CN109702874A - A kind of concrete test block standard curing room - Google Patents

A kind of concrete test block standard curing room Download PDF

Info

Publication number
CN109702874A
CN109702874A CN201910103553.2A CN201910103553A CN109702874A CN 109702874 A CN109702874 A CN 109702874A CN 201910103553 A CN201910103553 A CN 201910103553A CN 109702874 A CN109702874 A CN 109702874A
Authority
CN
China
Prior art keywords
water
test block
concrete test
fog room
standard curing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910103553.2A
Other languages
Chinese (zh)
Inventor
杨斌
刘庆兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Jjjjj Construction Engineering Inspection Co Ltd
Original Assignee
Beijing Jjjjj Construction Engineering Inspection Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Jjjjj Construction Engineering Inspection Co Ltd filed Critical Beijing Jjjjj Construction Engineering Inspection Co Ltd
Priority to CN201910103553.2A priority Critical patent/CN109702874A/en
Publication of CN109702874A publication Critical patent/CN109702874A/en
Pending legal-status Critical Current

Links

Landscapes

  • Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)

Abstract

The present invention relates to a kind of concrete test block standard curing rooms, it includes fog room ontology, Temperature and Humidity Control instrument, damping control, the water main that fog room bodies top is connect with water source is set, the water quality purifying treater that water main connect one end with water source is set, it is several along the setting of water main equal spacing in length direction and the sparge pipe that is connected to water main of one end and several to be equidistantly mounted on sparge pipe towards the atomizer of fog room body bottom portion, it further include the catch basin for being provided with fog room body bottom portion side, fog room sheet is set in vitro and lower than the water tank for groove bottom of catchmenting, connect the return pipe of catchment trench bottom and tank top, with the water pump of water tank bottom connection and connect the connecting tube of water pump and water main, filter cloth is provided in the middle part of the water tank, the damping control is electrically connected with water pump.The present invention, which has, saves water resource, improves the effect of water utilization rate.

Description

A kind of concrete test block standard curing room
Technical field
The present invention relates to cement conservation technical fields, more particularly, to a kind of concrete test block standard curing room.
Background technique
With the use of the continuous development of concrete technology, high performance concrete and additive, people are to concrete material The attention degree of performance steps up, and the test index of many concrete performances is also gradually well known.Concrete strength is One process gradually developed, development degree and speed depend on the aquation situation of cement, and temperature and humidity is to influence water An important factor for mud hydration rate and degree.Therefore, after concrete formation, it is necessary to keep within a certain period of time temperature appropriate and Enough humidity, so that the abundant aquation of cement, here it is the maintenances of concrete.
And the more closed space that the standard curing room of concrete is established aiming at above-mentioned maintenance measure, system The concrete test block for making to come out, which can be all put into, carries out wet curing, has a large amount of water can be from maintenance processes standard curing the room in The drainpipe of standard curing room bottom is discharged into sewer pipe, causes the waste of water resource.
Summary of the invention
The object of the present invention is to provide a kind of concrete test block standard curing rooms, have and save water resource, improve water The effect of resource utilization.
Above-mentioned purpose of the invention has the technical scheme that a kind of concrete test block standard curing Room including fog room ontology, Temperature and Humidity Control instrument, damping control, is arranged in what fog room bodies top was connect with water source Water main is arranged in water main and water source connects the water quality purifying treater, several between water main length direction etc. of one end Away from setting and the sparge pipe that is connected to water main of one end and several equidistantly it is mounted on sparge pipe towards fog room ontology bottom The atomizer in portion further includes the catch basin for being provided with fog room body bottom portion side, setting is external in fog room sheet and is lower than The water tank of groove bottom of catchmenting, connection catchment trench bottom and the return pipe of tank top, the water pump being connected to water tank bottom and company The connecting tube of water pump and water main, the water tank middle part are provided with filter cloth, and the damping control is electrically connected with water pump.
Through the above technical solutions, the temperature and humidity in Temperature and Humidity Control instrument meeting real-time display fog room ontology, with Judge whether to need convenient for people to carrying out water spray humidification in fog room ontology;Water quality purifying treater can be filtered water Purification;When conserving to cement briquette, concrete test block can be put into fog room ontology, then led into water main Water, subsequent water can be sprayed on concrete test block through atomizer, penetrate into fog room ontology bottom surface between subsequent water meeting, and flow into In catch basin, is flowed into water tank after through return pipe, under the action of filter cloth, the small concrete block meeting in water tank is poured by water It is left on filter cloth, and water can then enter water tank bottom, after accumulating a certain amount of water in water tank, staff can be by adding Wet controller starts water pump, flows into the water in water tank in water main under the action of water pump and connecting tube, final to be atomized again Spray head is sprayed onto mixed mud test block, to improve the utilization rate of water, has saved water resource.The setting of atomizer, can be Water is uniformly sprayed on concrete test block, improves maintenance efficiency.
The present invention is further arranged to: the fog room body bottom portion is tilted to catch basin direction downwards.
It is flowed into catch basin through the above technical solutions, being conducive to water, to be conducive to the collection to water.
The present invention is further arranged to: the trench bottom that catchments is tilted to equipped with return pipe direction downwards.
It is flowed into water tank through the above technical solutions, being conducive to water, to be conducive to the collection to water.
The present invention is further arranged to: the tank top offers sewage draining exit, and the water tank is equipped at sewage draining exit and cuts with scissors It is connected to sewage door.
Through the above technical solutions, staff is facilitated to clear up the sundries being deposited on filter cloth.
The present invention is further arranged to: two three-way electromagnetic valves are connected with close to water main one end on the sparge pipe, described two Three-way electromagnetic valve is electrically connected with damping control.
Through the above technical solutions, staff can be according to the position for being placed on the intrinsic concrete test block of fog room Two different three-way electromagnetic valves are opened using damping control, so that the atomizer above concrete test block only be made to be sprayed Water conservancy project is made, and does not place the atomizer above at concrete test block without work of spraying water, to improve the utilization rate of water, saves About water resource.
The present invention is further arranged to: the both ends that the fog room ontology is on water main length direction are respectively arranged with Feeding gate and discharge door, the fog room body bottom portion are equipped at least two guide rails parallel with water main length direction, institute It states and is provided with several pallets for being used to place concrete test block on guide rail, the tray bottom is fixedly connected with matches with guide rail rolling The traveling wheel of conjunction, the traveling wheel outer peripheral surface offer the groove for guide rail insertion.
Through the above technical solutions, concrete test block can be placed adjacent to when needing to conserve cement briquette On pallet at feeding gate, cement briquette is conserved, it, can be with when needing the cement briquette to next batch to conserve The pallet for loading cement briquette in standard curing room is pushed to discharge door direction, new pallet is then installed again on track simultaneously This batch of cement briquette is placed on the pallet being newly installed on track;When cement briquette is completed in standard curing room After maintenance, cement briquette is taken out into standard curing room from discharge door together with the pallet for being used to place it.
The present invention is further arranged to: intensive water seepage hole is offered on the pallet.
Through the above technical solutions, water is made to be easier to fall on the ground, cement briquette and pallet contact position humidity mistake are avoided Greatly.
The present invention is further arranged to: the guide rail bottom offers several through leading along its own equal spacing in length direction The limbers of rail two sides.
It is flowed into catch basin through the above technical solutions, being conducive to water, to be conducive to the collection to water.
In conclusion advantageous effects of the invention are as follows:
1, the utilization rate for improving water, has saved water resource, when conserving to cement briquette, concrete test block can be put into Fog room ontology, the then water flowing into water main, subsequent water can be sprayed on concrete test block through atomizer, between subsequent water meeting Fog room ontology bottom surface is penetrated into, and is flowed into catch basin, is flowed into water tank after through return pipe, under the action of filter cloth, It can be left on filter cloth by the small concrete block that water pours in water tank, and water can then enter water tank bottom, and then can be in water It is flowed into water main under the action of pump and connecting tube, is finally atomized spray head again and is sprayed onto mixed mud test block, to improve water Utilization rate, saved water resource;
2, the setting of atomizer uniformly can be sprayed onto water on concrete test block, improve maintenance efficiency;
3, staff can be opened according to the position for being placed on the intrinsic concrete test block of fog room using damping control Two different three-way electromagnetic valves so that the atomizer above concrete test block only be made to carry out water spray work, and are not placed mixed Atomizer above at solidifying soil test block has saved water resource to improve the utilization rate of water without water spray work;
4, when needing to conserve cement briquette, concrete test block can be placed adjacent on the pallet at feeding gate, it is right Cement briquette is conserved, and when needing the cement briquette to next batch to conserve, can will be loaded in standard curing room The pallet of cement briquette is pushed to discharge door direction, is then installed new pallet on track again and is tried this batch of cement Block is placed on the pallet being newly installed on track;After maintenance is completed in cement briquette in standard curing room, cement is tried Block takes out standard curing room from discharge door together with the pallet for placing it;
5, the temperature and humidity in Temperature and Humidity Control instrument meeting real-time display fog room ontology, in order to which people judges whether needs pair Water spray humidification is carried out in fog room ontology.
Detailed description of the invention
Fig. 1 is overall structure diagram of the invention;
Fig. 2 is the partial enlargement diagram of part A in Fig. 1;
Fig. 3 is the partial enlargement diagram of part B in Fig. 1;
Fig. 4 is other direction overall structure diagram of the invention;
Fig. 5 is the partial enlargement diagram of C portion in Fig. 4.
In figure, 1, fog room ontology;2, water main;3, sparge pipe;31, atomizer;32, two three-way electromagnetic valve;41, it catchments Slot;42, water tank;421, sewage draining exit;422, sewage door;43, return pipe;44, water pump;45, connecting tube;46, filter cloth;5, it feeds Door;6, discharge door;71, guide rail;711, limbers;72, pallet;721, water seepage hole;73, traveling wheel;731, groove;8, temperature and humidity Control instrument;9, damping control;10, water quality purifying treater.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
It referring to Figures 1 and 2, is a kind of concrete test block standard curing room disclosed by the invention, including fog room ontology 1, Can with the Temperature and Humidity Control instrument 8 of temperature and humidity in real-time display fog room ontology 1, be arranged in fog room ontology 1 Damping control 9, the water main 2 for being fixedly connected on 1 top side of fog room ontology are mounted on water main and connect one end with water source Water quality purifying treater 10, several along the setting of 2 equal spacing in length direction of water main and the water spray that is connected to water main 2 of one end It pipe 3 and several is equidistantly mounted on sparge pipe 3 towards the atomizer 31 of 1 bottom of fog room ontology.On damping control 9 It is provided with control panel.Water quality purifying treater 10 can be water purifier.
In conjunction with Fig. 4, catch basin 41 is offered in 1 bottom side of fog room ontology, outside fog room ontology 1 and lower than collection Sink is provided with water tank 42 at 41 bottom surface, return pipe 43 is connected between 42 top of 41 bottom of catch basin and water tank, in water tank The water pump 44 being connected to 42 bottom of water tank is fixedly connected on 42 lateral walls, water pump 44 is electrically connected with damping control 9, and work people Member can control whether water pump 44 is opened by damping control 9, be connected with connecting tube 45 in the water outlet of water pump 44.In water tank Filter cloth 46 is fixedly connected between 42 middle part return pipes 43 and water pump 44.Water main 2 passes through three-way magnetic valve and connecting tube 45 It is connected to running water pipe.
It is flowed into catch basin 41 to be conducive to water, 1 bottom of fog room ontology is tilted to 41 direction of catch basin downwards 2-3°.It is flowed into water tank 42 to be conducive to water, 41 bottom of catch basin tilts 2-3 ° to equipped with 43 direction of return pipe downwards.
When conserving to cement briquette, concrete test block can be put into fog room ontology 1, then to water main 2 Interior water flowing, subsequent water can be sprayed on concrete test block through atomizer 31, penetrate into 1 bottom of fog room ontology between subsequent water meeting Face, and flow into catch basin 41, it is flowed into water tank 42 after through return pipe 43, under the action of filter cloth 46, water is poured by water Small concrete block in case 42 can be left on filter cloth 46, and water can then enter 42 bottom of water tank, and then can be in water pump 44 It is flowed into water main 2 under the action of connecting tube 45, is finally atomized spray head 31 again and is sprayed onto mixed mud test block, to improve The utilization rate of water, has saved water resource.
Further, the sundries being deposited on filter cloth 46 is cleared up in order to facilitate staff, 42 top of water tank Sewage draining exit 421 is offered, is equipped on water tank 42 at sewage draining exit 421 and is hinged with sewage door 422.
Referring to Figures 1 and 2, two three-way electromagnetic valves 32, two three-way electromagnetic valves are connected with close to 2 one end of water main on sparge pipe 3 32 are electrically connected with damping control 9.Such staff can be according to the position for the concrete test block being placed in fog room ontology 1 It sets and opens two different three-way electromagnetic valves 32, so that the atomizer 31 above concrete test block is only made to carry out water spray work, And the atomizer 31 above at concrete test block is not placed without work of spraying water, to improve the utilization rate of water, save Water resource.
Further, it referring to Fig. 4 and Fig. 5, is set respectively at the both ends that fog room ontology 1 is on 2 length direction of water main It is equipped with feeding gate 5 and discharge door 6, is equipped at least two (present invention is for two) and main water in 1 bottom of fog room ontology The parallel guide rail 71 of 2 length direction of pipe is provided with several pallets 72 for being used to place concrete test block, in pallet on guide rail 71 72 bottoms are fixedly connected with the traveling wheel 73 that cooperation is rolled with guide rail 71, and 73 outer peripheral surface of traveling wheel is offered for the insertion of guide rail 71 Groove 731.It is worth noting that, intensive water seepage hole 721 is offered on pallet 72, in 71 bottom of guide rail along its own length Direction equidistantly offers several limbers 711 through 71 two sides of guide rail, so that water flows into catch basin 41.
When needing to conserve cement briquette, the pallet 72 that concrete test block can be placed adjacent at feeding gate 5 On, cement briquette is conserved, it, can will be in standard curing room when needing the cement briquette to next batch to conserve Load cement briquette pallet 72 to 6 direction of discharge door push, then installed again on track new pallet 72 and by this batch Secondary cement briquette is placed on the pallet 72 being newly installed on track;When maintenance is completed in cement briquette in standard curing room Afterwards, cement briquette is taken out into standard curing room from discharge door 6 together with the pallet 72 for being used to place it.
The embodiment of present embodiment is presently preferred embodiments of the present invention, not limits protection of the invention according to this Range, therefore: the equivalence changes that all structures under this invention, shape, principle are done, should all be covered by protection scope of the present invention it It is interior.

Claims (8)

1. a kind of concrete test block standard curing room, including fog room ontology (1), Temperature and Humidity Control instrument (8) and temperature and humidity control Water main (2) that the damping control (9) of instrument (8) processed electrical connection, setting are connect at the top of fog room ontology (1) with water source, The water quality purifying treater (10), several along water main (2) length direction etc. for connecting one end with water source in water main (2) is set Spacing setting and the sparge pipe (3) that be connected to water main (2) of one end and several to be equidistantly mounted on direction on sparge pipe (3) feeding The atomizer (31) for protecting room ontology (1) bottom, it is characterized in that: further including the collection for being provided with fog room ontology (1) bottom side Sink (41), setting are in fog room ontology (1) outside and lower than the water tank (42) of catch basin (41) bottom surface, connection catch basin (41) bottom Portion at the top of water tank (42) return pipe (43), with water tank (42) bottom connection water pump (44) and connect water pump (44) with lead The connecting tube (45) of water pipe (2), water tank (42) middle part are provided with filter cloth (46), the damping control (9) and water pump Electrical connection.
2. a kind of concrete test block standard curing room according to claim 1, it is characterized in that: the fog room ontology (1) Bottom is tilted to catch basin (41) direction downwards.
3. a kind of concrete test block standard curing room according to claim 1, it is characterized in that: the catch basin (41) bottom It is tilted to equipped with return pipe (43) direction downwards.
4. a kind of concrete test block standard curing room according to claim 1, it is characterized in that: being opened at the top of the water tank (42) Equipped with sewage draining exit (421), the water tank (42) is equipped at sewage draining exit (421) and is hinged with sewage door (422).
5. a kind of concrete test block standard curing room according to claim 1, it is characterized in that: being leaned on the sparge pipe (3) Nearly water main (2) one end is connected with two three-way electromagnetic valves (32), and two three-way electromagnetic valve (32) is electrically connected with damping control (9).
6. a kind of concrete test block standard curing room according to claim 5, it is characterized in that: the fog room ontology (1) Both ends on water main (2) length direction are respectively arranged with feeding gate (5) and discharge door (6), the fog room ontology (1) Bottom is equipped at least two guide rails (71) parallel with water main (2) length direction, is provided on the guide rail (71) several For placing the pallet (72) of concrete test block, pallet (72) bottom is fixedly connected with the row that cooperation is rolled with guide rail (71) Wheel (73) is walked, traveling wheel (73) outer peripheral surface offers the groove (731) for guide rail (71) insertion.
7. a kind of concrete test block standard curing room according to claim 6, it is characterized in that: being opened up on the pallet (72) There are intensive water seepage hole (721).
8. a kind of concrete test block standard curing room according to claim 6, it is characterized in that: the guide rail (71) bottom edge Its own equal spacing in length direction offers several limbers (711) through guide rail (71) two sides.
CN201910103553.2A 2019-01-18 2019-01-18 A kind of concrete test block standard curing room Pending CN109702874A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910103553.2A CN109702874A (en) 2019-01-18 2019-01-18 A kind of concrete test block standard curing room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910103553.2A CN109702874A (en) 2019-01-18 2019-01-18 A kind of concrete test block standard curing room

Publications (1)

Publication Number Publication Date
CN109702874A true CN109702874A (en) 2019-05-03

Family

ID=66264038

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910103553.2A Pending CN109702874A (en) 2019-01-18 2019-01-18 A kind of concrete test block standard curing room

Country Status (1)

Country Link
CN (1) CN109702874A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111546478A (en) * 2020-05-15 2020-08-18 傅娜 Concrete air curtain evaporates supports temperature control system
CN112917657A (en) * 2021-01-27 2021-06-08 苏州方正工程技术开发检测有限公司 Energy-saving curing system of concrete curing room

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150183128A1 (en) * 2013-12-31 2015-07-02 Elematic Oy Ab Arrangement and method for curing concrete products
CN206030188U (en) * 2016-08-30 2017-03-22 济南天冠新型建筑材料有限公司 Concrete test block curing room
CN206300823U (en) * 2016-12-15 2017-07-04 北京建工四建工程建设有限公司 The concrete test block mark that a kind of water resource is recycled supports room
CN207606963U (en) * 2017-10-31 2018-07-13 天津银龙预应力材料股份有限公司 A kind of track plates fog room with reclamation of condensate water function

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150183128A1 (en) * 2013-12-31 2015-07-02 Elematic Oy Ab Arrangement and method for curing concrete products
CN206030188U (en) * 2016-08-30 2017-03-22 济南天冠新型建筑材料有限公司 Concrete test block curing room
CN206300823U (en) * 2016-12-15 2017-07-04 北京建工四建工程建设有限公司 The concrete test block mark that a kind of water resource is recycled supports room
CN207606963U (en) * 2017-10-31 2018-07-13 天津银龙预应力材料股份有限公司 A kind of track plates fog room with reclamation of condensate water function

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111546478A (en) * 2020-05-15 2020-08-18 傅娜 Concrete air curtain evaporates supports temperature control system
CN112917657A (en) * 2021-01-27 2021-06-08 苏州方正工程技术开发检测有限公司 Energy-saving curing system of concrete curing room

Similar Documents

Publication Publication Date Title
CN204456412U (en) A kind of Intelligent rainwater collects reclaiming system
CN102359172B (en) City life residential area rainwater shunting, collecting and disposal system
CN103183426B (en) Rain water on roof recovery processing technique
CN104213599B (en) Zero energy consumption roof rain water reclaims Waste water utilization system
CN105126503A (en) Simple automatic water-saving spraying and dedusting system of temporarily constructed road
CN204601899U (en) The dust-proof control system in a kind of job site
CN109702874A (en) A kind of concrete test block standard curing room
CN104944688A (en) Automatic rain collecting and purifying system
CN209053161U (en) A kind of sponge urban rainwater circulator
CN204752403U (en) Automatic collection rain and clean system
CN107651795B (en) Rainwater collecting and purifying device and purifying method thereof
CN204768028U (en) Maintenance system is controlled and sprays to raise dust that job site was used
CN204816094U (en) Waste water waste gas combined cycle of spraying paint integration processing system
CN209500901U (en) Cement kiln CCS system production waste water reuse equipment
CN113003894A (en) Urban rain sewage integrated treatment green drainage system and working method thereof
CN203582628U (en) Treatment system for cooling tower water supplement with treated and cleaned rainwater
CN209011284U (en) A kind of double abandoned stream rain water separators
CN207566961U (en) Natural mixing stirring device and potassium permanganate composites
CN203701244U (en) Water resource regeneration and utilization integral circulating system on construction site
CN206607652U (en) The first unconspicuous separate system of rain feature handles exhaust system online
CN211492128U (en) Spraying maintenance system for reinforced concrete protective door
CN205633725U (en) A light -weight aggregate processing system that prewets for light steel fibre concrete
CN105019656A (en) Construction method for floor system concrete post-cast strip suspended formwork
CN205839889U (en) A kind of wastewater recycling system being applicable to building
CN109432833A (en) A kind of cement kiln CCS system production waste water reuse equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190503