CN109719161A - Correcting device and correcting method for welding deformation of steel box girder panel - Google Patents
Correcting device and correcting method for welding deformation of steel box girder panel Download PDFInfo
- Publication number
- CN109719161A CN109719161A CN201811630925.9A CN201811630925A CN109719161A CN 109719161 A CN109719161 A CN 109719161A CN 201811630925 A CN201811630925 A CN 201811630925A CN 109719161 A CN109719161 A CN 109719161A
- Authority
- CN
- China
- Prior art keywords
- door frame
- steel box
- jack
- deformation
- sides
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 47
- 239000010959 steel Substances 0.000 title claims abstract description 47
- 238000003466 welding Methods 0.000 title claims abstract description 22
- 238000000034 method Methods 0.000 title abstract description 4
- 238000012937 correction Methods 0.000 claims abstract description 10
- 239000000729 antidote Substances 0.000 claims description 6
- 238000010276 construction Methods 0.000 abstract description 7
- 238000010586 diagram Methods 0.000 description 3
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 229940075522 antidotes Drugs 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Butt Welding And Welding Of Specific Article (AREA)
Abstract
A correction device for welding deformation of a steel box girder panel comprises portal upright columns on two sides, portal cross beams, a movable trolley, jacks and trays; the two side portal upright columns are fixedly connected to two sides of the deformation position of the steel box girder panel, the portal cross beams are installed between the two side portal upright columns, the moving trolley penetrates into the portal cross beams, the tray is arranged at the bottom of the moving trolley, the jack is arranged in the tray, and the moving trolley and the tray are connected through a guide chain. The movable trolley slides by tightening the guide chain, so that the jack moves to the deformed steel box girder panel; the jack is shaken to jack the steel box girder panel and the portal beam tightly until the deformation is corrected; and moving the jack to other deformation positions by tightening the guide chain to continuously correct the steel box girder panel until all corrections are finished. The method can be suitable for correcting the deformation generated when the steel structure panel with larger thickness is welded on any construction site.
Description
Technical field
The invention belongs to construction steel structure installing areas, are related to a kind of apparatus for correcting for steel box-girder panel welding deformation
And antidote.
Background technique
Welding deformation is a kind of common phenomenon, at present for welding at the construction field (site) to the biggish steel box-girder panel of thickness
Generated deformation can not also be heated by flame, mechanical and millwork equipment carries out welding correction to it.
Summary of the invention
The object of the present invention is to provide a kind of apparatus for correcting for steel box-girder panel welding deformation, the apparatus for correcting is general
Property is strong, assembly operation is simple, reusable, is applicable to any construction site and welds to the biggish steel structure panel of thickness
The correction of the deformation generated when connecing.
It is a further object of the present invention to provide the antidotes of the above-mentioned apparatus for correcting for steel box-girder panel welding deformation.
As above design, the technical scheme is that a kind of apparatus for correcting for steel box-girder panel welding deformation, special
Sign is: including two sides door frame column, door frame crossbeam, moving trolley, jack and pallet;The two sides door frame column is fixed in
Steel box-girder panel deformation position two sides, the door frame crossbeam are mounted between the door frame column of two sides, and the moving trolley is through to
In door frame crossbeam, the pallet is placed in moving trolley bottom, and the jack is placed in pallet, the moving trolley and the support
It is connected between disk using guide chain.
Above-mentioned door frame crossbeam is mounted between the door frame column of two sides and is bolted.
Above-mentioned door frame crossbeam uses I-steel.
The antidote of the above-mentioned apparatus for correcting for steel box-girder panel welding deformation, includes the following steps:
1. two sides door frame column is welded on steel box-girder panel deformation position two sides;
2. moving trolley is through in I-shaped door frame crossbeam, door frame crossbeam is mounted between the door frame column of two sides simultaneously
It is tightened by bolt;
3. pallet is placed in moving trolley bottom, jack is placed in pallet;
4. using guide chain connection moving trolley and pallet;
5. tightening guide chain, the steel box-girder positions of panels that moving trolley makes jack be moved to deformation is slided;
6. putting down jack, shakes jack and hold out against steel box-girder panel and door frame crossbeam, until straightening;
7. tightening guide chain, jack is moved to its other deformation position and continues to correct steel box-girder panel, until
All correction is completed;
8. inversely removing device after welding deformation is corrected.
The present invention slides moving trolley by tightening guide chain, and jack is made to be moved to the steel box-girder positions of panels of deformation;
By putting down jack, shakes jack and hold out against steel box-girder panel and door frame crossbeam, until straightening;Passing through tightening guide chain
Jack is moved to its other deformation position to continue to correct steel box-girder panel, until all correction is completed.Therefore, originally
It invents that versatile, assembly operation is simple, reusable, is applicable to any biggish steel construction of construction site throat thickness
The correction of the deformation generated when panel.
Detailed description of the invention:
Fig. 1 is the structural schematic diagram for the apparatus for correcting of steel box-girder panel welding deformation;
Fig. 2 is the schematic diagram of Fig. 1 interior joint 1.;
Fig. 3 is the schematic diagram of Fig. 1 interior joint 2.;
Fig. 4 is the scheme of installation of moving trolley and door frame crossbeam.
In figure: 1-door frame column;2-steel box-girder panels;3-moving trolleys;4-door frame crossbeams;5-bolts;6-thousand
Jin top;7-pallets;8-guide chains.
Specific embodiment
As shown in the figure: a kind of apparatus for correcting for steel box-girder panel welding deformation, including two sides door frame column, door frame are horizontal
Beam, moving trolley, jack and pallet;The two sides door frame column is fixed in steel box-girder panel deformation position two sides, the door
Frame crossbeam is mounted between the door frame column of two sides by bolt, and the moving trolley is through in door frame crossbeam, and the pallet is set
In moving trolley bottom, the jack is placed in pallet, is connected between the moving trolley and the pallet using guide chain.On
Door frame crossbeam is stated using I-steel.
The antidote of the above-mentioned apparatus for correcting for steel box-girder panel welding deformation, includes the following steps:
1. two sides door frame column is welded on steel box-girder panel deformation position two sides;
2. moving trolley is through in I-shaped door frame crossbeam, door frame crossbeam is mounted between the door frame column of two sides simultaneously
It is tightened by bolt;
3. pallet is placed in moving trolley bottom, jack (6) is placed in pallet;
4. using guide chain connection moving trolley and pallet;
5. tightening guide chain, the steel box-girder positions of panels that moving trolley makes jack be moved to deformation is slided;
6. putting down jack, shakes jack and hold out against steel box-girder panel and door frame crossbeam, until straightening
7. tightening guide chain, jack is moved to its other deformation position and continues to correct steel box-girder panel, until
All correction is completed;
8. inversely removing device after welding deformation is corrected.
The present invention provides a kind of new door frame counter-force return back to top device and return back to top method, it can be achieved that at the construction field (site) welding it is thick
Spend the correction of produced deformation when biggish steel box-girder panel.
The above described is only a preferred embodiment of the present invention, not making in any form to structure of the invention
Limitation.Any simple modification, equivalent change and modification to the above embodiments according to the technical essence of the invention,
In the range of still falling within technical solution of the present invention.
Claims (4)
1. a kind of apparatus for correcting for steel box-girder panel welding deformation, it is characterised in that: horizontal including two sides door frame column, door frame
Beam, moving trolley, jack and pallet;The two sides door frame column is fixed in steel box-girder panel deformation position two sides, the door
Frame crossbeam is mounted between the door frame column of two sides, and the moving trolley is through in door frame crossbeam, and it is small that the pallet is placed in movement
Vehicle bottom, the jack are placed in pallet, are connected between the moving trolley and the pallet using guide chain.
2. the apparatus for correcting according to claim 1 for steel box-girder panel welding deformation, it is characterised in that: above-mentioned door frame
Crossbeam is mounted between the door frame column of two sides and is bolted.
3. the apparatus for correcting according to claim 1 for steel box-girder panel welding deformation, it is characterised in that: above-mentioned door frame
Crossbeam uses I-steel.
4. a kind of antidote of the apparatus for correcting according to claim 1 for steel box-girder panel welding deformation, special
Sign is: including the following steps:
1. two sides door frame column is welded on steel box-girder panel deformation position two sides;
2. moving trolley is through in I-shaped door frame crossbeam, door frame crossbeam is mounted between the door frame column of two sides and is passed through
Bolt is tightened;
3. pallet is placed in moving trolley bottom, jack is placed in pallet;
4. using guide chain connection moving trolley and pallet;
5. tightening guide chain, the steel box-girder positions of panels that moving trolley makes jack be moved to deformation is slided;
6. putting down jack, shakes jack and hold out against steel box-girder panel and door frame crossbeam, until straightening;
7. tightening guide chain, jack is moved to its other deformation position and continues to correct steel box-girder panel, until all
Correction is completed;
8. inversely removing device after welding deformation is corrected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811630925.9A CN109719161A (en) | 2018-12-29 | 2018-12-29 | Correcting device and correcting method for welding deformation of steel box girder panel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811630925.9A CN109719161A (en) | 2018-12-29 | 2018-12-29 | Correcting device and correcting method for welding deformation of steel box girder panel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109719161A true CN109719161A (en) | 2019-05-07 |
Family
ID=66296032
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811630925.9A Pending CN109719161A (en) | 2018-12-29 | 2018-12-29 | Correcting device and correcting method for welding deformation of steel box girder panel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109719161A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112322311A (en) * | 2020-10-20 | 2021-02-05 | 中国十九冶集团有限公司 | Online correction device and method for side bending of pushing ram |
CN112692106A (en) * | 2020-12-21 | 2021-04-23 | 包头双马动力科技有限公司 | Correction method suitable for protecting high-strength steel welding window cover |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BE744545A (en) * | 1969-01-18 | 1970-07-01 | Vidal Sario Javier | PROCESS FOR MANUFACTURING LARGE-DIMENSIONAL STRUCTURAL TUBES IN RELATIVELY REDUCED SERIES |
CN202343643U (en) * | 2011-10-13 | 2012-07-25 | 安徽鸿路钢结构(集团)股份有限公司 | H-steel flange plate wave flame straightening clamp |
CN103230965A (en) * | 2013-04-18 | 2013-08-07 | 安徽鸿路钢结构(集团)股份有限公司 | Welding deformation flatness correction method of finished steel crane beam |
CN104959403A (en) * | 2015-06-19 | 2015-10-07 | 防城港中一重工有限公司 | Auxiliary adjuster for hot straightening for deformation of solid-web type girder web and using method thereof |
CN105195557A (en) * | 2015-10-16 | 2015-12-30 | 重庆宝汇建筑材料有限公司 | Cross steel column end correction device convenient to transfer |
CN205253776U (en) * | 2015-12-04 | 2016-05-25 | 中冶宝钢技术服务有限公司 | Movable rectifies frock |
CN105645260A (en) * | 2016-04-15 | 2016-06-08 | 桑大勇 | Suspended walking combined gantry crane |
CN108941258A (en) * | 2017-05-26 | 2018-12-07 | 五冶集团上海有限公司 | Utilize the method for apparatus for correcting correction Simple process steel construction |
-
2018
- 2018-12-29 CN CN201811630925.9A patent/CN109719161A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BE744545A (en) * | 1969-01-18 | 1970-07-01 | Vidal Sario Javier | PROCESS FOR MANUFACTURING LARGE-DIMENSIONAL STRUCTURAL TUBES IN RELATIVELY REDUCED SERIES |
CN202343643U (en) * | 2011-10-13 | 2012-07-25 | 安徽鸿路钢结构(集团)股份有限公司 | H-steel flange plate wave flame straightening clamp |
CN103230965A (en) * | 2013-04-18 | 2013-08-07 | 安徽鸿路钢结构(集团)股份有限公司 | Welding deformation flatness correction method of finished steel crane beam |
CN104959403A (en) * | 2015-06-19 | 2015-10-07 | 防城港中一重工有限公司 | Auxiliary adjuster for hot straightening for deformation of solid-web type girder web and using method thereof |
CN105195557A (en) * | 2015-10-16 | 2015-12-30 | 重庆宝汇建筑材料有限公司 | Cross steel column end correction device convenient to transfer |
CN205253776U (en) * | 2015-12-04 | 2016-05-25 | 中冶宝钢技术服务有限公司 | Movable rectifies frock |
CN105645260A (en) * | 2016-04-15 | 2016-06-08 | 桑大勇 | Suspended walking combined gantry crane |
CN108941258A (en) * | 2017-05-26 | 2018-12-07 | 五冶集团上海有限公司 | Utilize the method for apparatus for correcting correction Simple process steel construction |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112322311A (en) * | 2020-10-20 | 2021-02-05 | 中国十九冶集团有限公司 | Online correction device and method for side bending of pushing ram |
CN112692106A (en) * | 2020-12-21 | 2021-04-23 | 包头双马动力科技有限公司 | Correction method suitable for protecting high-strength steel welding window cover |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109555319B (en) | Automatic bundling equipment for reinforcing mesh | |
CN109719161A (en) | Correcting device and correcting method for welding deformation of steel box girder panel | |
KR101648977B1 (en) | Jig device for floor frame assembling of special vehicle loading box | |
CN103643667A (en) | Ship lift nut column installation auxiliary adjustment method | |
CN112027022B (en) | Ultra-wide bilge section construction method | |
CN117259499B (en) | H-shaped steel straightening device for steel truss and straightening method thereof | |
CN105817821A (en) | Quick assembly welding device for freight forklift | |
CN105499890A (en) | Steel-structured multipurpose assembling machine | |
CN205325081U (en) | Steel construction multipurpose assemblage machine | |
CN204584619U (en) | A kind of narrow laser assembly solder device | |
CN105714935A (en) | AP1000 superposed dome assembling technology | |
CN211765535U (en) | Door frame structure and rail vehicle | |
CN107350819B (en) | Trial production line based on two-layer steel structure platform | |
KR101518248B1 (en) | Jig device for the production of construction lift mast | |
TW201315563A (en) | Box column assembly equipment and method | |
CN210025139U (en) | Wheel pulling device | |
CN209811562U (en) | Bogie frame assembly welding tool based on welding flexible platform | |
CN109396825B (en) | Assembly and conveying device for rear end beam of special vehicle | |
CN218426563U (en) | Diaphragm plate positioning device | |
CN115958343B (en) | Automatic positioning, assembling and welding equipment and method for corrugated steel plates | |
CN219675986U (en) | Non-surface inspection tool for surface treatment of plate and plate processing line | |
CN216576576U (en) | Automatic frame production line | |
CN211192670U (en) | Rail transit locomotive top skeleton welding strutting arrangement | |
CN216713964U (en) | Assembled equipment housing | |
CN221734462U (en) | Device for correcting deformation of welded rear axle panel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |