CN109695258A - A kind of band bell and spigot antiseep inspection shaft and construction method - Google Patents

A kind of band bell and spigot antiseep inspection shaft and construction method Download PDF

Info

Publication number
CN109695258A
CN109695258A CN201910066135.0A CN201910066135A CN109695258A CN 109695258 A CN109695258 A CN 109695258A CN 201910066135 A CN201910066135 A CN 201910066135A CN 109695258 A CN109695258 A CN 109695258A
Authority
CN
China
Prior art keywords
spigot
bell
well body
inspection shaft
steel fibre
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910066135.0A
Other languages
Chinese (zh)
Inventor
陈方
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910066135.0A priority Critical patent/CN109695258A/en
Publication of CN109695258A publication Critical patent/CN109695258A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • E02D29/121Manhole shafts; Other inspection or access chambers; Accessories therefor characterised by the connection between shaft elements, e.g. of rings forming said shaft
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • E02D29/125Manhole shafts; Other inspection or access chambers; Accessories therefor characterised by the lining of the shaft
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0051Including fibers
    • E02D2300/0064Including fibers made from metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Inorganic Chemistry (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Curing Cements, Concrete, And Artificial Stone (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

The invention discloses a kind of band bell and spigot antiseep inspection shaft and construction methods, including bell and spigot and well body, and the bell and spigot is set in well body, and the inner cavity of bell and spigot and well body connects;The bell and spigot is mixed by concrete with steel fibre and prefabricated forming, and casting concrete is on bell and spigot to form well body.Structure of the invention intensity is high, and long service life, bell and spigot is mixed by concrete and steel fibre, and intensity reaches 100Mpa or more.

Description

A kind of band bell and spigot antiseep inspection shaft and construction method
Technical field:
The present invention relates to a kind of band bell and spigot antiseep inspection shaft and construction methods.
Background technique:
Bell and spigot on existing inspection shaft is made of spheroidal graphite cast-iron, and spheroidal graphite cast-iron structure bell and spigot cost is high, and makes After the section time, it may occur that corrosion, service life are short.Therefore, it is necessory to be improved to the prior art to solve existing skill The deficiency of art.
Summary of the invention:
The present invention is to provide a kind of band bell and spigot antiseep inspection shaft in order to solve the above-mentioned problems of the prior art and apply Work method.
The technical solution adopted in the present invention has:
A kind of band bell and spigot antiseep inspection shaft, including bell and spigot and well body, the bell and spigot be set to well body on, and bell and spigot with The inner cavity of well body connects;
The bell and spigot is mixed by concrete with steel fibre and prefabricated forming, and casting concrete is on bell and spigot to form well Body.
Further, the steel fibre in the bell and spigot is post shapes, and the length of steel fibre is 13mm, diameter 0.2mm, The tensile strength of steel fibre is greater than 2300Mpa.
Further, the well body is rectangular-shaped or cylindric.
Further, the inner peripheral wall of the bell and spigot is equipped with seal groove, and sealing ring is equipped in seal groove.
A kind of construction method with bell and spigot antiseep inspection shaft, includes the following steps:
1) prefabricated bell and spigot;
2) formwork supporting plate, and the casting concrete in formwork supporting plate are built around bell and spigot, and ultimately form well body;
3) formwork supporting plate is removed;
The bell and spigot is uniformly mixing to obtain by the raw material of following weight percentage:
Silicon ash 3-5%;Ground slag 6-10%;Flyash 2-6%;Fly ash micro-sphere 2-6%;Cement 10-20%;Yellow sand 15-25%;Stone Sub- 10-20%;Steel fibre 5-10%;Polycarboxylate water-reducer 0.5-1%;Surplus is water, total amount 100%.
The invention has the following beneficial effects:
Structure of the invention intensity is high, and long service life, bell and spigot is mixed by concrete and steel fibre, and intensity reaches 100Mpa or more, well body are poured using existing conventional concrete, and intensity is in 50Mpa or so.
Detailed description of the invention:
Fig. 1 is structure of the invention figure.
Specific embodiment:
The present invention will be further described below with reference to the drawings.
As shown in Figure 1, the present invention, with bell and spigot antiseep inspection shaft, including bell and spigot 1 and well body 2, bell and spigot 1 is set to well On body 2, and bell and spigot 1 and the inner cavity of well body 2 connect.Bell and spigot 1 is mixed by concrete with steel fibre and prefabricated forming, Casting concrete is on bell and spigot 1 to form well body 2.
Steel fibre in the present invention in bell and spigot 1 is post shapes, and the length of steel fibre is 13mm, diameter 0.2mm, steel fibre The tensile strength of dimension is greater than 2300Mpa.
Wherein well body 2 is rectangular-shaped or cylindric.
Wherein the inner peripheral wall of bell and spigot 1 is equipped with seal groove, and sealing ring is equipped in seal groove.
Construction method of the present invention with bell and spigot antiseep inspection shaft, includes the following steps:
1) prefabricated bell and spigot 1;
2) formwork supporting plate, and the casting concrete in formwork supporting plate are built around bell and spigot 1, and ultimately form well body 2;
3) formwork supporting plate is removed;
Wherein bell and spigot 1 is uniformly mixing to obtain by the raw material of following weight percentage:
Silicon ash 3-5%;Ground slag 6-10%;Flyash 2-6%;Fly ash micro-sphere 2-6%;Cement 10-20%;Yellow sand 15-25%;Stone Sub- 10-20%;Steel fibre 5-10%;Polycarboxylate water-reducer 0.5-1%;Surplus is water, total amount 100%.
The construction method of the invention with bell and spigot antiseep inspection shaft is illustrated below by two embodiments.
Embodiment one:
Construction method with bell and spigot antiseep inspection shaft, includes the following steps:
1) prefabricated bell and spigot 1;
2) formwork supporting plate, and the casting concrete in formwork supporting plate are built around bell and spigot 1, and ultimately form well body 2;
3) formwork supporting plate is removed;
Wherein bell and spigot 1 is uniformly mixing to obtain by the raw material of following weight percentage:
Silicon ash 4%;Ground slag 7%;Flyash 5%;Fly ash micro-sphere 4%;Cement 15%;Yellow sand 20%;Stone 15%;Steel fibre 8%; Polycarboxylate water-reducer 0.5%;Water 21.5%.
Embodiment two:
Construction method with bell and spigot antiseep inspection shaft, includes the following steps:
1) prefabricated bell and spigot 1;
2) formwork supporting plate, and the casting concrete in formwork supporting plate are built around bell and spigot 1, and ultimately form well body 2;
3) formwork supporting plate is removed;
Wherein bell and spigot 1 is uniformly mixing to obtain by the raw material of following weight percentage:
Silicon ash 5%;Ground slag 8%;Flyash 5%;Fly ash micro-sphere 6%;Cement 18%;Yellow sand 18%;Stone 20%;Steel fibre 8%; Polycarboxylate water-reducer 1%;Water 11%.
Bell and spigot in the present invention is mixed by concrete and steel fibre, and intensity reaches 100Mpa or more.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art It for member, can also make several improvements without departing from the principle of the present invention, these improvement also should be regarded as of the invention Protection scope.

Claims (5)

1. a kind of band bell and spigot antiseep inspection shaft, it is characterised in that: including bell and spigot (1) and well body (2), the bell and spigot (1) it is set on well body (2), and bell and spigot (1) and the inner cavity of well body (2) connect;
The bell and spigot (1) is mixed by concrete with steel fibre and prefabricated forming, and casting concrete is on bell and spigot (1) with shape At well body (2).
2. band bell and spigot antiseep inspection shaft as described in claim 1, it is characterised in that: the steel in the bell and spigot (1) is fine Dimension is post shapes, and the length of steel fibre is 13mm, and the tensile strength of diameter 0.2mm, steel fibre are greater than 2300Mpa.
3. band bell and spigot antiseep inspection shaft as described in claim 1, it is characterised in that: the well body (2) be it is rectangular-shaped or Person is cylindric.
4. band bell and spigot antiseep inspection shaft as described in claim 1, it is characterised in that: the inner periphery of the bell and spigot (1) Wall is equipped with seal groove, and sealing ring is equipped in seal groove.
5. a kind of construction method with bell and spigot antiseep inspection shaft, characterized by the following steps:
1) prefabricated bell and spigot (1);
2) formwork supporting plate, and the casting concrete in formwork supporting plate are built around bell and spigot (1), and ultimately forms well body (2);
3) formwork supporting plate is removed;
The bell and spigot (1) is uniformly mixing to obtain by the raw material of following weight percentage:
Silicon ash 3-5%;Ground slag 6-10%;Flyash 2-6%;Fly ash micro-sphere 2-6%;Cement 10-20%;Yellow sand 15-25%;Stone Sub- 10-20%;Steel fibre 5-10%;Polycarboxylate water-reducer 0.5-1%;Surplus is water, total amount 100%.
CN201910066135.0A 2019-01-24 2019-01-24 A kind of band bell and spigot antiseep inspection shaft and construction method Pending CN109695258A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910066135.0A CN109695258A (en) 2019-01-24 2019-01-24 A kind of band bell and spigot antiseep inspection shaft and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910066135.0A CN109695258A (en) 2019-01-24 2019-01-24 A kind of band bell and spigot antiseep inspection shaft and construction method

Publications (1)

Publication Number Publication Date
CN109695258A true CN109695258A (en) 2019-04-30

Family

ID=66234285

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910066135.0A Pending CN109695258A (en) 2019-01-24 2019-01-24 A kind of band bell and spigot antiseep inspection shaft and construction method

Country Status (1)

Country Link
CN (1) CN109695258A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110295627A (en) * 2019-06-28 2019-10-01 上海二十冶建设有限公司 Road inspection well construction method
CN110924439A (en) * 2019-12-06 2020-03-27 安徽建川市政工程有限公司 Integral type inspection shaft prefab

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2515248Y (en) * 2001-12-27 2002-10-09 祁连海 Assembling concrete manhole
DE20319998U1 (en) * 2003-12-22 2004-03-11 Würmseher, Hans, Dipl.-Ing. (FH) Connection between main sewer, domestic drain and road gully, comprises pre=fabricated part acting as common inspection shaft
CN103626444A (en) * 2012-08-27 2014-03-12 沈保国 Construction process of steel fiber shotcrete
CN205444244U (en) * 2016-03-25 2016-08-10 句容市科达技术开发有限公司 Take bell and spigot antiseep inspection shaft
CN207092230U (en) * 2017-07-28 2018-03-13 桃江新兴管件有限责任公司 Inspection shaft
CN209873875U (en) * 2019-01-24 2019-12-31 陈方 Take bell and spigot antiseep inspection shaft

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2515248Y (en) * 2001-12-27 2002-10-09 祁连海 Assembling concrete manhole
DE20319998U1 (en) * 2003-12-22 2004-03-11 Würmseher, Hans, Dipl.-Ing. (FH) Connection between main sewer, domestic drain and road gully, comprises pre=fabricated part acting as common inspection shaft
CN103626444A (en) * 2012-08-27 2014-03-12 沈保国 Construction process of steel fiber shotcrete
CN205444244U (en) * 2016-03-25 2016-08-10 句容市科达技术开发有限公司 Take bell and spigot antiseep inspection shaft
CN207092230U (en) * 2017-07-28 2018-03-13 桃江新兴管件有限责任公司 Inspection shaft
CN209873875U (en) * 2019-01-24 2019-12-31 陈方 Take bell and spigot antiseep inspection shaft

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110295627A (en) * 2019-06-28 2019-10-01 上海二十冶建设有限公司 Road inspection well construction method
CN110924439A (en) * 2019-12-06 2020-03-27 安徽建川市政工程有限公司 Integral type inspection shaft prefab

Similar Documents

Publication Publication Date Title
CN107326810B (en) The reserved grout hole connection method of precast assembly bridge pier
CN109695258A (en) A kind of band bell and spigot antiseep inspection shaft and construction method
JP6230883B2 (en) Delay hardening type fluidized soil and filling method of underground cavities
CN100532788C (en) Pre-tensioned tube for shield-driven tunnel
CN110273359A (en) A kind of prefabricated bent cap and construction method of packaged type bridges
CN103358387A (en) Production technology of anti-corrosion prefabricated reinforced concrete inspection well
CN107759170A (en) A kind of prefabricated hollow stair of light ceramsite concrete and preparation method
CN110485276A (en) A kind of combined anti-seismic pier stud and its without templating construction method
CN109942259A (en) A kind of C35 underwater concrete formula and preparation method thereof
CN110438874A (en) Very-high performance road rehabilitation system
CN104909643B (en) A kind of assembled light thin-walled pipe gallery and preparation method thereof
CN109437933A (en) A kind of semi-drying is without concrete steel slag grid and preparation method thereof
CN209873875U (en) Take bell and spigot antiseep inspection shaft
CN109457727A (en) The assembly combination of prefabricated distribution civil engineering cable shaft
JP2004292174A (en) Cement composition and concrete product using the same
CN107460994A (en) Assembled steel tube high-strength concrete column and its construction method
CN1012475B (en) The flashboard of fire-resistant moulded parts, especially sliding gate
CN111548081A (en) High-strength concrete and construction process thereof
CN110640867A (en) Building block is pour with anti-hollowing device
CN112279594B (en) F-shaped steel bell mouth reinforced concrete drain pipe and processing technology thereof
CN211524821U (en) A restraint filling type section of jurisdiction lining cutting supporting construction for shield tunnel
CN210950454U (en) Novel fixing structure
CN207568634U (en) Soap-free emulsion polymeization ring anchor pre-stress lining structure anchorage slot concrete backfill device
CN105442692A (en) High-performance cement-based composite pipe
JP5004757B2 (en) Manufacturing method of artificial stone

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination