CN109723402A - Casing pressure control well cementation process - Google Patents

Casing pressure control well cementation process Download PDF

Info

Publication number
CN109723402A
CN109723402A CN201711030180.8A CN201711030180A CN109723402A CN 109723402 A CN109723402 A CN 109723402A CN 201711030180 A CN201711030180 A CN 201711030180A CN 109723402 A CN109723402 A CN 109723402A
Authority
CN
China
Prior art keywords
well
pressure
density
casing
stage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711030180.8A
Other languages
Chinese (zh)
Inventor
郭建华
李�杰
胡锡辉
马勇
曹权
刘波
李斌
徐冰青
付志
沈欣宇
夏连彬
杨华健
任锐
周代生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN201711030180.8A priority Critical patent/CN109723402A/en
Publication of CN109723402A publication Critical patent/CN109723402A/en
Pending legal-status Critical Current

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention discloses a casing pressure control well cementation process, and belongs to the technical field of oil and gas development well cementation. The casing pressure-control well cementation process sequentially comprises the following steps: casing setting stage, cementing and replacing stage, and bumping and waiting coagulation stage; and in the casing running stage, the cementing and replacing stage and the bumping and waiting-setting stage, controlling the annular pressure of a wellhead to keep the bottom hole circulation equivalent density of the well section with the narrow safety density window between the pore pressure equivalent density and the fracture pressure equivalent density corresponding to the well section with the narrow safety density window. In the well cementation process, through well head annulus pressure control, the well bottom circulation equivalent density corresponding to the well section with the narrow safety density window is between the pore pressure equivalent density and the fracture pressure equivalent density, so that a pressure-bearing weak stratum is not pressed and leaked while a stable oil gas display layer position is pressed, the casing well cementation construction risk of the well section with the narrow safety density window is reduced, the well cementation quality is improved, the well integrity is improved, and the development benefit is ensured.

Description

A kind of casing pressure control well shaft fixing technology
Technical field
The present invention relates to oil development cementing technology field, in particular to a kind of casing pressure control well shaft fixing technology.
Background technique
Casing cementing is to inject cement by casing G.I.H, and into the annular space between the borehole wall and casing, to water By the process of oil reservoir, gas-bearing formation and water layer packing in wellbore after mud solidification, to protect oil gas casing, increase the oil/gas well service life, It is one of the important link of oil gas well drilling engineering.
Currently, the basic process of casing cementing is, will be infused after predeterminated position under casing lower going-into-well using double rubber plug methods Cement and replacement construction, carry out bruising later, casing cementing are completed after theing cement solidifies.Pass through constantly changing to cement slurry property Into, including thickening time control, dehydration control, final setting time control, Auto-regulating System of Density of Heavy Medium etc., and the improvement of property of drilling fluid is come Meet the casing cementing demand of different condition wellbore.
However, for narrow ' Safe Density Windows stratum, using existing casing cementing technique be easy to cause leakage or Aggravation leakage causes to alter on the oil gas of lower part well section so that head of liquid be caused to reduce, and interface cementing strength is low, causes to cement the well It is off quality;And it is not easy to press stable high-pressure layer, alter on oil gas is easy;In addition, replacement efficiency is low, the borehole wall and casing in well cementing process False filter cake, oil film and drilling fluid on wall are difficult to clean completely.The above problem often leads to high narrow ' Safe Density Windows stratum set Pipe cementing operation operation well control safety risk is high, it is difficult to which cementing quality guarantees, opens oil/gas well integrality, oil gas field long-term safety Hair affects greatly.
Summary of the invention
In order to solve the above technical problems, the embodiment of the present invention, which provides one kind, can reduce narrow ' Safe Density Windows stratum Casing cementing construction risk casing pressure control well shaft fixing technology.
Specifically, including technical solution below.
The embodiment of the invention provides a kind of casing pressure control well shaft fixing technology, described sleeve pipe pressure control well shaft fixing technology successively includes: Setting of casing stage, cementing and replacement stage, bruising and time solidifying stage;
It in the setting of casing stage, the cementing and replaces stage, the bruising and waits in the solidifying stage, by controlling well Mouth annular pressure makes the shaft bottom of narrow ' Safe Density Windows well section recycle equal yield density and is maintained at the narrow ' Safe Density Windows well section Between corresponding pore pressure equal yield density and fracture pressure equal yield density.
Specifically, in the setting of casing stage, predeterminated position back seat casing hanger under described sleeve pipe lower going-into-well follows later Ring reduces drilling fluid density, and the pressure control equipment by the way that well head is arranged in applies back pressure from well head, controls well head annular pressure, makes The shaft bottom circulation equal yield density of the narrow ' Safe Density Windows well section is maintained at the corresponding hole of the narrow ' Safe Density Windows well section Between gap pressure equivalent density and fracture pressure equal yield density.
Specifically, in the cementing and in the replacement stage, the pressure control equipment by the way that well head is arranged in applies back from well head Pressure controls well head annular pressure, so that the shaft bottom of the narrow ' Safe Density Windows well section is recycled equal yield density and is maintained at the narrow peace Between the corresponding pore pressure equal yield density of theoretical density window well section and fracture pressure equal yield density, the back pressure value that is applied according to Annular space slurry rod structure situation of change is calculated.
Specifically, the cementing and replacement stage include cementing practice, note mud replacement construction and note clear water replacement Construction.
Specifically, solid according to prestressing force after carrying out note clear water replacement construction to bruising in the bruising and in the Hou Ning stage Well requires to carry out well head annular space to build the pressure Hou Ning, and the back pressure value applied needed for rod structure calculates is starched according to final annular space, passes through institute The pressure control equipment that well head is set is stated from well head application back pressure, well head annular pressure is controlled, makes the narrow ' Safe Density Windows well The shaft bottom circulation equal yield density of section is maintained at the corresponding pore pressure equal yield density of the narrow ' Safe Density Windows well section and rupture Between pressure equivalent density, after theing cement solidifies, cementing operation is completed.
Specifically, described sleeve pipe is seamless steel pipe.
Technical solution provided in an embodiment of the present invention the utility model has the advantages that
In casing pressure control well shaft fixing technology provided in an embodiment of the present invention, in casing cementing work progress, by controlling well Mouth annular pressure makes the shaft bottom circulation equal yield density of narrow ' Safe Density Windows well section be maintained at narrow ' Safe Density Windows well section corresponding Pore pressure equal yield density and fracture pressure equal yield density between, it is ensured that do not press leakage to hold while pressing steady hydrocarbon show zones position Weak formation is pressed, the risk for leading to well cementing operation failure is altered on the pressure leakage stratum that avoids conventional cannula cementing operation from occurring on oil gas, The casing cementing construction risk of narrow ' Safe Density Windows well section is substantially reduced, while cementing quality can be increased substantially, improves well Integrality meets later development production needs.
Casing pressure control well shaft fixing technology provided in an embodiment of the present invention is for conventional sandstone, carbonate and other complicated narrow peaces The casing cementing construction of theoretical density window well section is applicable in, especially suitable for high temperature and pressure ultra-deep shaft well ' Safe Density Windows well section Casing cementing construction.
Detailed description of the invention
To describe the technical solutions in the embodiments of the present invention more clearly, make required in being described below to embodiment Attached drawing is briefly described
Fig. 1 is a kind of flow chart of casing pressure control well shaft fixing technology provided in an embodiment of the present invention;
Fig. 2 is a kind of cementing operation curve graph of casing pressure control well shaft fixing technology shown according to an exemplary embodiment;
Wherein, 1. the number in Fig. 2, which represents, reduces mud density, 2. represents and adjusts mud property, 3. represents termination of pumping, back brake 4. door represents note flushing liquor, 5. represents cement injection, 6. represent termination of pumping, back brake door opens backing pin, 7. represent injection pressure plug liquid, 8. generation Table replaces drilling fluid, 9. represents and replaces clear water bruising.
Specific embodiment
To keep technical solution of the present invention and advantage clearer, below in conjunction with attached drawing to embodiment of the present invention make into One step it is described in detail.Unless otherwise defined, all technical terms used in the embodiment of the present invention all have and art technology The normally understood identical meaning of personnel.
Narrow ' Safe Density Windows well section refers to that the formation fracture pressure of the well section is not much different with formation pore pressure, drilling well The density range very little that liquid can choose, Yi Fasheng drilling complexity situation, drilling fluid density cause leakage beyond this range, are lower than This range causes cave-in chip off-falling, for this kind of well section, is easy to appear on oil gas and alters or leakage during casing cementing The problem of, cause well cementation to fail, or even safety accident can be caused.
Based on the above, referring to Fig. 1, the casing pressure control is solid the embodiment of the invention provides a kind of casing pressure control well shaft fixing technology Well technique successively includes: setting of casing stage, cementing and replaces stage, bruising and wait the solidifying stage;
In setting of casing stage, cementing and replaces stage, bruising and wait in the solidifying stage, by controlling well head annular pressure, So that the shaft bottom of narrow ' Safe Density Windows well section is recycled equal yield density (ECD) and is maintained at the corresponding hole of narrow ' Safe Density Windows well section Between pressure equivalent density and fracture pressure equal yield density.
In casing pressure control well shaft fixing technology provided in an embodiment of the present invention, in casing cementing work progress, by controlling well Mouth annular pressure makes the shaft bottom circulation equal yield density of narrow ' Safe Density Windows well section be maintained at narrow ' Safe Density Windows well section corresponding Pore pressure equal yield density and fracture pressure equal yield density between, it is ensured that do not press leakage to hold while pressing steady hydrocarbon show zones position Weak formation is pressed, the risk for leading to well cementing operation failure is altered on the pressure leakage stratum that avoids conventional cannula cementing operation from occurring on oil gas, The casing cementing construction risk of narrow ' Safe Density Windows well section is substantially reduced, while cementing quality can be increased substantially, improves well Integrality meets later development production needs.
Well head annular pressure involved in the embodiment of the present invention refers to the skill for being applied to well head production string and tripping in Annular pressure value between art casing.
Specifically, in the setting of casing stage, predeterminated position back seat hanging sleeve pipe hanger under casing lower going-into-well recycles later It reduces drilling fluid density and the pressure control equipment by the way that well head is arranged in and applies back pressure from well head, control well head annular pressure, make The shaft bottom circulation equal yield density of narrow ' Safe Density Windows well section is maintained at the corresponding pore pressure of narrow ' Safe Density Windows well section and works as Between metric density and fracture pressure equal yield density.
In the setting of casing stage, it can will be covered using casing+bruising assembly+float collar+casing shoe+guide shoe pipe pipe string combination Under pipe lower going-into-well.
Specifically, in cementing and in the replacement stage, including cementing practice, note mud replace construction and note clear water replaces Construction is injected flushing liquor into annular space by equipment such as cementing truck, slush pumps, cement slurry, tamponade liquid, replaces drilling fluid, clear water Equal liquid apply back pressure from well head by the way that the pressure control equipment of well head is arranged in above process, control well head annular pressure, make The shaft bottom circulation equal yield density of narrow ' Safe Density Windows well section is maintained at the corresponding pore pressure of narrow ' Safe Density Windows well section and works as Between metric density and fracture pressure equal yield density, the back pressure value applied is starched rod structure situation of change according to annular space and is calculated.
Specifically, it in bruising and in the Hou Ning stage, after carrying out note clear water replacement construction to bruising, is wanted according to special cementing It asks and carries out well head annular space and build the pressure Hou Ning, starch the back pressure value applied needed for rod structure calculates according to final annular space at the same time, pass through The pressure control equipment that well head is arranged in applies back pressure from well head, controls well head annular pressure, makes the well of narrow ' Safe Density Windows well section Bottoming cycle equal yield density is maintained at the corresponding pore pressure equal yield density of narrow ' Safe Density Windows well section and fracture pressure equivalent is close Between degree.After theing cement solidifies, cementing operation is completed.
Specifically, in casing pressure control well shaft fixing technology provided in an embodiment of the present invention, for controlling the control of well head annular pressure Pressure equipment may include swivel control head, self-choke control sled, back pressure compensation pump, data acquistion and control system etc..For The levels of precision embodiment of the present invention of pressure control setting is not particularly limited, can be according to the Pore Pressure of narrow ' Safe Density Windows well section Power and the gap of formation fracture pressure determine.When pore pressure and larger formation fracture pressure gap, can choose accurate The lower pressure control equipment of degree;And when pore pressure and smaller formation fracture pressure gap, it is higher to can choose levels of precision Pressure control equipment.
In casing pressure control well shaft fixing technology provided in an embodiment of the present invention, casing is oil/gas well seamless steel pipe.
Casing pressure control well shaft fixing technology provided in an embodiment of the present invention is done further in detail below by Specific construction data Thin description.
By certain casing pressure control well cementation for, Φ 311.2mm wellbore drilling after the completion of, using Φ 244.5mm casing into Row sealing 0.00m~3206.00m well section uses density 1.75g/cm when drilling well3Drilling fluid carry out fine controlled pressure drilling, control Pressure 0.5~3.0MPa of value, well safe Density Window are 1.80~1.91g/cm3
Casing pressure control well shaft fixing technology includes:
(1) setting of casing: drawn using Φ 244.5mm × TP110TS × 11.99mm casing+bruising assembly+float collar+casing shoe+ The combination of shoe joint string, under send casing to well depth 3206.00m, cover for seat pipe hanger, pressure control circulation adjustment drilling fluid density to 1.68g/cm3 Well head annular pressure is controlled in 2.2~5.69Mpa afterwards.
(2) cementing practice: well head annular pressure is controlled in 2.2~5.69Mpa, and in ground batch mixing cement slurry, water Mud vehicle positive injection flushing liquor 6.0m3(pump pressure 3.3~4.5MPa, 2.0~2.6m of discharge capacity3/ min), positive injection praise G grades of extended slurries of China 88.0m3(cement dry ash 116t is pumped 0.5~4.1MPa, 2.0~2.4m of discharge capacity3/ min, cement slurry density are averaged 1.90g/ cm3), G grades of quick-drying cement slurry 47.6m of positive injection3(cement dry ash 62.9t is pumped 0.5~4.1MPa, 2.0~2.4m of discharge capacity3/ min, Cement slurry density is averaged 1.90g/cm3), well head annular pressure is controlled in 2.2~5.69MPa, back brake door opens backing pin.
(3) note mud replaces construction: cementing truck positive injection density 1.03g/cm3Tamponade liquid 2.0m3(pump pressure 0.5~ 4.1MPa, 2.0~2.4m of discharge capacity3/ min), slush pump positive injection replaces drilling fluid 100.0m3(pump pressure 0.5~7.9MPa, discharge capacity 2.0 ~2.6m3/min)。
(4) note clear water replaces simultaneously bruising: cementing truck is just replacing density 1.0g/cm3Clear water 18.0m3(pump pressure 7.7~ 11.8MPa, 1.8~2.0m of discharge capacity3/ min), just replace density 1.0g/cm3Clear water 2.1m3(pump pressure 11.5~12.0MPa, discharge capacity 1.0~1.2m3/ min), 11.49 ↑ 25.0MPa of the vertical pressure of bruising.
(5) Hou Ning: annular space well head builds the pressure 6MPa Hou Ning, and construction is completed.
As shown in Fig. 2, after setting of casing, cover for seat pipe hanger, being dropped to guarantee that the cementing operation of casing pressure control is smoothly implemented Low drilling fluid density operation, by drilling fluid density by 1.75g/cm3It is down to 1.68g/cm3, while passing through ground pressure control equipment for well The control of mouth annular pressure is in 2.2~5.69MPa, at this point, shaft bottom circulation equal yield density is 1.86g/cm3, between formation pore pressure Power equal yield density 1.80g/cm3With formation fracture pressure equal yield density 1.91g/cm3Between, press quietly layer.In cementing and replacement In the process, under turn on pump state (be pumped not for 0), according to annular pressure lost, liquid column hydrostatic pressure situation by well head annular pressure control System makes shaft bottom circulation equal yield density between formation pore pressure and formation fracture pressure equal yield density in 0.3~3.8MPa, Press quietly layer.Under termination of pumping state (i.e. pump pressure be 0), controlled well head annular pressure 0.5 according to liquid column hydrostatic pressure situation~ 5.69MPa makes shaft bottom circulation equal yield density between formation pore pressure and formation fracture pressure equal yield density, and pressure is quietly Layer.
To sum up, it the embodiment of the invention provides a kind of casing pressure control cementing technology, is controlled, is made narrow by well head annular pressure The corresponding shaft bottom circulation equal yield density of ' Safe Density Windows well section is between formation pore pressure equal yield density and formation fracture pressure Between equal yield density, it is ensured that do not press leakage pressure-bearing weak formation while pressing steady hydrocarbon show zones position, it is close to substantially reduce narrow safety The casing cementing construction risk of window well section is spent, realizes near-banlanced cementing, improves cementing quality, improves well integrality, it is ensured that open Send out benefit.
The above is merely for convenience of it will be understood by those skilled in the art that technical solution of the present invention, not to limit The present invention.All within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in this Within the protection scope of invention.

Claims (6)

1. a kind of casing pressure control well shaft fixing technology, which is characterized in that described sleeve pipe pressure control well shaft fixing technology successively includes: setting of casing rank Section, cementing and replacement stage, bruising and time solidifying stage;
It in the setting of casing stage, the cementing and replaces stage, the bruising and waits in the solidifying stage, by controlling well head ring Pneumatics power makes the shaft bottom circulation equal yield density of narrow ' Safe Density Windows well section be maintained at the narrow ' Safe Density Windows well section corresponding Pore pressure equal yield density and fracture pressure equal yield density between.
2. casing pressure control well shaft fixing technology according to claim 1, which is characterized in that, will be oily in the setting of casing stage Predeterminated position back seat casing hanger under layer casing lower going-into-well, circulation reduces drilling fluid density and the pressure control by the way that well head is arranged in later Equipment applies back pressure from well head, controls well head annular pressure, so that the shaft bottom of the narrow ' Safe Density Windows well section is recycled equivalent close Degree is maintained between the corresponding pore pressure equal yield density of the narrow ' Safe Density Windows well section and fracture pressure equal yield density.
3. casing pressure control well shaft fixing technology according to claim 1, which is characterized in that in the cementing and replace the stage In, the pressure control equipment by the way that well head is arranged in applies back pressure from well head, controls well head annular pressure, makes the narrow Safe Density window The shaft bottom circulation equal yield density of mouthful well section be maintained at the corresponding pore pressure equal yield density of the narrow ' Safe Density Windows well section and Between fracture pressure equal yield density, the back pressure value applied is starched rod structure situation of change according to annular space and is calculated.
4. casing pressure control well shaft fixing technology according to claim 3, which is characterized in that the cementing and replace the stage include Cementing practice, note mud replace construction and note clear water replaces construction.
5. casing pressure control well shaft fixing technology according to claim 4, which is characterized in that in the bruising and in the Hou Ning stage, It carries out note clear water and replaces construction to after bruising, require to carry out well head annular space according to special cementing and build the pressure Hou Ning, and according to final Annular space starches the back pressure value applied needed for rod structure calculates, applies back pressure from well head by the pressure control equipment that well head is arranged in, Well head annular pressure is controlled, so that the shaft bottom circulation equal yield density of the narrow ' Safe Density Windows well section is maintained at the narrow safety close It spends between the corresponding pore pressure equal yield density of window well section and fracture pressure equal yield density, after theing cement solidifies, completes well cementation Construction.
6. described in any item casing pressure control well shaft fixing technologies according to claim 1~5, which is characterized in that described sleeve pipe is seamless Steel pipe.
CN201711030180.8A 2017-10-30 2017-10-30 Casing pressure control well cementation process Pending CN109723402A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711030180.8A CN109723402A (en) 2017-10-30 2017-10-30 Casing pressure control well cementation process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711030180.8A CN109723402A (en) 2017-10-30 2017-10-30 Casing pressure control well cementation process

Publications (1)

Publication Number Publication Date
CN109723402A true CN109723402A (en) 2019-05-07

Family

ID=66291680

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711030180.8A Pending CN109723402A (en) 2017-10-30 2017-10-30 Casing pressure control well cementation process

Country Status (1)

Country Link
CN (1) CN109723402A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110593856A (en) * 2019-10-21 2019-12-20 中国石油集团川庆钻探工程有限公司 Method for measuring density window of well cementation safety operation
CN110984903A (en) * 2019-09-09 2020-04-10 中国石油天然气股份有限公司 Well cementing method, well cementing device and storage medium
CN111058794A (en) * 2019-11-26 2020-04-24 中国石油天然气股份有限公司 Control method and device for applying back pressure to annulus
CN111395965A (en) * 2020-03-23 2020-07-10 中国石油天然气集团有限公司 Safe casing running operation method suitable for easily-leaking stratum
CN113338849A (en) * 2021-07-13 2021-09-03 中石化石油工程技术服务有限公司 Well cementation method for high-temperature oil and gas well
CN116163673A (en) * 2023-04-25 2023-05-26 中国石油大学(华东) Micro-pressure control device and method for deep water shallow gradient well cementation circulating wellhead

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080264690A1 (en) * 2007-04-26 2008-10-30 Waqar Khan Method and apparatus for programmable pressure drilling and programmable gradient drilling, and completion
CN102877812A (en) * 2012-09-14 2013-01-16 中国石油大学(华东) Method of balancing pressure for well cementation
CN106285554A (en) * 2016-09-07 2017-01-04 中国石油大学(华东) Wellbore pressure control system and method for the stage of cementing the well
CN106437609A (en) * 2016-10-14 2017-02-22 西南石油大学 Whole-process leakage-plugging and well-cementing design method for high-temperature and high-pressure ultra-deep well

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080264690A1 (en) * 2007-04-26 2008-10-30 Waqar Khan Method and apparatus for programmable pressure drilling and programmable gradient drilling, and completion
CN102877812A (en) * 2012-09-14 2013-01-16 中国石油大学(华东) Method of balancing pressure for well cementation
CN106285554A (en) * 2016-09-07 2017-01-04 中国石油大学(华东) Wellbore pressure control system and method for the stage of cementing the well
CN106437609A (en) * 2016-10-14 2017-02-22 西南石油大学 Whole-process leakage-plugging and well-cementing design method for high-temperature and high-pressure ultra-deep well

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
郭继刚: "精细动态控压固井技术在顺南区块的应用", 《钻井液与完井液》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110984903A (en) * 2019-09-09 2020-04-10 中国石油天然气股份有限公司 Well cementing method, well cementing device and storage medium
CN110984903B (en) * 2019-09-09 2022-07-05 中国石油天然气股份有限公司 Well cementing method, well cementing device and storage medium
CN110593856A (en) * 2019-10-21 2019-12-20 中国石油集团川庆钻探工程有限公司 Method for measuring density window of well cementation safety operation
CN111058794A (en) * 2019-11-26 2020-04-24 中国石油天然气股份有限公司 Control method and device for applying back pressure to annulus
CN111395965A (en) * 2020-03-23 2020-07-10 中国石油天然气集团有限公司 Safe casing running operation method suitable for easily-leaking stratum
CN111395965B (en) * 2020-03-23 2022-03-01 中国石油天然气集团有限公司 Safe casing running operation method suitable for easily-leaking stratum
CN113338849A (en) * 2021-07-13 2021-09-03 中石化石油工程技术服务有限公司 Well cementation method for high-temperature oil and gas well
CN113338849B (en) * 2021-07-13 2022-12-30 中石化石油工程技术服务有限公司 Well cementation method for high-temperature oil and gas well
CN116163673A (en) * 2023-04-25 2023-05-26 中国石油大学(华东) Micro-pressure control device and method for deep water shallow gradient well cementation circulating wellhead

Similar Documents

Publication Publication Date Title
CN109723402A (en) Casing pressure control well cementation process
CN109723403A (en) Tail pipe pressure control well cementation process
CN102493788B (en) Drainage gas recovery method for high-coal-rank coal bed gas well
CN110821454B (en) Downhole pulse generating device driven by oil pipe transmission and injection method
CN108915635A (en) Method for preventing gas channeling after cementing of high-pressure gas well tail pipe
CN109267984A (en) Construction method for opening fracturing channel
CN104153738A (en) Blocking controlling and leaking stopping tool assembly and leaking stopping method applied to drilling engineering
CN110374570A (en) A kind of bi-lateral horizontal well naked eye staged fracturing construction method
CN113187459B (en) Carbon dioxide acid fracturing method for ultra-deep well carbonate rock reservoir transformation
CN112360368B (en) Oil well water plugging method
CN110410030B (en) Composite material application repairing pipe column and method
CN112302605B (en) Shale gas horizontal well subsection repeated fracturing method
CN218563649U (en) Reservoir transformation system for ground leaching production well
RU2379472C1 (en) Method of well's horizontal borehole part repair insulation works
CN204175210U (en) A kind of changeable flow controlled pressure drilling return pressure compensation device
CN214997551U (en) Hydraulic control type pipe string fishing booster
CN106321053A (en) Oil and gas well production increasing method
CN110630213B (en) Ultra-deep narrow-gap liner cementing method with stratum invader
CN108005612A (en) Five open time deep well annular pressure management method
CN108086943A (en) Three open time deepwater drilling annular pressure management method
CN112780238B (en) Method for exploiting limestone light oil reservoir
CN114607313A (en) Solid-phase-free gel plugging method
CN109723377B (en) Open hole well completion reservoir integrated transformation method for window-opening side drilling
CN112832724A (en) Drainage and production integrated tubular column capable of intelligently controlling pressure of shaft and use method of drainage and production integrated tubular column
CN111154467B (en) Open hole section shaft treatment fluid and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190507

RJ01 Rejection of invention patent application after publication