CN109697842A - Continue the extremely long-range processing method of more days no datas based on intellectual water meter - Google Patents

Continue the extremely long-range processing method of more days no datas based on intellectual water meter Download PDF

Info

Publication number
CN109697842A
CN109697842A CN201811396251.0A CN201811396251A CN109697842A CN 109697842 A CN109697842 A CN 109697842A CN 201811396251 A CN201811396251 A CN 201811396251A CN 109697842 A CN109697842 A CN 109697842A
Authority
CN
China
Prior art keywords
terminal
meter
data
water meter
acquisition
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811396251.0A
Other languages
Chinese (zh)
Inventor
赵良德
疏奇奇
梁晓伟
肖坚红
史波
唐亮
高寅
丁建顺
王凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Anhui Electric Power Co Ltd
Zhejiang Huayun Information Technology Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Anhui Electric Power Co Ltd
Zhejiang Huayun Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Anhui Electric Power Co Ltd, Zhejiang Huayun Information Technology Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201811396251.0A priority Critical patent/CN109697842A/en
Publication of CN109697842A publication Critical patent/CN109697842A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G08SIGNALLING
    • G08CTRANSMISSION SYSTEMS FOR MEASURED VALUES, CONTROL OR SIMILAR SIGNALS
    • G08C19/00Electric signal transmission systems
    • GPHYSICS
    • G08SIGNALLING
    • G08CTRANSMISSION SYSTEMS FOR MEASURED VALUES, CONTROL OR SIMILAR SIGNALS
    • G08C17/00Arrangements for transmitting signals characterised by the use of a wireless electrical link
    • G08C17/02Arrangements for transmitting signals characterised by the use of a wireless electrical link using a radio link

Abstract

The invention discloses the extremely long-range processing method of more days no datas is continued based on intellectual water meter, it is related to a kind of long-range processing method of water meter.Currently, the O&M of intellectual water meter is typically all that the localized administrations such as gas company unit is responsible for, what can not remotely be handled turns relevant device localized administration unit, and working efficiency is low, and troubleshooting capabilities are weak.1) present invention is the following steps are included: obtain the data of water meter, and to the data of water meter into monitoring;2) it when persistently failing to collect the indicating value data of operation water meter of low-voltage customer, is analyzed and determined: 3) no data fault diagnosis processing in more days being continued to intellectual water meter;4) long-range processing, including check and correction marketing archives;Proofread terminal electric energy meter/AC sampling parameter;Proofread terminal task;Proofread terminal clock;Proof list timing clock.The technical program from many aspects, complete to realize remote diagnosis, processing, and accuracy is high, and effectively improves working efficiency, reduces cost by cooperation, improves troubleshooting capabilities.

Description

Continue the extremely long-range processing method of more days no datas based on intellectual water meter
Technical field
The present invention relates to a kind of long-range processing methods of intellectual water meter, especially continue more days no datas based on intellectual water meter Abnormal long-range processing method.
Background technique
The Guo Wang Committee of Development and Reform, Guo Wang Bureau of Energy were in joint publication " about the instruction for promoting smart grid development " in 2015 In mention taking into account and improve coal, electricity, oil, gas realm information Resources Sharing Mechanism, support water, gas and electricity, hot concentrated collection, construction across Industry energy operation state data integration platform.Instruction accordingly, Guo Wang sales department has issued " closes about four tables of propulsion are accelerated The notice of one acquisition applications work ", power information acquisition system is relied on, construction power supply is supplied water, gas supply, heat supply " multiple-in-one " Acquisition system.
With construction and popularization and application that multiple-in-one acquires, water, air and heat table have been able to realize remote data acquisition, But still relatively falls behind in application aspects such as exception monitoring, fault diagnosis, defect elimination management, lack similar power information acquisition abnormity defect elimination Process, the defect elimination of current acquisition abnormity are broadly divided into long-range processing part and in-situ processing part, but the O&M of intellectual water meter Typically the localized administrations unit such as water utilities company is responsible for, and troubleshooting capabilities are poor, and business processing working efficiency is poor.
Summary of the invention
The technical problem to be solved in the present invention and the technical assignment of proposition are to be improved and improved to prior art, It provides and the extremely long-range processing method of more days no datas is continued based on intellectual water meter, promote troubleshooting capabilities to reach, and improve industry The purpose of business processing working efficiency.For this purpose, the present invention takes following technical scheme.
Continue the extremely long-range processing method of more days no datas based on intellectual water meter, comprising the following steps:
1, the extremely long-range processing method of more days no datas is continued based on intellectual water meter, it is characterised in that the following steps are included:
1) data of intellectual water meter are obtained, and to the data of intellectual water meter into monitoring;
2) it when persistently failing to collect the indicating value data of operation intellectual water meter of low-voltage customer, is analyzed and determined:
201) judge whether to continue K days without positive active energy indicating value;And the terminal for excluding acquisition tables meter has been judged to terminal and master It stands without the case where ammeter is completely without data under communication, terminal;And the meter nullified is excluded, the meter removed including user;
It 202) is local 485 communication when communicating, and K >=1 day, or communication are locally non-485 communication, and K >=2 day, then generate event Hinder early warning inventory, while carrying out early warning;
203) exception in fault pre-alarming inventory is studied and judged again, is communicated when communicating for local 485, and K >=2 day, or is logical News communicate for local non-485, and K >=3 day, then are judged as abnormal, generate intellectual water meter and continue more days without meter reading data failure work It is single;
204) abnormal work order list to be treated is generated;
3) no data fault diagnosis processing in more days is continued to intellectual water meter
301) abnormal work order list to be treated is obtained, diagnostic task item is read from knowledge base according to abnormal phenomenon;
302) front interface service is called, data are carried out to each task items and call survey together;
303) timing read calls together survey result table, compare each item data call together survey result and main website it is whether consistent;All unanimously then arrange It looks into abnormal caused by main website reason;When call together dendrometry lose or time-out, need to send in-situ processing;When one or more data are inconsistent When, further long-range processing is needed, main website reason includes: relevant parameter, task;If long-range processing failure, it is existing that there is still a need for groups Field processing;
4) long-range processing, when remotely being handled, remote diagnosis tasks item can execute parallel, including the following contents:
401) check and correction marketing archives;Compare terminal administrative area code, terminal address, the SOT state of termination, electric meter address, ammeter specification, Ammeter state, synchronous archive information when inconsistent;
402) terminal electric energy meter/AC sampling parameter is proofreaded;It compares each measurement point number, communication protocol type, address, lead to Rate and port numbers are interrogated, parameter is re-issued when parameter is inconsistent;
403) terminal task is proofreaded, the consistency of main website and terminal task is compared, acquisition equipment is re-issued when inconsistent and is appointed Business;
404) terminal clock is proofreaded, calls together and surveys acquisition terminal clock, be compared with main website, error is beyond progress terminal pair when requiring When;
405) proof list timing clock is called intellectual water meter clock together thoroughly, is compared with main website, and error is beyond progress meter pair when requiring When;
5) after the completion of long-range processing, judge whether long-range processing handles success, if handling successfully, carry out filing verification;If remote Journey processing is unsuccessful, then carries out in-situ processing;
6) after handling at the scene, filing verification is carried out, judges whether to restore, if restoring, terminated after filing;If not restoring, In-situ processing is then carried out again.
The technical program from many aspects, complete to realize remote diagnosis, processing, and accuracy is high, and effectively improves work by cooperation Efficiency reduces cost.
Further, the information collection mode of multiple-in-one includes electric energy meter wireless collection, the acquisition of electric energy meter bimodulus, communication As a result converter acquisition mode.
Further, in electric energy meter wireless collection, electric energy meter and water, air and heat table use same wireless technology, networking side Case is different;Electric energy meter communication unit is as the wireless communication module in water, air and heat table data insertion equipment, with water, air and heat table Composition point-to-multipoint spoke subnet is communicated, and realizes the acquisition of multilist data;
In the acquisition of electric energy meter bimodulus, electric energy meter communication unit uses power line carrier and micropower wireless double mode communication mode; Electric energy meter communication unit realizes wireless water, air and heat table by micropower wireless channel as water, air and heat table data insertion equipment Data acquisition;
In the acquisition of communication interface converter, communication interface converter acquires water, air and heat table data by different communication interface, Data are uploaded to by concentrator by power information acquisition system local communi-cation channel again, if water, air and heat table are equipped with valve control dress When setting, the DC power supply of direct current 12V/5V is provided.
Further, intellectual water meter acquisition abnormity remotely handle the following steps are included:
A) it calls together and surveys terminal electric energy meter/ac sampling device configuration parameter;
B) whether alignment parameters and system are consistent, if then entering in next step, if it is not, then issuing terminal electric energy meter/AC sampling Device configuration parameter;
C) survey terminal task is called together;
D) judge whether terminal task is arranged if unanimously, entering in next step if it is not, then issuing task data with systems compliant Parameter;
E) survey terminal clock is called together;
F) whether consistent with main website terminal clock is judged, if unanimously, terminating, if it is not, then setting time to terminal.
The utility model has the advantages that the technical program, which facilitates staff, carries out failure exception type classification for intellectual water meter, carefully Change troubleshooting steps, clear failure analysis method strengthens professional skill accident analysis, it is different further to promote multiple-in-one acquisition Normal troubleshooting capabilities improve business processing working efficiency.
Since data collection system construction is related to main website, communication channel, acquisition equipment, measuring equipment etc., the amount of money of investment It is huge, in water, air and heat investment field, extensive independent data collection system, the energy number such as water, air and heat are not yet established at present According to generally by the way that local communication mode, access power user power consumption information acquisition system, shared data acquisition channel and master is transformed System stand to realize the remote collection of data, support cost clearing, with can the business such as information monitoring, give full play to power information and adopt Advantage in collecting system energy-consuming data set.
Detailed description of the invention
Fig. 1 is intellectual water meter acquisition abnormity defect elimination overall flow figure of the invention.
Fig. 2 is the extremely long-range process flow diagram of intellectual water meter of the invention.
Specific embodiment
Technical solution of the present invention is described in further detail below in conjunction with Figure of description.
As shown in Figure 1, the present invention the following steps are included:
1) data of intellectual water meter are obtained, and to the data of intellectual water meter into monitoring;
2) it when persistently failing to collect the indicating value data of operation intellectual water meter of low-voltage customer, is analyzed and determined:
201) judge whether to continue K days without positive active energy indicating value;And the terminal for excluding acquisition tables meter has been judged to terminal and master It stands without the case where ammeter is completely without data under communication, terminal;And the meter nullified is excluded, the meter removed including user;
It 202) is local 485 communication when communicating, and K >=1 day, or communication are locally non-485 communication, and K >=2 day, then generate event Hinder early warning inventory, while carrying out early warning;
203) exception in fault pre-alarming inventory is studied and judged again, is communicated when communicating for local 485, and K >=2 day, or Communication communicates for local non-485, and K >=3 day, then is judged as abnormal, generates intellectual water meter and continues more days without meter reading data failure Work order;
204) abnormal work order list to be treated is generated;
3) no data fault diagnosis processing in more days is continued to intellectual water meter
301) abnormal work order list to be treated is obtained, diagnostic task item is read from knowledge base according to abnormal phenomenon;
302) front interface service is called, data are carried out to each task items and call survey together;
303) timing read calls together survey result table, compare each item data call together survey result and main website it is whether consistent;All unanimously then arrange Exception caused by main website reason is looked into, dendrometry is called together and loses or illustrate the condition for not having main website processing when overtime, be required to send live place Reason;Inconsistent, specification exception is caused by main website reason, needs further long-range processing, and main website reason includes: relevant parameter, appoints Business;If long-range processing failure, there is still a need for send in-situ processing;
4) long-range processing, when remotely being handled, remote diagnosis tasks item can execute parallel, including the following contents:
401) check and correction marketing archives;Compare terminal administrative area code, terminal address, the SOT state of termination, electric meter address, ammeter specification, Ammeter state, synchronous archive information when inconsistent;
402) terminal electric energy meter/AC sampling parameter is proofreaded;It compares each measurement point number, communication protocol type, address, lead to Rate and port numbers are interrogated, parameter is re-issued when parameter is inconsistent;
403) terminal task is proofreaded, the consistency of main website and terminal task is compared, acquisition equipment is re-issued when inconsistent and is appointed Business;
404) terminal clock is proofreaded, calls together and surveys acquisition terminal clock, be compared with main website, error is beyond progress terminal pair when requiring When;
405) proof list timing clock is called intellectual water meter clock together thoroughly, is compared with main website, and error is beyond progress meter pair when requiring When;
5) after the completion of long-range processing, judge whether long-range processing handles success, if handling successfully, carry out filing verification;If remote Journey processing is unsuccessful, then carries out in-situ processing;
6) after handling at the scene, filing verification is carried out, judges whether to restore, if restoring, terminated after filing;If not restoring, In-situ processing is then carried out again.
Wherein, " multiple-in-one " information collection scheme should be according to building structure feature, and the distribution side of electricity, water, air and heat table The factors such as formula and installation site reasonably select.It is also contemplated that when " multiple-in-one " the information collection scheme of selection and is acquired with power information The fusion of system schema accesses.Acquisition scheme mainly has electric energy meter wireless collection, the acquisition of electric energy meter bimodulus, communication result converter The modes such as acquisition.
The characteristics of electric energy meter wireless collection scheme is that electric energy meter and water, air and heat table use same wireless technology, but networking side Case is different;Electric energy meter communication unit is as the wireless communication module in water, air and heat table data insertion equipment, with water, air and heat table Composition point-to-multipoint spoke subnet is communicated, and realizes the acquisition of multilist data.The characteristics of electric energy meter bimodulus acquisition scheme is electric energy Table communication unit uses power line carrier and micropower wireless double mode communication mode;Electric energy meter communication unit is as water, air and heat Table data insertion equipment realizes wireless water by micropower wireless channel, the data of air and heat table acquire.Communication interface converter is adopted The characteristics of collection scheme is that the communication mode of electric energy meter in original power information acquisition system can remain unchanged, communication interface converter Water, air and heat table data are acquired by different communication interface, then will be in data by power information acquisition system local communi-cation channel Concentrator is reached, if water, air and heat table are equipped with valve control device, also needs to provide the DC power supply of direct current 12V/5V.
As shown in Fig. 2, in the present embodiment, intellectual water meter acquisition abnormity remotely handle the following steps are included:
A) it calls together and surveys terminal electric energy meter/ac sampling device configuration parameter;
B) whether alignment parameters and system are consistent, if then entering in next step, if it is not, then issuing terminal electric energy meter/AC sampling Device configuration parameter;
C) survey terminal task is called together;
D) judge whether terminal task is arranged if unanimously, entering in next step if it is not, then issuing task data with systems compliant Parameter;
E) survey terminal clock is called together;
F) whether consistent with main website terminal clock is judged, if unanimously, terminating, if it is not, then setting time to terminal.
Figure 1 above, to continue the extremely long-range processing method of more days no datas based on intellectual water meter shown in 2 be tool of the invention Body embodiment has embodied substantive distinguishing features of the present invention and progress, needs can be used according to actual, in enlightenment of the invention Under, the equivalent modifications of shape, structure etc., the column in the protection scope of this programme are carried out to it.

Claims (4)

1. continuing the extremely long-range processing method of more days no datas based on intellectual water meter, it is characterised in that the following steps are included:
1) data of intellectual water meter are obtained, and to the data of intellectual water meter into monitoring;
2) it when persistently failing to collect the indicating value data of operation intellectual water meter of low-voltage customer, is analyzed and determined:
201) judge whether to continue K days without positive active energy indicating value;And the terminal for excluding acquisition tables meter has been judged to terminal and master It stands without the case where ammeter is completely without data under communication, terminal;The meter nullified is excluded, the meter removed including user;
It 202) is local 485 communication when communicating, and K >=1 day, or communication are locally non-485 communication, and K >=2 day, then generate event Hinder early warning inventory, while carrying out early warning;
203) exception in fault pre-alarming inventory is studied and judged again, is communicated when communicating for local 485, and K >=2 day, or is logical News communicate for local non-485, and K >=3 day, then are judged as abnormal, generate intellectual water meter and continue more days without meter reading data failure work It is single;
204) abnormal work order list to be treated is generated;
3) no data fault diagnosis processing in more days is continued to intellectual water meter
301) abnormal work order list to be treated is obtained, diagnostic task item is read from knowledge base according to abnormal phenomenon;
302) front interface service is called, data are carried out to each task items and call survey together;
303) timing read calls together survey result table, compare each item data call together survey result and main website it is whether consistent;All unanimously then arrange It looks into abnormal caused by main website reason;When call together dendrometry lose or time-out, need to send in-situ processing;When one or more data are inconsistent When, further long-range processing is needed, main website reason includes: relevant parameter, task;If long-range processing failure, it is existing that there is still a need for groups Field processing;
4) long-range processing, when remotely being handled, remote diagnosis tasks item can execute parallel, including the following contents:
401) check and correction marketing archives;Compare terminal administrative area code, terminal address, the SOT state of termination, electric meter address, ammeter specification, Ammeter state, synchronous archive information when inconsistent;
402) terminal electric energy meter/AC sampling parameter is proofreaded;It compares each measurement point number, communication protocol type, address, lead to Rate and port numbers are interrogated, parameter is re-issued when parameter is inconsistent;
403) terminal task is proofreaded, the consistency of main website and terminal task is compared, acquisition equipment is re-issued when inconsistent and is appointed Business;
404) terminal clock is proofreaded, calls together and surveys acquisition terminal clock, be compared with main website, error is beyond progress terminal pair when requiring When;
405) proof list timing clock is called intellectual water meter clock together thoroughly, is compared with main website, and error is beyond progress meter pair when requiring When;
5) after the completion of long-range processing, judge whether long-range processing handles success, if handling successfully, carry out filing verification;If remote Journey processing is unsuccessful, then carries out in-situ processing;
6) after handling at the scene, filing verification is carried out, judges whether to restore, if restoring, terminated after filing;If not restoring, In-situ processing is then carried out again.
2. according to claim 1 continue the extremely long-range processing method of more days no datas based on intellectual water meter, feature exists In: the information collection mode of multiple-in-one includes electric energy meter wireless collection, the acquisition of electric energy meter bimodulus, communication result converter acquisition Mode.
3. according to claim 1 continue the extremely long-range processing method of more days no datas based on intellectual water meter, feature exists In: in electric energy meter wireless collection, electric energy meter and water, air and heat table use same wireless technology, and networking plan is different;Electric energy meter Communication unit forms point-to-multipoint star as the wireless communication module in water, air and heat table data insertion equipment, with water, air and heat table Type subnet is communicated, and realizes the acquisition of multilist data;
In the acquisition of electric energy meter bimodulus, electric energy meter communication unit uses power line carrier and micropower wireless double mode communication mode; Electric energy meter communication unit realizes wireless water, air and heat table by micropower wireless channel as water, air and heat table data insertion equipment Data acquisition;
In the acquisition of communication interface converter, communication interface converter acquires water, air and heat table data by different communication interface, Data are uploaded to by concentrator by power information acquisition system local communi-cation channel again, if water, air and heat table are equipped with valve control dress When setting, the DC power supply of direct current 12V/5V is provided.
4. according to claim 1 continue the extremely long-range processing method of more days no datas based on intellectual water meter, feature exists Remotely handle in: intellectual water meter acquisition abnormity the following steps are included:
A) it calls together and surveys terminal electric energy meter/ac sampling device configuration parameter;
B) whether alignment parameters and system are consistent, if then entering in next step, if it is not, then issuing terminal electric energy meter/AC sampling Device configuration parameter;
C) survey terminal task is called together;
D) judge whether terminal task is arranged if unanimously, entering in next step if it is not, then issuing task data with systems compliant Parameter;
E) survey terminal clock is called together;
F) whether consistent with main website terminal clock is judged, if unanimously, terminating, if it is not, then setting time to terminal.
CN201811396251.0A 2018-11-22 2018-11-22 Continue the extremely long-range processing method of more days no datas based on intellectual water meter Pending CN109697842A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811396251.0A CN109697842A (en) 2018-11-22 2018-11-22 Continue the extremely long-range processing method of more days no datas based on intellectual water meter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811396251.0A CN109697842A (en) 2018-11-22 2018-11-22 Continue the extremely long-range processing method of more days no datas based on intellectual water meter

Publications (1)

Publication Number Publication Date
CN109697842A true CN109697842A (en) 2019-04-30

Family

ID=66230162

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811396251.0A Pending CN109697842A (en) 2018-11-22 2018-11-22 Continue the extremely long-range processing method of more days no datas based on intellectual water meter

Country Status (1)

Country Link
CN (1) CN109697842A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110703179A (en) * 2019-09-05 2020-01-17 国网新疆电力有限公司电力科学研究院 Voltage and current metering exception handling method based on knowledge base
CN111932842A (en) * 2020-06-30 2020-11-13 上海威派格智慧水务股份有限公司 Online water meter fault alarm system

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013004062A (en) * 2011-06-22 2013-01-07 Nec Engineering Ltd Safety confirmation system
CN104360208A (en) * 2014-12-05 2015-02-18 国家电网公司 Acquisition failure analyzing and processing method of electricity utilization information acquisition operating and maintaining system
CN106781413A (en) * 2017-01-03 2017-05-31 国网江苏省电力公司电力科学研究院 The multilist collection that a kind of self adaptation is checked meter copies communication interface converter
CN107221147A (en) * 2017-05-23 2017-09-29 国网湖南省电力公司 Double nets fusion acquisition system of multiple-in-one
CN107230340A (en) * 2017-04-07 2017-10-03 国网浙江省电力公司电力科学研究院 A kind of electric energy meter copied available for multilist collection and system
CN107451742A (en) * 2017-08-04 2017-12-08 国网浙江省电力公司 A kind of electric energy meter continues the more days remote diagnosis processing methods without meter reading data failure
CN107566157A (en) * 2017-08-04 2018-01-09 国网浙江省电力公司 Remote diagnosis processing method of the ammeter completely without data fault under a kind of concentrator
CN107633670A (en) * 2017-07-21 2018-01-26 国网浙江省电力公司 A kind of acquisition abnormity diagnostic method using collection O&M knowledge base
CN108020807A (en) * 2017-08-04 2018-05-11 国网浙江省电力公司 A kind of electric energy meter continues the more days live defect elimination methods without meter reading data failure

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013004062A (en) * 2011-06-22 2013-01-07 Nec Engineering Ltd Safety confirmation system
CN104360208A (en) * 2014-12-05 2015-02-18 国家电网公司 Acquisition failure analyzing and processing method of electricity utilization information acquisition operating and maintaining system
CN106781413A (en) * 2017-01-03 2017-05-31 国网江苏省电力公司电力科学研究院 The multilist collection that a kind of self adaptation is checked meter copies communication interface converter
CN107230340A (en) * 2017-04-07 2017-10-03 国网浙江省电力公司电力科学研究院 A kind of electric energy meter copied available for multilist collection and system
CN107221147A (en) * 2017-05-23 2017-09-29 国网湖南省电力公司 Double nets fusion acquisition system of multiple-in-one
CN107633670A (en) * 2017-07-21 2018-01-26 国网浙江省电力公司 A kind of acquisition abnormity diagnostic method using collection O&M knowledge base
CN107451742A (en) * 2017-08-04 2017-12-08 国网浙江省电力公司 A kind of electric energy meter continues the more days remote diagnosis processing methods without meter reading data failure
CN107566157A (en) * 2017-08-04 2018-01-09 国网浙江省电力公司 Remote diagnosis processing method of the ammeter completely without data fault under a kind of concentrator
CN108020807A (en) * 2017-08-04 2018-05-11 国网浙江省电力公司 A kind of electric energy meter continues the more days live defect elimination methods without meter reading data failure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110703179A (en) * 2019-09-05 2020-01-17 国网新疆电力有限公司电力科学研究院 Voltage and current metering exception handling method based on knowledge base
CN111932842A (en) * 2020-06-30 2020-11-13 上海威派格智慧水务股份有限公司 Online water meter fault alarm system
CN111932842B (en) * 2020-06-30 2022-06-14 上海威派格智慧水务股份有限公司 Online water meter fault alarm system

Similar Documents

Publication Publication Date Title
DE202008014767U1 (en) System for location-independent power purchase and / or for location-independent power supply of a mobile storage and consumption unit
CN107563740B (en) Electric power transaction electricity purchasing management platform system and meter data acquisition method
CN101216984A (en) An electricity energy information acquisition integrated platform
DE102008044528A1 (en) Control device for a charging station for power supply and / or power supply of a mobile storage and consumption unit
CN112346000B (en) Intelligent electric energy meter operation error data statistical processing system and method
CN109697842A (en) Continue the extremely long-range processing method of more days no datas based on intellectual water meter
CN104346839B (en) A kind of employee's electronic attendance system based on LAN
CN109631953A (en) The long-range processing method of data acquisition abnormity based on gas meter, flow meter
CN113538790A (en) Electric energy meter and system supporting digital currency
CN104915895A (en) Remote real-time power utilization charge control method
CN112505614B (en) Intelligent electric energy meter online monitoring system and method
CN103138396A (en) Cloud power utilization monitoring system and method thereof
CN204376530U (en) Electric power data supervisory control system
CN103501256A (en) Method for testing interchangeability of local communication unit of electric energy meter
CN104699553A (en) Clock self-recovery method after failure in acquiring terminal clock battery with electrical information
CN112615428A (en) Line loss analysis and treatment system and method
CN106771707A (en) A kind of line loss analyzing service terminal
CN104237697B (en) A kind of new-energy automobile charging equipment test system
CN116467648A (en) Early monitoring method for nonlinear platform power failure based on Internet of things table
CN109737991A (en) A kind of long-range processing method of data acquisition abnormity towards gas meter, flow meter
CN113660553B (en) Positioning navigation centralized meter reading operation and maintenance system
CN204204051U (en) The long-range inspection device of electric substation
CN205622321U (en) Power consumer intelligent terminal suitable for automatic demand response
CN107403339A (en) A kind of marketing electricity box collecting method based on mobile terminal
CN105572614A (en) Metering device remote tour inspection system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190430

RJ01 Rejection of invention patent application after publication