CN109685636A - Wage number generation method, device, system and computer storage medium - Google Patents

Wage number generation method, device, system and computer storage medium Download PDF

Info

Publication number
CN109685636A
CN109685636A CN201811559363.3A CN201811559363A CN109685636A CN 109685636 A CN109685636 A CN 109685636A CN 201811559363 A CN201811559363 A CN 201811559363A CN 109685636 A CN109685636 A CN 109685636A
Authority
CN
China
Prior art keywords
wage
duration
work
wage number
generation method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811559363.3A
Other languages
Chinese (zh)
Inventor
余秀庚
张少煌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Goldlion T&c Co Ltd
Original Assignee
Guangdong Goldlion T&c Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Goldlion T&c Co Ltd filed Critical Guangdong Goldlion T&c Co Ltd
Priority to CN201811559363.3A priority Critical patent/CN109685636A/en
Publication of CN109685636A publication Critical patent/CN109685636A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes
    • G06Q40/12Accounting
    • G06Q40/125Finance or payroll
    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07CTIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
    • G07C1/00Registering, indicating or recording the time of events or elapsed time, e.g. time-recorders for work people
    • G07C1/10Registering, indicating or recording the time of events or elapsed time, e.g. time-recorders for work people together with the recording, indicating or registering of other data, e.g. of signs of identity

Abstract

The invention discloses a kind of wage number generation method, wage number generating means are connected to attendance checking system, and the wage number generation method is the following steps are included: obtain the calculation formula of wage number;According to turning out for work duration and the calculation formula obtains increasing fund and item of withholing;According to basic wage, increase fund and item acquisition wage number of withholing.The invention also discloses a kind of wage number generating means, system and computer storage mediums, realize and calculate wage number automatically according to turn out for work duration, basic wage and calculation formula, largely save cost of labor when wage accounting.

Description

Wage number generation method, device, system and computer storage medium
Technical field
The present invention relates to field of computer technology more particularly to wage number generation method, device, system and computer to deposit Storage media.
Background technique
Wage refers to that constituent parts pay the labour remuneration of our unit worker over a period to come.The accounting of wage is each Most basic one of the business of unit financial accounting department, is not only related to the vital interests of each worker, also directly affects our unit Operation cost.Therefore the accounting of wage is particularly important.
Current a part of company settles accounts wage by the way of artificial, and the method low efficiency needs a large amount of cost of labor. Some company is then on computers, the accounting of wage to be carried out by filling in formula in table, still needs many Manual operation.
Above content is only used to facilitate the understanding of the technical scheme, and is not represented and is recognized that above content is existing skill Art.
Summary of the invention
The main purpose of the present invention is to provide the storages of a kind of wage number generation method, device, system and computer to be situated between Matter, it is intended to solve the problems, such as that cost of labor is big when current wage accounting.
To achieve the above object, the present invention provides a kind of wage number generation method, and wage number generating means are connected to Attendance checking system, the wage number generation method the following steps are included:
Obtain the calculation formula of wage number;
According to turning out for work duration and the calculation formula obtains increasing fund and item of withholing;
According to basic wage, increase fund and item acquisition wage number of withholing.
Preferably, the basis turns out for work duration and the packet the step of calculation formula obtains increasing fund and withholds It includes:
Duration is turned out for work and duration of turning out for work substantially obtains overtime work duration or duration absent from duty according to described;
According to the overtime work duration or the duration absent from duty and the basic wage and calculation formula acquisition Increase fund and item of withholing.
Preferably, before turn out for work according to duration and duration of the turning out for work substantially acquisition overtime work duration or duration absent from duty Further include:
The duration of turning out for work was updated to as unit of hour;
Described duration is turned out for work and the duration of turning out for work substantially determines the overtime work duration or described lacks according to updated Diligent duration.
Preferably, after the calculation formula for obtaining wage number further include:
When receiving user instruction, the calculation formula is added, processing is deleted or modified.
Preferably, it is described according to basic wage, increase fund and withhold item obtain wage number after further include:
According to the duration of turning out for work, the basic wage, the increasing fund, withhold item and the wage number generation Payroll statistics table is simultaneously stored.
Preferably, it is described according to basic wage, increase fund and withhold item obtain wage number after further include:
The payroll statistics table is sent to the work account of corresponding employee and the employee is prompted to confirm.
Preferably, it is described according to basic wage, increase fund and withhold item obtain wage number after further include:
According to the wage number by paying out wages to the Bank Account Number of corresponding employee.
In addition, to achieve the above object, the present invention also provides a kind of wage number generating means, the wage number is generated Device is connected to the attendance checking system, and the wage number generating means include: memory, processor and are stored in the storage On device and the wage number that can run on the processor generates program, and the wage number generates program by the processor When execution realize as described above any one of described in wage number generation method the step of.
In addition, to achieve the above object, the present invention also provides a kind of computer storage medium, the computer storage medium On be stored with wage number and generate program, the wage number generate realized when program is executed by processor it is any in as described above The step of wage number generation method described in item.
In addition, to achieve the above object, the present invention also provides a kind of wage numbers to generate system, the wage number is generated System includes the wage number generating means, and the wage number generating means are connected to the attendance checking system, for executing As described above any one of described in wage number generation method the step of.
Wage number generation method, device, system and the computer storage medium that the embodiment of the present invention proposes, wage number Generating means are connected to attendance checking system, by obtaining the calculation formula of wage number, then according to turn out for work duration and the meter It calculates formula to obtain increasing fund and item of withholing, further according to basic wage, increases fund and item acquisition wage number of withholing, realize basis Duration, basic wage and the calculation formula of turning out for work calculate wage number automatically, largely save cost of labor when wage accounting.
Detailed description of the invention
Fig. 1 is the terminal structure schematic diagram for the hardware running environment that the embodiment of the present invention is related to;
Fig. 2 is the flow diagram of wage number generation method first embodiment of the present invention;
Fig. 3 is the flow diagram of wage number generation method second embodiment of the present invention;
Fig. 4 is the flow diagram of wage number generation method 3rd embodiment of the present invention.
The embodiments will be further described with reference to the accompanying drawings for the realization, the function and the advantages of the object of the present invention.
Specific embodiment
It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not intended to limit the present invention.
The primary solutions of the embodiment of the present invention are:
Obtain the calculation formula of wage number;
According to turning out for work duration and the calculation formula obtains increasing fund and item of withholing;
According to basic wage, increase fund and item acquisition wage number of withholing.
Since in the prior art, current a part of company settles accounts wage by the way of artificial, and the method low efficiency needs A large amount of cost of labor.Some company is then on computers, the core of wage to be carried out by filling in formula in table It calculates, still needs many manual operations.
The present invention provides a solution, by obtain wage number calculation formula, then according to turn out for work duration with And the calculation formula obtains increasing fund and item of withholing, and further according to basic wage, increases fund and item acquisition wage number of withholing, It realizes and wage number is calculated according to turn out for work duration, basic wage and calculation formula automatically, when largely saving wage accounting Cost of labor.
As shown in Figure 1, Fig. 1 is the terminal structure schematic diagram for the hardware running environment that the embodiment of the present invention is related to.
The terminal of that embodiment of the invention can be PC, be also possible to the intelligent terminals such as smart phone, tablet computer.Such as figure Shown in 1, which may include: processor 1001, such as CPU, network interface 1004, user interface 1003, memory 1005, Communication bus 1002.Wherein, communication bus 1002 is for realizing the connection communication between these components.User interface 1003 can be with Including display screen (Display), input unit such as keyboard (Keyboard), optional user interface 1003 can also include standard Wireline interface, wireless interface.Network interface 1004 optionally may include standard wireline interface and wireless interface (such as WI-FI Interface).Memory 1005 can be high speed RAM memory, be also possible to stable memory (non-volatile ), such as magnetic disk storage memory.Memory 1005 optionally can also be the storage dress independently of aforementioned processor 1001 It sets.
It will be understood by those skilled in the art that the restriction of the not structure paired terminal of terminal structure shown in Fig. 1, can wrap It includes than illustrating more or fewer components, perhaps combines certain components or different component layouts.
As shown in Figure 1, as may include network communication module in a kind of memory 1005 of computer storage medium, using Family interface module and wage number generate program.
In terminal shown in Fig. 1, network interface 1004 is mainly used for connecting background server, carries out with background server Data communication;User interface 1003 is mainly used for connecting client (user terminal), carries out data communication with client;And processor 1001 can be used for that the wage number stored in memory 1005 is called to generate program, and execute following operation:
Obtain the calculation formula of wage number;
According to turning out for work duration and the calculation formula obtains increasing fund and item of withholing;
According to basic wage, increase fund and item acquisition wage number of withholing.
Further, processor 1001 can call the wage number stored in memory 1005 to generate program, also execute It operates below:
Duration is turned out for work and duration of turning out for work substantially obtains overtime work duration or duration absent from duty according to described;
According to the overtime work duration or the duration absent from duty and the basic wage and calculation formula acquisition Increase fund and item of withholing.
Further, processor 1001 can call the wage number stored in memory 1005 to generate program, also execute It operates below:
The duration of turning out for work was updated to as unit of hour;
Described duration is turned out for work and the duration of turning out for work substantially determines the overtime work duration or described lacks according to updated Diligent duration.
Further, processor 1001 can call the wage number stored in memory 1005 to generate program, also execute It operates below:
When receiving user instruction, the calculation formula is added, processing is deleted or modified.
Further, processor 1001 can call the wage number stored in memory 1005 to generate program, also execute It operates below:
According to the duration of turning out for work, the basic wage, the increasing fund, withhold item and the wage number generation Payroll statistics table is simultaneously stored.
Further, processor 1001 can call the wage number stored in memory 1005 to generate program, also execute It operates below:
The payroll statistics table is sent to the work account of corresponding employee and the employee is prompted to confirm.
Further, processor 1001 can call the wage number stored in memory 1005 to generate program, also execute It operates below:
According to the wage number by paying out wages to the Bank Account Number of corresponding employee.
It is the flow diagram of wage number generation method first embodiment of the present invention referring to Fig. 2, Fig. 2;
The present embodiment propose wage number generation method, the wage number generation method comprising steps of
Step S10 obtains the calculation formula of wage number;
In the present embodiment, the calculation formula of better common wage number can be preset, in early period with convenient Subsequent calculating.User can also carry out the modification of calculation formula according to the real wage settlement method of company in use.Meter Calculating formula can have multiple, and so as to calculate the number of disparity items, user can also do additions and deletions, example to calculation formula at any time Such as, when duration of turning out for work, which is greater than, should turn out for work duration, overtime work duration=duration-of turning out for work should turn out for work duration;It is less than in duration of turning out for work and answers When duration of turning out for work, duration=0 of working overtime.
Step S20, according to turning out for work duration and the calculation formula obtains increasing fund and item of withholing;
Step S30 according to basic wage, increases fund and item acquisition wage number of withholing.
In the present embodiment, increasing fund may include allowance for overtime work, duty allowance, high temperature subsidy and merit increase etc., withhold May include wage absent from duty, it is undisciplined withhold, five danger one gold medals and Individual Income Tax etc..The intelligent terminals such as PC first are connected to company Attendance checking system, receives the attendance duration of every employee in attendance checking system, and the intelligent terminals such as PC can also be connected to by certain user Other systems are to obtain other employee's data, such as employee name, work number, post and Bank Account Number.User passes through the intelligence such as PC Energy terminal will turn out for work, and the corresponding calculation formula of duration importing is interior to be calculated, and then obtains calculated result.For example, turning out for work in the employee It is Shi Changwei 23 days, 1 day a length of when can calculate the overtime work of the employee by calculation formula when should turn out for work at a length of 22 days, in turn According to calculation formula acquisition allowance for overtime work: allowance for overtime work=overtime work duration * (basic wage/should turn out for work duration), in basic wage When being 2200 yuan, it is 100 yuan according to the calculation formula allowance for overtime work of above-mentioned allowance for overtime work, that is, increases a part of fund.When So, when duration of turning out for work, which is less than, should turn out for work duration, wage absent from duty can also be calculated according to the calculation formula of wage absent from duty, that is, withholdd A part of item.Basic wage can be set by the user, and can also be directly acquired according to the corresponding basic wage of employee post.Further , the attendance duration of part company was calculated as unit of hour, then corresponding formula can be made modification, be changed to small When for unit calculation formula.After calculating all increasing fund and item of withholing by calculation formula, according to basic wage, increase Fund and item of withholing calculate wage number.The calculation formula of wage number may is that wage number=basic wage+increasing money Item-item of withholing.Above-mentioned calculating all after, user can choose export payroll statistics table store or other operate, Payroll statistics table may include name, work number, post, Bank Account Number, basic wage, allowance for overtime work, the post saliva of all employees Patch, merit increase, wage absent from duty, undisciplined withhold, five one gold medals of danger, Individual Income Tax, increases fund summation, item of withholing at high temperature subsidy The information such as summation and wage number.In addition, employee's system of company can be connected to by intelligent terminals such as PC, by above-mentioned wage The data of each employee are sent directly to the work account of the employee in statistical form, and reminding employees are confirmed, to ensure to calculate It is accurate.Meanwhile it can also be according to calculated wage number by the Bank Account Number of paying out wages to corresponding employee, into one Step is reduced and is manually operated.
Disclosed in the present embodiment in technical solution, by obtaining the calculation formula of wage number, further according to duration of turning out for work And the calculation formula obtains increasing fund and item of withholing, and further according to basic wage, increases fund and item acquisition wage number of withholing Volume is realized and calculates wage number automatically according to turn out for work duration, basic wage and calculation formula, when largely saving wage accounting Cost of labor.
As shown in figure 3, Fig. 3 is the flow diagram of wage number generation method second embodiment of the present invention;
Based on first embodiment shown in Fig. 2, step S20 includes: the present embodiment
Step S21 turns out for work duration and duration of turning out for work substantially obtains overtime work duration or duration absent from duty according to described;
Step S22, according to the overtime work duration or the duration absent from duty and the basic wage and the calculation formula Obtain the increasing fund and item of withholing.
In the present embodiment, user can customize all calculation formula, for example, the calculation formula of overtime work duration: turning out for work Duration is greater than when should turn out for work duration, and overtime work duration=duration-of turning out for work should turn out for work duration;Turning out for work, duration is less than the duration that should turn out for work When, duration=0 of working overtime.Similarly, the calculation formula of duration absent from duty: when duration of turning out for work, which is less than, should turn out for work duration, duration absent from duty =duration-of turning out for work should turn out for work duration;When duration of turning out for work, which is greater than, should turn out for work duration, duration=0 absent from duty.Increasing fund may include overtime work Subsidy, duty allowance, high temperature subsidy and merit increase etc., item of withholing may include wage absent from duty, it is undisciplined withhold, five one gold medals of danger and a People's income tax etc..A length of 23 days when turning out for work, when should turn out for work at a length of 22 days, this can be calculated by calculation formula in the employee A length of 1 day when the overtime work of employee, and then allowance for overtime work: allowance for overtime work=overtime work duration * (basic work is obtained according to calculation formula Provide/should turn out for work duration), when basic wage is 2200 yuan, be according to the calculation formula allowance for overtime work of above-mentioned allowance for overtime work 100 yuan, that is, increase a part of fund.It certainly, can also be according to the calculating of wage absent from duty when duration of turning out for work, which is less than, should turn out for work duration Formula calculates wage absent from duty, that is, a part for item of withholing.And then find out all increasing fund and item of withholing.
Disclosed in the present embodiment in technical solution, according to it is described turn out for work duration and substantially turn out for work duration obtain overtime work when Duration long or absent from duty, then according to the overtime work duration or the duration absent from duty and the basic wage and the calculation formula The increasing fund and item of withholing are obtained, realizes and calculates increasing fund automatically according to formula and item of withholing, save a large amount of people Work calculates cost.
As shown in figure 4, Fig. 4 is the flow diagram of wage number generation method 3rd embodiment of the present invention;
The present embodiment is based on first embodiment shown in Fig. 2, after step S30 further include:
Step S40, according to the duration of turning out for work, the basic wage, the increasing fund, item and the wage of withholing Number generates payroll statistics table and is stored;
The payroll statistics table is sent to the work account of corresponding employee and the employee is prompted to carry out really by step S50 Recognize;
Step S60, according to the wage number by paying out wages to the Bank Account Number of corresponding employee.
In the present embodiment, after calculating all increasing fund and withhold item and wage number by calculation formula, According to the name of all employees, work number, post, Bank Account Number, basic wage, allowance for overtime work, duty allowance, high temperature subsidy, achievement Effect reward, undisciplined withhold, five one gold medals of danger, Individual Income Tax, increases fund summation, a summation of withholing and wage number at wage absent from duty The information such as volume generate payroll statistics table and are stored, so that user carries out other operations according to the payroll statistics table.In addition, can lead to Employee's system that the intelligent terminals such as PC are connected to company is crossed, the data of each employee in above-mentioned payroll statistics table are sent directly to The work account of the employee, reminding employees are confirmed, accurate with ensure to calculate.Meanwhile it can also be according to calculated Wage number is further reduced in the Bank Account Number of paying out wages to corresponding employee and is manually operated.
Disclosed in the present embodiment in technical solution, according to the duration of turning out for work, the basic wage, the increasing fund, Withhold item and the wage number generate payroll statistics table and are stored, then the payroll statistics table is sent to correspondence The work account of employee simultaneously prompts the employee to confirm, then according to the wage number by paying out wages to corresponding employee Bank Account Number, realize it is automatic carry out wage accounting and paying out wages, save a large amount of cost of labor.
In addition, the embodiment of the present invention also proposes a kind of wage number generating means, the wage number generating means connection To attendance checking system, the wage number generating means include: memory, processor and are stored on the memory and can be in institute It states the wage number run on processor and generates program, the wage number is generated when program is executed by the processor and realized such as Described in upper embodiment the step of wage number generation method.
In addition, the embodiment of the present invention also proposes a kind of computer storage medium, it is stored in the computer storage medium Wage number generates program, and the wage number generates when program is executed by the processor and realizes work described in embodiment as above The step of providing number generation method.
In addition, the embodiment of the present invention also proposes that a kind of wage number generates system, the wage number generates system and includes The wage number generating means, the wage number generating means are connected to the attendance checking system, for executing implementation as above The step of wage number generation method described in example.
It should be noted that, in this document, the terms "include", "comprise" or its any other variant are intended to non-row His property includes, so that the process, method, article or the system that include a series of elements not only include those elements, and And further include other elements that are not explicitly listed, or further include for this process, method, article or system institute it is intrinsic Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including being somebody's turn to do There is also other identical elements in the process, method of element, article or system.
The serial number of the above embodiments of the invention is only for description, does not represent the advantages or disadvantages of the embodiments.
Through the above description of the embodiments, those skilled in the art can be understood that above-described embodiment side Method can be realized by means of software and necessary general hardware platform, naturally it is also possible to by hardware, but in many cases The former is more preferably embodiment.Based on this understanding, technical solution of the present invention substantially in other words does the prior art The part contributed out can be embodied in the form of software products, which is stored in one as described above In storage medium (such as ROM/RAM, magnetic disk, CD), including some instructions are used so that terminal device (it can be mobile phone, Computer, server, air conditioner or network equipment etc.) execute method described in each embodiment of the present invention.
The above is only a preferred embodiment of the present invention, is not intended to limit the scope of the invention, all to utilize this hair Equivalent structure or equivalent flow shift made by bright specification and accompanying drawing content is applied directly or indirectly in other relevant skills Art field, is included within the scope of the present invention.

Claims (10)

1. a kind of wage number generation method, which is characterized in that wage number generating means are connected to attendance checking system, the wage Number generation method the following steps are included:
Obtain the calculation formula of wage number;
According to turning out for work duration and the calculation formula obtains increasing fund and item of withholing;
According to basic wage, increase fund and item acquisition wage number of withholing.
2. wage number generation method as described in claim 1, which is characterized in that the basis is turned out for work duration and the meter Formula is calculated to obtain increasing fund and include: the step of withholing
Duration is turned out for work and duration of turning out for work substantially obtains overtime work duration or duration absent from duty according to described;
The increasing money is obtained according to the overtime work duration or the duration absent from duty and the basic wage and the calculation formula Item and item of withholing.
3. wage number generation method as claimed in claim 2, which is characterized in that duration and the base of turning out for work according to Originally duration of turning out for work obtains before overtime work duration or duration absent from duty further include:
The duration of turning out for work was updated to as unit of hour;
According to it is updated it is described turn out for work duration and the duration of turning out for work substantially determine the overtime work duration or it is described absent from duty when It is long.
4. wage number generation method as described in claim 1, which is characterized in that the calculation formula for obtaining wage number Later further include:
When receiving user instruction, the calculation formula is added, processing is deleted or modified.
5. wage number generation method as described in claim 1, which is characterized in that it is described according to basic wage, increase fund and Item of withholing obtains after wage number further include:
According to the duration of turning out for work, the basic wage, the increasing fund, item and the wage number generation wage of withholing Statistical form is simultaneously stored.
6. wage number generation method as described in claim 5, which is characterized in that described according to basic wage, increasing fund After item acquisition wage number of withholing further include:
The payroll statistics table is sent to the work account of corresponding employee and the employee is prompted to confirm.
7. wage number generation method as described in claim 1, which is characterized in that it is described according to basic wage, increase fund and Item of withholing obtains after wage number further include:
According to the wage number by paying out wages to the Bank Account Number of corresponding employee.
8. a kind of wage number generating means, which is characterized in that the wage number generating means are connected to the attendance checking system, The wage number generating means include: memory, processor and are stored on the memory and can be on the processor The wage number of operation generates program, and the wage number generates when program is executed by the processor and realizes such as claim 1 To described in any one of 7 the step of wage number generation method.
9. a kind of computer storage medium, which is characterized in that be stored with wage number in the computer storage medium and generate journey Sequence, the wage number generate the wage number realized as described in any one of claims 1 to 7 when program is executed by processor The step of generation method.
10. a kind of wage number generates system, which is characterized in that it includes that the wage number is raw that the wage number, which generates system, At device, the wage number generating means are connected to the attendance checking system, for executing such as any one of claims 1 to 7 The step of described wage number generation method.
CN201811559363.3A 2018-12-18 2018-12-18 Wage number generation method, device, system and computer storage medium Pending CN109685636A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811559363.3A CN109685636A (en) 2018-12-18 2018-12-18 Wage number generation method, device, system and computer storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811559363.3A CN109685636A (en) 2018-12-18 2018-12-18 Wage number generation method, device, system and computer storage medium

Publications (1)

Publication Number Publication Date
CN109685636A true CN109685636A (en) 2019-04-26

Family

ID=66186931

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811559363.3A Pending CN109685636A (en) 2018-12-18 2018-12-18 Wage number generation method, device, system and computer storage medium

Country Status (1)

Country Link
CN (1) CN109685636A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111445216A (en) * 2020-04-13 2020-07-24 浙江建连智信科技有限公司 Salary issuing method and device and electronic equipment
CN111667251A (en) * 2020-06-16 2020-09-15 四川隧唐科技股份有限公司 Salary issuing method and device based on real-name system attendance data

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0765084A (en) * 1993-08-27 1995-03-10 Fujita Corp Method for calculating salary for construction work
CN1855135A (en) * 2005-04-18 2006-11-01 上华资讯科技股份有限公司 Human resource salary management and computer system
CN103903092A (en) * 2014-03-21 2014-07-02 沈阳化工大学 Enterprise wage management system
CN105719123A (en) * 2016-01-15 2016-06-29 成都金万泰科技有限公司 Performance management method and system within enterprise
CN107657519A (en) * 2017-09-06 2018-02-02 深圳市恒创智达信息技术有限公司 Emolument calculating, delivery system and its method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0765084A (en) * 1993-08-27 1995-03-10 Fujita Corp Method for calculating salary for construction work
CN1855135A (en) * 2005-04-18 2006-11-01 上华资讯科技股份有限公司 Human resource salary management and computer system
CN103903092A (en) * 2014-03-21 2014-07-02 沈阳化工大学 Enterprise wage management system
CN105719123A (en) * 2016-01-15 2016-06-29 成都金万泰科技有限公司 Performance management method and system within enterprise
CN107657519A (en) * 2017-09-06 2018-02-02 深圳市恒创智达信息技术有限公司 Emolument calculating, delivery system and its method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111445216A (en) * 2020-04-13 2020-07-24 浙江建连智信科技有限公司 Salary issuing method and device and electronic equipment
CN111667251A (en) * 2020-06-16 2020-09-15 四川隧唐科技股份有限公司 Salary issuing method and device based on real-name system attendance data

Similar Documents

Publication Publication Date Title
CN108090755A (en) Billing model defines method, data system for settling account and computer readable storage medium
CN107730228A (en) Account settle accounts calculation method, equipment and storage medium
CN110286974A (en) Application configuration method, apparatus, equipment and storage medium based on the H5 page
CN109670824A (en) Generation method, device, equipment and the storage medium of electronics account book
CN109191090A (en) Means of payment recommended method, device, equipment and computer readable storage medium
CN102158373A (en) Performance evaluation system of high-end server for intermediary business of bank
CN107977457A (en) Data liquidation method, system and computer-readable recording medium
CN110059267A (en) Methods of exhibiting, device, computer equipment and the storage medium of data analysis result
CN109840851A (en) A kind of integrated management approach, device and the equipment of data of managing money matters
CN106910054A (en) A kind of method and apparatus of payment transaction data processing
CN104951926A (en) Electronic accounting method and system
CN108830715A (en) Disk processing method and system are returned in batch documents part
CN107977867A (en) Billing model update method, data system for settling account and computer-readable recording medium
CN102411757B (en) Method and system for forecasting capacity of large host central processing unit (CPU)
CN111199145A (en) Method, device, storage medium and electronic equipment for generating value-added tax report
CN109685636A (en) Wage number generation method, device, system and computer storage medium
CN115082203A (en) Method and device for pushing living scheme, electronic equipment and storage medium
CN109299913A (en) Employee's wages scheme generation method and device
CN112633862A (en) Bill management platform and method
CN109118373A (en) Supplementary pension method of commerce, device and computer readable storage medium
CN109858959A (en) Credit card recommended method, device, computer equipment and storage medium
CN109636341A (en) Agenda managing method, device, equipment and computer readable storage medium
CN112001595B (en) Resource splitting method and device
CN109978304A (en) The appraisal procedure and device of object-oriented
CN110827124B (en) Method for realizing tourism-first and payment-later product, composition system and electronic equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190426

RJ01 Rejection of invention patent application after publication