CN109697842A - Continue the extremely long-range processing method of more days no datas based on intellectual water meter - Google Patents
Continue the extremely long-range processing method of more days no datas based on intellectual water meter Download PDFInfo
- Publication number
- CN109697842A CN109697842A CN201811396251.0A CN201811396251A CN109697842A CN 109697842 A CN109697842 A CN 109697842A CN 201811396251 A CN201811396251 A CN 201811396251A CN 109697842 A CN109697842 A CN 109697842A
- Authority
- CN
- China
- Prior art keywords
- terminal
- meter
- data
- water meter
- acquisition
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G08—SIGNALLING
- G08C—TRANSMISSION SYSTEMS FOR MEASURED VALUES, CONTROL OR SIMILAR SIGNALS
- G08C19/00—Electric signal transmission systems
-
- G—PHYSICS
- G08—SIGNALLING
- G08C—TRANSMISSION SYSTEMS FOR MEASURED VALUES, CONTROL OR SIMILAR SIGNALS
- G08C17/00—Arrangements for transmitting signals characterised by the use of a wireless electrical link
- G08C17/02—Arrangements for transmitting signals characterised by the use of a wireless electrical link using a radio link
Abstract
The invention discloses the extremely long-range processing method of more days no datas is continued based on intellectual water meter, it is related to a kind of long-range processing method of water meter.Currently, the O&M of intellectual water meter is typically all that the localized administrations such as gas company unit is responsible for, what can not remotely be handled turns relevant device localized administration unit, and working efficiency is low, and troubleshooting capabilities are weak.1) present invention is the following steps are included: obtain the data of water meter, and to the data of water meter into monitoring;2) it when persistently failing to collect the indicating value data of operation water meter of low-voltage customer, is analyzed and determined: 3) no data fault diagnosis processing in more days being continued to intellectual water meter;4) long-range processing, including check and correction marketing archives;Proofread terminal electric energy meter/AC sampling parameter;Proofread terminal task;Proofread terminal clock;Proof list timing clock.The technical program from many aspects, complete to realize remote diagnosis, processing, and accuracy is high, and effectively improves working efficiency, reduces cost by cooperation, improves troubleshooting capabilities.
Description
Technical field
The present invention relates to a kind of long-range processing methods of intellectual water meter, especially continue more days no datas based on intellectual water meter
Abnormal long-range processing method.
Background technique
The Guo Wang Committee of Development and Reform, Guo Wang Bureau of Energy were in joint publication " about the instruction for promoting smart grid development " in 2015
In mention taking into account and improve coal, electricity, oil, gas realm information Resources Sharing Mechanism, support water, gas and electricity, hot concentrated collection, construction across
Industry energy operation state data integration platform.Instruction accordingly, Guo Wang sales department has issued " closes about four tables of propulsion are accelerated
The notice of one acquisition applications work ", power information acquisition system is relied on, construction power supply is supplied water, gas supply, heat supply " multiple-in-one "
Acquisition system.
With construction and popularization and application that multiple-in-one acquires, water, air and heat table have been able to realize remote data acquisition,
But still relatively falls behind in application aspects such as exception monitoring, fault diagnosis, defect elimination management, lack similar power information acquisition abnormity defect elimination
Process, the defect elimination of current acquisition abnormity are broadly divided into long-range processing part and in-situ processing part, but the O&M of intellectual water meter
Typically the localized administrations unit such as water utilities company is responsible for, and troubleshooting capabilities are poor, and business processing working efficiency is poor.
Summary of the invention
The technical problem to be solved in the present invention and the technical assignment of proposition are to be improved and improved to prior art,
It provides and the extremely long-range processing method of more days no datas is continued based on intellectual water meter, promote troubleshooting capabilities to reach, and improve industry
The purpose of business processing working efficiency.For this purpose, the present invention takes following technical scheme.
Continue the extremely long-range processing method of more days no datas based on intellectual water meter, comprising the following steps:
1, the extremely long-range processing method of more days no datas is continued based on intellectual water meter, it is characterised in that the following steps are included:
1) data of intellectual water meter are obtained, and to the data of intellectual water meter into monitoring;
2) it when persistently failing to collect the indicating value data of operation intellectual water meter of low-voltage customer, is analyzed and determined:
201) judge whether to continue K days without positive active energy indicating value;And the terminal for excluding acquisition tables meter has been judged to terminal and master
It stands without the case where ammeter is completely without data under communication, terminal;And the meter nullified is excluded, the meter removed including user;
It 202) is local 485 communication when communicating, and K >=1 day, or communication are locally non-485 communication, and K >=2 day, then generate event
Hinder early warning inventory, while carrying out early warning;
203) exception in fault pre-alarming inventory is studied and judged again, is communicated when communicating for local 485, and K >=2 day, or is logical
News communicate for local non-485, and K >=3 day, then are judged as abnormal, generate intellectual water meter and continue more days without meter reading data failure work
It is single;
204) abnormal work order list to be treated is generated;
3) no data fault diagnosis processing in more days is continued to intellectual water meter
301) abnormal work order list to be treated is obtained, diagnostic task item is read from knowledge base according to abnormal phenomenon;
302) front interface service is called, data are carried out to each task items and call survey together;
303) timing read calls together survey result table, compare each item data call together survey result and main website it is whether consistent;All unanimously then arrange
It looks into abnormal caused by main website reason;When call together dendrometry lose or time-out, need to send in-situ processing;When one or more data are inconsistent
When, further long-range processing is needed, main website reason includes: relevant parameter, task;If long-range processing failure, it is existing that there is still a need for groups
Field processing;
4) long-range processing, when remotely being handled, remote diagnosis tasks item can execute parallel, including the following contents:
401) check and correction marketing archives;Compare terminal administrative area code, terminal address, the SOT state of termination, electric meter address, ammeter specification,
Ammeter state, synchronous archive information when inconsistent;
402) terminal electric energy meter/AC sampling parameter is proofreaded;It compares each measurement point number, communication protocol type, address, lead to
Rate and port numbers are interrogated, parameter is re-issued when parameter is inconsistent;
403) terminal task is proofreaded, the consistency of main website and terminal task is compared, acquisition equipment is re-issued when inconsistent and is appointed
Business;
404) terminal clock is proofreaded, calls together and surveys acquisition terminal clock, be compared with main website, error is beyond progress terminal pair when requiring
When;
405) proof list timing clock is called intellectual water meter clock together thoroughly, is compared with main website, and error is beyond progress meter pair when requiring
When;
5) after the completion of long-range processing, judge whether long-range processing handles success, if handling successfully, carry out filing verification;If remote
Journey processing is unsuccessful, then carries out in-situ processing;
6) after handling at the scene, filing verification is carried out, judges whether to restore, if restoring, terminated after filing;If not restoring,
In-situ processing is then carried out again.
The technical program from many aspects, complete to realize remote diagnosis, processing, and accuracy is high, and effectively improves work by cooperation
Efficiency reduces cost.
Further, the information collection mode of multiple-in-one includes electric energy meter wireless collection, the acquisition of electric energy meter bimodulus, communication
As a result converter acquisition mode.
Further, in electric energy meter wireless collection, electric energy meter and water, air and heat table use same wireless technology, networking side
Case is different;Electric energy meter communication unit is as the wireless communication module in water, air and heat table data insertion equipment, with water, air and heat table
Composition point-to-multipoint spoke subnet is communicated, and realizes the acquisition of multilist data;
In the acquisition of electric energy meter bimodulus, electric energy meter communication unit uses power line carrier and micropower wireless double mode communication mode;
Electric energy meter communication unit realizes wireless water, air and heat table by micropower wireless channel as water, air and heat table data insertion equipment
Data acquisition;
In the acquisition of communication interface converter, communication interface converter acquires water, air and heat table data by different communication interface,
Data are uploaded to by concentrator by power information acquisition system local communi-cation channel again, if water, air and heat table are equipped with valve control dress
When setting, the DC power supply of direct current 12V/5V is provided.
Further, intellectual water meter acquisition abnormity remotely handle the following steps are included:
A) it calls together and surveys terminal electric energy meter/ac sampling device configuration parameter;
B) whether alignment parameters and system are consistent, if then entering in next step, if it is not, then issuing terminal electric energy meter/AC sampling
Device configuration parameter;
C) survey terminal task is called together;
D) judge whether terminal task is arranged if unanimously, entering in next step if it is not, then issuing task data with systems compliant
Parameter;
E) survey terminal clock is called together;
F) whether consistent with main website terminal clock is judged, if unanimously, terminating, if it is not, then setting time to terminal.
The utility model has the advantages that the technical program, which facilitates staff, carries out failure exception type classification for intellectual water meter, carefully
Change troubleshooting steps, clear failure analysis method strengthens professional skill accident analysis, it is different further to promote multiple-in-one acquisition
Normal troubleshooting capabilities improve business processing working efficiency.
Since data collection system construction is related to main website, communication channel, acquisition equipment, measuring equipment etc., the amount of money of investment
It is huge, in water, air and heat investment field, extensive independent data collection system, the energy number such as water, air and heat are not yet established at present
According to generally by the way that local communication mode, access power user power consumption information acquisition system, shared data acquisition channel and master is transformed
System stand to realize the remote collection of data, support cost clearing, with can the business such as information monitoring, give full play to power information and adopt
Advantage in collecting system energy-consuming data set.
Detailed description of the invention
Fig. 1 is intellectual water meter acquisition abnormity defect elimination overall flow figure of the invention.
Fig. 2 is the extremely long-range process flow diagram of intellectual water meter of the invention.
Specific embodiment
Technical solution of the present invention is described in further detail below in conjunction with Figure of description.
As shown in Figure 1, the present invention the following steps are included:
1) data of intellectual water meter are obtained, and to the data of intellectual water meter into monitoring;
2) it when persistently failing to collect the indicating value data of operation intellectual water meter of low-voltage customer, is analyzed and determined:
201) judge whether to continue K days without positive active energy indicating value;And the terminal for excluding acquisition tables meter has been judged to terminal and master
It stands without the case where ammeter is completely without data under communication, terminal;And the meter nullified is excluded, the meter removed including user;
It 202) is local 485 communication when communicating, and K >=1 day, or communication are locally non-485 communication, and K >=2 day, then generate event
Hinder early warning inventory, while carrying out early warning;
203) exception in fault pre-alarming inventory is studied and judged again, is communicated when communicating for local 485, and K >=2 day, or
Communication communicates for local non-485, and K >=3 day, then is judged as abnormal, generates intellectual water meter and continues more days without meter reading data failure
Work order;
204) abnormal work order list to be treated is generated;
3) no data fault diagnosis processing in more days is continued to intellectual water meter
301) abnormal work order list to be treated is obtained, diagnostic task item is read from knowledge base according to abnormal phenomenon;
302) front interface service is called, data are carried out to each task items and call survey together;
303) timing read calls together survey result table, compare each item data call together survey result and main website it is whether consistent;All unanimously then arrange
Exception caused by main website reason is looked into, dendrometry is called together and loses or illustrate the condition for not having main website processing when overtime, be required to send live place
Reason;Inconsistent, specification exception is caused by main website reason, needs further long-range processing, and main website reason includes: relevant parameter, appoints
Business;If long-range processing failure, there is still a need for send in-situ processing;
4) long-range processing, when remotely being handled, remote diagnosis tasks item can execute parallel, including the following contents:
401) check and correction marketing archives;Compare terminal administrative area code, terminal address, the SOT state of termination, electric meter address, ammeter specification,
Ammeter state, synchronous archive information when inconsistent;
402) terminal electric energy meter/AC sampling parameter is proofreaded;It compares each measurement point number, communication protocol type, address, lead to
Rate and port numbers are interrogated, parameter is re-issued when parameter is inconsistent;
403) terminal task is proofreaded, the consistency of main website and terminal task is compared, acquisition equipment is re-issued when inconsistent and is appointed
Business;
404) terminal clock is proofreaded, calls together and surveys acquisition terminal clock, be compared with main website, error is beyond progress terminal pair when requiring
When;
405) proof list timing clock is called intellectual water meter clock together thoroughly, is compared with main website, and error is beyond progress meter pair when requiring
When;
5) after the completion of long-range processing, judge whether long-range processing handles success, if handling successfully, carry out filing verification;If remote
Journey processing is unsuccessful, then carries out in-situ processing;
6) after handling at the scene, filing verification is carried out, judges whether to restore, if restoring, terminated after filing;If not restoring,
In-situ processing is then carried out again.
Wherein, " multiple-in-one " information collection scheme should be according to building structure feature, and the distribution side of electricity, water, air and heat table
The factors such as formula and installation site reasonably select.It is also contemplated that when " multiple-in-one " the information collection scheme of selection and is acquired with power information
The fusion of system schema accesses.Acquisition scheme mainly has electric energy meter wireless collection, the acquisition of electric energy meter bimodulus, communication result converter
The modes such as acquisition.
The characteristics of electric energy meter wireless collection scheme is that electric energy meter and water, air and heat table use same wireless technology, but networking side
Case is different;Electric energy meter communication unit is as the wireless communication module in water, air and heat table data insertion equipment, with water, air and heat table
Composition point-to-multipoint spoke subnet is communicated, and realizes the acquisition of multilist data.The characteristics of electric energy meter bimodulus acquisition scheme is electric energy
Table communication unit uses power line carrier and micropower wireless double mode communication mode;Electric energy meter communication unit is as water, air and heat
Table data insertion equipment realizes wireless water by micropower wireless channel, the data of air and heat table acquire.Communication interface converter is adopted
The characteristics of collection scheme is that the communication mode of electric energy meter in original power information acquisition system can remain unchanged, communication interface converter
Water, air and heat table data are acquired by different communication interface, then will be in data by power information acquisition system local communi-cation channel
Concentrator is reached, if water, air and heat table are equipped with valve control device, also needs to provide the DC power supply of direct current 12V/5V.
As shown in Fig. 2, in the present embodiment, intellectual water meter acquisition abnormity remotely handle the following steps are included:
A) it calls together and surveys terminal electric energy meter/ac sampling device configuration parameter;
B) whether alignment parameters and system are consistent, if then entering in next step, if it is not, then issuing terminal electric energy meter/AC sampling
Device configuration parameter;
C) survey terminal task is called together;
D) judge whether terminal task is arranged if unanimously, entering in next step if it is not, then issuing task data with systems compliant
Parameter;
E) survey terminal clock is called together;
F) whether consistent with main website terminal clock is judged, if unanimously, terminating, if it is not, then setting time to terminal.
Figure 1 above, to continue the extremely long-range processing method of more days no datas based on intellectual water meter shown in 2 be tool of the invention
Body embodiment has embodied substantive distinguishing features of the present invention and progress, needs can be used according to actual, in enlightenment of the invention
Under, the equivalent modifications of shape, structure etc., the column in the protection scope of this programme are carried out to it.
Claims (4)
1. continuing the extremely long-range processing method of more days no datas based on intellectual water meter, it is characterised in that the following steps are included:
1) data of intellectual water meter are obtained, and to the data of intellectual water meter into monitoring;
2) it when persistently failing to collect the indicating value data of operation intellectual water meter of low-voltage customer, is analyzed and determined:
201) judge whether to continue K days without positive active energy indicating value;And the terminal for excluding acquisition tables meter has been judged to terminal and master
It stands without the case where ammeter is completely without data under communication, terminal;The meter nullified is excluded, the meter removed including user;
It 202) is local 485 communication when communicating, and K >=1 day, or communication are locally non-485 communication, and K >=2 day, then generate event
Hinder early warning inventory, while carrying out early warning;
203) exception in fault pre-alarming inventory is studied and judged again, is communicated when communicating for local 485, and K >=2 day, or is logical
News communicate for local non-485, and K >=3 day, then are judged as abnormal, generate intellectual water meter and continue more days without meter reading data failure work
It is single;
204) abnormal work order list to be treated is generated;
3) no data fault diagnosis processing in more days is continued to intellectual water meter
301) abnormal work order list to be treated is obtained, diagnostic task item is read from knowledge base according to abnormal phenomenon;
302) front interface service is called, data are carried out to each task items and call survey together;
303) timing read calls together survey result table, compare each item data call together survey result and main website it is whether consistent;All unanimously then arrange
It looks into abnormal caused by main website reason;When call together dendrometry lose or time-out, need to send in-situ processing;When one or more data are inconsistent
When, further long-range processing is needed, main website reason includes: relevant parameter, task;If long-range processing failure, it is existing that there is still a need for groups
Field processing;
4) long-range processing, when remotely being handled, remote diagnosis tasks item can execute parallel, including the following contents:
401) check and correction marketing archives;Compare terminal administrative area code, terminal address, the SOT state of termination, electric meter address, ammeter specification,
Ammeter state, synchronous archive information when inconsistent;
402) terminal electric energy meter/AC sampling parameter is proofreaded;It compares each measurement point number, communication protocol type, address, lead to
Rate and port numbers are interrogated, parameter is re-issued when parameter is inconsistent;
403) terminal task is proofreaded, the consistency of main website and terminal task is compared, acquisition equipment is re-issued when inconsistent and is appointed
Business;
404) terminal clock is proofreaded, calls together and surveys acquisition terminal clock, be compared with main website, error is beyond progress terminal pair when requiring
When;
405) proof list timing clock is called intellectual water meter clock together thoroughly, is compared with main website, and error is beyond progress meter pair when requiring
When;
5) after the completion of long-range processing, judge whether long-range processing handles success, if handling successfully, carry out filing verification;If remote
Journey processing is unsuccessful, then carries out in-situ processing;
6) after handling at the scene, filing verification is carried out, judges whether to restore, if restoring, terminated after filing;If not restoring,
In-situ processing is then carried out again.
2. according to claim 1 continue the extremely long-range processing method of more days no datas based on intellectual water meter, feature exists
In: the information collection mode of multiple-in-one includes electric energy meter wireless collection, the acquisition of electric energy meter bimodulus, communication result converter acquisition
Mode.
3. according to claim 1 continue the extremely long-range processing method of more days no datas based on intellectual water meter, feature exists
In: in electric energy meter wireless collection, electric energy meter and water, air and heat table use same wireless technology, and networking plan is different;Electric energy meter
Communication unit forms point-to-multipoint star as the wireless communication module in water, air and heat table data insertion equipment, with water, air and heat table
Type subnet is communicated, and realizes the acquisition of multilist data;
In the acquisition of electric energy meter bimodulus, electric energy meter communication unit uses power line carrier and micropower wireless double mode communication mode;
Electric energy meter communication unit realizes wireless water, air and heat table by micropower wireless channel as water, air and heat table data insertion equipment
Data acquisition;
In the acquisition of communication interface converter, communication interface converter acquires water, air and heat table data by different communication interface,
Data are uploaded to by concentrator by power information acquisition system local communi-cation channel again, if water, air and heat table are equipped with valve control dress
When setting, the DC power supply of direct current 12V/5V is provided.
4. according to claim 1 continue the extremely long-range processing method of more days no datas based on intellectual water meter, feature exists
Remotely handle in: intellectual water meter acquisition abnormity the following steps are included:
A) it calls together and surveys terminal electric energy meter/ac sampling device configuration parameter;
B) whether alignment parameters and system are consistent, if then entering in next step, if it is not, then issuing terminal electric energy meter/AC sampling
Device configuration parameter;
C) survey terminal task is called together;
D) judge whether terminal task is arranged if unanimously, entering in next step if it is not, then issuing task data with systems compliant
Parameter;
E) survey terminal clock is called together;
F) whether consistent with main website terminal clock is judged, if unanimously, terminating, if it is not, then setting time to terminal.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811396251.0A CN109697842A (en) | 2018-11-22 | 2018-11-22 | Continue the extremely long-range processing method of more days no datas based on intellectual water meter |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811396251.0A CN109697842A (en) | 2018-11-22 | 2018-11-22 | Continue the extremely long-range processing method of more days no datas based on intellectual water meter |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109697842A true CN109697842A (en) | 2019-04-30 |
Family
ID=66230162
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811396251.0A Pending CN109697842A (en) | 2018-11-22 | 2018-11-22 | Continue the extremely long-range processing method of more days no datas based on intellectual water meter |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109697842A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110703179A (en) * | 2019-09-05 | 2020-01-17 | 国网新疆电力有限公司电力科学研究院 | Voltage and current metering exception handling method based on knowledge base |
CN111932842A (en) * | 2020-06-30 | 2020-11-13 | 上海威派格智慧水务股份有限公司 | Online water meter fault alarm system |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2013004062A (en) * | 2011-06-22 | 2013-01-07 | Nec Engineering Ltd | Safety confirmation system |
CN104360208A (en) * | 2014-12-05 | 2015-02-18 | 国家电网公司 | Acquisition failure analyzing and processing method of electricity utilization information acquisition operating and maintaining system |
CN106781413A (en) * | 2017-01-03 | 2017-05-31 | 国网江苏省电力公司电力科学研究院 | The multilist collection that a kind of self adaptation is checked meter copies communication interface converter |
CN107221147A (en) * | 2017-05-23 | 2017-09-29 | 国网湖南省电力公司 | Double nets fusion acquisition system of multiple-in-one |
CN107230340A (en) * | 2017-04-07 | 2017-10-03 | 国网浙江省电力公司电力科学研究院 | A kind of electric energy meter copied available for multilist collection and system |
CN107451742A (en) * | 2017-08-04 | 2017-12-08 | 国网浙江省电力公司 | A kind of electric energy meter continues the more days remote diagnosis processing methods without meter reading data failure |
CN107566157A (en) * | 2017-08-04 | 2018-01-09 | 国网浙江省电力公司 | Remote diagnosis processing method of the ammeter completely without data fault under a kind of concentrator |
CN107633670A (en) * | 2017-07-21 | 2018-01-26 | 国网浙江省电力公司 | A kind of acquisition abnormity diagnostic method using collection O&M knowledge base |
CN108020807A (en) * | 2017-08-04 | 2018-05-11 | 国网浙江省电力公司 | A kind of electric energy meter continues the more days live defect elimination methods without meter reading data failure |
-
2018
- 2018-11-22 CN CN201811396251.0A patent/CN109697842A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2013004062A (en) * | 2011-06-22 | 2013-01-07 | Nec Engineering Ltd | Safety confirmation system |
CN104360208A (en) * | 2014-12-05 | 2015-02-18 | 国家电网公司 | Acquisition failure analyzing and processing method of electricity utilization information acquisition operating and maintaining system |
CN106781413A (en) * | 2017-01-03 | 2017-05-31 | 国网江苏省电力公司电力科学研究院 | The multilist collection that a kind of self adaptation is checked meter copies communication interface converter |
CN107230340A (en) * | 2017-04-07 | 2017-10-03 | 国网浙江省电力公司电力科学研究院 | A kind of electric energy meter copied available for multilist collection and system |
CN107221147A (en) * | 2017-05-23 | 2017-09-29 | 国网湖南省电力公司 | Double nets fusion acquisition system of multiple-in-one |
CN107633670A (en) * | 2017-07-21 | 2018-01-26 | 国网浙江省电力公司 | A kind of acquisition abnormity diagnostic method using collection O&M knowledge base |
CN107451742A (en) * | 2017-08-04 | 2017-12-08 | 国网浙江省电力公司 | A kind of electric energy meter continues the more days remote diagnosis processing methods without meter reading data failure |
CN107566157A (en) * | 2017-08-04 | 2018-01-09 | 国网浙江省电力公司 | Remote diagnosis processing method of the ammeter completely without data fault under a kind of concentrator |
CN108020807A (en) * | 2017-08-04 | 2018-05-11 | 国网浙江省电力公司 | A kind of electric energy meter continues the more days live defect elimination methods without meter reading data failure |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110703179A (en) * | 2019-09-05 | 2020-01-17 | 国网新疆电力有限公司电力科学研究院 | Voltage and current metering exception handling method based on knowledge base |
CN111932842A (en) * | 2020-06-30 | 2020-11-13 | 上海威派格智慧水务股份有限公司 | Online water meter fault alarm system |
CN111932842B (en) * | 2020-06-30 | 2022-06-14 | 上海威派格智慧水务股份有限公司 | Online water meter fault alarm system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE202008014767U1 (en) | System for location-independent power purchase and / or for location-independent power supply of a mobile storage and consumption unit | |
CN107563740B (en) | Electric power transaction electricity purchasing management platform system and meter data acquisition method | |
CN101216984A (en) | An electricity energy information acquisition integrated platform | |
DE102008044528A1 (en) | Control device for a charging station for power supply and / or power supply of a mobile storage and consumption unit | |
CN112346000B (en) | Intelligent electric energy meter operation error data statistical processing system and method | |
CN109697842A (en) | Continue the extremely long-range processing method of more days no datas based on intellectual water meter | |
CN104346839B (en) | A kind of employee's electronic attendance system based on LAN | |
CN109631953A (en) | The long-range processing method of data acquisition abnormity based on gas meter, flow meter | |
CN113538790A (en) | Electric energy meter and system supporting digital currency | |
CN104915895A (en) | Remote real-time power utilization charge control method | |
CN112505614B (en) | Intelligent electric energy meter online monitoring system and method | |
CN103138396A (en) | Cloud power utilization monitoring system and method thereof | |
CN204376530U (en) | Electric power data supervisory control system | |
CN103501256A (en) | Method for testing interchangeability of local communication unit of electric energy meter | |
CN104699553A (en) | Clock self-recovery method after failure in acquiring terminal clock battery with electrical information | |
CN112615428A (en) | Line loss analysis and treatment system and method | |
CN106771707A (en) | A kind of line loss analyzing service terminal | |
CN104237697B (en) | A kind of new-energy automobile charging equipment test system | |
CN116467648A (en) | Early monitoring method for nonlinear platform power failure based on Internet of things table | |
CN109737991A (en) | A kind of long-range processing method of data acquisition abnormity towards gas meter, flow meter | |
CN113660553B (en) | Positioning navigation centralized meter reading operation and maintenance system | |
CN204204051U (en) | The long-range inspection device of electric substation | |
CN205622321U (en) | Power consumer intelligent terminal suitable for automatic demand response | |
CN107403339A (en) | A kind of marketing electricity box collecting method based on mobile terminal | |
CN105572614A (en) | Metering device remote tour inspection system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190430 |
|
RJ01 | Rejection of invention patent application after publication |