CN109732554A - A kind of method of bridge anchor tie plate unit scriber scribing line - Google Patents

A kind of method of bridge anchor tie plate unit scriber scribing line Download PDF

Info

Publication number
CN109732554A
CN109732554A CN201811601832.3A CN201811601832A CN109732554A CN 109732554 A CN109732554 A CN 109732554A CN 201811601832 A CN201811601832 A CN 201811601832A CN 109732554 A CN109732554 A CN 109732554A
Authority
CN
China
Prior art keywords
scriber
scribing line
tie plate
anchor
plate unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811601832.3A
Other languages
Chinese (zh)
Inventor
张国江
任晓霞
顾彦华
姜璠
赵丽
单逸飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Zhongtie Shanqiao Heavy Industry Co Ltd
Original Assignee
Jiangsu Zhongtie Shanqiao Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Zhongtie Shanqiao Heavy Industry Co Ltd filed Critical Jiangsu Zhongtie Shanqiao Heavy Industry Co Ltd
Publication of CN109732554A publication Critical patent/CN109732554A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to a kind of methods of bridge anchor tie plate unit scriber scribing line, it is characterised in that: specific step is as follows: S1: the group weldering of components;S2: level control;S3: the installation of scriber;S4: scriber route input;S5: the delineating of needle scribing line;Scriber is arranged using the milling head end of numerically-controlled machine tool in the present invention, the movement routine scribing line precision of scriber is higher, avoids the scribing line time for having saved high-volume anchor tie plate unit using the manual hatched manner of punctuate line, improves productivity;In addition, avoiding anchor tie plate unit installation site and the mistake in direction from causing unnecessary scribing line problem, the scribing line of needle scribing line is more efficient, and accidentally scribing line rate is zero using first the mobile a distance of center line is crossed cutting line again on anchor web when delineating needle scribing line.

Description

A kind of method of bridge anchor tie plate unit scriber scribing line
Technical field
It crosses the present invention relates to bridge anchor tie plate unit production field more particularly to a kind of bridge anchor tie plate unit scriber Method.
Background technique
The connection of suspension cable and steel bridge mostly uses anchor drawplate type anchor structure at present, in production anchor tie plate unit process most It is important that the angle precision of control anchor tie plate.Anchor tie plate unit piece structure generally by end sleeve, cap web, anchor plate, The parts such as intermediate pressurized tube, ribbed stiffener are constituted, and need accurately to cut anchor web free end after the completion of the weldering of these part groups, with Keep anchor tie plate manufacture angle [alpha] accurate.Therefore, it is necessary to develop a kind of scribble methods with high accuracy to mark the angle α cutting line.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of methods of bridge anchor tie plate unit scriber scribing line, are able to solve General anchor tie plate, which delineates cutting line angle precision difference, leads to the problem of cutting accuracy difference.
In order to solve the above technical problems, the technical solution of the present invention is as follows: a kind of side of bridge anchor tie plate unit scriber scribing line Method, innovative point are: specific step is as follows:
S1: the group weldering of components: by anchor tie plate end sleeve, anchor web, anchor plate, intermediate pressurized tube, each part of ribbed stiffener A group weldering, which is carried out, according to drawing and welding requirements forms anchor tie plate unit;Reserved cutting surplus before the weldering of anchor web group;
S2: level control: the anchor tie plate unit that group welds is placed on numerically-controlled machine tool platform, and modulates each group using level Weld the level at control point;
S3: the installation of scriber: the steel needle that movable milling head end installs that a root long is 15mm-20mm on numerically-controlled machine tool, which is used as, to be drawn Needle;
S4: the input of scriber route: numerical control program inputs each anchor tie plate and manufactures angle [alpha] value, and presets the milling head with scriber Walking path:
S5: the delineating of needle scribing line: first by the steel needle of milling head end along anchor web center line walking certain length L value;Then according to The angle [alpha] set in pre- numerically-controlled machine tool marks cutting line actual path along cut end.
The present invention has the advantages that
1) scriber is arranged using the milling head end of numerically-controlled machine tool in the present invention, the movement routine scribing line precision of scriber is higher, avoids The scribing line time that high-volume anchor tie plate unit has been saved using the manual hatched manner of punctuate line, improve productivity;In addition, Using first the mobile a distance of center line is crossed cutting line again on anchor web when delineating needle scribing line, anchor tie plate unit is avoided Installation site and the mistake in direction cause unnecessary scribing line problem, and the scribing line of needle scribing line is more efficient, and accidentally scribing line rate is zero.
Specific embodiment
The following examples can make professional and technical personnel that the present invention be more fully understood, but therefore not send out this It is bright to be limited among the embodiment described range.
A kind of method of bridge anchor tie plate unit scriber scribing line, the specific steps are as follows:
S1: the group weldering of components: by anchor tie plate end sleeve, anchor web, anchor plate, intermediate pressurized tube, each part of ribbed stiffener A group weldering, which is carried out, according to drawing and welding requirements forms anchor tie plate unit;Reserved cutting surplus before the weldering of anchor web group.
S2: level control: the anchor tie plate unit that group welds is placed on numerically-controlled machine tool platform, and is modulated using level The level at each group weldering control point.
S3: the installation of scriber: the steel needle that movable milling head end installs that a root long is 15mm-20mm on numerically-controlled machine tool is made For scriber.
S4: the input of scriber route: numerical control program inputs each anchor tie plate and manufactures angle [alpha] value, and presets with scriber Milling head walking path.
S5: the delineating of needle scribing line: first by the steel needle of milling head end along anchor web center line walking certain length L value;Then Cutting line actual path is marked along cut end according to the angle [alpha] set in pre- numerically-controlled machine tool.
It should be understood by those skilled in the art that the present invention is not limited to the above embodiments, above-described embodiment and explanation It is merely illustrated the principles of the invention described in book, without departing from the spirit and scope of the present invention, the present invention also has Various changes and modifications, these changes and improvements all fall within the protetion scope of the claimed invention.The claimed scope of the invention It is defined by the appending claims and its equivalent thereof.

Claims (1)

1. a kind of method of bridge anchor tie plate unit scriber scribing line, it is characterised in that: specific step is as follows:
S1: the group weldering of components: by anchor tie plate end sleeve, anchor web, anchor plate, intermediate pressurized tube, each part of ribbed stiffener A group weldering, which is carried out, according to drawing and welding requirements forms anchor tie plate unit;Reserved cutting surplus before the weldering of anchor web group;
S2: level control: the anchor tie plate unit that group welds is placed on numerically-controlled machine tool platform, and modulates each group using level Weld the level at control point;
S3: the installation of scriber: the steel needle that movable milling head end installs that a root long is 15mm-20mm on numerically-controlled machine tool, which is used as, to be drawn Needle;
S4: the input of scriber route: numerical control program inputs each anchor tie plate and manufactures angle [alpha] value, and presets the milling head with scriber Walking path:
S5: the delineating of needle scribing line: first by the steel needle of milling head end along anchor web center line walking certain length L value;Then according to The angle [alpha] set in pre- numerically-controlled machine tool marks cutting line actual path along cut end.
CN201811601832.3A 2018-09-28 2018-12-26 A kind of method of bridge anchor tie plate unit scriber scribing line Pending CN109732554A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN2018111400222 2018-09-28
CN201811140022 2018-09-28

Publications (1)

Publication Number Publication Date
CN109732554A true CN109732554A (en) 2019-05-10

Family

ID=66360042

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811601832.3A Pending CN109732554A (en) 2018-09-28 2018-12-26 A kind of method of bridge anchor tie plate unit scriber scribing line

Country Status (1)

Country Link
CN (1) CN109732554A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113427488A (en) * 2021-07-13 2021-09-24 西安交通大学 Digital marking method, system and device based on geometric feature recognition

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3410448A1 (en) * 1984-03-22 1985-09-26 Dyckerhoff & Widmann AG, 8000 München Anchoring for a tensible tension member, e.g. an inclined cable for a cable-stayed bridge
EP0333953A1 (en) * 1988-03-21 1989-09-27 California Industrial Products, Inc. Multiple sleeve-nut anchor plate
CN102229046A (en) * 2011-06-15 2011-11-02 李永飞 Machine tool
CN203080411U (en) * 2013-01-25 2013-07-24 安徽省交通投资集团有限责任公司 Anchoring plate assembly used for cable-stayed bridge concrete main beam
CN103639496A (en) * 2013-11-26 2014-03-19 中冶天工集团有限公司 High-precision processing method for end-milling surface of large-section steel member
CN103990841A (en) * 2014-05-29 2014-08-20 中冶天工集团有限公司 End face milling method for large-section steel member
CN104552219A (en) * 2014-11-27 2015-04-29 沈阳飞机工业(集团)有限公司 Lateral scriber used in numerical control machining and using method of lateral scriber
CN205636492U (en) * 2016-05-09 2016-10-12 上海振华重工(集团)股份有限公司 Suspension cable bridge anchor case member
CN108381128A (en) * 2018-05-18 2018-08-10 中铁山桥集团有限公司 A kind of suspension centre is pierced by work shape weathering steel edge-beam production method

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3410448A1 (en) * 1984-03-22 1985-09-26 Dyckerhoff & Widmann AG, 8000 München Anchoring for a tensible tension member, e.g. an inclined cable for a cable-stayed bridge
EP0333953A1 (en) * 1988-03-21 1989-09-27 California Industrial Products, Inc. Multiple sleeve-nut anchor plate
CN102229046A (en) * 2011-06-15 2011-11-02 李永飞 Machine tool
CN203080411U (en) * 2013-01-25 2013-07-24 安徽省交通投资集团有限责任公司 Anchoring plate assembly used for cable-stayed bridge concrete main beam
CN103639496A (en) * 2013-11-26 2014-03-19 中冶天工集团有限公司 High-precision processing method for end-milling surface of large-section steel member
CN103990841A (en) * 2014-05-29 2014-08-20 中冶天工集团有限公司 End face milling method for large-section steel member
CN104552219A (en) * 2014-11-27 2015-04-29 沈阳飞机工业(集团)有限公司 Lateral scriber used in numerical control machining and using method of lateral scriber
CN205636492U (en) * 2016-05-09 2016-10-12 上海振华重工(集团)股份有限公司 Suspension cable bridge anchor case member
CN108381128A (en) * 2018-05-18 2018-08-10 中铁山桥集团有限公司 A kind of suspension centre is pierced by work shape weathering steel edge-beam production method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王永亮: "高海拔寒区斜拉桥锚拉板单元制作技术研究", 《青海交通科技》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113427488A (en) * 2021-07-13 2021-09-24 西安交通大学 Digital marking method, system and device based on geometric feature recognition

Similar Documents

Publication Publication Date Title
CN204122954U (en) A kind of hydraulic support structural member robot automatic welding flow production line
CN109732554A (en) A kind of method of bridge anchor tie plate unit scriber scribing line
CN103510714A (en) Welding and construction method for cross-shaped steel pillar
CN106078028A (en) A kind of comprehensive automatic welding machinery hands
CN104014904A (en) Welding equipment capable of adjusting welding current automatically and welding current control method
CN105034607A (en) Laser marking machine capable of positioning focus rapidly and focus positioning method
CN103949783B (en) The welding method of extra large work crane cylinder neckline
CN204975873U (en) Concentric anchor clamps of tubular product
CN105149770B (en) Automatic tracking system for mechanical type laser welding
CN204913018U (en) Automatic weld platform device at bottom of elevator sedan -chair
CN208245877U (en) A kind of large-scale cover type gap bridge positioning templet of bridge drilling
CN103143843B (en) Method for positioning mold line sample plate with positioning hole in repairing process
CN103639597B (en) Aluminum alloy bodywork components laser double wire welding technique
CN102814632A (en) Secondary cutting technique method of transverse clapboards
CN109108732A (en) The automatic laser positioning device and its localization method of thickening plate
CN212145295U (en) Pipeline welding complete automatic system
CN202639671U (en) Welding device for tower foot of transmission line iron tower
CN208643893U (en) A kind of feeding laser centring device
CN105414778B (en) A kind of laser welding alignment method for microwave components
CN208885279U (en) A kind of shield machine automatic deviation correction anti-derail unit
CN107378330A (en) A kind of H profile steel welder
CN204975957U (en) Alignment installation mechanism that no benchmark was inserted among auto panel die
CN205147561U (en) Bridge crane box roof beam weld forming and lap orthopedic frock instrument
CN107813103B (en) A kind of steel form aciculiform girder construction manufacture craft
CN204913095U (en) It rules and measuring caliper to weld welding hole

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Zhang Guojiang

Inventor after: Ren Xiaoxia

Inventor after: Gu Yanhua

Inventor after: Jiang Fan

Inventor after: Zhao Li

Inventor after: Shan Yifei

Inventor before: Zhang Guojiang

Inventor before: Ren Xiaoxia

Inventor before: Gu Yanhua

Inventor before: Jiang Fan

Inventor before: Zhao Li

Inventor before: Shan Yifei

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190510