CN109680618A - Steel box-girder entirety fall girder apparatus and its fall beam method - Google Patents

Steel box-girder entirety fall girder apparatus and its fall beam method Download PDF

Info

Publication number
CN109680618A
CN109680618A CN201910084013.4A CN201910084013A CN109680618A CN 109680618 A CN109680618 A CN 109680618A CN 201910084013 A CN201910084013 A CN 201910084013A CN 109680618 A CN109680618 A CN 109680618A
Authority
CN
China
Prior art keywords
girder
steel box
steel
jack
fall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910084013.4A
Other languages
Chinese (zh)
Inventor
沈强
张俊
李潭
刘贝贝
周辉辉
张雄超
张尚尉
季轩
夏一飞
赵斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Heavy Machinery Co Ltd
Original Assignee
China Railway Heavy Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Heavy Machinery Co Ltd filed Critical China Railway Heavy Machinery Co Ltd
Priority to CN201910084013.4A priority Critical patent/CN109680618A/en
Publication of CN109680618A publication Critical patent/CN109680618A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/04Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to a kind of steel box-girder entirety fall girder apparatus and its fall beam method, the device include two groups be respectively provided at steel box-girder both ends fall beam reaction frame, it includes steel pipe pier, equalizer bar and long beam that every group, which falls beam reaction frame,;It is fallen in beam reaction frame at every group, steel pipe pier be located at steel box-girder two sides and every side it is equal there are two, equalizer bar is across on two ipsilateral steel pipe piers and being distributed in steel box-girder two sides, long beam is on the equalizer bar in steel box-girder two sides, by anchorage installation, there are two the jack of hydraulic-driven on long beam, jack is connect by steel strand wires with the lifting lug of underlying steel box-girder, and two jack are driven by the same pumping plant;All on steel box-girder to promote the range sensor being equipped at suspension centre for detecting height, two groups of pumping plants fallen on beam reaction frame are controlled by the same control system, and range sensor is connected to control system, and control system is connected to remote monitoring system.Construction efficiency of the present invention is high, keeps steady under steel box-girder, securely and reliably.

