CN109750680A - A kind of earth-retaining net and friction pile-earth-retaining net combine retaining system - Google Patents
A kind of earth-retaining net and friction pile-earth-retaining net combine retaining system Download PDFInfo
- Publication number
- CN109750680A CN109750680A CN201910101885.7A CN201910101885A CN109750680A CN 109750680 A CN109750680 A CN 109750680A CN 201910101885 A CN201910101885 A CN 201910101885A CN 109750680 A CN109750680 A CN 109750680A
- Authority
- CN
- China
- Prior art keywords
- earth
- net
- retaining
- cable
- retaining net
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
The present invention provides a kind of earth-retaining nets, cable 1 and carrying flexible net 3 including alternating parallel arrangement, suture rope 4 sequentially pass through the grommet of the cable 1 and the cable 1 and carrying flexible net 3 are fastened and are connect with one layer of mesh of cable joint carrying flexible net 3.In the present invention, the mesh of the carrying flexible net and the grommet hole of cable are used as drainage hole, when being used for aqueous slip mass abundant, be conducive to the underground water in removal of landslide body, the level of ground water height in landslide can be reduced to the maximum extent, to reduce the sliding force on landslide, Landslide Stability is improved.The present invention also provides friction pile-earth-retaining nets to combine retaining system, has draining and supporting and retaining system double action concurrently, on the one hand can be used as supporting and retaining system control measure, is on the other hand also beneficial to the draining of slip mass, improves Landslide Stability on both side.
Description
Technical field
The present invention relates to landslide disaster prevention engineering field more particularly to a kind of earth-retaining nets and landslide anti-slide pile-earth-retaining net
Joint retaining system.
Background technique
In China, because 70% region is mountain area, therefore landslide disaster generation density is big, and frequency is high, and China has become in the world
It is hundreds of millions of because being lost caused by landslide disaster every year by landslide one of the countries with the most serious ..., give the country and people's life
Property brings massive losses, generates serious social influence.In many landslide disaster prevention measures, since pile plate wall has antiskid
The advantages that effect is good is widely used in landslide control engineering.
Pile plate wall is to utilize antiskid by friction pile and retaining plate between piles a kind of joint prevention and treatment landslide structure dimerous
The elastic resistance of the following anchorage part stake surrounding soil of the intensity and sliding surface of stake body pushes away to balance the remaining landslide of sliding surface or more
Power makes landslide keep stablizing, then friction pile is connected by breast boards, the loose soil body between interception friction pile, and will
The soil pressure and thrust of inter-pile soil body pass to stable stratum by friction pile, to make the come down soil body and this control structure guarantor
It is fixed to keep steady.Due to the presence of breast boards, good sealing effect is played to inter-pile soil body or soft rock, is conducive to the long-term of landslide
Stablize.
However the breast boards structure type of traditional pile plate wall is upright full closeding state, project amount is big, and drainage effect is poor.
When slip mass it is aqueous it is abundant, landslide thrust body is huge when, current peg board wall construction due to there is a problem of that drainability is limited,
Generally requiring increasing structure design size can be only achieved the effect of the unstable slopes of supporting and retaining system, so as to cause engineering construction and its later period
Maintenance cost it is sufficiently expensive.
Summary of the invention
The purpose of the present invention is to provide a kind of earth-retaining nets and friction pile-earth-retaining net co-ordinative construction, reduce to greatest extent
Level of ground water height in landslide reduces landslide sliding force, improves Landslide Stability.
The present invention provides a kind of earth-retaining net, cable 1 and carrying flexible net 3 including alternating parallel arrangement, suture rope 4 according to
It is secondary by the cable 1 and to be held across the grommet of the cable 1 and with one layer of mesh of 1 joint of cable carrying flexible net 3
Flexible net 3 is carried to be fastened connection;
When the cable 1 is fixedly connected with carrying flexible net 3, it is in straight line that the cable 1, which tenses, and the carrying is flexible
It is in a plane that net 3, which tenses,.
Preferably, the aperture of the mesh of the flexible bearer network 3 is 0.722 times of cable pitch.
Preferably, the mesh form of the flexible bearer network 3 is annular.
Preferably, multilayer carrying flexible net is fixed between every adjacent two cables.
Preferably, fixed be of five storeys carries flexible net between every adjacent two cables.
Preferably, the earth-retaining net is blocked by cable 1.
Preferably, the suture rope 4 is wirerope, and the wirerope is the wirerope that tensile strength is not less than 1770MPa.
The present invention also provides a kind of friction pile-earth-retaining nets to combine retaining system, including friction pile, further includes being arranged in institute
Earth-retaining net described in the above-mentioned technical proposal between friction pile is stated, 6 sidewall weld of friction pile pile body has fixed arch to connect
Reinforcing steel structural member 5, for being connect with the earth-retaining net 101.
Preferably, the arch connection reinforcing steel structural member 5 is arranged in the middle part of pile body rear portion or pile body.
Preferably, the grommet of every 1 end of cable is corresponding in the earth-retaining net 101 is buckled in the arch connection bar construction
On part 5.
Preferably, the arch connection reinforcing steel structural member 5 corresponds to the iron of the earth-retaining net in the distribution density of 6 side wall of pile body
Rope quantity.
It preferably, further include the sandy gravel anti-filter that 101 outside of earth-retaining net is set, faces landslide glide direction side
Layer 7 is greater than the grommet inner width of carrying flexible net mesh aperture and cable close to the partial size of the sandy gravel of earth-retaining net.
The present invention provides a kind of earth-retaining net, cable 1 and carrying flexible net 3 including alternating parallel arrangement, suture rope 4 according to
It is secondary by the cable 1 and to be held across the grommet of the cable 1 and with one layer of mesh of 1 joint of cable carrying flexible net 3
Flexible net 3 is carried to be fastened connection.In the present invention, the mesh of the carrying flexible net and the grommet hole of cable are as drainage hole
It uses, when being used for aqueous slip mass abundant, is conducive to the underground water in removal of landslide body, cunning can be reduced to the maximum extent
Level of ground water height in slope improves Landslide Stability to reduce the sliding force on landslide.
The earth-retaining net is used in combination the present invention with friction pile, provides a kind of friction pile-earth-retaining net joint supporting and retaining system system
System, the pile body sidewall weld of friction pile is fixed with arch connection reinforcing steel structural member, the arch connection disclosed in the prior art
Friction pile is connect by reinforcing steel structural member with the earth-retaining net, forms friction pile-earth-retaining net joint retaining system.It is mentioned in the present invention
The joint retaining system of confession lays earth-retaining net among friction pile, intercepts antiskid for preventing the landslide soil body between friction pile from gliding
The loose soil body, the soil pressure of the soil body between friction pile and thrust are transmitted on friction pile by earth-retaining net, passed through later between stake
This part power is passed to stable stratum by friction pile, so that landslide be made to keep stablizing.
Joint retaining system provided by the invention has draining and supporting and retaining system double action concurrently, on the one hand can be used as supporting and retaining system prevention and treatment
On the other hand measure is also beneficial to the draining of slip mass, improves Landslide Stability on both side.For the cunning of underground water rich content
The prevention and treatment on slope, joint retaining system provided by the invention can effectively make up the shortcoming of traditional pile plate wall, structure type
Novelty, stability is good, consolidation process effect is obvious.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of earth-retaining net 101 provided in an embodiment of the present invention;1 it is wherein cable, 2 be net ring, 3 is
Carrying flexible net, 4 are suture rope;
Fig. 2 is the structural schematic diagram of cable in earth-retaining net;
Fig. 3 is the structural schematic diagram that flexible net is carried in earth-retaining net;
Fig. 4 is the elevation of friction pile provided in an embodiment of the present invention;5 it is wherein arch connection reinforcing steel structural member, 6 is anti-
Sliding pile pile body;
Fig. 5 is the elevation that friction pile provided in an embodiment of the present invention-earth-retaining net combines retaining system;
Fig. 6 is the top view that friction pile provided in an embodiment of the present invention-earth-retaining net combines retaining system;Wherein 7 be earth-retaining
Gravel loaded filter after net.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
The present invention provides a kind of earth-retaining net, cable 1 and carrying flexible net 3 including alternating parallel arrangement, suture rope 4 according to
It is secondary by the cable 1 and to be held across the grommet of the cable 1 and with one layer of mesh of 1 joint of cable carrying flexible net 3
Flexible net 3 is carried to be fastened connection;
Referring to Fig. 1 and Fig. 2, earth-retaining net 101 provided by the invention includes cable 1, and it is in straight line that the cable 1, which tenses,.
In the present invention, the cable 1 is that flexible chain (crude iron chain) made of the grommet socket weaved into iron works as institute in the present invention
In the environment for stating the application of earth-retaining net 101, landslide size is bigger, and inter-pile soil body soil pressure and thrust are bigger, selects cable grommet
Straight flange diameter is bigger.It is 10mm as grommet straight flange diameter in an embodiment of the present invention, can be used, grommet pitch is 40mm, rope
Ring inner width 12mm, grommet outer width 34mm can bear inter-pile soil body soil pressure and thrust 100kN/m.
Referring to Fig. 1 and Fig. 3, earth-retaining net 101 provided in an embodiment of the present invention include carrying flexible net 3, the cable 1 with hold
Flexible net 3 is carried to be arranged alternately in parallel.In the present invention, the carrying flexible net 3 is coiled into net circle and mutual by high-tensile steel wires
It is socketed to form, circle number needed for the net circle is coiled by individual wire of the Nominal Tensile not less than 1770MPa (such as 3 circles,
5 circles, 7 circles etc.) it forms, and at least there are three tighten a little around circle;Outside flash trimming hoddy circle, each net circle and 4, its periphery
Net circle, which mutually covers, to be fetched to form flexible bearer network.In an embodiment of the present invention, the mesh form of the carrying flexible net 3 is ring
Shape, then the carrying flexible net 3 is ring network, is coiled cyclization by high-tensile steel wires and is mutually socketed to form.
In an embodiment of the present invention, when landslide size is bigger, inter-pile soil body soil pressure and thrust are bigger, and selection carrying is soft
The diameter of property net mesh is bigger;In an embodiment of the present invention, the 3 net ring gauge of wire of carrying flexible net is not less than 3mm.
In an embodiment of the present invention, the aperture of the mesh of the flexible bearer network 3 is 0.722 times of the grommet pitch of cable.
As shown in Figure 1, in an embodiment of the present invention, being twined between the cable 1 and carrying flexible net 3 by suture rope 4
Around being fixedly connected, the suture rope 4 sequentially passes through the grommet of the cable 1 and carries flexible net 3 with the cable joint
One layer of mesh, so that the cable 1 is fixedly connected with carrying flexible net 3;Specifically, the suture rope 4 is wirerope, to protect
4 connection of card suture rope does not weaken the protective capacities of retaining system, and the specification and intensity of suture rope 4 must not be lower than system carrying flexible nets
Wirerope used in 3.In the present invention, it is described suture rope 4 major function be flexible net 3 will be carried to connect with cable 1, thus
Form the earth-retaining net an of entirety;It can will carry the soil pressure being subject in flexible net 3 simultaneously and Thrust of Landslide passes to cable 1.
4 alternate cycles of the suture rope pass through the grommet hole of cable 1 and one layer of mesh with cable joint carrying flexible net 3,
When being fixedly connected, it is in straight line that the cable 1, which tenses, and it is in a plane that the carrying flexible net 3, which tenses,;The suture rope 4
Knotting processing is done in the end of carrying flexible net 3 and cable 1.
In an embodiment of the present invention, the earth-retaining net is blocked by cable 1, is provided with multilayer between every adjacent two cables
Carry flexible net.In one embodiment of the invention, it is flexible that the carrying being of five storeys can be fixed between adjacent two cables
Net, it is prefabricated in combination with being carried out needed for concrete engineering in Practical Project.Landslide size is bigger, and inter-pile soil body soil pressure and thrust are got over
Greatly, laying cable quantity is more, and the number of plies for carrying flexible net is fewer, such as can be 3 layers, 5 layers or 7 layers.
The present invention also provides a kind of friction pile-earth-retaining nets to combine retaining system, including friction pile, further includes being arranged in institute
Earth-retaining net described in the above-mentioned technical proposal between friction pile is stated, 6 sidewall weld of friction pile pile body has fixed arch to connect
Reinforcing steel structural member 5, for being connect with the earth-retaining net 101.
In the present invention, it is described joint retaining system in arch connection reinforcing steel structural member 5 can not only by friction pile with
Earth-retaining net connection, additionally it is possible to which the soil pressure being subject on cable and Thrust of Landslide are passed into friction pile.
Joint retaining system provided by the invention includes friction pile, and 6 sidewall weld of friction pile pile body has fixed arch
Reinforcing steel structural member 5 is connected, arch connects 5 diameter of reinforcing steel structural member and is equal to cable grommet straight flange diameter, while being less than cable grommet
Inner width;Arch connection 5 liang of arch tail ends of reinforcing steel structural member are parallel, and two parallel tail ends distances are greater than cable grommet straight flange diameter, with
Arch connection reinforcing steel structural member 5 is buckled into conducive to cable end grommet.Referring to fig. 4 and Fig. 5, in an embodiment of the present invention, described
Arch connection reinforcing steel structural member 5 may be provided in the middle part of pile body rear portion or pile body.In one embodiment of the present of invention, the arch connects
Reinforcing steel structural member 5 is connect to be arranged in the middle part of pile body.
Referring to Fig. 5, in an embodiment of the present invention, the grommet correspondence of every 1 end of cable is buckled in the earth-retaining net 101
On the arch connection reinforcing steel structural member 5;Distribution density of the corresponding arch connection reinforcing steel structural member 5 in 6 side wall of pile body
The cable quantity of the corresponding earth-retaining net.
During Specific construction, in side wall (laying earth-retaining net direction) welding when the binding of friction pile pile body steel reinforcement cage is welded
Upper fixed arch connects reinforcing steel structural member, then casting concrete again;After casting concrete, arch is connected outside reinforcing steel structural member
Dew, to be attached with earth-retaining net.In Practical Project, first carry out the construction of friction pile, according to the quantity of cable in earth-retaining net and
Distance, the position of the accurate pre-buried arch connection reinforcing steel structural member of measuring, to meet the quantity of arcuate structural member and apart from matching iron
The quantity and distance of rope, consequently facilitating the installation of earth-retaining net.Earth-retaining screen cloth is located at adjacent two by the construction for carrying out earth-retaining net again
Between root friction pile, every last grommet in cable end is buckled on the correspondence arch connection member of friction pile in earth-retaining net, from
And form joint retaining system.
In other embodiment of the present invention, the friction pile-earth-retaining net joint retaining system further includes being arranged in institute
The sandy gravel loaded filter 7 stated 101 outside of earth-retaining net, face landslide glide direction side, close to the partial size of the sandy gravel of earth-retaining net
Greater than carrying flexible net mesh aperture and cable grommet inner width.In an embodiment of the present invention, the sandy gravel loaded filter 7
Thickness is not less than 20cm.Referring to Fig. 6, the side for facing landslide glide direction is provided with sandy gravel loaded filter.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.
Claims (12)
1. a kind of earth-retaining net, cable (1) and carrying flexible net (3) including alternating parallel arrangement, suture rope (4) sequentially pass through institute
It states the grommet of cable (1) and carries one layer of mesh of flexible net (3) for the cable (1) with the cable (1) joint and hold
Flexible net (3) are carried to be fastened connection;
When the cable (1) is fixedly connected with carrying flexible net (3), it is in straight line that the cable (1), which tenses, and the carrying is soft
Property net (3) tense be in a plane.
2. earth-retaining net according to claim 1, which is characterized in that the aperture of the mesh of the flexibility bearer network (3) is iron
0.722 times of rope (1) grommet pitch.
3. earth-retaining net according to claim 1 or 2, which is characterized in that the mesh form of the flexibility bearer network (3) is ring
Shape.
4. earth-retaining net according to claim 3, which is characterized in that it is soft to be fixed with multilayer carrying between per adjacent two cables
Property net.
5. earth-retaining net according to claim 4, which is characterized in that the fixed carrying being of five storeys between per adjacent two cables
Flexible net.
6. earth-retaining net according to claim 1, which is characterized in that the earth-retaining net is blocked by cable (1).
7. earth-retaining net according to claim 1, which is characterized in that the suture rope (4) is wirerope, and the wirerope is
Tensile strength is not less than the wirerope of 1770MPa.
8. a kind of friction pile-earth-retaining net combines retaining system, including friction pile, which is characterized in that further include setting described anti-
Earth-retaining net described in claim 1~7 any one between sliding pile, friction pile pile body (6) sidewall weld have fixed bow
Shape connects reinforcing steel structural member (5), for connecting with the earth-retaining net (101).
9. friction pile according to claim 8-earth-retaining net combines retaining system, which is characterized in that the arch connects steel
Muscle structural member (5) is arranged in the middle part of pile body rear portion or pile body.
10. friction pile according to claim 8-earth-retaining net combines retaining system, which is characterized in that the earth-retaining net
(101) grommet of every cable (1) end is corresponding in is buckled on arch connection reinforcing steel structural member (5).
11. friction pile according to claim 8-earth-retaining net combines retaining system, which is characterized in that the arch connects steel
Muscle structural member (5) corresponds to the cable quantity of the earth-retaining net in the distribution density of pile body (6) side wall.
12. the friction pile according to claim 8~11 any one-earth-retaining net combines retaining system, which is characterized in that also
Sandy gravel loaded filter (7) including being arranged on the outside of the earth-retaining net (101), facing landslide glide direction side, close to earth-retaining
The partial size of the sandy gravel of net is greater than the grommet inner width of carrying flexible net mesh aperture and cable.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910101885.7A CN109750680B (en) | 2019-01-31 | 2019-01-31 | Soil retaining net and anti-slide pile-soil retaining net combined retaining system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910101885.7A CN109750680B (en) | 2019-01-31 | 2019-01-31 | Soil retaining net and anti-slide pile-soil retaining net combined retaining system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109750680A true CN109750680A (en) | 2019-05-14 |
CN109750680B CN109750680B (en) | 2021-02-26 |
Family
ID=66407375
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910101885.7A Active CN109750680B (en) | 2019-01-31 | 2019-01-31 | Soil retaining net and anti-slide pile-soil retaining net combined retaining system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109750680B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111733835A (en) * | 2020-06-28 | 2020-10-02 | 中冶地集团西北岩土工程有限公司 | Slope reinforcement construction method |
CN114250795A (en) * | 2021-12-07 | 2022-03-29 | 任斌 | Slope protection supporting device and slope protection supporting method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5579610A (en) * | 1995-08-03 | 1996-12-03 | Jackson; Robert L. | Leaf retaining net |
KR20160001983A (en) * | 2014-06-30 | 2016-01-07 | 한국건설기술연구원 | Flexible Rockfall Protection Fence |
CN105862912A (en) * | 2016-04-18 | 2016-08-17 | 中冶建工集团有限公司 | Construction method of protective walls of concrete antiskid piles |
CN107988925A (en) * | 2017-11-27 | 2018-05-04 | 成都理工大学 | Landslide or the stake net and its design method of rockfall hazards protection |
-
2019
- 2019-01-31 CN CN201910101885.7A patent/CN109750680B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5579610A (en) * | 1995-08-03 | 1996-12-03 | Jackson; Robert L. | Leaf retaining net |
KR20160001983A (en) * | 2014-06-30 | 2016-01-07 | 한국건설기술연구원 | Flexible Rockfall Protection Fence |
CN105862912A (en) * | 2016-04-18 | 2016-08-17 | 中冶建工集团有限公司 | Construction method of protective walls of concrete antiskid piles |
CN107988925A (en) * | 2017-11-27 | 2018-05-04 | 成都理工大学 | Landslide or the stake net and its design method of rockfall hazards protection |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111733835A (en) * | 2020-06-28 | 2020-10-02 | 中冶地集团西北岩土工程有限公司 | Slope reinforcement construction method |
CN114250795A (en) * | 2021-12-07 | 2022-03-29 | 任斌 | Slope protection supporting device and slope protection supporting method |
Also Published As
Publication number | Publication date |
---|---|
CN109750680B (en) | 2021-02-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106014452A (en) | High-strength confined concrete supporting system applicable to underground tunnel | |
CN109750680A (en) | A kind of earth-retaining net and friction pile-earth-retaining net combine retaining system | |
CN104481552B (en) | Super-huge karst cave hole roof fall stone protection construction method | |
CN208844589U (en) | Ecological Slope safeguard structure and guard system | |
CN107250460A (en) | Pre- ingot bar keeping wall method for preventing landslide | |
CN107988925A (en) | Landslide or the stake net and its design method of rockfall hazards protection | |
CN108385715A (en) | A kind of assembled stake arch combination retaining wall and its construction method | |
CN206035505U (en) | Stride across hangar tunnel structure of debris flow gully | |
CN109024634A (en) | Ecological Slope safeguard structure, guard system and Ecological Slope construction method | |
CN206408630U (en) | Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system of pile body | |
CN205591237U (en) | A make up and prevent and treat structure for mountain area height is filled | |
CN104654996B (en) | Ground measurement apparatus under mountain cracks | |
CN109339078A (en) | A kind of rectangular pile is inscribed in the Combined Anti-sliding stake of round stake | |
CN106194213B (en) | A kind of shed hole structure and construction method across debris flow gully | |
CN108049367A (en) | A kind of dykes and dams safeguard structure and its construction method | |
CN203007977U (en) | Composite protective structure for reinforced net-plane stopping wall | |
CN209555918U (en) | A kind of Anchor anti-slide piles structure | |
CN107975062A (en) | A kind of light-duty combination retaining structure of Steep Slope Embankment and construction method | |
CN104404972B (en) | Reinforce anchor structure and the construction method at high steep basement rock-embankment interface | |
CN103147443A (en) | Foundation pit supporting structure and construction method thereof | |
JP4630851B2 (en) | Anchor for slope | |
CN207331728U (en) | A kind of building supporting construction applied to slope terrain | |
CN105256763A (en) | Diking method based on bamboo raft frame structure | |
CN113186950B (en) | Ecological protection construction method for high fill slope | |
CN109653287A (en) | Excavator detection platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |