CN109778653A - A kind of concrete structure crack method for repairing and mending - Google Patents

A kind of concrete structure crack method for repairing and mending Download PDF

Info

Publication number
CN109778653A
CN109778653A CN201811646071.3A CN201811646071A CN109778653A CN 109778653 A CN109778653 A CN 109778653A CN 201811646071 A CN201811646071 A CN 201811646071A CN 109778653 A CN109778653 A CN 109778653A
Authority
CN
China
Prior art keywords
crack
repairing
mending
concrete structure
adhesive
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811646071.3A
Other languages
Chinese (zh)
Inventor
许良
王贵军
张健华
谢远东
高先兵
张楚宏
黎文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Hua Da Construction Engineering Co Ltd
Original Assignee
Guangdong Hua Da Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Hua Da Construction Engineering Co Ltd filed Critical Guangdong Hua Da Construction Engineering Co Ltd
Priority to CN201811646071.3A priority Critical patent/CN109778653A/en
Publication of CN109778653A publication Critical patent/CN109778653A/en
Pending legal-status Critical Current

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of concrete structure crack method for repairing and mending, belong to building engineering field.The concrete structure crack method for repairing and mending, including grooving step, reinforce preparation process, cleanup step, the step that mends a split, reinforcing crack step, sealing groove step, the method for repairing and mending above crack by opening up strengthening groove, adhesive is poured into crack, the further expansion cracking for reinforcing connecting pre- cracking-proof is played inside crack, repair layer is perfused again on crack top simultaneously, and adds rinforcement bar identical with crack growth direction in repair layer, rinforcement bar is conducive to resist cracking forces;By the crack repairing method, it can avoid crack and crack again after repairing.

Description

A kind of concrete structure crack method for repairing and mending
Technical field
The present invention relates to building engineering field more particularly to a kind of concrete structure crack method for repairing and mending.
Background technique
Currently, reinforced concrete structure has many advantages, such as that easy for construction, bearing capacity is big, in phases such as bridge pavement urban architectures It closes in architectural engineering, since various construction reasons or use environment influence, it is unavoidable that crack, which occurs, in concrete structure.Than Such as, around the road surface of reinforced concrete structure or the expansion joint of bridge floor, due to various factors, building is using a period of time Later, crack can be extended by expansion joint, this crack is usually irregular cracks, for this structure sheaf crack, if too late When repair, will cause rainwater and infiltrated into inside reinforced concrete structure by crack, lead to internal steel bar stress corrosion so that The depression of bearing force of road surface or bridge floor is easy to cause the damage on bridge floor or road surface.
But the existing concrete structure crack method for repairing and mending to road or bridge, generally only directly infused into crack Epoxy resin is repaired with fracture, but again by load action around crack, concrete structure is stretched, crack It can split again;Such method for repairing and mending is inefficient.
Summary of the invention
For overcome the deficiencies in the prior art, the concrete structure good the purpose of the present invention is to provide a kind of repair efficiency Crack repairing method.
The purpose of the present invention adopts the following technical scheme that realization:
Grooving step: a kind of concrete structure crack method for repairing and mending chooses slotted zones, so that crack is located at the slotted zones It is interior, the groove depth of 8-15cm is outputed in slotted zones using cutter device, to form strengthening groove, slot of the crack in the strengthening groove Bottom has opening;
Preparation process: the extending direction along the crack is reinforced, interval opens up several groups reinforced hole group, reinforces described in every group Hole group includes the reinforcing vertical core being symmetrically positioned in the crack two sides;
Cleanup step: the crack two sides, the cleaning reinforcing vertical core, the cleaning reinforcement are cleared up using high pressure blower Slot;
Mend a split step: adhesive being injected the crack using syringe;
It reinforces crack step: adhesive being injected into the reinforcing vertical core using syringe;Both ends have the reinforcing of bending part Muscle both ends are inserted into respectively in the reinforcing vertical core of the crack two sides;
Sealing groove step: the casting concrete in the strengthening groove forms repair layer to fill the strengthening groove.
Further, further include curing step: carrying out water seasoning in the repair layer, it is described to split after maintenance Seam position can continue to use.
Further, further include cleaning step before the grooving step: first cleaning the crack and its attached with water flow Close concrete structure.
Further, the average headway in the slotted zones two sides and the crack is 3-8cm.
Further, several rinforcement bars are connected and fixed integrally by longitudinal rib.
Further, each reinforced hole group interval 5-10cm setting.
Further, the adhesive used in step and reinforcing crack step that mends a split is poly- ammonia Asia rouge Adhesive.
Further, in the cleanup step, it is also necessary to using degreasing staple dip in acetone or alcohol scrubbing polishing is crossed Region, to remove the concrete powder and dust around crack.
Compared with prior art, the beneficial effects of the present invention are:
Strengthening groove is opened up above crack, adhesive is poured into crack, and reinforcement is played inside crack and connects pre- anticracking The further expansion of seam cracks, while repair layer being perfused again on crack top, and add in repair layer and crack growth direction Identical rinforcement bar, rinforcement bar are conducive to resist cracking forces;By the crack repairing method, crack can avoid after repairing again Cracking.
Detailed description of the invention
Fig. 1 is the process flow chart of concrete structure crack method for repairing and mending of the invention.
Specific embodiment
In the following, being described further in conjunction with attached drawing and specific embodiment to the present invention, it should be noted that not Under the premise of conflicting, new implementation can be formed between various embodiments described below or between each technical characteristic in any combination Example.
As shown in Figure 1, a kind of concrete structure crack method for repairing and mending is present embodiments provided, this method comprises:
Grooving step: choosing slotted zones, so that crack is located in slotted zones, using cutter device, such as utilizes grooving machine, The groove depth of 8-15cm is outputed in slotted zones, and to form strengthening groove, crack has opening in the slot bottom of strengthening groove;
Preparation process: the extending direction along crack is reinforced, interval opens up several groups reinforced hole group, and every group of reinforced hole group includes It is symmetrically positioned in the reinforcing vertical core in crack two sides, reinforces vertical core for fixing rinforcement bar;
Cleanup step: reinforcing vertical core, cleaning strengthening groove using high pressure blower cleaning crack two sides, cleaning, by crack, The dirt sand clast blowout in vertical core and in strengthening groove is reinforced, the repair efficiency in impurity effect later period is avoided;
Mend a split step: adhesive is injected into crack using syringe, wherein can use ordinary syringe, adhesive Polyurethane, epoxy resin etc. can be selected, and adhesive can increase penetrant, be conducive to adhesive and penetrate into crack;
It reinforces crack step: adhesive being injected using syringe and reinforces vertical core;Both ends have the rinforcement bar two of bending part End is inserted into respectively in the reinforcing vertical core of crack two sides;By rinforcement bar across crack, the work that limitation crack is further cracked is played With, cooperate crack inside adhesive, effectively crack is avoided to crack again;Improve repair efficiency;
Sealing groove step: to adhesive primary solidification, the casting concrete in strengthening groove forms repairing to fill strengthening groove Layer.
Preferably, it reinforces in the step of crack, toward reinforcing in vertical core the adhesive for injecting 1/2 to 2/3 hole depth, then by rinforcement bar End insertion, rinforcement bar squeeze out adhesive extra in vertical core, so that filling full glue between rinforcement bar and reinforcing vertical core inner wall Glutinous agent, after adhesive is dry, rinforcement bar is connected firmly with vertical core inner wall is reinforced, so that even if generating shake at crack when bearing load Dynamic, rinforcement bar still keeps fastening strength, will not generate displacement.
Specifically, strengthening groove is opened up above crack, adhesive is poured into crack, and reinforcement connection is played inside crack The further expansion of pre- cracking-proof cracks, while repair layer being perfused again on crack top, and adds in repair layer and expand with crack The identical rinforcement bar of general orientation, rinforcement bar are conducive to resist cracking forces;By the crack repairing method, it can avoid crack and repairing It cracks again afterwards.
Preferably, further include curing step: carrying out water seasoning in repair layer, after maintenance, location of cracks can be with It continues to use.
Preferably, further include cleaning step before grooving step: first cleaning crack and its neighbouring concrete with water flow Structure.
Preferably, the average headway in slotted zones two sides and crack is 3-8cm.
Preferably, it in order to improve the consolidation effect of rinforcement bar, is connected and fixed integrally in several rinforcement bars by longitudinal rib.
Preferably, each reinforced hole group interval 5-10cm is arranged.
Preferably, adhesive used in the step that mends a split and reinforcing crack step is poly- ammonia Asia rouge adhesive, is gathered Ammonia Asia rouge adhesive can rapid curing, it is only necessary to wait 10 minutes or so, be conducive to accelerate patch work progress.
Preferably, in cleanup step, it is also necessary to the region that acetone or alcohol scrubbing polishing are crossed is dipped in using degreasing staple, with Remove the concrete powder and dust around crack.
The above embodiment is only the preferred embodiment of the present invention, and the scope of protection of the present invention is not limited thereto, The variation and replacement for any unsubstantiality that those skilled in the art is done on the basis of the present invention belong to institute of the present invention Claimed range.

Claims (8)

1. a kind of concrete structure crack method for repairing and mending, it is characterised in that:
Grooving step: slotted zones are chosen so that crack is located in the slotted zones and output 8- in slotted zones using cutter device The groove depth of 15cm, to form strengthening groove, the crack has opening in the slot bottom of the strengthening groove;
Preparation process: the extending direction along the crack is reinforced, interval opens up several groups reinforced hole group, reinforced hole group described in every group Including being symmetrically positioned in the reinforcing vertical core in the crack two sides;
Cleanup step: the crack two sides, the cleaning reinforcing vertical core, the cleaning strengthening groove are cleared up using high pressure blower;
Mend a split step: adhesive being injected the crack using syringe;
It reinforces crack step: adhesive being injected into the reinforcing vertical core using syringe;Both ends have the rinforcement bar two of bending part End is inserted into respectively in the reinforcing vertical core of the crack two sides;
Sealing groove step: the casting concrete in the strengthening groove forms repair layer to fill the strengthening groove.
2. concrete structure crack method for repairing and mending as described in claim 1, it is characterised in that:
Further include curing step: carrying out water seasoning in the repair layer, after maintenance, the location of cracks can continue It uses.
3. concrete structure crack method for repairing and mending as described in claim 1, it is characterised in that:
Further include cleaning step before the grooving step: first cleaning the crack and its neighbouring concrete knot with water flow Structure.
4. concrete structure crack method for repairing and mending as described in claim 1, it is characterised in that:
The average headway in the slotted zones two sides and the crack is 3-8cm.
5. concrete structure crack method for repairing and mending according to any one of claims 1-4, it is characterised in that:
Several rinforcement bars are connected and fixed integrally by longitudinal rib.
6. concrete structure crack method for repairing and mending as claimed in claim 5, it is characterised in that:
Each reinforced hole group interval 5-10cm setting.
7. concrete structure crack method for repairing and mending according to any one of claims 1-4, it is characterised in that:
The adhesive used in step and reinforcing crack step that mends a split is poly- ammonia Asia rouge adhesive.
8. concrete structure crack method for repairing and mending as described in claim 1, it is characterised in that:
In the cleanup step, it is also necessary to dip in the region that acetone or alcohol scrubbing polishing are crossed using degreasing staple, be split with removal Concrete powder and dust around stitching.
CN201811646071.3A 2018-12-30 2018-12-30 A kind of concrete structure crack method for repairing and mending Pending CN109778653A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811646071.3A CN109778653A (en) 2018-12-30 2018-12-30 A kind of concrete structure crack method for repairing and mending

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811646071.3A CN109778653A (en) 2018-12-30 2018-12-30 A kind of concrete structure crack method for repairing and mending

Publications (1)

Publication Number Publication Date
CN109778653A true CN109778653A (en) 2019-05-21

Family

ID=66499657

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811646071.3A Pending CN109778653A (en) 2018-12-30 2018-12-30 A kind of concrete structure crack method for repairing and mending

Country Status (1)

Country Link
CN (1) CN109778653A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110714626A (en) * 2019-10-23 2020-01-21 广东穗都建筑工程有限公司 Building wall leakage repairing method
CN110952464A (en) * 2019-12-20 2020-04-03 沈靖林 Bridge pier repairing and reinforcing construction method
CN111996928A (en) * 2020-09-03 2020-11-27 侯小柱 Bridge crack repairing method
CN112176817A (en) * 2020-08-20 2021-01-05 中冶天工集团有限公司 Method for treating cracks of base panel of road reconstruction project

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2873772A1 (en) * 2013-11-14 2015-05-20 Oliver T. Meyer Method and device for the repair of cracks in asphalt or similar surfaces
CN204401432U (en) * 2015-01-09 2015-06-17 洛阳城市建设勘察设计院有限公司 A kind of measures of cracks on concrete pavement repairs structure
CN107604801A (en) * 2017-10-13 2018-01-19 苏州东振路桥工程有限公司 The reparation structure and its gap casting glue restorative procedure of a kind of impaired bituminous paving

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2873772A1 (en) * 2013-11-14 2015-05-20 Oliver T. Meyer Method and device for the repair of cracks in asphalt or similar surfaces
CN204401432U (en) * 2015-01-09 2015-06-17 洛阳城市建设勘察设计院有限公司 A kind of measures of cracks on concrete pavement repairs structure
CN107604801A (en) * 2017-10-13 2018-01-19 苏州东振路桥工程有限公司 The reparation structure and its gap casting glue restorative procedure of a kind of impaired bituminous paving

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
大西铁路客运专线有限责任公司: "《大西高铁施工技术实践》", 31 October 2014, 中国铁道出版社 *
王水龙: "《桥梁病害》", 31 August 2015, 上海大学出版社 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110714626A (en) * 2019-10-23 2020-01-21 广东穗都建筑工程有限公司 Building wall leakage repairing method
CN110714626B (en) * 2019-10-23 2021-09-28 广东穗都建筑工程有限公司 Building wall leakage repairing method
CN110952464A (en) * 2019-12-20 2020-04-03 沈靖林 Bridge pier repairing and reinforcing construction method
CN110952464B (en) * 2019-12-20 2020-10-27 江苏骏豪建设工程有限公司 Bridge pier repairing and reinforcing construction method
CN112176817A (en) * 2020-08-20 2021-01-05 中冶天工集团有限公司 Method for treating cracks of base panel of road reconstruction project
CN111996928A (en) * 2020-09-03 2020-11-27 侯小柱 Bridge crack repairing method

Similar Documents

Publication Publication Date Title
CN109778653A (en) A kind of concrete structure crack method for repairing and mending
CN204401432U (en) A kind of measures of cracks on concrete pavement repairs structure
KR101434523B1 (en) Seismic Retrofitting of Concrete Structures by using Coating Fiber Mesh Grid and Inorganic Cementitious Matrix Composite
CN104895581B (en) Structure and its restorative procedure are quickly repaired in a kind of tunnel-liner based on Carbon Fibre Textile
CN104675141A (en) FRP (Fiber Reinforced Plastic) pipe confined cement based composite material reinforced pier column structure
CN204941566U (en) A kind of grid steel frame for reinforcing existing tunnel
CN204326567U (en) A kind of reinforced concrete wall runs through large fracture preparing structure
CN102561412A (en) Reinforcement method for fiber reinforced composite plastic and concrete
CN104847130B (en) A kind of ruggedized construction and its construction method of existing structure beam
CN106401205A (en) Construction method for reinforcement of externally bonded profile steel of reinforced concrete structure
CN104594199B (en) A kind of Reinforced Concrete Bridge longitudinally connected construction method of framing longitudinal joint
CN108019054A (en) A kind of wall hole to be provided antiseep plugging device
CN108868182A (en) A kind of concrete structure longitudinal crack method for repairing and mending
CN106401204A (en) Composite reinforcing method for wrapping fiber-reinforced high-damping polymer concrete with carbon fiber cloth
CN106149554A (en) A kind of prefabricated bridge expansion joint connecting elements, preparation method and construction method thereof
CN102605721A (en) Method for seismic hardening pier by steel plate
CN110284724A (en) GRC plate method for repairing and mending
CN209384076U (en) Space cloth muscle asphalt pavement pit repairing structure
CN204571341U (en) A kind of FRP pipe constraint cement-base composite material reinforces pillarwork
CN204782044U (en) Reinforced structure of existing structure roof beam
CN107098622B (en) A kind of compound mortar of high-performance reinforces the construction method of existing subway tunnel structure
CN203559345U (en) Non-concrete bridge expansion joint device
CN108316942A (en) A kind of tunnel double-lining microcrack reinforcement
CN209482290U (en) A kind of assembled basement process device of soft soil foundation
CN105401740B (en) Timber structure and timber structure restorative procedure after reparation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190521