CN109763453A - Method for urban inner rivers and canals Comprehensive Treatment of Pollution - Google Patents

Method for urban inner rivers and canals Comprehensive Treatment of Pollution Download PDF

Info

Publication number
CN109763453A
CN109763453A CN201910087134.4A CN201910087134A CN109763453A CN 109763453 A CN109763453 A CN 109763453A CN 201910087134 A CN201910087134 A CN 201910087134A CN 109763453 A CN109763453 A CN 109763453A
Authority
CN
China
Prior art keywords
water
canals
rivers
pollution
water quality
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910087134.4A
Other languages
Chinese (zh)
Inventor
高艳
万帆
黄浩
曾祥国
吴海涛
李华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Planning And Design Co Ltd
Original Assignee
Wuhan Planning And Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Planning And Design Co Ltd filed Critical Wuhan Planning And Design Co Ltd
Priority to CN201910087134.4A priority Critical patent/CN109763453A/en
Publication of CN109763453A publication Critical patent/CN109763453A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins

Abstract

The present invention relates to water environment protections and Water Ecological Recovery technical field; more particularly to a kind of method for urban inner rivers and canals Comprehensive Treatment of Pollution, this method by water quality monitoring and pollution sources origin analysis, pollution control dam project, sponge urban renewal engineering, setting initial rainwater treating stations and initial rainwater is handled, bed mud dredging engineering, Ecological Restoration Project, clear water engineering, the big step of shore protection training works eight carry out comprehensive treatment;The selection and collocation of each project slash are determined based on water quality monitoring result and pollutant sources parsing result in method of the invention, guarantee the logic reasonability of measures to a greater extent, realize the effect that more measures have complementary advantages, greatly improve the status that original water pollution control scheme engineering technology is single or multiple-project technical logic complementarity is poor.This method had not only been able to achieve coast pollution object and had effectively been cut down, but also can promote rivers and canals water quality, while can guarantee the permanently effective stably reaching standard of water quality.

Description

Method for urban inner rivers and canals Comprehensive Treatment of Pollution
Technical field
The present invention relates to water environment protections and Water Ecological Recovery technical field, and in particular to one kind is used for urban inner rivers and canals The method of Comprehensive Treatment of Pollution.
Background technique
China's problem of environmental pollution is still extremely serious at present, and the life of water environmental problems and the people are closely bound up: water quality It is continuous worsening to affect water intaking water safety problem;The variation of rivers and canals water and water level affects the generation frequency of urban waterlogging accumulated water Rate;Rivers and canals water front ecoscape missing extreme influence nearby resident quality of the life.Therefore, urban inner rivers and canals water is promoted Matter improves the large- and-medium size cities that rivers and canals environmental aspect is current numerous high speed developments and needs the contradiction faced and urgently to be resolved ask Topic.However, existing rivers and canals water pollution control method mostly uses greatly more single project slash whole to water environment progress It controls, improvement result is caused to be extremely difficult to water quality effect up to standard steady in a long-term.Following equal existing defects of single method:
Bed mud dredging engineering in rivers and canals administering method can effectively cut down the total nitrogen of rivers and canals sediment release, total phosphorus and again The pollutants such as metal.After completing bed mud dredging engineering, the pollution layer of rivers and canals bed mud and a part of transition zone can be moved effectively It removes, effective control can be obtained in the release of internal contamination at this time, with stylish exposed topsoil to the pollutant of sedimentation With certain suction-operated, the concentration of some of the contaminants can be further decreased.But satisfy when topsoil progressivelyes reach absorption With it is rear, can occur the phenomenon that sediment release pollutant again, water quality is caused to deteriorate once again.
Ecological purification engineering is by the planting aquatic plants in water body and the method for launching aquatic animal, to reach gradually Improve water environment and repairs the purpose of aquatic ecosystem.However, in the water body that water quality is not yet obviously improved, aquatic animals and plants Survival rate hardly results in basic assurance.If the water plant survived is not gathered in periodically, the nitrogen absorbed is grown The pollutants such as phosphorus again can because of plant decline and corruption and be discharged into water body again, can not fundamentally reach depollution The effect of object.
Pollutant can be effectively controlled by importing the wastewater interception pipe that rivers and canals end in city is laid in sewage in end interception project Into in water body to be protected.However, the efficiency for having been introduced into the pollutant natural degradation in water body is typically more faint, lead to It crosses pollutant Natural Attenuation and proposes target purpose reaching water quality and need long time.Meanwhile after completing end interception project, according to It is old it is difficult to ensure that area source pollutants are efficiently removed.
Ecological water supplement engineering replaces contaminated water body using good water sources, substantially belongs to the transfer of pollutant, influences The water quality of downstream storage water body.Meanwhile if the clear water after being replaced remains unchanged in the case where no completion system pollution control cuts dirty It is difficult to maintain preferable water quality.Revetment improvement project can be effectively improved the landscape effect of urban inner rivers and canals two sides, to pollutant Removal and the improvement result of water quality have little effect.
Therefore, it is necessary to seek a kind of new method of the urban inner rivers and canals Comprehensive Treatment of Pollution of combined type.
Summary of the invention
The present invention for the universal poor and resident of current urban inner rivers and canals water quality to the contradiction between excellent water environment demand, A kind of method for urban inner rivers and canals Comprehensive Treatment of Pollution is provided, this method is parsed with water quality monitoring and pollutant sources Based on, according to the typical pollutant (being under normal conditions the highest several pollutants of times of ultra standard) of water body and corresponding pollution The science collocation (sequencing including measure and implement intensity) of project slash is carried out in source, to guarantee between more measures Effect be able to achieve mutual supplement with each other's advantages.The implementation of the systems approach can effectively eliminate black and odorous water, and typical pollutant is obviously cut Subtract, aquatic ecosystem in situ is tentatively repaired, and water body partial function is restored, water quality from bad V class be promoted to V class and with On.
To achieve the above object, a kind of method for urban inner rivers and canals Comprehensive Treatment of Pollution designed by the present invention, packet Include following steps:
1) water quality monitoring and pollution sources origin analysis:
A. by carrying out water quality monitoring to urban inner rivers and canals, pollutant characteristic and times of ultra standard situation are grasped;
B. by being monitored analysis to bed mud in urban inner rivers and canals, the sediment pollution situation of different depth is grasped;
C. analyzing in rivers and canals leads to the major pollutants source of water degradation, and completes major pollutants origin analysis;
2) pollution control dam project:
Misconnection investigation and error correction are mixed to the rain dirt pipeline of existing pipe network, and carry out on the basis of existing pipe network perfect, is mentioned Riser net sewage collecting efficiency, and shutting off to guarantee that pollutants discharged into rivers is cut down to the full extent in end completion sewage;
3) sponge urban renewal engineering:
Sponge urban renewal engineering is carried out, sets about completing cutting for area source pollutants from the source that rainfall forms runoff pollution Subtract;
4) initial rainwater treating stations are set and initial rainwater is handled:
Initial rainwater remaining after source reduction is collected using initial rainwater treating stations, to the dirt in initial rainwater Dye object control effectively, and further cuts down the amount of pollutants discharged into rivers;
5) bed mud dredging engineering:
The pollution layer of bed mud is removed, the internal contamination including the total nitrogen in bed mud, total phosphorus and heavy metal is connect The background value of nearly this area's soil effectively removes the internal contamination including total nitrogen, total phosphorus and heavy metal with reaching Purpose;
6) Ecological Restoration Project:
Aquatic animal is supported in planting aquatic plants and throwing in water body after tentatively improving to water quality, accelerates rivers and canals aquatic ecosystem Building;Wherein, water quality, which tentatively improves, refers to that the black smelly feature of water body disappears substantially, and water quality basically reaches the requirement of surface water V class, Meet the growth demand of aquatic animals and plants;
7) clear water engineering:
The tail water of good water sources or step 4) initial rainwater treating stations is introduced into rivers and canals upstream, carries out ecological water supplement;
8) shore protection training works:
Slope protection and landscape to rivers and canals two sides carry out overall planning and construction, add the gallery for resident's leisure;
Further, in step 1) (a) small step, water quality monitoring is divided into dry season water quality monitoring and rainy season water quality prison Survey, the rainy season water quality monitoring be divided into again at the beginning of rain, in the rain with water quality monitoring after rain;
In (b) small step, bed mud monitoring analysis includes the thickness measure of bed mud and the constituent analysis of bed mud in rivers and canals.
Still further, during existing pipe network improves, rain sewage diversion system is established in water catchment area in the step 2) System.
Still further, sponge urban renewal engineering includes Rain Garden, sunk type greenery patches, grass planting in the step 3) Ditch, porous pavement transformation and plant pit transformation etc.;Diversified forms collocation construction need to be selected in conjunction with the actual conditions in water catchment area.
Still further, the downstream position of urban inner rivers and canals is arranged in initial rainwater treating stations in the step 4), and Initial rainwater treating stations successively include grille well, first rain storage pond, rotational flow grit chamber plus sand high speed pellets pond, secondary filter pond And clear water reserviors, the just rain storage pond, rotational flow grit chamber and sand high speed pellets Chi Junyu storage basin is added to connect, on the clear water reserviors The row of being provided with river is managed and water supply pipe, is provided with elevator pump on the water supply pipe, the water supply pipe other end is connected to rivers and canals upstream Pipeline.
Still further, (pollution of area source caused by initial rainwater has the initial rainwater treating stations processing rainwater method It is sudden and intermittent, therefore the technique that this method handles initial rainwater is determined as materializing strategy technique), including following step It is rapid:
First rain initially enters grille well, screens out to coarse floating material and suspended matter, and the dross of accumulation is by manually fixed Phase removes;Enter storage pond later, has the function that stablize and avoid the peak hour;Subsequently into primary reinforcement treatment process, first rain is successive It flows through rotation setting pot and adds sand high speed pellets pond, clear water reserviors are finally entered after secondary filter, when the tail water of clear water reserviors reaches When to level-one B standard (the level-one B standard in " urban wastewater treatment firm pollutant emission standard " (GB18918-2002)), one Part tail water is back to the origin or beginning of rivers and canals upstream line as ecological water supplement by elevator pump, and remainder is discharged into rivers and canals.
Still further, rivers and canals bed mud dredging engineering is based on sediment measurement as a result, only removing bed mud in the step 5) Pollution layer retains transition zone and normal layer.
Still further, water plant selected by Ecological Restoration Project and aquatic animal are local in the step 6) Plant and local biology, and water plant meet it is claimed below:
1. it is convenient for plantation, vitality strong and high survival rate,
2. there is the waterlogging-resistant ability of preferable drought resisting,
3. there is preferable absorption to the pollutant in water body,
4. facilitate convenient for harvesting the pollutant band water-outlet body absorbed,
5. having certain landscape effect.
Still further, shore protection training works include part rivers and canals water reoxygenation structure: among rivers and canals in the step 8) It is aerated fountain every setting, the section setting offshore that portion flow rate easily deposits slowly is aerated pipeline section.
Beneficial effects of the present invention:
In method of the invention the selection and collocation of each project slash be based on water quality monitoring result and pollutant come Source resolution result determines, therefore can guarantee the logic reasonability of measures to a greater extent, realizes that more measure advantages are mutual The effect of benefit greatly improves that original water pollution control scheme engineering technology is single or the complementary difference of multiple-project technical logic Status.Before urban inner rivers and canals pollution control engineering measure implementation, water quality monitoring and bed mud first are carried out to rivers and canals water body Analysis proposes that targeted engineering measure, the overlapping of avoiding measures effect cause on the basis of completing pollutant sources parsing Investment cost effective rate of utilization is low.Select materializing strategy technique that just rain treating stations are set, it can be achieved that area source pollutants are effectively cut Subtract, rather than the dilution of pollutant or transfer.The bed mud dredging engineering of science can retain the original aquatic ecosystem of rivers and canals, can be effective Resist the invasion of alien species.After Ecological Restoration Project can guarantee that pollution control and water quality are promoted, rivers and canals water quality reaches steadily in the long term Mark, the building of aquatic ecosystem can enhance the ability of water body anti-shock loading, while the orientable band of regular harvesting of water plant Walk the pollutant in water body.
In conclusion not only logic is reasonable but also scientific and effective by the present invention.The systems approach had both been able to achieve coast pollution object It is effectively cut down, and rivers and canals water quality can be promoted, while can guarantee the permanently effective stably reaching standard of water quality.
Detailed description of the invention
Fig. 1 is the process flow chart of present system method;
Fig. 2 is first rain processing technological flow figure.
Specific embodiment
The present invention is described in further detail combined with specific embodiments below, so as to those skilled in the art understand that.
Comprehensive improvement is carried out for Wuhan City's rivers and canals, which is located in Wuhan City's main city zone, and 1500 meters of rivers and canals overall length, Channel mean breadth is 10 meters.This rivers and canals confluence region it is built-in set land character mainly with education and scientific research land used and residential estate as Main (65%) includes a kind of industrial land (12%) in part, greening, massif accounting 13.4%.Population in this rivers and canals confluence region It is more intensive, and mobility is big.Before comprehensive treatment, rivers and canals two sides slope protection is long neglected and in disrepair, more ruined, two sides hard slope surface Height, lacks waterfront leisure space, and landscape humanity effect is poor.According to the smelly water of urban black in " city black and odorous water renovation guide " Body classification and criterion, the rivers and canals are severe black and odorous water, and the people for seriously affecting periphery occupies life;Using as shown in Fig. 1~2 The method for urban inner rivers and canals Comprehensive Treatment of Pollution administered, comprising the following steps:
1) water quality monitoring and pollution sources origin analysis:
A. by carrying out water quality monitoring to urban inner rivers and canals, pollutant characteristic and times of ultra standard situation are grasped;Wherein, water Quality supervision survey is divided into dry season water quality monitoring and rainy season water quality monitoring, the rain rainy season water quality monitoring is divided into again at the beginning of, in the rain with water after rain Quality supervision is surveyed;
B. by being monitored analysis to bed mud in urban inner rivers and canals, the sediment pollution situation of different depth is grasped;Its In, bed mud monitoring analysis includes the thickness measure of bed mud and the constituent analysis of bed mud in rivers and canals;
C. analyzing in rivers and canals leads to the major pollutants source of water degradation, and completes major pollutants origin analysis;
Learn through above-mentioned monitoring and analysis: water total nitrogen, total phosphorus and ammonia nitrogen concentration severely exceed in the rivers and canals, belong to bad V class Water body, wherein ammonia nitrogen concentration is 14.3mg/L, alreadys exceed slight black smelly standard;The water quality monitoring of littoral sewage draining exit shows, ammonia Nitrogen is up to 27.2mg/L, is an important factor for causing rivers and canals overproof water quality;By carrying out investigation discovery to pollution sources, mainly enter river The sanitary sewage that students' dining hall, dormitory and residential block overflow of the pollutant from rivers and canals bank go out;Rainy season rainwash generates Area source pollutants contribution rate it is larger;Sediment pollution is serious inside rivers and canals, equally discharges a large amount of pollutants;
2) pollution control dam project:
Misconnection investigation and error correction are mixed to the rain dirt pipeline of existing pipe network, and carry out on the basis of existing pipe network it is perfect and It carries out establishing rain sewage diversion system in water catchment area, promotes pipe network sewage collecting efficiency, and shutting off to protect in end completion sewage Card pollutants discharged into rivers is cut down to the full extent;
3) sponge urban renewal engineering:
Sponge urban renewal engineering is carried out, sets about completing cutting for area source pollutants from the source that rainfall forms runoff pollution Subtract;Sponge urban renewal engineering includes Rain Garden, sunk type greenery patches, grass planting ditch, porous pavement transformation and plant pit transformation etc.; Diversified forms collocation construction need to be selected in conjunction with the actual conditions in water catchment area;
4) initial rainwater treating stations are set and initial rainwater is handled:
Initial rainwater remaining after source reduction is collected using initial rainwater treating stations, to the dirt in initial rainwater Dye object control effectively, and further cuts down the amount of pollutants discharged into rivers;Wherein, initial rainwater treating stations are arranged in urban inner river The downstream position of canal, and initial rainwater treating stations successively include that grille well, first rain storage pond, rotational flow grit chamber plus sand high speed are heavy Shallow lake pond, secondary filter pond and clear water reserviors, the just rain storage pond, rotational flow grit chamber and plus sand high speed pellets Chi Junyu storage basin company It connects, the row of being provided with river pipe and water supply pipe on the clear water reserviors, is provided with elevator pump, the water supply pipe other end on the water supply pipe It is connected to rivers and canals upstream line, (pollution of area source caused by initial rainwater has the initial rainwater treating stations processing rainwater method It is sudden and intermittent, therefore the technique that this method handles initial rainwater is determined as materializing strategy technique), including following step It is rapid:
First rain initially enters grille well, screens out to coarse floating material and suspended matter, and the dross of accumulation is by manually fixed Phase removes;Enter storage pond later, has the function that stablize and avoid the peak hour;Subsequently into primary reinforcement treatment process, first rain is successive It flows through rotation setting pot and adds sand high speed pellets pond, clear water reserviors are finally entered after secondary filter, when the tail water of clear water reserviors reaches When to level-one B standard (the level-one B standard in " urban wastewater treatment firm pollutant emission standard " (GB18918-2002)), one Part tail water is back to the origin or beginning of rivers and canals upstream line as ecological water supplement by elevator pump, and remainder is discharged into rivers and canals;
5) bed mud dredging engineering:
To the pollution layer of bed mud, (rivers and canals bed mud dredging engineering as a result, only remove the pollution layer of bed mud, is protected based on sediment measurement Stay transition zone and normal layer) it is removed, make internal contamination including total nitrogen, total phosphorus and the heavy metal in bed mud close to the ground The background value of area's soil, to achieve the purpose that effectively remove the internal contamination including total nitrogen, total phosphorus and heavy metal;
6) Ecological Restoration Project:
Aquatic animal is supported in planting aquatic plants and throwing in water body after tentatively improving to water quality, accelerates rivers and canals aquatic ecosystem Building;Wherein, water plant and aquatic animal selected by Ecological Restoration Project are eciophyte and local biology, and aquatic Plant meets claimed below:
1. it is convenient for plantation, vitality strong and high survival rate,
2. there is the waterlogging-resistant ability of preferable drought resisting,
3. there is preferable absorption to the pollutant in water body,
4. facilitate convenient for harvesting the pollutant band water-outlet body absorbed,
5. having certain landscape effect.
7) clear water engineering:
The tail water of good water sources or step 4) initial rainwater treating stations is introduced into rivers and canals upstream, carries out ecological water supplement;
8) shore protection training works:
Slope protection and landscape to rivers and canals two sides carry out overall planning and construction, add the gallery for resident's leisure;Wherein, it protects Bank training works include part rivers and canals water reoxygenation structure: setting aeration fountain in interval in rivers and canals, what portion flow rate easily deposited slowly Section is arranged offshore and is aerated pipeline section
According to the actual levels of pollution of the present embodiment rivers and canals, the comprehensive treatment period of present system method is about 9-12 Month, the ecological engineering substep timesharing phase in later period feeds the period as 2-3.After comprehensive improvement early period, the present embodiment rivers and canals are black smelly Sign thoroughly disappears, and water body chroma and turbidity are decreased obviously, and transparency significantly improves.Water quality is effectively promoted, from original length Phase bad V class water quality is promoted to V class level, and part index number even can meet IV class water quality requirement.Ecology and water environment obtain bright Aobvious to improve, aqueous bio diversity is obviously improved, and a variety of fishes and shrimps gradually reappear, and original aquatic ecosystem obtains gradually extensive It is multiple.Rivers and canals two sides landscape is beautified, and reads for student's morning and resident's night takes a walk, and restores the leisure of rivers and canals bank and the function played of dwelling Energy.
Other unspecified parts are the prior art.Although above-described embodiment is made that the present invention and retouches in detail State, but it is only a part of the embodiment of the present invention, rather than whole embodiments, people can also according to the present embodiment without Other embodiments are obtained under the premise of creativeness, these embodiments belong to the scope of the present invention.

Claims (9)

1. a kind of method for urban inner rivers and canals Comprehensive Treatment of Pollution, it is characterised in that: the following steps are included:
1) water quality monitoring and pollution sources origin analysis:
A. by carrying out water quality monitoring to urban inner rivers and canals, pollutant characteristic and times of ultra standard situation are grasped;
B. by being monitored analysis to bed mud in urban inner rivers and canals, the sediment pollution situation of different depth is grasped;
C. analyzing in rivers and canals leads to the major pollutants source of water degradation, and completes major pollutants origin analysis;
2) pollution control dam project:
Misconnection investigation and error correction are mixed to the rain dirt pipeline of existing pipe network, and carry out perfect, riser on the basis of existing pipe network Net sewage collecting efficiency, and shutting off to guarantee that pollutants discharged into rivers is cut down to the full extent in end completion sewage;
3) sponge urban renewal engineering:
Sponge urban renewal engineering is carried out, sets about completing the reduction of area source pollutants from the source that rainfall forms runoff pollution;
4) initial rainwater treating stations are set and initial rainwater is handled:
Initial rainwater remaining after source reduction is collected using initial rainwater treating stations, to the pollutant in initial rainwater It control effectively, further cuts down the amount of pollutants discharged into rivers;
5) bed mud dredging engineering:
The pollution layer of bed mud is removed, the internal contamination including total nitrogen, total phosphorus and the heavy metal in bed mud is made to approach this The background value of Soils In The Region, to achieve the purpose that effectively remove the internal contamination including total nitrogen, total phosphorus and heavy metal;
6) Ecological Restoration Project:
Aquatic animal is supported in planting aquatic plants and throwing in water body after tentatively improving to water quality, accelerates the structure of rivers and canals aquatic ecosystem It builds;Wherein, water quality, which tentatively improves, refers to that the black smelly feature of water body disappears substantially, and water quality basically reaches the requirement of surface water V class, meets The growth demand of aquatic animals and plants;
7) clear water engineering:
The tail water of good water sources or step 4) initial rainwater treating stations is introduced into rivers and canals upstream, carries out ecological water supplement;
8) shore protection training works:
Slope protection and landscape to rivers and canals two sides carry out overall planning and construction, add the gallery for resident's leisure.
2. being used for the method for urban inner rivers and canals Comprehensive Treatment of Pollution according to claim 1, it is characterised in that: the step 1) in (a) small step, water quality monitoring is divided into dry season water quality monitoring and rainy season water quality monitoring, and the rainy season water quality monitoring is divided into just again Rain, in the rain with water quality monitoring after rain;
In (b) small step, bed mud monitoring analysis includes the thickness measure of bed mud and the constituent analysis of bed mud in rivers and canals.
3. being used for the method for urban inner rivers and canals Comprehensive Treatment of Pollution according to claim 1, it is characterised in that: the step 2) in, during existing pipe network improves, rain sewage diversion system is established in water catchment area.
4. being used for the method for urban inner rivers and canals Comprehensive Treatment of Pollution according to claim 1, it is characterised in that: the step 3) in, sponge urban renewal engineering includes Rain Garden, sunk type greenery patches, grass planting ditch, porous pavement transformation and plant pit transformation; Diversified forms collocation construction need to be selected in conjunction with the actual conditions in water catchment area.
5. being used for the method for urban inner rivers and canals Comprehensive Treatment of Pollution according to claim 1, it is characterised in that: the step 4) in, the downstream position of urban inner rivers and canals is arranged in initial rainwater treating stations, and initial rainwater treating stations successively include grid Well, first rain storage pond, rotational flow grit chamber plus sand high speed pellets pond, secondary filter pond and clear water reserviors, the just rain storage pond, rotation Stream setting pot and plus sand high speed pellets Chi Junyu storage basin connect, on the clear water reserviors row of being provided with river manage and water supply pipe, it is described Elevator pump is provided on water supply pipe, the water supply pipe other end is connected to rivers and canals upstream line.
6. being used for the method for urban inner rivers and canals Comprehensive Treatment of Pollution according to claim 5, it is characterised in that: the initial stage Rainwater treatment station handles rainwater method, comprising the following steps:
First rain initially enters grille well, screens out to coarse floating material and suspended matter, and the dross of accumulation is by artificial periodically clear It removes;Enter storage pond later, has the function that stablize and avoid the peak hour;Subsequently into primary reinforcement treatment process, first rain is successively flowed through It rotates setting pot and adds sand high speed pellets pond, clear water reserviors are finally entered after secondary filter, when the tail water of clear water reserviors reaches one When grade B standard, a part of tail water is back to the origin or beginning of rivers and canals upstream line as ecological water supplement, remainder row by elevator pump Enter rivers and canals.
7. being used for the method for urban inner rivers and canals Comprehensive Treatment of Pollution according to claim 1, it is characterised in that: the step 5) in, rivers and canals bed mud dredging engineering as a result, only remove the pollution layer of bed mud, retains transition zone and normal layer based on sediment measurement.
8. being used for the method for urban inner rivers and canals Comprehensive Treatment of Pollution according to claim 1, it is characterised in that: the step 6) in, water plant selected by Ecological Restoration Project and aquatic animal are eciophyte and local biology, and water plant is full Foot is claimed below:
1. it is convenient for plantation, vitality strong and high survival rate,
2. there is the waterlogging-resistant ability of preferable drought resisting,
3. there is preferable absorption to the pollutant in water body,
4. facilitate convenient for harvesting the pollutant band water-outlet body absorbed,
5. having certain landscape effect.
9. being used for the method for urban inner rivers and canals Comprehensive Treatment of Pollution according to claim 1, it is characterised in that: the step 8) in, shore protection training works include part rivers and canals water reoxygenation structure: interval setting aeration fountain, portion flow rate are easy slowly in rivers and canals The section setting offshore of siltation is aerated pipeline section.
CN201910087134.4A 2019-01-29 2019-01-29 Method for urban inner rivers and canals Comprehensive Treatment of Pollution Pending CN109763453A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910087134.4A CN109763453A (en) 2019-01-29 2019-01-29 Method for urban inner rivers and canals Comprehensive Treatment of Pollution

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910087134.4A CN109763453A (en) 2019-01-29 2019-01-29 Method for urban inner rivers and canals Comprehensive Treatment of Pollution

Publications (1)

Publication Number Publication Date
CN109763453A true CN109763453A (en) 2019-05-17

Family

ID=66455631

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910087134.4A Pending CN109763453A (en) 2019-01-29 2019-01-29 Method for urban inner rivers and canals Comprehensive Treatment of Pollution

Country Status (1)

Country Link
CN (1) CN109763453A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110264052A (en) * 2019-06-06 2019-09-20 郑州市污水净化有限公司 Urban river water quality lifting system
CN111392869A (en) * 2020-04-03 2020-07-10 清控环境(北京)有限公司 System treatment method for urban black and odorous water body
CN111552763A (en) * 2020-05-13 2020-08-18 水利部交通运输部国家能源局南京水利科学研究院 Urban non-point source pollution load monitoring method
CN112624341A (en) * 2019-09-24 2021-04-09 中国电建集团华东勘测设计研究院有限公司 Construction method of ecological comprehensive treatment and restoration system for urban micro water body water
CN112723654A (en) * 2020-12-08 2021-04-30 上海市园林工程有限公司 Water quality improvement method for static landscape water system
CN113356321A (en) * 2021-05-11 2021-09-07 中国电建集团华东勘测设计研究院有限公司 Method for controlling overflow pollution of urban rainwater system of high-density built-up area
CN113356325A (en) * 2021-06-24 2021-09-07 中国科学院城市环境研究所 Comprehensive treatment method for ecological environment of landscape water area water
CN116432948A (en) * 2023-03-16 2023-07-14 中节能国祯环保科技股份有限公司 Urban rain source type river system step-by-step treatment method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040173522A1 (en) * 2003-03-04 2004-09-09 Douglas Allard Prefilter for water treatment
CN202322549U (en) * 2011-09-09 2012-07-11 武汉大学 Rain sewage recycling and treating system
WO2014201223A1 (en) * 2013-06-14 2014-12-18 Oldcastle Precast, Inc. Stormwater treatment system with gutter pan flow diverter
CN105565584A (en) * 2014-10-16 2016-05-11 上海库克莱生态科技有限公司 Rapid method for constructing river way water ecosystem
CN108867541A (en) * 2018-06-28 2018-11-23 福建闽泰交通工程有限公司 A kind of black smelly river body ecology synthesis repairing and treating system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040173522A1 (en) * 2003-03-04 2004-09-09 Douglas Allard Prefilter for water treatment
CN202322549U (en) * 2011-09-09 2012-07-11 武汉大学 Rain sewage recycling and treating system
WO2014201223A1 (en) * 2013-06-14 2014-12-18 Oldcastle Precast, Inc. Stormwater treatment system with gutter pan flow diverter
CN105565584A (en) * 2014-10-16 2016-05-11 上海库克莱生态科技有限公司 Rapid method for constructing river way water ecosystem
CN108867541A (en) * 2018-06-28 2018-11-23 福建闽泰交通工程有限公司 A kind of black smelly river body ecology synthesis repairing and treating system

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
周飞祥等: "城市黑臭水体治理的实践与探索――以河南省鹤壁市海绵城市为例", 《建设科技》 *
水工业市场杂志: "《2011水处理典型技术案例大全》", 31 March 2012, 中国环境科学出版社 *
王增长: "《建筑给水排水工程》", 31 August 2010, 中国建筑工业出版社出版 *
靳俊伟等: "重庆市新华水库流域黑臭水体综合整治", 《中国给水排水》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110264052A (en) * 2019-06-06 2019-09-20 郑州市污水净化有限公司 Urban river water quality lifting system
CN110264052B (en) * 2019-06-06 2023-05-30 郑州市污水净化有限公司 Urban river water quality improving system
CN112624341A (en) * 2019-09-24 2021-04-09 中国电建集团华东勘测设计研究院有限公司 Construction method of ecological comprehensive treatment and restoration system for urban micro water body water
CN111392869A (en) * 2020-04-03 2020-07-10 清控环境(北京)有限公司 System treatment method for urban black and odorous water body
CN111552763A (en) * 2020-05-13 2020-08-18 水利部交通运输部国家能源局南京水利科学研究院 Urban non-point source pollution load monitoring method
CN112723654A (en) * 2020-12-08 2021-04-30 上海市园林工程有限公司 Water quality improvement method for static landscape water system
CN113356321A (en) * 2021-05-11 2021-09-07 中国电建集团华东勘测设计研究院有限公司 Method for controlling overflow pollution of urban rainwater system of high-density built-up area
CN113356325A (en) * 2021-06-24 2021-09-07 中国科学院城市环境研究所 Comprehensive treatment method for ecological environment of landscape water area water
CN116432948A (en) * 2023-03-16 2023-07-14 中节能国祯环保科技股份有限公司 Urban rain source type river system step-by-step treatment method

Similar Documents

Publication Publication Date Title
CN109763453A (en) Method for urban inner rivers and canals Comprehensive Treatment of Pollution
CN101538088B (en) Construction method of ecological sewage treatment and water restoration system
CN105966366B (en) A kind of method and its system from clear water-saving pattern synthesis carwash for civil engineering building site
CN107176694A (en) Gush black smelly method in a kind of comprehensive regulation river
CN101811807B (en) Black and odorous and eutrophication water body biological and ecological remediation and treatment process
CN107739098B (en) Method for purifying water quality and restoring water ecology of polluted urban internal lake
CN205222816U (en) City river says that quick oneself of rainwater purifies combination dam system
CN105217798B (en) A kind of self quick purification method of urban river channel rainwater
CN105638015B (en) A kind of restoration methods of inter-tidal saltmarshes wetland
CN105502828A (en) Oligodynamic in-situ ecological restoration method of urban beheaded river
CN103938518A (en) Method for constructing road runoff pollution control greening system
CN111932403A (en) Urban sewage pipe network and water environment quality-improving and efficiency-increasing technology integration method
CN105401552A (en) Method for transforming saline-alkali wasteland into low-pollution water-wet land deep treatment system
CN108867541A (en) A kind of black smelly river body ecology synthesis repairing and treating system
CN109912040A (en) The ecology pond systems of preventing and controlling agricultural area source pollution
CN103641282B (en) Method for performing surface slow-rate infiltration land treatment on rural domestic wastewater
CN1580415A (en) Composite wet land artesian polluted river water purifying method
CN205061699U (en) Biological filter
CN217498848U (en) Urban high-density built-up area lake and pond wetland system based on split system
CN206070498U (en) A kind of farmland submerged plant ecological canal for processing early-stage rainwater
CN114368871A (en) Rural ecological wetland environment protection construction method
CN211499026U (en) Rainwater purifies sand stone cage
CN106703155A (en) Urban open trench black and odorous water body treatment method
CN207727537U (en) A kind of novel farmland eco-drainage ditch
CN112624341A (en) Construction method of ecological comprehensive treatment and restoration system for urban micro water body water

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190517