CN109750593A - A kind of permeable skid ecology wooden footway - Google Patents

A kind of permeable skid ecology wooden footway Download PDF

Info

Publication number
CN109750593A
CN109750593A CN201910101657.XA CN201910101657A CN109750593A CN 109750593 A CN109750593 A CN 109750593A CN 201910101657 A CN201910101657 A CN 201910101657A CN 109750593 A CN109750593 A CN 109750593A
Authority
CN
China
Prior art keywords
plank
permeable
keel
surface layer
support column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910101657.XA
Other languages
Chinese (zh)
Inventor
刘程
高彦波
张雨娜
王奇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Star View Eco Environment Technology (suzhou) Co Ltd
Original Assignee
Star View Eco Environment Technology (suzhou) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Star View Eco Environment Technology (suzhou) Co Ltd filed Critical Star View Eco Environment Technology (suzhou) Co Ltd
Priority to CN201910101657.XA priority Critical patent/CN109750593A/en
Publication of CN109750593A publication Critical patent/CN109750593A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/108Rainwater harvesting

Abstract

The invention discloses a kind of permeable skid ecology wooden footways, comprising: plank road plank, keel and support column;The upper surface of plank road plank is provided with permeable surface layer, and permeable surface layer includes fine sand and flexible adhesives, is bonded between fine sand by flexible adhesives, is provided with hole between fine sand;Plank road plank and the joint face of permeable surface layer are provided with catch basin, and catch basin is located at the middle position of plank road plank;The first aqueduct is provided in plank road plank, the first aqueduct is connected to catch basin;Keel are symmetricly set on the lower section of plank road plank, and keel are connected to the first aqueduct;The lower section of keel is arranged in support column, and vertical the second aqueduct for running through support column is provided in support column;The surface of keel and support column is provided with erosion resistant coating.By the above-mentioned means, the present invention effectively can carry out infiltration collection to the rainwater for flowing through wooden footway surface, improves the wet and slippery perishable situation in wooden footway surface, extend the service life of wooden footway.

Description

A kind of permeable skid ecology wooden footway
Technical field
The present invention relates to plank road technical fields, more particularly to a kind of permeable skid ecology wooden footway.
Background technique
" plank road " is also known as the road at " stack pavilion ", this is a big invention on ancient times traffic history.People are in order to current in deep mountain valleys Road, and it is flat without hindrance, the hole of some prismatics is just dug with implements on the cliffs and precipices of river water isolation, plugs stone in hole Stake or timber.Horizontal boarding or slabstone above with pedestrian and can be open to traffic, this is just plank road.These timbers and plank in order to prevent It is caught in the rain and becomes rotten and rotten, and on the top of plank road build up room pavilion (also known as Lang Ting) here it is pavilions, also known as stack pavilion.Mutually coherent title It exhales, is just the road Zhan Gezhi, referred to as plank road.Plank road original refers to a kind of road built along overhanging cliff, also known as Ge Dao, Fu Dao, in Overhead channel is also referred to as plank road between state's ancient times high building.
The present meaning of plank road shows the outstanding skill for adapting to sufficiently complex orographic condition than wide in road construction work Art ability is especially known as the wooden stack such as the wooden road of the stair shape in gardens rich in temperament and interest in the more of real estate industry Road.However, since wooden footway is chronically in outdoor outdoor environment, can expose to wind and rain in use because of solarization etc. to wood Plank road causes to corrode rotten damage, reduces the service life of wooden footway, it is often necessary to repair, considerably increase the cost of maintenance.
Summary of the invention
It, can be effectively to flowing through wood the invention mainly solves the technical problem of providing a kind of permeable skid ecology wooden footway The rainwater on plank road surface carries out infiltration collection, improves the wet and slippery perishable situation in wooden footway surface, extends the service life of wooden footway.
In order to achieve the above objectives, the technical solution adopted by the present invention to solve the technical problems is:
A kind of permeable skid ecology wooden footway, comprising: plank road plank, keel and support column;
The upper surface of the plank road plank is provided with permeable surface layer, and the permeable surface layer includes fine sand and flexible adhesives, It is bonded between the fine sand by flexible adhesives, is provided with hole between the fine sand;
The plank road plank and the joint face of permeable surface layer are provided with catch basin, and the catch basin is located at the plank road plank Middle position, the length of the catch basin is less than the length of the plank road plank;First is provided in the plank road plank to lead Water pipe, first aqueduct are connected to catch basin;
The keel are symmetricly set on the lower section of the plank road plank, and the keel are set as hollow structure, the keel It is connected to the first aqueduct;
The lower section of the keel is arranged in the support column, is provided in the support column vertical through the second of support column Aqueduct, second aqueduct are connected to the keel;The surface of the keel and support column is provided with erosion resistant coating.
Preferably, the 1/4~1/3 of the thickness with a thickness of the plank road plank of the permeable surface layer.
Preferably, the permeable surface layer with a thickness of 0.3cm~0.6cm.
Preferably, the voidage of the permeable surface layer is at least 10%.
Preferably, screw is provided in the permeable surface layer, the permeable surface layer is solid by screw and the plank road plank Fixed connection.
Preferably, the plank road plank and the joint face of permeable surface layer are set as intermediate structure low, periphery is high.
Preferably, the material of the keel is one of channel steel or angle steel.
Preferably, the surface of the keel and support column is provided with erosion resistant coating.
Due to the application of the above technical scheme, the present invention have compared with prior art it is following the utility model has the advantages that
Provide a kind of permeable skid ecology wooden footway, the surface of keel and support column is both provided with erosion resistant coating, using saturating The microcellular structure of water surface layer is collected infiltration to the rainwater on wooden footway surface, so that rainwater is entered catch basin and arranges again via aqueduct Out, infiltration collection effectively can be carried out to the rainwater for flowing through wooden footway surface, improves the wet and slippery perishable situation in wooden footway surface, together When can be rotted damage to avoid wooden footway by corrosion, extend the service life of wooden footway, reduce maintenance frequency, reduce maintenance at This.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of permeable skid ecology wooden footway of the present invention.
Fig. 2 is a kind of top view of permeable skid ecology wooden footway of the present invention.
Fig. 3 is the side schematic view in a kind of permeable skid ecology wooden footway of the present invention inside plank road plank.
Detailed description of the invention:
Permeable surface layer 1, screw 11, plank road plank 2, the first aqueduct 21, catch basin 22, keel 3, support column 4, second are led Water pipe 41, ground 5, drainage pipeline 6.
Specific embodiment
The preferred embodiments of the present invention will be described in detail with reference to the accompanying drawing, so that advantages and features of the invention energy It is easier to be readily appreciated by one skilled in the art, so as to make a clearer definition of the protection scope of the present invention.
Refering to attached drawing, a kind of permeable skid ecology wooden footway, comprising: plank road plank 2, keel 3 and support column 4.Plank road wood The upper surface of plate 2, which is mated formation, permeable surface layer 1, and the 1/4~1/ of the thickness with a thickness of plank road plank 2 of permeable surface layer 1 can be set 3.Under normal circumstances, the thickness of permeable surface layer 1 can be 0.3cm~0.6cm.The width of permeable surface layer 1, length are connect with it Plank road plank 2 it is identical.
Permeable surface layer 1 includes fine sand and flexible adhesives, is bonded between fine sand by flexible adhesives.It is arranged between fine sand There is hole, the voidage of permeable surface layer 1 is at least 10%.The material of namely permeable surface layer 1 is a kind of permeability flexible composite wood Material, this permeability flexible composite material generally uses fine sand to do raw material, and flexible adhesives is added wherein.
Flexible adhesives also known as weight brick viscose glue mud, is the binding material using Portland cement as substrate, has bonding very well Performance and resist glidepath, the heavier plane materiel of Pasting, various stone materials is such as used for, such as dried mushroom stone, steel gray stone, granite, marble, porcelain Brick and heavier plane materiel etc. are on cement basal plane, metope or have the stickup of the basal plane slightly shaken.It is added in fine sand flexible viscous Mixture need to keep there is hole between fine sand, and effective drainage porosity need to reach 10% or more, while making fine sand that one kind be presented and not flowing It moves, be unlikely to deform, there is some strength, elasticity and stabilized sand board status flexible, flowed through so that permeable surface layer 1 is permeable The rainwater on wooden footway surface, anti-skidding anti-corrosion.
Plank road plank 2 is located at the lower section of permeable surface layer 1, is bonded together with permeable surface layer 1, primarily serves the permeable face of support Layer 1, confluence water conservancy diversion rainwater, the effect for connecting keel 3.Plank road plank 2 and permeable surface layer 1, can also be saturating in addition to bonding connection Screw 11 is provided on water surface layer 1, permeable surface layer 1 is fixedly connected by screw 11 with plank road plank 2, so that the two connects more Securely.
Can be set plank road plank 2 with a thickness of 1cm~1.5cm, width is 10cm~15cm, and length is according to live practical It selects, is usually no more than 300cm.Situation wider for place can be mated formation side by side with multiple groups plank road.
Plank road plank 2 and the joint face of permeable surface layer 1 are provided with catch basin 22, and catch basin 22 is located inside plank road plank 2 Middle position.Plank road plank 2 and the joint face of permeable surface layer 1 are set as intermediate structure low, periphery is high, that is, plank road wood Two sides of 2 upper surface of plate are tilted to catch basin 22, and catch basin 22 is located at the minimum position in 2 upper surface of plank road plank, guarantee infiltration It is pooled in catch basin 22 to permeable surface layer 1 and the rainwater of 2 junction of plank road plank by gravity.
The length of catch basin 22 is less than the length of plank road plank 2, i.e. catch basin 22 does not extend transversely through plank road plank 2, Two sides end so as to ensure catch basin 22 is water-tight.The depth that catch basin 22 can be set is 2mm~3mm, and width is 1.2cm~1.5cm, length are 3cm~5cm shorter than plank road plank 2.
Keel 3 are symmetricly set on the lower section of plank road plank 2, and keel 3 are connected to the first aqueduct 21.Keel 3 are generally selected The rectangle channel steel of all round closure can also select the identical angle steel of specification, and opposite welding forms closed hollow, rectangular structure, dragon The hollow structure of bone 3 is for storing rainwater.
The lower section of keel 3 is arranged in support column 4, and support column 4 generally selects concrete, wooden or metal material, support Column 4 connects basis or ground 5, supports entire plank road structure, generally distance 300-500cm between support column 4 by keel 3.
The surface of keel 3 and support column 4 is both needed to do preservative treatment, is such as provided with erosion resistant coating, the anti-corrosion material in erosion resistant coating It can be various organic and inorganic coating, glass reinforced plastic, inorganic plate etc., can inhibit keel 3 and support column 4 that chemical attack occurs And electrochemical corrosion.
The first aqueduct 21 is provided in plank road plank 2, the first aqueduct 21 is connected to catch basin 22.It is set in support column 4 It is equipped with vertical the second aqueduct 41 for running through support column 4, the second aqueduct 41 is connected to keel 3.First aqueduct 21, keel 3 Conduit pipe is collectively formed with the second aqueduct 41, it can be by the rainwater collected in catch basin 22 by the first aqueduct 21, dragon Bone 3 and the second aqueduct 41 are discharged out of wooden footway.
Rainwater is pooled in keel 3 by the first aqueduct 21 and stores, then is discharged from the second aqueduct 41, avoids rainwater Outflow enters inside wooden footway.The bottom of second aqueduct 41 can connect drainage pipeline 6, and rainwater is discharged from drainage pipeline 6 again Into storing facilities of water.Drainage pipeline 6 can be set on ground 5, can also be embedded in underground.Drainage pipeline 6 can generally be selected PE material.
The ecology wooden footway is carried out shaping using the flexible adhesives fine sand that will mat formation, and it is compound to ultimately form a kind of permeability flexible Material, this manufacture craft make fine sand that a kind of structure of immobilising, similar water-permeable brick be presented, are unlikely to deform;And have certain Flexibility, the plank road plank that can be bonded with it are connect very well, guarantee integrally-built stability.
Rainwater permeates by permeable surface layer 1 and is flowed to plank road plank 2 by catch basin 22, is discharged using conduit pipe Into storing facilities of water, stored.Due to the microcellular structure of permeable surface layer 1, there is preferable filtration, purification to collected rainwater Effect, guarantees Effects of Water Quality, and total has the function of very efficient collection, purification, water conservancy diversion rainwater and saves water resource.
In actual operation, usual plank road area (i.e. plank road plank perpendicular to the ground projected area) of effectively mating formation reaches The 80% of entire wooden footway occupied area, general rainwater-collecting efficiency can reach 80-85%, so while permeable surface layer it is permeable with And water guide, the water storage of other structures, the ecology wooden footway can effectively realize that the rainfall to one's respective area 60%~70% is collected, Greatly improve wooden footway surface because rainwater deposition due to it is wet and slippery perishable, and rainwater resource waste status, permeable skid it is more Functionality has certain popularizing action in gardens construction.
The above is only the embodiment of the present invention, are not intended to limit the scope of the invention, all to be said using the present invention Equivalent structure or equivalent flow shift made by bright book and accompanying drawing content is applied directly or indirectly in other relevant technology necks Domain is included within the scope of the present invention.

Claims (8)

1. a kind of permeable skid ecology wooden footway characterized by comprising plank road plank, keel and support column;
The upper surface of the plank road plank is provided with permeable surface layer, and the permeable surface layer includes fine sand and flexible adhesives, described It is bonded between fine sand by flexible adhesives, is provided with hole between the fine sand;
The plank road plank and the joint face of permeable surface layer are provided with catch basin, and the catch basin is located in the plank road plank Between position, the length of the catch basin is less than the length of the plank road plank;It is provided with the first aqueduct in the plank road plank, First aqueduct is connected to catch basin;
The keel are symmetricly set on the lower section of the plank road plank, and the keel are set as hollow structure, the keel and The connection of one aqueduct;
The lower section of the keel is arranged in the support column, and vertical the second water guide for running through support column is provided in the support column Pipe, second aqueduct are connected to the keel.
2. a kind of permeable skid ecology wooden footway according to claim 1, it is characterised in that: the thickness of the permeable surface layer It is the 1/4~1/3 of the thickness of the plank road plank.
3. a kind of permeable skid ecology wooden footway according to claim 1, it is characterised in that: the thickness of the permeable surface layer For 0.3cm~0.6cm.
4. a kind of permeable skid ecology wooden footway according to claim 1, it is characterised in that: the gap of the permeable surface layer Rate is at least 10%.
5. a kind of permeable skid ecology wooden footway according to claim 1, it is characterised in that: be arranged in the permeable surface layer There is screw, the permeable surface layer is fixedly connected by screw with the plank road plank.
6. a kind of permeable skid ecology wooden footway according to claim 1, it is characterised in that: the plank road plank with it is permeable The joint face of surface layer is set as intermediate structure low, periphery is high.
7. a kind of permeable skid ecology wooden footway according to claim 1, it is characterised in that: the material of the keel is slot One of steel or angle steel.
8. a kind of permeable skid ecology wooden footway according to claim 1, it is characterised in that: the keel and support column Surface is provided with erosion resistant coating.
CN201910101657.XA 2019-01-30 2019-01-30 A kind of permeable skid ecology wooden footway Pending CN109750593A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910101657.XA CN109750593A (en) 2019-01-30 2019-01-30 A kind of permeable skid ecology wooden footway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910101657.XA CN109750593A (en) 2019-01-30 2019-01-30 A kind of permeable skid ecology wooden footway

Publications (1)

Publication Number Publication Date
CN109750593A true CN109750593A (en) 2019-05-14

Family

ID=66407300

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910101657.XA Pending CN109750593A (en) 2019-01-30 2019-01-30 A kind of permeable skid ecology wooden footway

Country Status (1)

Country Link
CN (1) CN109750593A (en)

Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0853808A (en) * 1994-08-12 1996-02-27 S K Eng Kk Water permeable sidewalk block
DE4445157A1 (en) * 1994-12-17 1996-06-20 Emil Voss Moulded tile made from recycled polymers
JP2000104206A (en) * 1998-09-29 2000-04-11 Takei Co Ltd Pavement slab and structure of pavement and sidewalk using same
DE202004011578U1 (en) * 2004-07-23 2004-09-23 Bernauer, Anton Wooden floor for balconies or patios comprises an elongated trough-shaped water-drainage profile between adjacent wooden slats which lie with their under sides on the two upward-protruding profile edges of the water-drainage profile
DE102005012517A1 (en) * 2004-03-16 2005-10-20 Wood Company Vertriebs Gmbh Wall element for a surface, preferably for a balcony or patio surface, is designed as a panel part which is laid on a bearing surface with a surface element covering the bearing surface and having a liquid drainage channel
KR100552276B1 (en) * 2005-10-08 2006-02-21 케이에스엠기술 주식회사 Subsidence prevent structure of footway for road
KR100801599B1 (en) * 2007-08-21 2008-02-05 (주)에스엔건설 Method of water percolating drainage system for improved performance of concrete bridge deck surfacing and the concrete bridge deck surfacing body
JP2010095903A (en) * 2008-10-16 2010-04-30 Ohbayashi Corp Paving stone pavement system
KR20110000617U (en) * 2009-07-13 2011-01-20 주식회사 엠 케이 우드 Eco-friendly timber sidewalk blocks that is easy to establishment
KR101293164B1 (en) * 2013-03-27 2013-08-12 (주) 아라기술 Gutters means, which includes wooden deck walkway
CN105216158A (en) * 2015-09-16 2016-01-06 湖北润和科技发展有限公司 A kind of plastic mould moulding the production of plank road plate for easy draining wood
CA2936858A1 (en) * 2015-07-22 2017-01-22 Keystone Retaining Wall Systems Llc Patio blocks and block systems with side surface positioning and retaining structures
CN206438598U (en) * 2016-12-21 2017-08-25 山东飞越钢结构工程有限公司 A kind of balcony panel
DE102016107796A1 (en) * 2016-04-26 2017-10-26 Reiner Laubach Profiled drainage element for a balcony or terrace floor
CN206800113U (en) * 2017-06-08 2017-12-26 陕西服装工程学院 A kind of permeable road of ecology garden landscape
CN207295446U (en) * 2017-10-12 2018-05-01 潍坊市市政工程股份有限公司 A kind of bridge pave-load layer water-proof drainage structure
CN209741645U (en) * 2019-01-30 2019-12-06 星景生态环保科技(苏州)有限公司 ecological wooden plank road of antiskid permeates water

Patent Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0853808A (en) * 1994-08-12 1996-02-27 S K Eng Kk Water permeable sidewalk block
DE4445157A1 (en) * 1994-12-17 1996-06-20 Emil Voss Moulded tile made from recycled polymers
JP2000104206A (en) * 1998-09-29 2000-04-11 Takei Co Ltd Pavement slab and structure of pavement and sidewalk using same
DE102005012517A1 (en) * 2004-03-16 2005-10-20 Wood Company Vertriebs Gmbh Wall element for a surface, preferably for a balcony or patio surface, is designed as a panel part which is laid on a bearing surface with a surface element covering the bearing surface and having a liquid drainage channel
DE202004011578U1 (en) * 2004-07-23 2004-09-23 Bernauer, Anton Wooden floor for balconies or patios comprises an elongated trough-shaped water-drainage profile between adjacent wooden slats which lie with their under sides on the two upward-protruding profile edges of the water-drainage profile
KR100552276B1 (en) * 2005-10-08 2006-02-21 케이에스엠기술 주식회사 Subsidence prevent structure of footway for road
KR100801599B1 (en) * 2007-08-21 2008-02-05 (주)에스엔건설 Method of water percolating drainage system for improved performance of concrete bridge deck surfacing and the concrete bridge deck surfacing body
JP2010095903A (en) * 2008-10-16 2010-04-30 Ohbayashi Corp Paving stone pavement system
KR20110000617U (en) * 2009-07-13 2011-01-20 주식회사 엠 케이 우드 Eco-friendly timber sidewalk blocks that is easy to establishment
KR101293164B1 (en) * 2013-03-27 2013-08-12 (주) 아라기술 Gutters means, which includes wooden deck walkway
CA2936858A1 (en) * 2015-07-22 2017-01-22 Keystone Retaining Wall Systems Llc Patio blocks and block systems with side surface positioning and retaining structures
CN105216158A (en) * 2015-09-16 2016-01-06 湖北润和科技发展有限公司 A kind of plastic mould moulding the production of plank road plate for easy draining wood
DE102016107796A1 (en) * 2016-04-26 2017-10-26 Reiner Laubach Profiled drainage element for a balcony or terrace floor
CN206438598U (en) * 2016-12-21 2017-08-25 山东飞越钢结构工程有限公司 A kind of balcony panel
CN206800113U (en) * 2017-06-08 2017-12-26 陕西服装工程学院 A kind of permeable road of ecology garden landscape
CN207295446U (en) * 2017-10-12 2018-05-01 潍坊市市政工程股份有限公司 A kind of bridge pave-load layer water-proof drainage structure
CN209741645U (en) * 2019-01-30 2019-12-06 星景生态环保科技(苏州)有限公司 ecological wooden plank road of antiskid permeates water

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
姚昱晨等: "《道路工程技术》", 中央广播电视大学出版社, pages: 177 *
王海莹;李大纲;王坤明;: "室外用木塑地板铺装技术", 新型建筑材料, no. 08, 25 August 2011 (2011-08-25), pages 177 - 99 *

Similar Documents

Publication Publication Date Title
CN108301280B (en) Permeable pavement structure
CN204849520U (en) Road drainage system
CN102227534A (en) Road surfacing, method of constructing road surfacing, and concrete form
CN207512545U (en) A kind of road surface drainage structure
AU2016228704B2 (en) Hard road construction method for natural groundwater recharge
WO2018076940A1 (en) Storage and infiltration system, honeycomb roadbed and screen barrels thereof
CN202347641U (en) Permeable concrete rainwater drainage structure
CN207537844U (en) Town road discharge structure
CN205604000U (en) Novel permeable pavement brick
CN107090755A (en) A kind of paving structure of permeable Footpath brick and porous pavement
CN207405427U (en) A kind of combined type permeable pavement structure
CN201495693U (en) Overhead wood floor roofing
CN104878827A (en) Road drainage structure
CN209741645U (en) ecological wooden plank road of antiskid permeates water
CN109750593A (en) A kind of permeable skid ecology wooden footway
CN206467518U (en) A kind of road surfacing structure
KR100217946B1 (en) Porous concrete construction method
CN211848696U (en) Type bituminous paving structure permeates water
CN209482090U (en) A kind of tunnel drainage pavement structure
CN208830083U (en) A kind of overhead type draining floor file structure
CN208917611U (en) It is a kind of can anti-softening road structure
CN208701602U (en) A kind of formula ecological bank protection structure
CN206784112U (en) Weeping plastic track
CN208250846U (en) Surface drainage
KR101902890B1 (en) Reinforced waterway pipe having gutter type and rectangular type

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination