitube method.Wherein, gunite material includes and is not limited to water, compressed gas, cement, cement additive or blending Agent.The setting of high-pressure mortar spraying, whitewashing amount, injection pressure, whitewashing radius and range, whitewashing range superposition rate, drilling rod promote/under Reduction of speed degree and rotation speed are default, or are adjusted according to the variations of the practical physical characteristics of the soil body.High pressure or super-pressure spray Penetrating grouting device is high-pressure jet complexes (such as: high-pressure rotary jetting apparatus), and control and the method for operation are automatic and/or artificial Operation and control mode manually.
To the high-pressure mortar spraying implementing continuous multiple spot in the predetermined altitude range of single disk body lower part and being overlapped mutually, spray operation point For around pile body and the predeterminated position other than disk body perspective plane, setting quantity is not less than 1.Whitewashing process be setting according to Secondary continuous whitewashing or each setting are whitewashed simultaneously, and the whitewashing range of adjacent setting is overlapped by preset superposition rate.Continuously Multiple spot and soil cement made of the mix of single disk body lower part is connected by the high-pressure mortar spraying being overlapped mutually, after soil cement hardening at To hold in the palm the whole induration for holding single disk body.As shown in fig. 7, P41 is that whitewashing reinforcing body, P42 are load disk body, P43 under disk body For main pile body.
Embodiment two
With reference to Fig. 2, the present embodiment increases following steps on the basis of example 1:
S105, the more pile bodies or a clump of piles are implemented in advance within the scope of multiple disk body lower part preset heights of absolute altitude If the continuous multiple spot of setting and what is be overlapped mutually be abound with whitewashing, by the more pile bodies or a clump of piles with multiple disks of absolute altitude The soil cement of body lower part is connected, and forms one and includes soil cement including multiple single-deck lower part soil cements and bigger Body becomes support after soil-cement body hardening and holds the more stakes with the induration cushion cap of the multiple disk bodies of absolute altitude.
For more or a clump of piles, can implement to connect within the scope of multiple disk body lower parts preset height of same absolute altitude by being pre-designed What continuous multiple spot was overlapped mutually is abound with high-pressure mortar spraying, and more piles are connected with the soil cement of multiple disk body lower parts of absolute altitude, shape Include soil-cement body including the soil cement of multiple single-deck lower parts and bigger at one, becomes support after soil-cement body hardening and hold more Induration cushion cap of the stake with the multiple disk bodies of absolute altitude.As shown in figure 8, P51 be whitewash under disk body reinforcing body, P52 be load disk body, P53 is main pile body.
Embodiment three
With reference to Fig. 3, a kind of construction method of cast-in-place concrete pile, comprising:
S201, the construction for carrying out stake holes with drilling machine by the structure for the stake being pre-designed.
According to the structure for the stake being pre-designed, the processes such as site localization, embedded casing and drilling machine before carrying out pore-forming are in place.
Drilling machine pore-forming technique is the non-mud off pore-forming of mud off pore-forming or other forms;Pore-forming drill be drilling machine or The integrated apparatus that drilling machine and stake holes ring cone-shaped cavity former are composed, control and the method for operation are automatic or manual hand Dynamic operation and control mode.
S202, the stake being pre-designed structure when presetting acyclic cone-shaped cavity, the drilling machine directly carries out pore-forming extremely Whole hole.
Drilling machine drilling and forming hole, until being drilled into design stake bottom absolute altitude, whole hole.
S203, borehole cleaning is carried out to the stake holes, hangs steel reinforcement cage and conduit to the stake holes, second is carried out to the stake holes Secondary borehole cleaning makes the stake holes fill concrete, institute after the concrete hardening stake holes concrete perfusion to default absolute altitude Stake holes is stated as pile body.
Material, production processing and the quality requirement of steel reinforcement cage and ingredient, proportion, quality and the intensity of concrete are (containing predetermined Intensity) it requires to be to be pre-designed.
After borehole cleaning, drilling machine keeps rotation status but does not creep into, it is therefore an objective to blend the bulk soil body remaining in hole clearly Except clean and adjust mud balance;Drilling machine is promoted, stake holes is detected, hangs steel reinforcement cage and conduit after detection is qualified.
Secondary pile hole cleaning is carried out, the sediment generated when hanging steel reinforcement cage is removed.A borehole cleaning is completed according to pre-set programs, is being hung Steel reinforcement cage is put to after setting absolute altitude, hang conduit and secondary pile hole cleaning, disposable concrete perfusion is to setting absolute altitude.
S204, after the concrete reaches predetermined strength, with high pressure jet grouting device to the stake of the pile body under The soil body in the predetermined elevation range in portion carries out continuous multiple spot and the high-pressure mortar spraying that is overlapped mutually and/or is abound with high-pressure mortar spraying.
When concrete strength of pile reaches predetermined strength or more, the lower part high-pressure mortar spraying of pile body bottom can be carried out.
Whitewashing mode is preset as high pressure or superhigh pressure jetting slip casting, and rotating-spray or vectored injection can be used or swing injection Single pipe method or multitube method.Wherein, gunite material includes and is not limited to water, compressed gas, cement, cement additive or blending Agent.The setting of high-pressure mortar spraying, whitewashing amount, injection pressure, whitewashing radius and range, whitewashing range superposition rate, drilling rod promote/under Reduction of speed degree and rotation speed are default, or are adjusted according to the variations of the practical physical characteristics of the soil body.High pressure or super-pressure spray Penetrating grouting device is high-pressure jet complexes (such as: high-pressure rotary jetting apparatus), and control and the method for operation are automatic and/or artificial Operation and control mode manually.
To the high-pressure mortar spraying implementing continuous multiple spot in the predetermined altitude range of Single Pile bottom and being overlapped mutually, spray operation point For around pile body and the predeterminated position other than disk body perspective plane, setting quantity is not less than 1.Whitewashing process be setting according to Secondary continuous whitewashing or each setting are whitewashed simultaneously, and the whitewashing range of adjacent setting is overlapped by preset superposition rate.Continuously Multiple spot and soil cement made of the mix of single disk body lower part is connected by the high-pressure mortar spraying being overlapped mutually, after soil cement hardening at To hold in the palm the whole induration for holding single disk body.
Example IV
With reference to Fig. 4, the present embodiment increases following steps on the basis of embodiment three:
S205, setting is preset with implementation in the stake bottom predetermined altitude range of absolute altitude to multiple pile bodies or a clump of piles Continuous multiple spot and what is be overlapped mutually be abound with high-pressure mortar spraying, the soil cement of the stake bottom of multiple pile bodies or a clump of piles is linked to be One forms the bigger soil-cement body including a stake bottom soil cement comprising multiple pile bodies or a clump of piles, cement Become the induration cushion cap that support holds multiple pile bodies or clump of piles stake bottom after soil body hardening.
Embodiment five
With reference to Fig. 5, a kind of construction equipment of cast-in-place concrete pile, the construction equipment, comprising: P31 pore-forming drill, P32 ring Cone-shaped cavity former, P33 high pressure jet grouting device.
1) P31 pore-forming drill is used for the structure construction for carrying out stake holes by the stake being pre-designed;
2) P32 ring cone-shaped cavity former, which is used to preset in the stake holes, carries out the forming of ring cone-shaped cavity at absolute altitude;
3) P33 high pressure jet grouting device is for the soil body in the predetermined elevation range in stake bottom of disk body lower part and pile body It carries out continuous multiple spot and the high-pressure mortar spraying that is overlapped mutually and is abound with high-pressure mortar spraying.
Default disk body in the present invention and consolidation object/induration cushion cap technique is formed in disk body or pile body lower part, especially It is that consolidation object/induration cushion cap technique is formed at disk body or pile body lower part, weight will be generated to the pile foundation construction of field of civil engineering Big technological innovation, not only can greatly high single pile, more or a clump of piles bearing capacity, but also can be significantly reduced even except row Settlement difference in the industry and thus caused by settlement issues, and cavity forming process and process of whitewashing are non-cross, Ke Yiming It is aobvious to improve work efficiency.Whole set process will also significantly reduce project cost, more reasonably shorten the construction period.
It should be noted that, in this document, the terms "include", "comprise" or its any other variant are intended to non-row His property includes, so that the process, method, article or the device that include a series of elements not only include those elements, and And further include other elements that are not explicitly listed, or further include for this process, method, article or device institute it is intrinsic Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including being somebody's turn to do There is also other identical elements in the process, method of element, article or device.
The serial number of the above embodiments of the invention is only for description, does not represent the advantages or disadvantages of the embodiments.
The embodiment of the present invention is described with above attached drawing, but the invention is not limited to above-mentioned specific Embodiment, the above mentioned embodiment is only schematical, rather than restrictive, those skilled in the art Under the inspiration of the present invention, without breaking away from the scope protected by the purposes and claims of the present invention, it can also make very much Form, all of these belong to the protection of the present invention.

Claims (10)

1. a kind of construction method of cast-in-place concrete pile, which is characterized in that the construction method of the cast-in-place concrete pile includes such as Lower step:
The construction of stake holes is carried out with drilling machine by the structure for the stake being pre-designed;
When the structure of the stake being pre-designed is preset with ring cone-shaped cavity, simultaneously with forming in the work progress of the stake holes Device is preset in the stake holes and carries out the forming of ring cone-shaped cavity at absolute altitude, then the drilling machine pore-forming to whole hole;
When the structure of the stake being pre-designed presets acyclic cone-shaped cavity, the drilling machine directly carries out pore-forming to whole hole;
Borehole cleaning is carried out to the stake holes, steel reinforcement cage and conduit is hung to the stake holes, second of borehole cleaning is carried out to the stake holes, it is right The stake holes concrete perfusion makes the stake holes and/or the ring cone-shaped cavity fill concrete, the coagulation to default absolute altitude The stake holes becomes pile body after soil hardening, and the ring cone-shaped cavity becomes disk body;
After the concrete reaches predetermined strength, with high pressure jet grouting device to the disk body lower part and/or the pile body The predetermined elevation range in stake bottom in the soil body carry out continuous multiple spot and the high-pressure mortar spraying that is overlapped mutually and/or be abound with high pressure spray Slurry.
2. the construction method of cast-in-place concrete pile according to claim 1, which is characterized in that presetting the ring conical cavity Body is be communicated as one on the outside of the stake holes and with the stake holes, continuous and uninterrupted or intermittent cavity, and described Stake holes is coaxial relation;
Absolute altitude, cavity size and the quantity of the ring cone-shaped cavity are configured according to the design requirement of the stake holes.
3. the construction method of cast-in-place concrete pile according to claim 1, which is characterized in that the shape of the ring cone-shaped cavity It is rotary cutting mode and/or fashion of extrusion at mode.
4. the construction method of cast-in-place concrete pile according to claim 1, which is characterized in that in the ring cone-shaped cavity If or not setting reinforcing bar or fashioned iron.
5. the construction method of cast-in-place concrete pile according to claim 1, which is characterized in that the high-pressure mortar spraying is using rotation Turn injection or vectored injection or swings the single pipe method or multitube method of injection;
The gunite material of the high-pressure mortar spraying includes and is not limited to water, compressed gas, cement, cement additive or admixture;
Setting, whitewashing amount, injection pressure, whitewashing radius and the range of the high-pressure mortar spraying, whitewashing range superposition rate, drilling rod mention Liter/decrease speed and rotation speed are default, or are adjusted according to the variations of the practical physical characteristics of the soil body.
6. the construction method of cast-in-place concrete pile according to claim 1, which is characterized in that predetermined to the disk body lower part Implement the high-pressure mortar spraying that continuous multiple spot is overlapped mutually in altitude range, spray operation point is around the pile body and in the disk body Predeterminated position other than perspective plane, setting quantity 1 or more;Or
Before the structure by the stake being pre-designed carries out the construction of stake holes with drilling machine, the stake holes is preset pre- at absolute altitude Determine the high-pressure mortar spraying implementing continuous multiple spot in advance in altitude range and being overlapped mutually, reaches pre- to the soil cement in the altitude range If carrying out the construction of stake holes with drilling machine by the structure for the stake being pre-designed again after intensity and being carried out in the predetermined altitude range The forming of ring cone-shaped cavity;
High-pressure mortar spraying process is that setting successively continuously whitewash simultaneously by whitewashing or each setting, and the whitewashing range of adjacent setting is pressed Preset superposition rate is overlapped;Continuous multiple spot and the high-pressure mortar spraying being overlapped mutually are by cement made of the mix of single disk body lower part Soil is connected, and becomes the whole induration that support holds single disk body after soil cement hardening.
7. the construction method of cast-in-place concrete pile according to claim 6, which is characterized in that
To the more pile bodies or a clump of piles with the default setting of implementation within the scope of multiple disk body lower part preset heights of absolute altitude Continuous multiple spot and what is be overlapped mutually be abound with whitewashing, by the more pile bodies or a clump of piles with multiple disk body lower parts of absolute altitude Soil cement is connected, and forms one and includes soil-cement body including multiple single-deck lower part soil cements and bigger, cement Become support after soil body hardening and holds the more stakes with the induration cushion cap of the multiple disk bodies of absolute altitude.
8. the construction method of cast-in-place concrete pile according to claim 1, which is characterized in that presetting acyclic conical cavity When body/disk body, to the high-pressure mortar spraying implementing continuous multiple spot in the stake bottom predetermined altitude range of the pile body and being overlapped mutually, Spray operation point is setting quantity 1 or more around pile body and the predeterminated position other than pile body perspective plane, and whitewashing process is Setting successively continuously whitewash simultaneously by whitewashing or each setting;
The whitewashing range of adjacent setting is overlapped by preset superposition rate;
The continuous multiple spot and soil cement of the stake bottom of the single pile body is connected by the high-pressure mortar spraying being overlapped mutually, cement Become the induration that support holds a bottom after soil hardening.
9. the construction method of cast-in-place concrete pile according to claim 8, which is characterized in that presetting acyclic conical cavity When body/disk body, to the default setting of implementation in the same grade stake bottom predetermined altitude range of multiple pile bodies or a clump of piles Continuous multiple spot and what is be overlapped mutually be abound with high-pressure mortar spraying, is linked to be one for the soil cement of the stake bottom of multiple pile bodies or a clump of piles Body forms the bigger soil-cement body including a stake bottom soil cement comprising multiple pile bodies, soil-cement body hardening Become the induration cushion cap that support holds the stake bottom of multiple pile bodies afterwards.
10. a kind of construction equipment of cast-in-place concrete pile, which is characterized in that the construction of the cast-in-place concrete pile is set including pore-forming Drilling machine, ring cone-shaped cavity former, high pressure jet grouting device;
The pore-forming drill is used for the structure construction for carrying out stake holes by the stake being pre-designed;
The ring cone-shaped cavity former, which is used to preset in the stake holes, carries out the forming of ring cone-shaped cavity at absolute altitude;
The high pressure jet grouting device for disk body lower part and/or pile body the predetermined elevation range in stake bottom in the soil body into The continuous multiple spot of row and the high-pressure mortar spraying being overlapped mutually and/or it is abound with high-pressure mortar spraying.
CN201910211363.2A 2019-03-20 2019-03-20 Construction method and device of concrete cast-in-place pile Active CN109778847B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910211363.2A CN109778847B (en) 2019-03-20 2019-03-20 Construction method and device of concrete cast-in-place pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910211363.2A CN109778847B (en) 2019-03-20 2019-03-20 Construction method and device of concrete cast-in-place pile

Publications (2)

Publication Number Publication Date
CN109778847A true CN109778847A (en) 2019-05-21
CN109778847B CN109778847B (en) 2021-04-09

Family

ID=66488771

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910211363.2A Active CN109778847B (en) 2019-03-20 2019-03-20 Construction method and device of concrete cast-in-place pile

Country Status (1)

Country Link
CN (1) CN109778847B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110886292A (en) * 2019-11-29 2020-03-17 裴晓峰 Full-casing composite expanded-disk pile construction method and equipment
CN112211186A (en) * 2020-09-30 2021-01-12 裴隽仪 Post-tensioning unbonded prestressed anchoring pile structure and construction method thereof
WO2021103209A1 (en) * 2019-11-29 2021-06-03 祝波 Composite expanded-plate pile construction method and equipment

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1093429A (en) * 1994-04-01 1994-10-12 张俊生 The compounding method of ground and foundation pile
CN1208102A (en) * 1998-07-31 1999-02-17 叶长生 Deposited pile and its construction
UA65307A (en) * 2003-07-04 2004-03-15 Cherkasy State Tech Univ Method for arranging piles with widened beam toe
CN104612134A (en) * 2014-12-16 2015-05-13 中铁建大桥工程局集团第五工程有限公司 Cast-in place pile post-grouting construction method for pouring construction
CN104988907A (en) * 2015-08-02 2015-10-21 王继忠 Construction method of concrete pile
CN106120706A (en) * 2016-06-27 2016-11-16 浙大宁波理工学院科技研究院有限公司 Foundation-reinforcing device and foundation reinforcement method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1093429A (en) * 1994-04-01 1994-10-12 张俊生 The compounding method of ground and foundation pile
CN1208102A (en) * 1998-07-31 1999-02-17 叶长生 Deposited pile and its construction
UA65307A (en) * 2003-07-04 2004-03-15 Cherkasy State Tech Univ Method for arranging piles with widened beam toe
CN104612134A (en) * 2014-12-16 2015-05-13 中铁建大桥工程局集团第五工程有限公司 Cast-in place pile post-grouting construction method for pouring construction
CN104988907A (en) * 2015-08-02 2015-10-21 王继忠 Construction method of concrete pile
CN106120706A (en) * 2016-06-27 2016-11-16 浙大宁波理工学院科技研究院有限公司 Foundation-reinforcing device and foundation reinforcement method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110886292A (en) * 2019-11-29 2020-03-17 裴晓峰 Full-casing composite expanded-disk pile construction method and equipment
WO2021103210A1 (en) * 2019-11-29 2021-06-03 裴晓峰 Construction method and device for full-casing composite expanded disk pile
WO2021103209A1 (en) * 2019-11-29 2021-06-03 祝波 Composite expanded-plate pile construction method and equipment
CN110886292B (en) * 2019-11-29 2021-10-26 祝波 Full-casing composite expanded-disk pile construction method and equipment
EP4056762A4 (en) * 2019-11-29 2022-12-14 Bo Zhu Composite expanded-plate pile construction method and equipment
CN112211186A (en) * 2020-09-30 2021-01-12 裴隽仪 Post-tensioning unbonded prestressed anchoring pile structure and construction method thereof

Also Published As

Publication number Publication date
CN109778847B (en) 2021-04-09

Similar Documents

Publication Publication Date Title
CN101532290B (en) Granule grouting pile of ripple plastic sleeve with hole for strengthening soft soil foundation and strengthening method
CN109778847A (en) A kind of construction method and device of cast-in-place concrete pile
CN105256795B (en) Hold type thread core built pile and its construction equipment and construction method in a kind of end
CN105604001B (en) Drilling tool is stirred in the stake of stiff-core cement soil cylinder and the rotation of construction method and tubular
CN107417182B (en) Expansion type high polymer cement slurry, grouting reinforcement device and grouting reinforcement method
CN107513995A (en) A kind of bridge struction pile post grouting construction method
WO2021103209A1 (en) Composite expanded-plate pile construction method and equipment
CN104895583B (en) Tunnel surrounding rock control method combining pressure relief and slip-casting reinforcement
CN110747847A (en) Double-pipe high-pressure jet grouting construction method for building impervious wall in soft foundation
CN106498943A (en) Disposable high-pressure rotary-spray type enlarged footing Prestressed Soil anchor pole construction method
CN108265706A (en) A kind of engineering pile and pile-formation process in solution cavity geology
CN102979091B (en) Method for constructing cement jet grouting pile with fine aggregate concrete core
CN114215042A (en) Miniature steel pipe pile for reinforcing foundation and construction method thereof
CN112761166A (en) Construction method for shallow foundation pit of combined support of piles and pre-grouting steel pipes based on SMW (soil mixing wall) construction method
CN103556646A (en) Method for forming water shutoff walls in sand and gravel layer
CN211713954U (en) Cast-in-situ bored pile in deep fine sand stratum
CN109518676B (en) Method for treating large-pore loose foundation soil through micro-gas explosion grouting
CN108385667A (en) A kind of geotextiles anti-block water permeable pile driving construction device and method
CN112982386A (en) String bead karst cave pile-forming treatment construction method
CN107975027B (en) Construction method for reinforcing soil body at shield launching and arrival end
CN106759296A (en) One kind draining odd-shaped cross section ring pile tube and its can take root in formula construction method
CN206319347U (en) A kind of steel pipe reinforces piling strtucture
CN103774645A (en) Cemented soil and concrete composite pile and construction method thereof
CN107780308A (en) A kind of application process of Bag Grouting Pile in Soft Railway
CN203977418U (en) Prevent cast-in-place pile concrete loss device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Pei Xiaofeng

Inventor after: Zhu Bo

Inventor after: Chen Yongshun

Inventor before: Pei Xiaofeng

Inventor before: Zhu Bo

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20210305

Address after: 518000 16e, block B, building 9, Qiaoxiang village, No.1, antuoshan ninth Road, Futian District, Shenzhen City, Guangdong Province

Applicant after: Zhu Bo

Applicant after: Pei Juanyi

Address before: 300201 No.401, gate 6, longjiangli, Dongting Road, Hexi District, Tianjin

Applicant before: Pei Xiaofeng

Applicant before: Zhu Bo

GR01 Patent grant
GR01 Patent grant