CN109711565A - Property facility maintenance of equipment dispatching method and its system, property total management system - Google Patents

Property facility maintenance of equipment dispatching method and its system, property total management system Download PDF

Info

Publication number
CN109711565A
CN109711565A CN201811511930.8A CN201811511930A CN109711565A CN 109711565 A CN109711565 A CN 109711565A CN 201811511930 A CN201811511930 A CN 201811511930A CN 109711565 A CN109711565 A CN 109711565A
Authority
CN
China
Prior art keywords
maintenance
master worker
property
equipment
resource
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811511930.8A
Other languages
Chinese (zh)
Inventor
代颖娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Yuehua Property Co Ltd
Original Assignee
Guangzhou Yuehua Property Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Yuehua Property Co Ltd filed Critical Guangzhou Yuehua Property Co Ltd
Priority to CN201811511930.8A priority Critical patent/CN109711565A/en
Publication of CN109711565A publication Critical patent/CN109711565A/en
Pending legal-status Critical Current

Links

Abstract

The present invention relates to property facility maintenance of equipment dispatching method and its systems, property total management system.The property total management system includes mutually independent property facility maintenance of equipment scheduling system and property quality checking system.When in use, property facility maintenance of equipment scheduling system need to match the property total management system with a property facility maintenance of equipment dispatching method, and property quality checking system need to be matched with a property quality check method.The present invention judges whether there is corresponding Maintenance Resource by resource module, to avoid maintenance personal from wasting time to repair because not having Maintenance Resource.Meanwhile by judging that the time of master worker and maintenance master worker arrival maintenace point on duty are repaired in operation, carry out the work of reasonable arrangement maintenance master worker.Human resources can be made to obtain rationally reducing the operating cost of property using arrangement in this way.

Description

Property facility maintenance of equipment dispatching method and its system, property total management system
Technical field
The present invention relates to Property Management System technical field, in particular to property facility maintenance of equipment dispatching method and its it is System, property total management system.
Background technique
Estate management refers to owner to shared building, field in the shared part of condominium ownership and building zoning Building that institute, the common management of facility or commission property service enterprise, other administrators share owner, facility, equipment, The activity that place, place are managed.Property rights law regulation, owner can voluntarily manage property, service for infrastructure can also be entrusted to look forward to Industry or other managers are managed.
Facility, equipment in cell etc. are easy to appear problem after long-term use.It goes to tie up before needing the maintenance personal of profession It repairs.When existing property is scheduled management to maintenance personal, the work of maintenance master worker cannot be arranged well according to the actual situation Make, so that state of the human resources often in waste.The operating cost that will lead to property in this way increases.For this purpose, it is proposed that Property facility maintenance of equipment dispatching method and its system, property total management system.
Summary of the invention
Based on this, it is necessary to ineffective so that manpower provides because coordinating and managing for property in maintenance master worker's scheduling process Source often in waste state and provide service for infrastructure operating cost the problem of, a kind of property facility maintenance of equipment tune is provided Degree method judges whether there is Maintenance Resource corresponding with the type by maintenance of equipment by resource module to avoid repairing Personnel waste time to repair because not having Maintenance Resource.The most fast of maintenace point is reached by judging that master worker one is repaired in operation simultaneously Whether the time one is less than the most fast time two that maintenance master worker on duty reaches the maintenace point, carrys out the work of reasonable arrangement maintenance master worker Make, so that human resources are rationally utilized.
The technical solution of the one of embodiment of the present invention is that property facility maintenance of equipment dispatching method is used for property Reasonable arrangement scheduling is carried out to the work of property maintenance personal in total management system, the property total management system includes Receiving module, resource module and backstage assignment module, the receiving module are used to receive the electronic maintenance that the owner uploads Equipment application information records the quantity for the Maintenance Resource that maintenance need to use in the resource module, which is characterized in that described in real time Property facility maintenance of equipment dispatching method the following steps are included:
S21, the receiving module obtain the electronic maintenance equipment application information, and according to electronic maintenance equipment Shen Please the Maintenance Resource that need to use of information judgement maintenance, the electronic maintenance equipment application information includes maintenace point;
S22, judge currently whether there is the required Maintenance Resource in the resource module, when having the Maintenance Resource, Then carry out step S23;
S23, judge whether scene has maintenance master worker to be in working condition to be repaired, that is, judge whether scene has dimension on duty Master worker is repaired, is, then carries out step S24;
S24, judge whether scene has maintenance master worker in working condition Under Repair, that is, judge whether scene has operation Master worker one is repaired, is then to carry out step S25;
S25, judge that whether the operation maintenance master worker one reaches the most fast time one of the maintenace point less than described on duty Maintenance master worker reaches the most fast time two of the maintenace point, is then to carry out step S26;
After S26, the backstage assignment module assign the operation maintenance master worker one to terminate the maintenance task in hand, then go to institute Maintenace point is stated to repair.
Further, when scene is without the maintenance master worker on duty, the property facility maintenance of equipment dispatching method is also Include:
S27, judge whether scene has operation to repair master worker two, be to carry out step S26, otherwise carry out step S28;
S28, determine that maintenance master worker in having a holiday, executes step after can not handling the electronic maintenance equipment application information S29;
S29, according to the electronic maintenance equipment application information, the backstage assignment module judges the electronic maintenance equipment Shen Please information it is whether urgent, when the electronic maintenance equipment application information is not urgent, then carry out step S210;
S210, it goes to repair again after the maintenance master worker has had a holiday.
Further, when judging that the electronic maintenance equipment application information is urgent, the property facility maintenance of equipment scheduling Method further include:
S211, it goes to repair before recalling the maintenance master worker being on furlough immediately.
Further, it is greater than the dimension on duty when the most fast time one that operation maintenance master worker one reaches the maintenace point When repairing master worker and reaching most fast time two of the maintenace point, the property facility maintenance of equipment dispatching method further include:
S212, the maintenance master worker on duty is assigned to go to repair.
Further, when scene no operation maintenance master worker a period of time, then step S212 is carried out.
Further, when in the resource module currently without the required Maintenance Resource, the property facility is set Standby Maintenance Scheduling method further include:
S213, judge whether scene has operation to repair master worker three, be to carry out step S26, otherwise carry out step S214;
S214, the supplement Maintenance Resource, then carry out step S23.
Further, the electronic maintenance equipment application information further include maintenance of equipment title, maintenance of equipment photo and Repair content.
Further, the property total management system further includes intercom system, the intercom system, receiving module, money Source module and backstage assignment module are mutually indepedent, and the backstage assignment module is repaired by the intercom system and the operation Master worker one, operation maintenance master worker two, operation maintenance master worker three and maintenance master worker on duty connection, to judge it is described whether scene has Operation maintenance master worker one, operation maintenance master worker two, operation repair master worker three and maintenance master worker on duty and judge the operation Whether the most fast time one that maintenance master worker reaches the maintenace point, which is less than the maintenance master worker one on duty, reaches the maintenace point The most fast time two.
The present invention also proposes property facilities and equipment Maintenance Scheduling system, is used to cooperate the property facility maintenance of equipment Dispatching method, and property facility maintenance of equipment scheduling system is in property total management system and to the work of maintenance personal Make to carry out reasonable arrangement scheduling, the property total management system includes that mould is assigned on receiving module, resource module and backstage Block, the receiving module are used to receive the electronic maintenance equipment application information that the owner uploads, in the resource module in real time The quantity for the Maintenance Resource that maintenance need to use is recorded, the property facility maintenance of equipment scheduling system includes:
Information analysis module is used for when the receiving module obtains the electronic maintenance equipment application information, according to The Maintenance Resource that the electronic maintenance equipment application information judgement maintenance need to use, the electronic maintenance equipment application information Including maintenace point;
Resource judgment module is used to judge in the resource module currently whether thering is the required Maintenance Resource;
Working condition judgment module one is used for when having the Maintenance Resource in the resource module, judges that judgement is existing Whether field has maintenance master worker to be in working condition to be repaired, that is, judges whether scene has maintenance master worker on duty;
Working condition judgment module two is used to have maintenance master worker on duty to judge whether scene has maintenance for the moment when scene Master worker is in working condition Under Repair, that is, judges whether scene has operation to repair master worker one;
Compare judgment module, be used to judge operation maintenance master worker one reach the most fast time of the maintenace point first is that The no most fast time two that the maintenace point is reached less than the maintenance master worker on duty;
Assignment module is used to reach the most fast time one of the maintenace point less than described as operation maintenance master worker one Maintenance master worker on duty reaches the most fast time two of the maintenace point, and the maintenance for assigning the operation maintenance master worker one to terminate in hand is appointed After business, then the maintenace point is gone to repair.
In addition the present invention also proposes property total management system, be used to synthesize and coordinate every affairs in management cell, The property total management system includes and the matching used property facility of the property facility maintenance of equipment dispatching method System is dispatched in maintenance of equipment
Compared with prior art, beneficial effects of the present invention are as follows:
1, the present invention judges whether there is corresponding Maintenance Resource by resource module, to avoid maintenance personal because not repairing Resource and waste time to repair.Meanwhile by judging that the time of master worker and maintenance master worker arrival maintenace point on duty are repaired in operation, Carry out the work of reasonable arrangement maintenance master worker.Human resources can be made to obtain rationally reducing the operation of property using arrangement in this way Cost.
2, the present invention is by realizing supervision indirectly in such a way that property is from dual evaluation of the evaluation with his evaluation of owner The effect of maintenance personal's field maintenance quality.And the corresponding rewards and punishments measure of maintenance personal is given to adjust according to the quality of field maintenance The enthusiasm and conscientious property of dynamic maintenance personal's work, finally also ensure while improving residential property service quality well The life of owner.
Detailed description of the invention
It is more particularly described by the preferred embodiment of the present invention shown in the drawings, the above and other purpose of the present invention, feature It will be become more fully apparent with advantage.Identical appended drawing reference indicates identical part in all the attached drawings, and not deliberately by real Size equal proportion scaling in border draws attached drawing, it is preferred that emphasis is shows this purport.
Fig. 1 is property facility maintenance of equipment dispatching method flow chart.
Fig. 2 property quality check method flow chart.
Specific embodiment
To facilitate the understanding of the present invention, below with reference to relevant drawings to being originally described more fully.
It should be noted that it can be directly to separately when an element is considered as " connection " another element One element and it is in combination be integrated, or may be simultaneously present centering elements.Term as used herein " installation ", " one End ", " other end " and similar statement are for illustrative purposes only.
Unless otherwise defined, the technology of all technical and scientific terms used herein and the technical field for belonging to this The normally understood meaning of personnel is identical.Term used in book described herein is intended merely to the mesh of description specific embodiment , it is not intended that in the limitation present invention.Term " and or " used herein includes one or more relevant listed items Any and all combinations.
Existing residential property all establishes electronic record to building information, owner's archive information and garage information etc., still For managing substantially also in the stage of papery for cell, the efficiency of management is low.To improve this drawback, the present invention is proposed Property total management system.
The property total management system includes mutually independent property facility maintenance of equipment scheduling system and property product Matter checking system.When in use, system is dispatched in property facility maintenance of equipment need to be with a property for the property total management system Facilities and equipment Maintenance Scheduling method matches, property quality checking system need to a property quality check method is mating makes With.Property can be effectively improved by the running of above system to provide to the efficiency of management of cell, while also for cell owner The one strong safety of part and quality assurance.System and property facility equipment will be dispatched to property facility maintenance of equipment below Maintenance Scheduling method, property quality checking system and property quality check method are described in detail respectively.
Embodiment 1
Property facility maintenance of equipment dispatching method, is used for the work in property total management system to property maintenance personal Carry out reasonable arrangement scheduling.The property total management system includes receiving module, resource module and backstage assignment module. The receiving module is used to receive the electronic maintenance equipment application information that the owner uploads.It is recorded in real time in the resource module Repair the quantity for the Maintenance Resource that need to be used.
With reference to Fig. 1, the property facility maintenance of equipment dispatching method the following steps are included:
S21, the receiving module obtain the electronic maintenance equipment application information, and according to electronic maintenance equipment Shen It please the Maintenance Resource that need to use of information judgement maintenance.The Maintenance Resource is the maintenance such as multimeter, filter, screwdriver Apparatus.The electronic maintenance equipment application information includes maintenace point.The electronic maintenance equipment application information further includes that maintenance is set Standby title, maintenance of equipment photo and maintenance content.It is all could fill out in above-mentioned electronic maintenance equipment application information a Shen Please it is single in.
S22, judge currently whether there is the required Maintenance Resource in the resource module, when having the Maintenance Resource, Then carry out step S23;Not when the required Maintenance Resource, then step S213 is carried out;
S23, judge whether scene has maintenance master worker to be in working condition to be repaired, that is, judge whether scene has dimension on duty Master worker is repaired, is, then carries out step S24;When scene is without the maintenance master worker on duty, then step S27 is carried out;
S24, judge whether scene has maintenance master worker in working condition Under Repair, that is, judge whether scene has operation Master worker one is repaired, is then to carry out step S25;Scene for the moment, then carries out step S212 without operation maintenance master worker
S25, judge that whether the operation maintenance master worker one reaches the most fast time one of the maintenace point less than described on duty Maintenance master worker reaches the most fast time two of the maintenace point, is then to carry out step S26;When the operation, maintenance master worker one is reached When the most fast time one of the maintenace point reaches most fast time two of the maintenace point greater than the maintenance master worker on duty, then carry out Step S212;
After S26, the backstage assignment module assign the operation maintenance master worker one to terminate the maintenance task in hand, then go to institute Maintenace point is stated to repair;
S27, judge whether scene has operation to repair master worker two, be to carry out step S26, otherwise carry out step S28;
S28, determine that maintenance master worker in having a holiday, executes step after can not handling the electronic maintenance equipment application information S29;
S29, according to the electronic maintenance equipment application information, the backstage assignment module judges the electronic maintenance equipment Shen Please information it is whether urgent, when the electronic maintenance equipment application information is not urgent, then carry out step S210;The electronic maintenance equipment Shen Please information it is urgent when, then carry out step S211;The backstage assignment module reads the maintenance content, to distinguish the electronics dimension It is promptly whether urgent to repair equipment application information;
S210, it goes to repair again after the maintenance master worker has had a holiday;
S211, it goes to repair before recalling the maintenance master worker being on furlough immediately;
S212, the maintenance master worker on duty is assigned to go to repair;
S213, judge whether scene has operation to repair master worker three, be to carry out step S26, otherwise carry out step S214;
S214, the supplement Maintenance Resource, then carry out step S23.
Wherein, the property total management system further includes intercom system.The intercom system, receiving module, resource mould Block and backstage assignment module are mutually indepedent.Intercom system includes intercom and the wireless transmitter for receiving intercom signal. Intercom, which is matched, to be stayed on each master worker.The backstage assignment module by the intercom system and the operation repair master worker one, Master worker two, operation maintenance master worker three and maintenance master worker on duty connection are repaired in operation, to judge whether scene has the operation to tie up It repairs master worker one, operation maintenance master worker two, operation maintenance master worker three and maintenance master worker on duty and judges the operation repair technician Fu reach the maintenace point the most fast time one whether be less than it is described it is on duty maintenance master worker one reach the maintenace point it is most fast when Between two.Wherein, operation maintenance master worker one, operation repair master worker two as the content that operation maintenance this three of master worker three refers to, This three all refers to maintenance master worker, and three does not distinguish.
In the present embodiment, corresponding Maintenance Resource is judged whether there is by resource module, to avoid maintenance personal because not having Maintenance Resource and waste time to repair.Meanwhile by judging that master worker is repaired in operation and maintenance master worker on duty reaches maintenace point Time carrys out the work of reasonable arrangement maintenance master worker.Human resources can be made to obtain rationally reducing property using arrangement in this way Operating cost.
For the use for cooperating property facilities and equipment Maintenance Scheduling method, the present embodiment also proposes that the maintenance of property facilities and equipment is adjusted Degree system.Property facility maintenance of equipment scheduling system in property total management system and to the work of maintenance personal into Row is reasonable to arrange scheduling.The property total management system includes receiving module, resource module and backstage assignment module.Institute State the electronic maintenance equipment application information that receiving module is uploaded for receiving the owner.Dimension is recorded in the resource module in real time Repair the quantity for the Maintenance Resource that need to be used.System is dispatched in the property facility maintenance of equipment
Information analysis module is used for when the receiving module obtains the electronic maintenance equipment application information, according to The Maintenance Resource that the electronic maintenance equipment application information judgement maintenance need to use, the electronic maintenance equipment application information Including maintenace point;
Resource judgment module is used to judge in the resource module currently whether thering is the required Maintenance Resource;
Working condition judgment module one is used for when having the Maintenance Resource in the resource module, judges that judgement is existing Whether field has maintenance master worker to be in working condition to be repaired, that is, judges whether scene has maintenance master worker on duty;
Working condition judgment module two is used to have maintenance master worker on duty to judge whether scene has maintenance for the moment when scene Master worker is in working condition Under Repair, that is, judges whether scene has operation to repair master worker one;
Compare judgment module, be used to judge operation maintenance master worker one reach the most fast time of the maintenace point first is that The no most fast time two that the maintenace point is reached less than the maintenance master worker on duty;
Assignment module is used to reach the most fast time one of the maintenace point less than described as operation maintenance master worker one Maintenance master worker on duty reaches the most fast time two of the maintenace point, and the maintenance for assigning the operation maintenance master worker one to terminate in hand is appointed After business, then the maintenace point is gone to repair.
Embodiment 2
Property quality check method is used in property total management system be used to verify the maintenance of the maintenance personal of property Quality.The property total management system includes that backstage verification module, background data base, backstage logging modle and LED are shown Screen.The backstage verifies module and is used to receive information after the rectification that maintenance personal uploads.The maintenance personal passes through cell phone Upload information after the rectification.Information includes rectification equipment, rectifies and improves reason and by rectification point after the rectification.It is described to be rectified and improved Point is equipped with monitoring device, and the monitoring device is used to monitor the daily operation by rectification point.The background data base note Repairing information in record cell 2~3 years.The repairing information is including reporting equipment for repairment and reporting content for repairment.The backstage records mould Block record cell phone IP address, maintenance personal corresponding with the cell phone IP address, with corresponding maintenance personal's phase Corresponding maintenance department.
With reference to Fig. 2, the property quality check method the following steps are included:
S31, the backstage verify module receive after the rectification information and judge the rectification reason and it is described report for repairment it is interior Whether appearance is consistent, is then to carry out step S32;It is no, then carry out step S317;
S32, the backstage logging modle identify the surname of the maintenance personal by obtaining the IP address of the cell phone Name, and identify maintenance department belonging to the maintenance personal;
S33, the backstage verify module and are carried out by transferring the video recording of the monitoring device production to the rectification reason Judgement, when judging whether the rectification reason is caused by human factor, not to be that human factor causes, then carries out step S34; When being that human factor causes, then step S316 is carried out;
After S34, the judgement this time rectification after the uplink time rectification similar with last time of information between the uplink time of information Whether every being more than or equal to M and being less than or equal to M+7, M is positive integer, is, then carries out step S35, and the uplink time is single with day Position;It is no, then carry out step S313;
S35, the backstage verify module and determine that the maintenance quality of maintenance personal is grade one, and to the maintenance personal and The maintenance department makes punishment one, then carries out step S36;
S36, the LED display receive and show information after the maintenance quality and the rectification of judgement;
S37, owner comment according to maintenance quality of the information shown on the LED display to the maintenance personal Point.Specifically, by the way that cipher small keyboard is arranged on the display screen.Owner presses the number on the cipher small keyboard and carries out The scoring is transferred to the backstage and verifies module by scoring, the cipher small keyboard;
S38, the backstage verify module and receive and judge whether the scoring is lower than scoring one, no, then carry out step S39;The scoring for the moment lower than scoring, then carries out step S312;In the present embodiment, scoring one is set as 60 points.
S39, judge whether the scoring is higher than scoring two, it is no, then carry out step S310;It is then to carry out step S312;This In embodiment, scoring two is set as 85 points.
The scoring of S310, statistics simultaneously calculates the maintenance personal and the maintenance department most according to the scoring Final review point;
S311, according to the final scoring, different prizes is made to the maintenance personal and the corresponding maintenance department Encourage two.
S312, determine that the scoring is invalid;
After S313, the judgement this time rectification after the uplink time rectification similar with last time of information between the uplink time of information Whether every being more than or equal to M+8 and being less than or equal to M+29, M is positive integer, is, then carries out step S314, the uplink time is with day For unit;When the uplink time interval of information is greater than M+29 after the rectification similar with last time of the uplink time of information after the rectification, Then carry out step S315;
S314, the maintenance quality for determining the maintenance personal are grade two, and to the maintenance personal and the maintenance department Door makes punishment two, then carries out step S36;
S315, the maintenance quality for determining the maintenance personal are grade three, and to the maintenance personal and the maintenance department Door makes reward one, then carries out step S36.
S316, it goes to repair before sending the maintenance personal, and gives the maintenance personal and accordingly reward three.
S317, by background data base described in data input after the rectification, to update the number inside the background data base According to content.
Wherein, in the present embodiment, 1 M.In the present embodiment, punishment one, punishment two, reward one, reward two, reward Three setting can be such that
Punishment measure:
Punishment one: when maintenance personal provides year-end bonus, 20% deduction is carried out;The working capital for being issued to maintenance part exists 50% is reduced on the basis of original.
Punishment two: when maintenance personal provides year-end bonus, 10% deduction is carried out;The working capital for being issued to maintenance part exists 20% is reduced on the basis of original.
Incentive measure:
Reward one: when maintenance personal provides year-end bonus, without deducting;The working capital of maintenance part is issued to original On the basis of increase by 1%;
Reward two: (1) 60 < finally scores≤70, and the annual leave number of days of maintenance personal increases by 1 day, and the activity of maintenance department provides Gold increases by 2% on the basis of original;
(2) 70 < finally score≤80, and the annual leave number of days of maintenance personal increases by 3 days, and maintenance department's working capital exists Increase by 5% on the basis of original;
(3) 80 < finally score≤85, issue the title of outstanding employee to the maintenance personal, and give the maintenance people The cash bonuses of 500 yuan of the member and annual leave number of days of maintenance personal increases by 5 days, the maintenance department obtain that " quality optimal flow is red Flag " and maintenance department's working capital increases by 10% on the basis of original;.
Reward three: according to labour cost is repaired accordingly on the market, the subsidy of maintenance personal's fund is given;
Above-mentioned punishment measure, incentive measure and implemented independently of each other according to the prize scale obtained that finally scores.One In a little embodiments, it can also be carried out by above-mentioned punishment measure, incentive measure and according to the prize scale obtained that finally scores comprehensive After total calculation, final judgement is made to maintenance personal and corresponding maintenance department.
In this implementation, by realizing prison indirectly in such a way that property is from dual evaluation of the evaluation with his evaluation of owner The effect of pipe maintenance personal's field maintenance quality.And according to the quality of field maintenance give the corresponding rewards and punishments measure of maintenance personal with The enthusiasm and conscientious property for transferring maintenance personal's work, finally also ensure while improving residential property service quality well The life of owner.
It is used for cooperation property quality check method, also proposes property quality checking system in the present embodiment.The property The maintenance quality of maintenance personal of the quality checking system for being used to verify property in property total management system.The property is comprehensive Closing management system includes that module, background data base, backstage logging modle are verified in backstage.Module is verified for receiving dimension in the backstage Repair personnel upload rectification after information.The maintenance personal uploads information after the rectification by cell phone.After the rectification Information includes rectification equipment, rectifies and improves reason and by rectification point.It is described that monitoring device is equipped with by rectification point.The back-end data Repairing information in library recording cell 2~3 years.The repairing information is including reporting equipment for repairment and reporting content for repairment.The backstage note Record module record cell phone IP address, maintenance personal corresponding with the cell phone IP address, with corresponding maintenance people The corresponding maintenance department of member.The property quality checking system includes:
No.1 judgment module is used to verify module from the background and receives after the rectification that maintenance personal uploads after information, judges institute It states rectification reason and whether described to report content for repairment consistent;
Determine identification module, be used for when the rectification reason with it is described report for repairment content it is consistent when, pass through the acquisition shifting The IP address of machine of starting identifies the name of the maintenance personal, and identifies maintenance department belonging to the maintenance personal;
No. two judgment modules are used to sentence the rectification reason by the video recording for transferring the monitoring device production It is disconnected, judge whether the rectification reason is for caused by human factor;
No. three judgment modules are used for when the rectification reason is not that human factor causes, the judgement this time rectification Whether the uplink time interval of information is more than or equal to M and is less than or equal to M+7 after the rectification similar with last time of the uplink time of information afterwards, M is positive integer, and the uplink time is as unit of day;
No.1 determination module is used for information after the uplink time rectification similar with last time of information after this described rectification Uplink time interval be greater than equal to M and be less than or equal to M+7 when, determine the maintenance quality of the maintenance personal for grade one, And punishment one is made to the maintenance personal and the maintenance department;
Display module is used for when the No.1 determination module determines, and the LED display, which is received and shown, to be sentenced Information after the fixed maintenance quality and the rectification;
Grading module is used for owner and is scored according to information after the judgement result and the rectification;
Whether No. four judgment modules are used for when the owner makes the scoring, judge the scoring lower than scoring One;
No. five judgment modules are used for the scoring and are higher than scoring for the moment, judge whether the scoring is higher than scoring two;
Count computing module, be used to count the scoring and according to the scoring calculate the corresponding maintenance personal with And the final scoring of corresponding maintenance department;
Assessment module is used to make the maintenance personal and the corresponding maintenance department according to the final scoring Different rewards determines.
Those of ordinary skill in the art will appreciate that: realize that all or part of the steps of above-mentioned each method embodiment can lead to The relevant hardware of program instruction is crossed to complete.Program above-mentioned can be stored in a computer readable storage medium.The journey When being executed, execution includes the steps that above-mentioned each method embodiment to sequence;And storage medium above-mentioned include: ROM, RAM, magnetic disk or The various media that can store program code such as person's CD
Each technical characteristic of embodiment described above can be combined arbitrarily, for simplicity of description, not to above-mentioned reality It applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, all should be considered as described in this specification.
The several embodiments invented above described embodiment only expresses, the description thereof is more specific and detailed, but not It can therefore be construed as limiting the scope of the patent.It should be pointed out that for those of ordinary skill in the art, Without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to protection model of the invention It encloses.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.

Claims (10)

1. property facility maintenance of equipment dispatching method, be used in property total management system to the work of property maintenance personal into Row is reasonable to arrange scheduling, and the property total management system includes receiving module, resource module and backstage assignment module, institute The electronic maintenance equipment application information that receiving module is uploaded for receiving the owner is stated, records dimension in real time in the resource module Repair the quantity for the Maintenance Resource that need to be used, which is characterized in that the property facility maintenance of equipment dispatching method the following steps are included:
S21, the receiving module obtain the electronic maintenance equipment application information, and according to the electronic maintenance equipment letter of application The Maintenance Resource that breath judgement maintenance need to use, the electronic maintenance equipment application information includes maintenace point;
S22, judge currently whether there is the required Maintenance Resource in the resource module, when having the Maintenance Resource, then into Row step S23;
S23, judge whether scene has maintenance master worker to be in working condition to be repaired, that is, judge whether scene has repair technician on duty Fu is then to carry out step S24;
S24, judge whether scene has maintenance master worker in working condition Under Repair, that is, judge whether scene has operation maintenance Master worker one, is, then carries out step S25;
S25, judge that whether the operation maintenance master worker one reaches the most fast time one of the maintenace point less than the maintenance on duty Master worker reaches the most fast time two of the maintenace point, is then to carry out step S26;
After S26, the backstage assignment module assign the operation maintenance master worker one to terminate the maintenance task in hand, then go the dimension It repairs and a little repairs.
2. property facility maintenance of equipment dispatching method according to claim 1, which is characterized in that when scene without it is described When master worker is repaired on hilllock, the property facility maintenance of equipment dispatching method further include:
S27, judge whether scene has operation to repair master worker two, be to carry out step S26, otherwise carry out step S28;
S28, maintenance master worker is determined in having a holiday, execute step S29 after can not handling the electronic maintenance equipment application information;
S29, according to the electronic maintenance equipment application information, the backstage assignment module judges the electronic maintenance equipment letter of application Whether breath is urgent, when the electronic maintenance equipment application information is not urgent, then carries out step S210;
S210, it goes to repair again after the maintenance master worker has had a holiday.
3. property facility maintenance of equipment dispatching method according to claim 2, which is characterized in that when judging the electronic maintenance When equipment application information is urgent, the property facility maintenance of equipment dispatching method further include:
S211, it goes to repair before recalling the maintenance master worker being on furlough immediately.
4. property facility maintenance of equipment dispatching method according to claim 1, which is characterized in that when the operation repair technician The most fast time one that Fu one reaches the maintenace point is greater than the most fast time two that the maintenance master worker on duty reaches the maintenace point When, the property facility maintenance of equipment dispatching method further include:
S212, the maintenance master worker on duty is assigned to go to repair.
5. property facility maintenance of equipment dispatching method according to claim 1, which is characterized in that when scene is without the work Industry repairs master worker for the moment, then carries out step S212.
6. property facility maintenance of equipment dispatching method according to claim 1, which is characterized in that when in the resource module When currently without the required Maintenance Resource, the property facility maintenance of equipment dispatching method further include:
S213, judge whether scene has operation to repair master worker three, be to carry out step S26, otherwise carry out step S214;
S214, the supplement Maintenance Resource, then carry out step S23.
7. property facility maintenance of equipment dispatching method according to claim 1, which is characterized in that the electronic maintenance equipment Application information further includes maintenance of equipment title, maintenance of equipment photo and maintenance content.
8. property facility maintenance of equipment dispatching method according to claim 1, which is characterized in that the property integrated management System further includes intercom system, and the intercom system, receiving module, resource module and backstage assignment module are mutually indepedent, institute It states backstage assignment module and master worker one, operation maintenance master worker two, operation repair technician is repaired by the intercom system and the operation Fu three and maintenance master worker on duty connection, to judge whether scene has the operation maintenance master worker one, operation maintenance master worker two, makees Industry repairs master worker three and maintenance master worker on duty and judges that the operation maintenance master worker reaches the most fast time of the maintenace point Whether one be less than the most fast time two that the maintenance master worker one on duty reaches the maintenace point.
9. system is dispatched in property facility maintenance of equipment, it is used to cooperate property facility described in any one of claim 1 to 8 Maintenance of equipment dispatching method, and property facility maintenance of equipment scheduling system is in property total management system and to maintenance The work of personnel carry out it is reasonable arrange scheduling, the property total management system include receiving module, resource module and after Platform assignment module, the receiving module are used to receive the electronic maintenance equipment application information that the owner uploads, the resource mould The quantity for the Maintenance Resource that maintenance need to use is recorded in block in real time, which is characterized in that property facility maintenance of equipment scheduling system System includes:
Information analysis module is used for when the receiving module obtains the electronic maintenance equipment application information, according to described The Maintenance Resource that the judgement maintenance of electronic maintenance equipment application information need to use, the electronic maintenance equipment application information include Maintenace point;
Resource judgment module is used to judge in the resource module currently whether thering is the required Maintenance Resource;
Working condition judgment module one is used for when having the Maintenance Resource in the resource module, judges that judgement scene is It is no to there is maintenance master worker to be in working condition to be repaired, that is, judge whether scene has maintenance master worker on duty;
Working condition judgment module two is used to have maintenance master worker on duty to judge whether scene has maintenance master worker for the moment when scene In working condition Under Repair, that is, judge whether scene has operation to repair master worker one;
Judgment module is compared, whether the most fast time one for being used to judge that the operation maintenance master worker one to reach the maintenace point is small The most fast time two of the maintenace point is reached in the maintenance master worker on duty;
Assignment module is used to reach the most fast time one of the maintenace point less than described on duty as operation maintenance master worker one Maintenance master worker reaches the most fast time two of the maintenace point, and the operation maintenance master worker one is assigned to terminate the maintenance task in hand Afterwards, then the maintenace point is gone to repair.
10. property total management system is used to synthesize and coordinate every affairs in management cell, which is characterized in that the object Industry total management system includes tieing up with the matching used property facility equipment of the property facility maintenance of equipment dispatching method Degree of trimming system.
CN201811511930.8A 2018-12-11 2018-12-11 Property facility maintenance of equipment dispatching method and its system, property total management system Pending CN109711565A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811511930.8A CN109711565A (en) 2018-12-11 2018-12-11 Property facility maintenance of equipment dispatching method and its system, property total management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811511930.8A CN109711565A (en) 2018-12-11 2018-12-11 Property facility maintenance of equipment dispatching method and its system, property total management system

Publications (1)

Publication Number Publication Date
CN109711565A true CN109711565A (en) 2019-05-03

Family

ID=66256349

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811511930.8A Pending CN109711565A (en) 2018-12-11 2018-12-11 Property facility maintenance of equipment dispatching method and its system, property total management system

Country Status (1)

Country Link
CN (1) CN109711565A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111275315A (en) * 2020-01-17 2020-06-12 重庆国翰能源发展有限公司 Charging pile maintenance scheduling method and system
CN117057513A (en) * 2023-10-11 2023-11-14 山东建筑大学 Intelligent park is with control management system based on internet

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004094903A (en) * 2002-09-03 2004-03-25 Wataru Douseki Method for offering and dispatching worker, and communication system
CN103020755A (en) * 2012-11-23 2013-04-03 成都锦瑞投资有限公司 Staff dispatching system
CN107067163A (en) * 2017-03-24 2017-08-18 青岛海信网络科技股份有限公司 A kind of breakdown maintenance work dispatching method and device
CN108133321A (en) * 2017-12-21 2018-06-08 广州供电局有限公司 Specially become O&M trustship work management method, system, medium and computer equipment
CN108564280A (en) * 2018-04-13 2018-09-21 上海财经大学 Worksheet processing classification maintenance unit based on history maintenance record

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004094903A (en) * 2002-09-03 2004-03-25 Wataru Douseki Method for offering and dispatching worker, and communication system
CN103020755A (en) * 2012-11-23 2013-04-03 成都锦瑞投资有限公司 Staff dispatching system
CN107067163A (en) * 2017-03-24 2017-08-18 青岛海信网络科技股份有限公司 A kind of breakdown maintenance work dispatching method and device
CN108133321A (en) * 2017-12-21 2018-06-08 广州供电局有限公司 Specially become O&M trustship work management method, system, medium and computer equipment
CN108564280A (en) * 2018-04-13 2018-09-21 上海财经大学 Worksheet processing classification maintenance unit based on history maintenance record

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111275315A (en) * 2020-01-17 2020-06-12 重庆国翰能源发展有限公司 Charging pile maintenance scheduling method and system
CN117057513A (en) * 2023-10-11 2023-11-14 山东建筑大学 Intelligent park is with control management system based on internet
CN117057513B (en) * 2023-10-11 2024-01-12 山东建筑大学 Intelligent park is with control management system based on internet

Similar Documents

Publication Publication Date Title
CN206921161U (en) It is a kind of to include inspection management and defect processing and the intelligent inspection system of examination
CN108915771B (en) Cloud control mine comprehensive management system
CN106022649B (en) Project supervision, cost, bid, the total management system of consulting
CN104361445B (en) Labour&#39;s real-time management system and management method
CN108898360A (en) A kind of power engineering wisdom building site integrated control information system
CN109763683B (en) Digital urban rail transit vehicle base construction method and system
CN104076767B (en) Railway signal equipment overhauling control system and method
CN108985714A (en) A kind of construction site wisdom control integrated system
CN111767329A (en) Key field food safety supervision informatization system
CN106447156A (en) Attendance management method and system
CN112200535A (en) Highway engineering project engineering system of patrolling and examining based on BIM technique
CN112132535A (en) Wisdom production garden management system
CN110942529A (en) Wisdom attendance system
CN111598411A (en) Intelligent safety control system for operation site of transformer substation
CN107693997B (en) Fire fighting equipment detection and maintenance management system and management method
CN111681333A (en) Be applied to personnel&#39;s intelligent attendance management equipment of business of building trade of business
CN109711565A (en) Property facility maintenance of equipment dispatching method and its system, property total management system
CN113269902A (en) Intelligent building worker direction and attendance management method and system
CN113469544A (en) Risk control method and system for safety operation
CN113780594A (en) Intelligent server identification and inspection system
CN113095633A (en) Engineering project construction site potential safety hazard investigation system based on componentization
CN116957341A (en) Intelligent safety risk management and control system based on steel mill
CN108960758A (en) Architectural engineering process control management system
CN113379370A (en) Segment production informatization management system
CN109360291B (en) Construction machinery equipment inspection service system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190503