CN107451742A - A kind of electric energy meter continues the more days remote diagnosis processing methods without meter reading data failure - Google Patents
A kind of electric energy meter continues the more days remote diagnosis processing methods without meter reading data failure Download PDFInfo
- Publication number
- CN107451742A CN107451742A CN201710659880.7A CN201710659880A CN107451742A CN 107451742 A CN107451742 A CN 107451742A CN 201710659880 A CN201710659880 A CN 201710659880A CN 107451742 A CN107451742 A CN 107451742A
- Authority
- CN
- China
- Prior art keywords
- electric energy
- terminal
- energy meter
- task
- meter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000004171 remote diagnosis Methods 0.000 title claims abstract description 16
- 238000003672 processing method Methods 0.000 title claims abstract description 12
- 238000012545 processing Methods 0.000 claims abstract description 14
- 238000004458 analytical method Methods 0.000 claims abstract description 10
- 230000002159 abnormal effect Effects 0.000 claims abstract description 4
- 238000011084 recovery Methods 0.000 claims abstract description 4
- 238000005070 sampling Methods 0.000 claims description 10
- 230000005611 electricity Effects 0.000 claims description 5
- 238000004891 communication Methods 0.000 claims description 4
- 238000003745 diagnosis Methods 0.000 claims description 3
- 230000001360 synchronised effect Effects 0.000 claims description 3
- 238000012423 maintenance Methods 0.000 abstract description 6
- 238000011065 in-situ storage Methods 0.000 abstract description 4
- 238000011161 development Methods 0.000 abstract description 3
- 238000011835 investigation Methods 0.000 abstract description 3
- 238000007726 management method Methods 0.000 description 3
- 241000208340 Araliaceae Species 0.000 description 1
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 description 1
- 235000003140 Panax quinquefolius Nutrition 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 235000008434 ginseng Nutrition 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000001502 supplementing effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0635—Risk analysis of enterprise or organisation activities
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04J—MULTIPLEX COMMUNICATION
- H04J3/00—Time-division multiplex systems
- H04J3/02—Details
- H04J3/06—Synchronising arrangements
- H04J3/0635—Clock or time synchronisation in a network
- H04J3/0638—Clock or time synchronisation among nodes; Internode synchronisation
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Health & Medical Sciences (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Public Health (AREA)
- Primary Health Care (AREA)
- Water Supply & Treatment (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- General Health & Medical Sciences (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
A kind of electric energy meter continues the more days remote diagnosis processing methods without meter reading data failure, is related to power network collection O&M field.At present, when electric energy meter continues more days without meter reading data, because situation is complicated, in-situ processing mode, cost of human resources height are removed by using work is sent.The present invention comprises the following steps:1)Archives anomaly analysis;2)Abnormal parameters are analyzed;3)Task abnormity is analyzed;4)Clock anomaly analysis;5)After remote diagnosis processing, to filing for fault recovery, the still unrecovered investigation processing for needing to send work to carry out scene of failure.The technical program carries out analyzing judgement processing step by step successively, improves the speed for solving failure, avoids replicate analysis from handling;Avoiding must send work to go the situation of in-situ processing once electric energy meter occur and continuing more days without meter reading data, save cost of human resources, ensure that the efficient development of collection maintenance work.
Description
Technical field
The present invention relates to power network collection O&M field, more particularly to a kind of electric energy meter to continue more days without meter reading data failure
Remote diagnosis processing method.
Background technology
Grid company all-round popularization power information acquisition system from 2010(Hereinafter referred to as " acquisition system ").By
The end of the year 2014, unified collection coverage rate have reached 70% or so, and part net provincial company has realized collection all standing.With collection
All standing work is gradually completing, and collecting work center of gravity just progressively switchs to system operation from system Construction and safeguarded.To ensure to gather
System is safe and stable, reliable, Effec-tive Function, specification acquisition system operation maintenance work, strengthens acquisition system operation maintenance closed loop
Management, acquisition system application level is improved, according to《State Grid Corporation of China's power information acquisition system operation maintenance management method》
It is required that in O&M closed loop management flow is gathered, remote processing has become the priority treatment means of acquisition abnormity;At present, when
When electric energy meter continues more days without meter reading data, because situation is complicated, by using sending work to go in-situ processing mode, human resources into
This height, and influence the efficient development of collection maintenance work.
The content of the invention
The technical problem to be solved in the present invention and the technical assignment proposed are prior art to be improved with being improved,
A kind of electric energy meter is provided and continues the more days remote diagnosis processing methods without meter reading data failure, manpower purpose is reduced to reach.For
This, the present invention takes following technical scheme.
A kind of electric energy meter continues the more days remote diagnosis processing methods without meter reading data failure, it is characterised in that including following
Step:
1)Archives anomaly analysis, judge whether user/terminal/electric energy meter archives are identical with marketing archives, if identical, carry out down
One step, otherwise according to marketing archives, synchronous archive information;
2)Abnormal parameters are analyzed, and are called survey terminal/electric energy meter/ac sampling device configuration parameter together, will be called the parameter measured and collection together
System file is compared, if unanimously, in next step, otherwise re-issue terminal/electric energy meter/ac sampling device and match somebody with somebody
Put parameter;
3)Task abnormity analyze, call together survey terminal task data arrange parameter, and with the task in acquisition system terminal task list
Data arrange parameter is compared, if unanimously, carrying out in next step, otherwise re-issuing task data arrange parameter;
4)Clock anomaly analysis, compare terminal/meter clock and call survey together, meter/terminal is set time;When calling survey terminal calendar together
Clock, be compared with main website GPRS clocks, if terminal clock with main website GPRS clocking errors in allowed limits, remotely
Diagnosis terminates, and otherwise remotely terminal is set time;
5)After remote diagnosis processing, to filing for fault recovery, the still unrecovered row for needing to send work to carry out scene of failure
Investigate and prosecute reason.
The technical program carries out analyzing judgement processing step by step successively, improves the speed for solving failure, avoids replicate analysis
Processing.
The technical program avoids must send work to go in-situ processing once electric energy meter occur and continuing more days without meter reading data
Situation, saved cost of human resources, ensure that collection maintenance work efficient development.
As further improving and supplementing to above-mentioned technical proposal, present invention additionally comprises following additional technical feature.
In step 1), archives compare include with every family number, electricity consumption address, user capacity, taiwan area numbering, with electrical properties,
Industry numbering, user type, installed date;Ammeter asset number, ammeter multiplying power, ammeter table address, CT no-load voltage ratios, PT no-load voltage ratios, communication
Address, communication protocol, meter digit, the mode of connection;Terminal wealth number, terminal address, terminal type, SIM card number, collection side
Formula.
In step 2), configuration parameter, which is set, to be included(AFN=04H)F10 terminals electric energy meter/ac sampling device configuration ginseng
Number, parameter include electric energy meter address, electric energy meter stipulations, baud rate, port numbers, CT no-load voltage ratios, PT no-load voltage ratio parameters;In step 3)
In, task data, which is set, to be included(AFN=04H)F65 timings report 1 class data task to set, F66 timings report 2 class data tasks
Set;Parameter includes task number, task names, measures period, task status, report fiducial time, report cycle unit, report
Cycle parameter.
In step 4), main website calls survey 1 class data of request together(AFN=0CH)F2 terminal calendar clocks.
Beneficial effect:The technical program automatic comparison archive information, compare terminal electric energy meter or AC sampling parameter, compare
Terminal task, the relevant parameters such as clock are compared, corrected for discrepant parameter, realize field electric energy table parameter and main website
Unanimously, artificial investigation is reduced, and then improves the operating efficiency of collection O&M.
Brief description of the drawings
Fig. 1 is flow chart of the present invention.
Embodiment
Technical scheme is described in further detail below in conjunction with Figure of description.
As shown in figure 1, the present invention comprises the following steps:
1)Archives anomaly analysis, judge whether archives are identical with marketing archives, if identical, into a step, otherwise according to marketing
Archives, synchronous archive information;Archives compare include with every family number, electricity consumption address, user capacity, taiwan area numbering, with electrical properties, OK
Industry numbering, user type, installed date;Ammeter asset number, ammeter multiplying power, ammeter table address, CT no-load voltage ratios, PT no-load voltage ratios, communicatively
Location, communication protocol, meter digit, the mode of connection;Terminal wealth number, terminal address, terminal type, SIM card number, acquisition mode.
2)Abnormal parameters are analyzed, and call survey terminal/electric energy meter/ac sampling device configuration parameter together, will call together the parameter that measures with
Acquisition system archives are compared, if unanimously, in next step, otherwise re-issue terminal electric energy/ac sampling device and match somebody with somebody
Put parameter;Configuration parameter, which is set, to be included(AFN=04H)F10 terminals electric energy meter/ac sampling device configuration parameter, parameter include electricity
Can table table address, electric energy meter stipulations, baud rate, port numbers, CT no-load voltage ratios, PT no-load voltage ratio parameters.
3)Task abnormity analyze, call together survey terminal task data arrange parameter, and with acquisition system terminal task list
Task data arrange parameter is compared, if unanimously, carrying out in next step, otherwise re-issuing task data arrange parameter;Appoint
Business data arrange parameter includes task number, task names, measures period, task status, reports fiducial time, report cycle list
Position, report cycle parameter;Task data, which is set, to be included(AFN=04H)F65 timings report 1 class data task to set, in F66 timings
2 class data tasks are reported to set.
4)Clock anomaly analysis, compare terminal/meter clock and call survey together, meter/terminal is set time;Call survey terminal calendar together
Clock, be compared with main website GPRS clocks, if terminal clock with main website GPRS clocking errors in allowed limits, far
Journey diagnosis terminates, and otherwise remotely terminal is set time, and main website calls the calendar clock for surveying terminal together and asks 1 class data to call survey together(AFN
=0CH)F2 terminal calendar clocks.
5)After remote diagnosis processing, to filing for fault recovery, failure is still unrecovered to be needed to send work to carry out scene
Investigation processing.
It is this hair that a kind of electric energy meter shown in figure 1 above, which continues the more days remote diagnosis processing methods without meter reading data failure,
Bright specific embodiment, substantive distinguishing features of the present invention and progress are embodied, can be according to the use needs of reality, in the present invention
Enlightenment under, carry out equivalent modifications to it, this programme protection domain row.
Claims (5)
1. a kind of electric energy meter continues the more days remote diagnosis processing methods without meter reading data failure, it is characterised in that including following step
Suddenly:
1)Archives anomaly analysis, judge whether user/terminal/electric energy meter archives are identical with marketing archives, if identical, carry out down
One step, otherwise according to marketing archives, synchronous archive information;
2)Abnormal parameters are analyzed, and are called survey terminal/electric energy meter/ac sampling device configuration parameter together, will be called the parameter measured and collection together
System file is compared, if unanimously, carrying out in next step, otherwise re-issuing terminal/electric energy meter/ac sampling device configuration
Parameter;
3)Task abnormity analyze, call together survey terminal task data arrange parameter, and with the task in acquisition system terminal task list
Data arrange parameter is compared, if unanimously, carrying out in next step, otherwise re-issuing task data arrange parameter;
4)Clock anomaly analysis, compare terminal/meter clock and call survey together, meter/terminal is set time;When calling survey terminal calendar together
Clock, be compared with main website GPRS clocks, if terminal clock with main website GPRS clocking errors in allowed limits, remotely
Diagnosis terminates, and otherwise remotely terminal is set time;
5)After remote diagnosis processing, to filing for fault recovery, the still unrecovered row for needing to send work to carry out scene of failure
Investigate and prosecute reason.
2. a kind of electric energy meter according to claim 1 continues the more days remote diagnosis processing methods without meter reading data failure,
It is characterized in that:In step 1), archives compare include with every family number, electricity consumption address, user capacity, taiwan area numbering, electricity consumption category
Property, industry numbering, user type, installed date;It is ammeter asset number, ammeter multiplying power, ammeter table address, CT no-load voltage ratios, PT no-load voltage ratios, logical
Interrogate address, communication protocol, meter digit, the mode of connection;Terminal wealth number, terminal address, terminal type, SIM card number, collection side
Formula.
3. a kind of electric energy meter according to claim 1 continues the more days remote diagnosis processing methods without meter reading data failure,
It is characterized in that:In step 2), configuration parameter, which is set, to be included(AFN=04H)F10 terminals electric energy meter/ac sampling device configuration
Parameter, parameter include electric energy meter address, electric energy meter stipulations, baud rate, port numbers, CT no-load voltage ratios, PT no-load voltage ratio parameters.
4. a kind of electric energy meter according to claim 1 continues the more days remote diagnosis processing methods without meter reading data failure,
It is characterized in that:In step 3), task data, which is set, to be included(AFN=04H)F65 timings report 1 class data task to set, F66
Timing reports 2 class data tasks to set;When parameter includes task number, task names, measures period, task status, reports benchmark
Between, report cycle unit, report cycle parameter.
5. a kind of electric energy meter according to claim 1 continues the more days remote diagnosis processing methods without meter reading data failure,
It is characterized in that:In step 4), main website calls survey 1 class data of request together(AFN=0CH)F2 terminal calendar clocks.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710659880.7A CN107451742A (en) | 2017-08-04 | 2017-08-04 | A kind of electric energy meter continues the more days remote diagnosis processing methods without meter reading data failure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710659880.7A CN107451742A (en) | 2017-08-04 | 2017-08-04 | A kind of electric energy meter continues the more days remote diagnosis processing methods without meter reading data failure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107451742A true CN107451742A (en) | 2017-12-08 |
Family
ID=60489920
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710659880.7A Pending CN107451742A (en) | 2017-08-04 | 2017-08-04 | A kind of electric energy meter continues the more days remote diagnosis processing methods without meter reading data failure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107451742A (en) |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108010305A (en) * | 2017-12-14 | 2018-05-08 | 深圳市科陆电子科技股份有限公司 | A kind of self-diagnosing method of comprehensive energy management platform data acquisition failure |
CN108614138A (en) * | 2018-04-03 | 2018-10-02 | 广东电网有限责任公司 | Data benefit based on metering device itself copies mechanism |
CN108919172A (en) * | 2018-07-27 | 2018-11-30 | 国家电网有限公司 | A kind of automatic time synchronization method of electric energy meter, device and terminal device |
CN109631953A (en) * | 2018-11-22 | 2019-04-16 | 国网新疆电力有限公司电力科学研究院 | The long-range processing method of data acquisition abnormity based on gas meter, flow meter |
CN109697842A (en) * | 2018-11-22 | 2019-04-30 | 国网安徽省电力有限公司电力科学研究院 | Continue the extremely long-range processing method of more days no datas based on intellectual water meter |
CN109885021A (en) * | 2019-02-15 | 2019-06-14 | 中国电力科学研究院有限公司 | A kind of method and system that acquisition equipment is monitored based on real-time data collection |
CN109982284A (en) * | 2019-02-21 | 2019-07-05 | 国网山东省电力公司临沂供电公司 | Communication system and method for line data-logging |
CN110047014A (en) * | 2019-01-04 | 2019-07-23 | 国网浙江省电力有限公司电力科学研究院 | A kind of user's electricity data restorative procedure based on load curve and history electricity |
CN110070257A (en) * | 2019-01-04 | 2019-07-30 | 国网浙江省电力有限公司 | A kind of electric power acquisition O&M object portrait method based on label |
CN111045319A (en) * | 2019-12-12 | 2020-04-21 | 广西电网有限责任公司 | Method for automatically correcting clock differentiation of electric energy meter |
CN111398675A (en) * | 2020-03-26 | 2020-07-10 | 杭州电瓦特信息技术有限责任公司 | Electric energy meter reading method, device and system |
CN112287003A (en) * | 2020-09-24 | 2021-01-29 | 杭州海兴电力科技股份有限公司 | Meter reading method and meter reading system |
CN116681263A (en) * | 2023-07-28 | 2023-09-01 | 国网湖北省电力有限公司超高压公司 | Electric power data management method and system based on internal model market |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104394020A (en) * | 2014-12-04 | 2015-03-04 | 国家电网公司 | Automatic fault processing and safety control system and method for power information collection device |
-
2017
- 2017-08-04 CN CN201710659880.7A patent/CN107451742A/en active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104394020A (en) * | 2014-12-04 | 2015-03-04 | 国家电网公司 | Automatic fault processing and safety control system and method for power information collection device |
Non-Patent Citations (1)
Title |
---|
于立新等编: "《内蒙古电力公司企业标准汇编》", 31 October 2013, 中国电力出版社 * |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108010305A (en) * | 2017-12-14 | 2018-05-08 | 深圳市科陆电子科技股份有限公司 | A kind of self-diagnosing method of comprehensive energy management platform data acquisition failure |
CN108010305B (en) * | 2017-12-14 | 2020-06-30 | 深圳市科陆电子科技股份有限公司 | Self-diagnosis method for data acquisition fault of integrated energy management platform |
CN108614138A (en) * | 2018-04-03 | 2018-10-02 | 广东电网有限责任公司 | Data benefit based on metering device itself copies mechanism |
CN108919172A (en) * | 2018-07-27 | 2018-11-30 | 国家电网有限公司 | A kind of automatic time synchronization method of electric energy meter, device and terminal device |
CN109631953A (en) * | 2018-11-22 | 2019-04-16 | 国网新疆电力有限公司电力科学研究院 | The long-range processing method of data acquisition abnormity based on gas meter, flow meter |
CN109697842A (en) * | 2018-11-22 | 2019-04-30 | 国网安徽省电力有限公司电力科学研究院 | Continue the extremely long-range processing method of more days no datas based on intellectual water meter |
CN110070257A (en) * | 2019-01-04 | 2019-07-30 | 国网浙江省电力有限公司 | A kind of electric power acquisition O&M object portrait method based on label |
CN110047014A (en) * | 2019-01-04 | 2019-07-23 | 国网浙江省电力有限公司电力科学研究院 | A kind of user's electricity data restorative procedure based on load curve and history electricity |
CN110047014B (en) * | 2019-01-04 | 2024-04-23 | 国网浙江省电力有限公司电力科学研究院 | User electric quantity data restoration method based on load curve and historical electric quantity |
CN109885021A (en) * | 2019-02-15 | 2019-06-14 | 中国电力科学研究院有限公司 | A kind of method and system that acquisition equipment is monitored based on real-time data collection |
CN109982284A (en) * | 2019-02-21 | 2019-07-05 | 国网山东省电力公司临沂供电公司 | Communication system and method for line data-logging |
CN111045319A (en) * | 2019-12-12 | 2020-04-21 | 广西电网有限责任公司 | Method for automatically correcting clock differentiation of electric energy meter |
CN111398675A (en) * | 2020-03-26 | 2020-07-10 | 杭州电瓦特信息技术有限责任公司 | Electric energy meter reading method, device and system |
CN112287003A (en) * | 2020-09-24 | 2021-01-29 | 杭州海兴电力科技股份有限公司 | Meter reading method and meter reading system |
CN116681263A (en) * | 2023-07-28 | 2023-09-01 | 国网湖北省电力有限公司超高压公司 | Electric power data management method and system based on internal model market |
CN116681263B (en) * | 2023-07-28 | 2023-11-07 | 国网湖北省电力有限公司超高压公司 | Electric power data management method and system based on internal model market |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107451742A (en) | A kind of electric energy meter continues the more days remote diagnosis processing methods without meter reading data failure | |
CN107566157A (en) | Remote diagnosis processing method of the ammeter completely without data fault under a kind of concentrator | |
CN101650847B (en) | Check gauge of prepayment IC-card electric energy meter and method thereof | |
CN101557111B (en) | Intelligent screening processing system for electricity consumption gathering data | |
CN103454516A (en) | Intelligent transformer substation secondary equipment health state diagnosis method | |
CN102436624A (en) | Method for processing flow and standard of power-marketing site services on basis of handheld terminal | |
CN104394020A (en) | Automatic fault processing and safety control system and method for power information collection device | |
CN110728836A (en) | Concentrator meter reading abnormity analysis method and system | |
CN102419903B (en) | Semiautomatic meter reading device and meter reading method thereof | |
CN103200051A (en) | Intelligent substation message simulation testing and association message analysis system and method | |
CN202939301U (en) | Remote monitoring diagnosis system of electric energy metering device | |
CN101957396A (en) | On-line monitoring device and method for voltage quality of electric power system | |
CN202600765U (en) | Data comprehensive management system for intelligent power supply system | |
CN101846708B (en) | Method for detecting power-failure counting function of distribution transformer terminals in batch | |
CN104574207A (en) | Regional power grid electric quantity analyzing and counting system | |
CN107817401A (en) | The method for testing pressure and device of a kind of power information acquisition system | |
CN104392603B (en) | A kind of live power information collecting device intelligent diagnosis system | |
CN107655515A (en) | A kind of acquisition terminal and live defect elimination method of the main website without communication failure | |
CN106443171A (en) | System and method for metering data of power bus during power failure of power utilization equipment | |
CN108093039B (en) | Method for processing sleeping electric meter based on national network Q/GDW3761 protocol | |
CN113284003B (en) | Electric power transaction data processing method, device and equipment based on double-core intelligent electric meter | |
CN203102588U (en) | Intelligent electric energy meter data acquisition device | |
CN104614700B (en) | Remote monitoring and diagnosing method for electric energy metering device with good real-time performance | |
CN205247604U (en) | Offline electric power measurement data acquisition and processing system | |
CN104699553A (en) | Clock self-recovery method after failure in acquiring terminal clock battery with electrical information |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171208 |
|
RJ01 | Rejection of invention patent application after publication |