Description

Steel box-girder entirety fall girder apparatus and its fall beam method
Technical field
The invention belongs to sciences of bridge building to apply technical field, and in particular to a kind of steel box-girder entirety fall girder apparatus and its fall beam side Method.
Background technique
Bridge using pushing tow and dilatory equal constructions across after the facilities such as existing highway, railway, river, generally with it is predetermined Position can have difference in height, it is therefore desirable to carry out falling beam construction, to fall on predetermined position.Currently, steel box-girder is carried out falling beam and be applied It is working hour, general to use the construction technology that jack is set at concrete pier and steel pipe pier is successively cut off to decline, the technology Have the following deficiencies: that 1) jack is on concrete pier, when construction can have an impact concrete bridge pier structure;2) jack Fall Liang Sudu, synchronism not can guarantee, construct it is unreliable;3) falling joist steel pipe need to be used alternatingly, and construction efficiency is low.
Summary of the invention
The object of the present invention is to provide a kind of steel box-girder entirety fall girder apparatus and its beam method is fallen, construction efficiency of the present invention Height is kept steady under steel box-girder, securely and reliably.
The technical scheme adopted by the invention is that:
A kind of steel box-girder entirety fall girder apparatus, including two groups be respectively provided at steel box-girder both ends fall beam reaction frame, every group falls Beam reaction frame includes steel pipe pier, equalizer bar and long beam;Fallen in beam reaction frame at every group, steel pipe pier be located at steel box-girder two sides and There are two every side is equal, equalizer bar is across on two ipsilateral steel pipe piers and steel box-girder two sides are distributed in, and long beam is across in steel On the equalizer bar of box beam two sides, by anchorage installation there are two the jack of hydraulic-driven on long beam, jack passes through steel Twisted wire is connect with the lifting lug of underlying steel box-girder, and two jack are driven by the same pumping plant;All promotions on steel box-girder The range sensor for detecting height is equipped at suspension centre, two groups of pumping plants fallen on beam reaction frame are by the same control system control System, range sensor are connected to control system, and control system is connected to remote monitoring system.
Further, lifting lug lower weld is fixed on the web of steel box-girder, top is equipped with ears piece, and steel strand wires lower end is solid Surely have a connecting cylinder, connecting cylinder lower end is equipped with ears piece, the ears piece on lifting lug top be located between the ears piece of connecting cylinder lower end and The ears piece of the two is cooperatively connected by connecting shaft.
Further, the two sides of ears on piece and the connecting hole of connecting shaft cooperation are equipped with stiffening plate.
Further, one-way hydraulic lock and stall proof descending mechanism are equipped on all jack.
Further, it is equipped with oil pressure sensor on all jack, oil pressure sensor is connected to control system.
Further, the promotion speed of jack is by the proportional valve control in pumping plant on proportional hydraulic oil circuit.
It is a kind of that beam method is fallen based on above-mentioned steel box-girder entirety fall girder apparatus, it is characterised in that: including step, 1) steel box-girder After the completion of pushing tow, steel box-girder is integrally fallen on pushing tow falsework, is cut off nose girder, is removed incremental launching device;2) at steel box-girder both ends It is respectively set two groups and falls beam reaction frame, jack is connect by steel strand wires with the lifting lug of underlying steel box-girder;3) it controls System controls the starting of two pumps station, and steel box-girder is integrally promoted a stroke by steel strand wires, first cuts off certain altitude by jack Pushing tow falsework, then jack transfer a stroke;4) step 3) is repeated, until steel box-girder is transferred to permanent support On;5) steel box-girder axis and absolute altitude are adjusted, beam completion is entirely fallen.
The beneficial effects of the present invention are:
Device construction efficiency is high --- after the horizontal pushing tow of steel box-girder is to predetermined mileage, using falling beam counter-force bracket and thousand Jin top is transferred to designed elevation by steel box-girder;The device makes to keep steady under steel box-girder --- and control system is controlled by pumping plant Jack integrating action, when range sensor reflects the promotion suspension centre on steel box-girder there are when difference in height, control system passes through Pumping plant controls corresponding jack movement, realizes that all positions for promoting suspension centre are synchronous;The equipment safety is reliable --- and system processed is logical The information for crossing range sensor and pumping plant obtains the aerial statue information of steel box-girder, and control system is determined by aerial statue information The next step of pumping plant acts, and whole process is remotely monitored by remote monitoring system.
Detailed description of the invention
Fig. 1 is the front view of the embodiment of the present invention.
Fig. 2 is the side view of the embodiment of the present invention.
Fig. 3 is the connection schematic diagram of steel box-girder and steel strand wires in the embodiment of the present invention.
Fig. 4 is the side view of Fig. 3.
Fig. 5 is the process chart of the embodiment of the present invention.
In figure: 1- steel box-girder;2- jack;3- anchorage;4- long beam;5- equalizer bar;6- steel pipe pier;7- pushing tow is interim Bracket;8- pumping plant;9- lifting lug;10- steel strand wires;11- connecting cylinder.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
As depicted in figs. 1 and 2, a kind of steel box-girder entirety fall girder apparatus is respectively provided at falling for 1 both ends of steel box-girder including two groups Beam reaction frame, it includes steel pipe pier 6, equalizer bar 5 and long beam 4 that every group, which falls beam reaction frame,;It is fallen in beam reaction frame at every group, steel pipe Pier 6 be located at 1 two sides of steel box-girder and every side it is equal there are two, equalizer bar 5 is across on two ipsilateral steel pipe piers 6 and being distributed in steel case 1 two sides of beam, long beam 4 is on the equalizer bar 5 in 1 two sides of steel box-girder, and by the installation of anchorage 3, there are two liquid on long beam 4 The jack 2 of driving is pressed, jack 2 is connect by steel strand wires 10 with the lifting lug 9 of underlying steel box-girder 1, two jack 2 It is driven by the same pumping plant 8;All promoted is equipped with range sensor for detecting height on steel box-girder 1 at suspension centres, and two groups The pumping plant 8 fallen on beam reaction frame is controlled by the same control system, and range sensor is connected to control system, control system connection To remote monitoring system.Device construction efficiency is high --- after the horizontal pushing tow of steel box-girder 1 is to predetermined mileage, using falling Liang Fanli Bracket and jack 2 transfer steel box-girder 1 to designed elevation;The device makes to keep steady under steel box-girder 1 --- control system Jack integrating action is controlled by pumping plant 8, there are differences in height when range sensor reflects the promotion suspension centre on steel box-girder 1 When, control system controls corresponding jack 2 by pumping plant 8 and acts, and realizes that all positions for promoting suspension centre are synchronous;The equipment safety Reliably --- system processed obtains the aerial statue information of steel box-girder 1 by the information of range sensor and pumping plant 8, and control system is logical The next step movement that aerial statue information determines pumping plant 8 is crossed, whole process is remotely monitored by remote monitoring system.
As shown in Figure 3 and Figure 4, in the present embodiment, 9 lower weld of lifting lug is fixed on the web of steel box-girder 1, top is set There is ears piece, 10 lower end of steel strand wires is fixed with connecting cylinder 11, and 11 lower end of connecting cylinder is equipped with ears piece, the ears piece position on lifting lug top Between the ears piece of 11 lower end of connecting cylinder and the ears piece of the two is cooperatively connected by connecting shaft 12.
As shown in figure 3, in the present embodiment, the two sides for the connecting hole that ears on piece and connecting shaft 12 cooperate are equipped with reinforcement Plate.
In the present embodiment, one-way hydraulic lock and stall proof descending mechanism (balanced valve) are equipped on all jack 2.It is single It can ensure that automatic synchronization is self-locking when accidental power failure, pipeline rupture occurs in construction to hydraulic lock and stall proof descending mechanism, steel case Beam 1 is smoothly parked in a certain height and will not drop, and improves construction safety.
In the present embodiment, it is equipped with oil pressure sensor on all jack 2, oil pressure sensor is connected to control system. Control system has by each load change situation for promoting suspension centre of oil pressure sensor real-time monitoring if promoting the load of suspension centre Abnormal mutation, then control system can control the shutdown of jack 2 and signal of alarming, and improve construction safety.
In the present embodiment, the promotion speed (maximum lift speed is not more than 10 ms/h) of jack 2 is by pumping plant 8 Proportional valve control on proportional hydraulic oil circuit.
The course of work of the present embodiment is: 1) after the completion of 1 pushing tow of steel box-girder, steel box-girder 1 is whole to fall in pushing tow falsework 7 On, it cuts off nose girder, remove incremental launching device;2) two groups are respectively set at 1 both ends of steel box-girder and fall beam reaction frame, jack 2 is passed through Steel strand wires 10 are connect with the lifting lug 9 of underlying steel box-girder 1;3) control system control two pumps station 8 starts, and jack 2 is logical Steel strand wires 10 are crossed by one stroke of whole promotion of steel box-girder 1, the pushing tow falsework 7 of 500mm are first cut off, then under jack 2 Put a stroke;4) step 3) is repeated, until steel box-girder 1 is transferred on permanent support;5) 1 axis of steel box-girder and mark are adjusted Height entirely falls beam completion.
It should be understood that for those of ordinary skills, it can be modified or changed according to the above description, And all these modifications and variations should all belong to the protection domain of appended claims of the present invention.

Claims (7)

1. a kind of steel box-girder entirety fall girder apparatus, it is characterised in that: including two groups be respectively provided at steel box-girder both ends fall Liang Fanli Frame, it includes steel pipe pier, equalizer bar and long beam that every group, which falls beam reaction frame,;It is fallen in beam reaction frame at every group, steel pipe pier is located at steel Box beam two sides and every side it is equal there are two, equalizer bar is long horizontal across on two ipsilateral steel pipe piers and being distributed in steel box-girder two sides Beam on the equalizer bar in steel box-girder two sides, on long beam by anchorage installation there are two hydraulic-driven jack, thousand Jin top is connect by steel strand wires with the lifting lug of underlying steel box-girder, and two jack are driven by the same pumping plant;Steel box-girder The range sensor for detecting height is equipped at upper all promotion suspension centres, two groups of pumping plants fallen on beam reaction frame are by same Control system control, range sensor are connected to control system, and control system is connected to remote monitoring system.
2. steel box-girder entirety fall girder apparatus as described in claim 1, it is characterised in that: lifting lug lower weld is fixed on steel box-girder Web on, top be equipped with ears piece, steel strand wires lower end is fixed with connecting cylinder, and connecting cylinder lower end is equipped with ears piece, lifting lug top Ears piece be located between the ears piece of connecting cylinder lower end and the ears piece of the two pass through connecting shaft be cooperatively connected.
3. steel box-girder entirety fall girder apparatus as claimed in claim 2, it is characterised in that: the company of ears on piece and connecting shaft cooperation The two sides for connecing hole are equipped with stiffening plate.
4. steel box-girder entirety fall girder apparatus as described in claim 1, it is characterised in that: be equipped with unidirectional liquid on all jack Pressure lock and stall proof descending mechanism.
5. steel box-girder entirety fall girder apparatus as described in claim 1, it is characterised in that: be equipped with oil pressure biography on all jack Sensor, oil pressure sensor are connected to control system.
6. steel box-girder entirety fall girder apparatus as described in claim 1, it is characterised in that: the promotion speed of jack is by pumping plant Proportional valve control on proportional hydraulic oil circuit.
7. a kind of fall beam method based on any steel box-girder entirety fall girder apparatus of claim 1 to 6, it is characterised in that: packet Include step, 1) after the completion of steel box-girder pushing tow, steel box-girder is integrally fallen on pushing tow falsework, is cut off nose girder, is removed incremental launching device; 2) two groups are respectively set at steel box-girder both ends and fall beam reaction frame, by jack hanging by steel strand wires and underlying steel box-girder Ear connection;3) steel box-girder is integrally promoted a stroke by steel strand wires by the starting of control system control two pumps station, jack, first The pushing tow falsework of certain altitude is cut off, then jack transfers a stroke;4) step 3) is repeated, until will be under steel box-girder It is put on permanent support;5) steel box-girder axis and absolute altitude are adjusted, beam completion is entirely fallen.
CN201910084013.4A 2019-01-28 2019-01-28 Steel box-girder entirety fall girder apparatus and its fall beam method Pending CN109680618A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910084013.4A CN109680618A (en) 2019-01-28 2019-01-28 Steel box-girder entirety fall girder apparatus and its fall beam method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910084013.4A CN109680618A (en) 2019-01-28 2019-01-28 Steel box-girder entirety fall girder apparatus and its fall beam method

Publications (1)

Publication Number Publication Date
CN109680618A true CN109680618A (en) 2019-04-26

Family

ID=66194993

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910084013.4A Pending CN109680618A (en) 2019-01-28 2019-01-28 Steel box-girder entirety fall girder apparatus and its fall beam method

Country Status (1)

Country Link
CN (1) CN109680618A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112813834A (en) * 2020-12-31 2021-05-18 中铁八局集团昆明铁路建设有限公司 Beam piece mounting system and mounting method
CN117536118A (en) * 2023-11-28 2024-02-09 保利长大工程有限公司 Beam Duan Zhineng hoisting method for bridge deck crane system and bridge deck crane system

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201770403U (en) * 2010-01-18 2011-03-23 上海同济宝冶建设机器人有限公司 Papilionaceous combined lifting tool
CN102127899A (en) * 2010-12-30 2011-07-20 中铁大桥局集团第二工程有限公司 System for lifting and sliding large-tonnage steel box girder in land area and shoal area and construction method thereof
CN102535347A (en) * 2012-03-09 2012-07-04 中铁四局集团第二工程有限公司 Continuous beam falling system and continuous beam falling method
CN102704415A (en) * 2012-06-25 2012-10-03 上海同罡建筑工程有限公司 Method for jacking bridges
CN203653080U (en) * 2013-12-16 2014-06-18 中国石油天然气第一建设公司 Mooring rope hanging mechanism capable of meeting motion of portal crane
CN104963301A (en) * 2015-06-30 2015-10-07 武汉二航路桥特种工程有限责任公司 Dragging, translating and lowering device and method for dismantling pier top beam section and pier
KR101623047B1 (en) * 2015-07-24 2016-05-31 고재덕 Bridge segment launching method using side pulling apparatus
CN207244465U (en) * 2017-08-11 2018-04-17 中铁上海工程局集团有限公司 A kind of hanging apparatus for adjusting and positioning for steel box arch rib aerial statue
CN108729357A (en) * 2018-06-25 2018-11-02 中交路桥建设有限公司 An a kind of high position based on incremental launching method falls beam method
CN209722747U (en) * 2019-01-28 2019-12-03 中铁重工有限公司 Steel box-girder entirety fall girder apparatus

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201770403U (en) * 2010-01-18 2011-03-23 上海同济宝冶建设机器人有限公司 Papilionaceous combined lifting tool
CN102127899A (en) * 2010-12-30 2011-07-20 中铁大桥局集团第二工程有限公司 System for lifting and sliding large-tonnage steel box girder in land area and shoal area and construction method thereof
CN102535347A (en) * 2012-03-09 2012-07-04 中铁四局集团第二工程有限公司 Continuous beam falling system and continuous beam falling method
CN102704415A (en) * 2012-06-25 2012-10-03 上海同罡建筑工程有限公司 Method for jacking bridges
CN203653080U (en) * 2013-12-16 2014-06-18 中国石油天然气第一建设公司 Mooring rope hanging mechanism capable of meeting motion of portal crane
CN104963301A (en) * 2015-06-30 2015-10-07 武汉二航路桥特种工程有限责任公司 Dragging, translating and lowering device and method for dismantling pier top beam section and pier
KR101623047B1 (en) * 2015-07-24 2016-05-31 고재덕 Bridge segment launching method using side pulling apparatus
CN207244465U (en) * 2017-08-11 2018-04-17 中铁上海工程局集团有限公司 A kind of hanging apparatus for adjusting and positioning for steel box arch rib aerial statue
CN108729357A (en) * 2018-06-25 2018-11-02 中交路桥建设有限公司 An a kind of high position based on incremental launching method falls beam method
CN209722747U (en) * 2019-01-28 2019-12-03 中铁重工有限公司 Steel box-girder entirety fall girder apparatus

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
霰建平;王婷;杨敏;丛培山;: "移动模架液压连续千斤顶同步整体下放技术", 桥梁建设, no. 1, pages 4 *
高飞;张才;: "白果村跨岳常高速钢桁梁顶推施工技术", 江西建材, no. 04 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112813834A (en) * 2020-12-31 2021-05-18 中铁八局集团昆明铁路建设有限公司 Beam piece mounting system and mounting method
CN117536118A (en) * 2023-11-28 2024-02-09 保利长大工程有限公司 Beam Duan Zhineng hoisting method for bridge deck crane system and bridge deck crane system
CN117536118B (en) * 2023-11-28 2024-04-12 保利长大工程有限公司 Beam Duan Zhineng hoisting method for bridge deck crane system and bridge deck crane system

Similar Documents

Publication Publication Date Title
CN104480862B (en) A kind of erection method of cable stayed bridge end bay steel truss girder
CN109137744B (en) Asymmetric construction method and control method for main truss of large-span flexible suspension bridge
CN102192368B (en) Large-span overhead pipeline sliding installation method
CN108660946B (en) Method for replacing main cable of suspension bridge
CN108049656B (en) Reverse chimney dismantling device and method
CN107989380A (en) Steel truss gallery hydraulic synchronizing lifting construction technique
CN109680618A (en) Steel box-girder entirety fall girder apparatus and its fall beam method
CN101284628B (en) Hoisting method for framework of large tonnage pressing machine
CN105442458A (en) Method for hanging and installing stay cable of cable-stayed bridge special-shaped tower pillar
CN104727236A (en) Whole striding bridge lowering dismounting system based on ground supporting and construction method thereof
CN104060835A (en) Lifting-sliding construction method for single plane truss
CN209722747U (en) Steel box-girder entirety fall girder apparatus
CN109610308A (en) The device and method of bridge settlement is avoided suitable for tunnel underbridge beam work progress
CN104153586B (en) A kind of suspension cable hangs the construction method of mounting purlines
CN203820287U (en) Composite steel carrying pole for hoisting roof tiles of steel structure workshops
CN106285019A (en) A kind of overhead traveling crane installation method under confined space
CN105155418A (en) Construction method for bridge horizontal movement
CN206298286U (en) A kind of wet electrical dust precipitator body equipment integral hoisting aids in hanging beam
CN117168658A (en) Soil pressure monitoring and early warning system and method for splicing bridge above subway station
CN102372228B (en) Translational installation method for large-span crane beam
CN102642482B (en) Urgent repair construction method for anchor mast of catenary
CN106968178B (en) Construction method for main beam of cable-stayed suspension bridge
CN203269440U (en) Winding lifting system with overweight early warning function
CN207209786U (en) The cast-in-place boom support monoblock type automatic disassembling device of falsework
CN205421021U (en) Integral hoisting roof beam sand box that falls

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination