CN109724908A - 一种悬挂式止水帷幕渗流模型试验系统 - Google Patents

一种悬挂式止水帷幕渗流模型试验系统 Download PDF

Info

Publication number
CN109724908A
CN109724908A CN201810937896.4A CN201810937896A CN109724908A CN 109724908 A CN109724908 A CN 109724908A CN 201810937896 A CN201810937896 A CN 201810937896A CN 109724908 A CN109724908 A CN 109724908A
Authority
CN
China
Prior art keywords
water
native
main body
box main
curtain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810937896.4A
Other languages
English (en)
Inventor
张钦喜
张志红
王成名
周与诚
石健
郑筱彦
翟玉新
孔恒
郭飞
田治州
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Jianancheng Geotechnical Engineering Co Ltd
Beijing Urban Construction Science And Technology Promotion Association
Beijing University of Technology
China Railway Construction Group Co Ltd
Beijing Municipal Construction Co Ltd
Original Assignee
Beijing Jianancheng Geotechnical Engineering Co Ltd
Beijing Urban Construction Science And Technology Promotion Association
Beijing University of Technology
China Railway Construction Group Co Ltd
Beijing Municipal Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Jianancheng Geotechnical Engineering Co Ltd, Beijing Urban Construction Science And Technology Promotion Association, Beijing University of Technology, China Railway Construction Group Co Ltd, Beijing Municipal Construction Co Ltd filed Critical Beijing Jianancheng Geotechnical Engineering Co Ltd
Priority to CN201810937896.4A priority Critical patent/CN109724908A/zh
Publication of CN109724908A publication Critical patent/CN109724908A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Aerodynamic Tests, Hydrodynamic Tests, Wind Tunnels, And Water Tanks (AREA)

Abstract

本发明公开一种悬挂式止水帷幕渗流模型试验系统,包括:土箱、土箱主体、上水箱、水循环系统、水压监测系统、沉降监测系统、进水过渡板、帷幕挡板和流量计、基坑。本发明的悬挂式止水帷幕渗流模型试验系统通过改变不同的帷幕插入深度,模拟实际工程中悬挂式止水帷幕下基坑工程的渗流场的分布。该装置能准确模拟实际工况,还可以改变基坑形状,研究不同基坑形状下的渗流场特点。

Description

一种悬挂式止水帷幕渗流模型试验系统
技术领域
本发明属于地下水渗流控制技术领域,尤其涉及一种适用于研究截水或者降水条件下基坑渗流的模型试验系统。
背景技术
地下水渗流控制是基坑工程中一项重要安全控制技术。目前规范中鲜有关于悬挂式止水帷幕下的基坑渗流分析,现有的悬挂式止水帷幕渗流模型试验系统尺寸都比较小,没有充分考虑影响半径对渗流的影响。且他们的水头测量装置在测量过程中存在较大的误差。经过考虑影响半径以及对测量装置进行改良,本发明设计了一套全新的悬挂式止水帷幕渗流模型试验系统,此系统可以更准确的用于渗流基本理论研究或数值计算结果的验证。
发明内容
为了克服上述现有技术的不足,本发明提供一种悬挂式止水帷幕渗流模型试验系统,旨在通过土箱上的水压监测系统与沉降监测系统,得到基坑中的渗流场分布以及基坑外的沉降变化规律。
为满足上述需求,本发明采用的技术方案是:
一种悬挂式止水帷幕渗流模型试验系统,包括:土箱、土箱主体、上水箱、水循环系统、水压监测系统、沉降监测系统、进水过渡板、帷幕挡板、流量计、基坑;其中,
土箱各个面为有机玻璃板,土箱内部自左至右设置帷幕挡板和进水过渡板,将土箱内部自左至右分割为基坑、土箱主体和上水箱,土箱主体的正面设有多个第二通孔,土箱主体内部盛放砂土;上水箱无上盖,上水箱右侧设有第一通孔,采用活塞堵住第一通孔;基坑左侧设有多个下游出水口;土箱主体与上水箱之间由进水过渡板分隔,进水过渡板上设有第三通孔,进水过渡板由第一挡板支架固定,且可在第一挡板支架之间竖向滑动;土箱主体与基坑之间由帷幕挡板分隔,帷幕挡板由第二挡板支架固定,且可在第二挡板支架之间竖向滑动;
水循环系统由自吸水泵和水箱组成,自吸水泵的一端连接水箱的一端,自吸水泵的另一端通过水管插入到上水箱内部,水箱的另一端连接流量计的一端,流量计的另一端连接三通管件,所述三通管件穿过下游出水口插入到基坑内,将下游出水口的水经水箱泵回上水箱。
水压监测系统由多个液位计与多个孔隙水压力计组成,液位计排布在土箱主体下部外侧每隔10cm放置一个,液位计通过水箱宝塔接头穿过第二通孔与土箱主体内的降水井管相连;孔隙水压力计埋置在土箱主体的砂土中,且位于帷幕挡板的右侧,从下往上每隔20cm放置一个。
沉降监测系统由多个位移测微计组成,位移测微计位于土箱主体的砂土表面上,沿着纵向布置,每隔20cm放置一个。
作为优选,进水过渡板和帷幕挡板为两片铝板加内置骨架。
本发明有益效果是:本发明悬挂式止水帷幕渗流模型试验系统能够在土箱内渗流达到稳定状态下,对出水口流量进行观测,得到帷幕板不同插入深度下的基坑涌水量试验值;能够通过观测基坑外水位,得到基坑降水影响半径试验值;同时还能够通过观测基坑外地面沉降,得到基坑降水造成的坑外沉降试验值。
附图说明
图1为悬挂式止水帷幕渗流模型试验系统前视图;
图中:1—土箱主体;2—上水箱;3—水循环系统;4—孔隙水压力;5—位移测微计;6—进水过渡板;7—帷幕挡板;8—流量计;9—基坑;10—土箱;11—第二通孔;12—自吸水泵;13—水箱。
具体实施方式
悬挂式止水帷幕渗流模型试验系统具有可以模拟实际工况,获得与实际工程相符的渗流流网形态,用来研究地下水渗流场的特征和规律。实验结果可指导实际工程设计,同时用来修正基坑规程中的地下水涌水量、坑外水位降深以及降水引起的沉降计算等优点。
如图1所示,本发明提供一种悬挂式止水帷幕渗流模型试验系统,包括:土箱、土箱主体、上水箱、水循环系统、水压监测系统、沉降监测系统、进水过渡板、帷幕挡板、流量计、基坑;其中,
土箱各个面为有机玻璃板,土箱内部自左至右设置帷幕挡板和进水过渡板,将土箱内部自左至右分割为基坑、土箱主体和上水箱,土箱主体的正面设有多个第二通孔,土箱主体内部盛放砂土;上水箱无上盖,上水箱右侧设有第一通孔,采用活塞堵住第一通孔;基坑左侧设有多个下游出水口;土箱主体与上水箱之间由进水过渡板分隔,进水过渡板上设有第三通孔,进水过渡板由第一挡板支架固定,且可在第一挡板支架之间竖向滑动;土箱主体与基坑之间由帷幕挡板分隔,帷幕挡板由第二挡板支架固定,且可在第二挡板支架之间竖向滑动;
水循环系统由自吸水泵和水箱组成,自吸水泵的一端连接水箱的一端,自吸水泵的另一端通过水管插入到上水箱内部,水箱的另一端连接流量计的一端,流量计的另一端连接三通管件,所述三通管件穿过下游出水口插入到基坑内,将下游出水口的水经水箱泵回上水箱。
水压监测系统由多个液位计与多个孔隙水压力计组成,液位计排布在土箱主体下部外侧每隔10cm放置一个,液位计通过水箱宝塔接头穿过第二通孔与土箱主体内的降水井管相连;孔隙水压力计埋置在土箱主体的砂土中,且位于帷幕挡板的右侧,从下往上每隔20cm放置一个。
沉降监测系统由多个位移测微计组成,位移测微计位于土箱主体的砂土表面上,沿着纵向布置,每隔20cm放置一个。
进水过渡板和帷幕挡板为两片铝板加内置骨架。
本发明悬挂式止水帷幕渗流模型试验系统能够在土箱内渗流达到稳定状态下,对出水口流量进行观测,得到帷幕板不同插入深度下的基坑涌水量试验值;能够通过观测基坑外水位,得到基坑降水影响半径试验值。能够通过观测基坑外地面沉降,得到基坑降水造成的坑外沉降试验值。
本发明利用悬挂式止水帷幕渗流模型试验系统通过改变不同的帷幕插入深度,模拟实际工程中悬挂式止水帷幕下基坑工程的渗流场的分布。该系统能准确模拟实际工况,还可以改变基坑形状,研究不同基坑形状下的渗流场特点。

Claims (2)

1.一种悬挂式止水帷幕渗流模型试验系统,其特征在于,包括:土箱、土箱主体、上水箱、水循环系统、水压监测系统、沉降监测系统、进水过渡板、帷幕挡板、流量计、基坑;其中,
土箱各个面为有机玻璃板,土箱内部自左至右设置帷幕挡板和进水过渡板,将土箱内部自左至右分割为基坑、土箱主体和上水箱,土箱主体的正面设有多个第二通孔,土箱主体内部盛放砂土;上水箱无上盖,上水箱右侧设有第一通孔,采用活塞堵住第一通孔;基坑左侧设有多个下游出水口;土箱主体与上水箱之间由进水过渡板分隔,进水过渡板上设有第三通孔,进水过渡板由第一挡板支架固定,且可在第一挡板支架之间竖向滑动;土箱主体与基坑之间由帷幕挡板分隔,帷幕挡板由第二挡板支架固定,且可在第二挡板支架之间竖向滑动;
水循环系统由自吸水泵和水箱组成,自吸水泵的一端连接水箱的一端,自吸水泵的另一端通过水管插入到上水箱内部,水箱的另一端连接流量计的一端,流量计的另一端连接三通管件,所述三通管件穿过下游出水口插入到基坑内,将下游出水口的水经水箱泵回上水箱;
水压监测系统由多个液位计与多个孔隙水压力计组成,液位计排布在土箱主体下部外侧每隔10cm放置一个,液位计通过水箱宝塔接头穿过第二通孔与土箱主体内的降水井管相连;孔隙水压力计埋置在土箱主体的砂土中,且位于帷幕挡板的右侧,从下往上每隔20cm放置一个;
沉降监测系统由多个位移测微计组成,位移测微计位于土箱主体的砂土表面上,沿着纵向布置,每隔20cm放置一个。
2.如权利要求1所述的悬挂式止水帷幕渗流模型试验系统,其特征在于,进水过渡板和帷幕挡板为两片铝板加内置骨架。
CN201810937896.4A 2018-08-17 2018-08-17 一种悬挂式止水帷幕渗流模型试验系统 Pending CN109724908A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810937896.4A CN109724908A (zh) 2018-08-17 2018-08-17 一种悬挂式止水帷幕渗流模型试验系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810937896.4A CN109724908A (zh) 2018-08-17 2018-08-17 一种悬挂式止水帷幕渗流模型试验系统

Publications (1)

Publication Number Publication Date
CN109724908A true CN109724908A (zh) 2019-05-07

Family

ID=66294630

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810937896.4A Pending CN109724908A (zh) 2018-08-17 2018-08-17 一种悬挂式止水帷幕渗流模型试验系统

Country Status (1)

Country Link
CN (1) CN109724908A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110850060A (zh) * 2019-11-22 2020-02-28 北京交通大学 可视化多孔注浆的试验装置及其实验方法
CN114184531A (zh) * 2021-11-18 2022-03-15 中煤科工集团西安研究院有限公司 用于截水帷幕位置优选及效果评价的试验装置及试验方法

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104914231A (zh) * 2015-05-20 2015-09-16 上海理工大学 基坑群开挖顺序及支撑情况对地层影响的模型试验装置
CN105369812A (zh) * 2015-10-13 2016-03-02 上海交通大学 悬挂式止水帷幕下基坑定流量抽水的承压水位确定方法
CN105756103A (zh) * 2016-03-08 2016-07-13 同济大学 模拟基坑降水承压含水层地下水渗流的透明土试验方法
CN105912798A (zh) * 2016-04-25 2016-08-31 上海市城市建设设计研究总院 基于超深基坑抽水的地面沉降智能预警方法及监测系统
CN107119731A (zh) * 2017-06-12 2017-09-01 上海理工大学 基坑群开挖对邻近建筑物变形影响的模型试验装置
US20180044907A1 (en) * 2016-08-12 2018-02-15 Wuhan Zhihe Geotechnical Engineering Co., Ltd Inverse construction method for deep, large and long pit assembling structure of suspension-type envelope enclosure
CN207147941U (zh) * 2017-09-26 2018-03-27 湖北省电力勘测设计院 帷幕基坑抽水装置及帷幕基坑抽水系统
CN108222082A (zh) * 2018-01-09 2018-06-29 中南大学 多含水层条件下基坑动态降水室内模型试验方法及装置
CN209296530U (zh) * 2018-08-17 2019-08-23 北京工业大学 一种悬挂式止水帷幕渗流模型试验系统

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104914231A (zh) * 2015-05-20 2015-09-16 上海理工大学 基坑群开挖顺序及支撑情况对地层影响的模型试验装置
CN105369812A (zh) * 2015-10-13 2016-03-02 上海交通大学 悬挂式止水帷幕下基坑定流量抽水的承压水位确定方法
CN105756103A (zh) * 2016-03-08 2016-07-13 同济大学 模拟基坑降水承压含水层地下水渗流的透明土试验方法
CN105912798A (zh) * 2016-04-25 2016-08-31 上海市城市建设设计研究总院 基于超深基坑抽水的地面沉降智能预警方法及监测系统
US20180044907A1 (en) * 2016-08-12 2018-02-15 Wuhan Zhihe Geotechnical Engineering Co., Ltd Inverse construction method for deep, large and long pit assembling structure of suspension-type envelope enclosure
CN107119731A (zh) * 2017-06-12 2017-09-01 上海理工大学 基坑群开挖对邻近建筑物变形影响的模型试验装置
CN207147941U (zh) * 2017-09-26 2018-03-27 湖北省电力勘测设计院 帷幕基坑抽水装置及帷幕基坑抽水系统
CN108222082A (zh) * 2018-01-09 2018-06-29 中南大学 多含水层条件下基坑动态降水室内模型试验方法及装置
CN209296530U (zh) * 2018-08-17 2019-08-23 北京工业大学 一种悬挂式止水帷幕渗流模型试验系统

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
薛丽影 等: "基坑工程地下水渗流模型试验系统研究", 岩土工程学报, vol. 39, no. 1, pages 126 - 130 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110850060A (zh) * 2019-11-22 2020-02-28 北京交通大学 可视化多孔注浆的试验装置及其实验方法
CN114184531A (zh) * 2021-11-18 2022-03-15 中煤科工集团西安研究院有限公司 用于截水帷幕位置优选及效果评价的试验装置及试验方法

Similar Documents

Publication Publication Date Title
CN202041444U (zh) 一种测定三维水动力弥散系数的地下水污染模拟装置
CN105136638B (zh) 尾矿坝渗流场相似模拟试验系统
CN102434151B (zh) 底水油藏开发中底水锥进动态模拟实验装置及模拟系统
CN102720476B (zh) O形井物理模拟实验装置
CN105588796A (zh) 一种精确快速测定土壤渗透系数的装置
CN204125898U (zh) 一种模拟地震作用下坝基渗流的试验装置
JP2014085332A (ja) 現場飽和透水係数測定器
CN105810075A (zh) 抽水触发岩溶塌陷过程实验装置
CN104880396A (zh) 外荷作用下土体二向渗流模型装置及测试方法
CN106706416A (zh) 模拟承压水作用下地下室底板受力的试验装置及使用方法
CN106644385B (zh) 一种地表水与地下水潜流交换自循环试验装置及使用方法
CN206470116U (zh) 一种模拟承压水作用下地下室底板受力的试验装置
CN109724908A (zh) 一种悬挂式止水帷幕渗流模型试验系统
CN113027435B (zh) 一种模拟页岩多尺度分支裂缝的试验装置及试验方法
CN204389355U (zh) 一种测定渗透变形下帷幕两侧水头分布的试验装置
CN104033147A (zh) 一种低渗水平井分段压裂耦合流动实验装置
CN209296530U (zh) 一种悬挂式止水帷幕渗流模型试验系统
CN104712295B (zh) 一种可视化水平井油藏填砂物理模型及系统
CN108986624A (zh) 上阻下透型盖层塌陷成因实验装置
CN205591900U (zh) 一种平板填砂模型渗流实验系统
CN108717039B (zh) 一种渗透劈裂注浆的临界试验模拟设备
CN105781509A (zh) 一种平板填砂模型渗流实验系统
CN106198919A (zh) 一种水头与渗流路径可调节的土层渗流实验装置
CN206670706U (zh) 一种萃取槽出口流量测量装置
CN112195986A (zh) 一种模拟离岸式桶型基础试验模型装置及沉贯试验方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination