CN109672137A - It is a kind of for drawing formula ground wire grounding structure in the weather-proof steel material angle steel tower of residential area and area with less lightning activities environment - Google Patents

It is a kind of for drawing formula ground wire grounding structure in the weather-proof steel material angle steel tower of residential area and area with less lightning activities environment Download PDF

Info

Publication number
CN109672137A
CN109672137A CN201910024971.2A CN201910024971A CN109672137A CN 109672137 A CN109672137 A CN 109672137A CN 201910024971 A CN201910024971 A CN 201910024971A CN 109672137 A CN109672137 A CN 109672137A
Authority
CN
China
Prior art keywords
drainage thread
tower
tower body
weather
lightning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910024971.2A
Other languages
Chinese (zh)
Other versions
CN109672137B (en
Inventor
王力
陈彦焰
宋庆志
罗正帮
张天忠
姬书军
罗义华
刘军
刘登金
张金锋
计策
魏松
郑少将
李先纯
张岩
刘西民
赵晖
杨雪锋
刘琨
杨进
葛宜俊
崔磊
刘兵
靳琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei Baibang Human Resources Co Ltd
State Grid Anhui Electric Power Co Ltd
Anhui Huadian Engineering Consulting and Design Co Ltd
Bozhou Power Supply Co of State Grid Anhui Electric Power Co Ltd
Original Assignee
Hefei Baibang Human Resources Co Ltd
State Grid Anhui Electric Power Co Ltd
Anhui Huadian Engineering Consulting and Design Co Ltd
Bozhou Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei Baibang Human Resources Co Ltd, State Grid Anhui Electric Power Co Ltd, Anhui Huadian Engineering Consulting and Design Co Ltd, Bozhou Power Supply Co of State Grid Anhui Electric Power Co Ltd filed Critical Hefei Baibang Human Resources Co Ltd
Priority to CN201910024971.2A priority Critical patent/CN109672137B/en
Publication of CN109672137A publication Critical patent/CN109672137A/en
Application granted granted Critical
Publication of CN109672137B publication Critical patent/CN109672137B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G13/00Installations of lightning conductors; Fastening thereof to supporting structure
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/02Structures made of specified materials
    • E04H12/08Structures made of specified materials of metal
    • E04H12/10Truss-like structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/24Cross arms
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01RELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
    • H01R4/00Electrically-conductive connections between two or more conductive members in direct contact, i.e. touching one another; Means for effecting or maintaining such contact; Electrically-conductive connections having two or more spaced connecting locations for conductors and using contact members penetrating insulation
    • H01R4/58Electrically-conductive connections between two or more conductive members in direct contact, i.e. touching one another; Means for effecting or maintaining such contact; Electrically-conductive connections having two or more spaced connecting locations for conductors and using contact members penetrating insulation characterised by the form or material of the contacting members
    • H01R4/66Connections with the terrestrial mass, e.g. earth plate, earth pin
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G13/00Installations of lightning conductors; Fastening thereof to supporting structure
    • H02G13/40Connection to earth

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Materials Engineering (AREA)
  • Wood Science & Technology (AREA)
  • Suspension Of Electric Lines Or Cables (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The present invention relates to a kind of for drawing formula ground wire grounding structure in the weather-proof steel material angle steel tower of residential area and area with less lightning activities environment, solves that there has been no the defects for being directed to weather-proof steel material angle steel tower and carrying out lightning-arrest design compared with prior art.Drainage thread A, drainage thread B, drainage thread C and drainage thread D of the invention draws in tower body at the top of lightning conducter cross-arm and is connected respectively with grounding body by column foot grounding assembly after tower body, drainage thread A and drainage thread B is arranged along tower body with the tower body of the same side lightning conducter A, drainage thread C and drainage thread D arranges that drainage thread A, drainage thread B, drainage thread C and drainage thread D pass through the fixed armour clamp assembly of insulation and be mounted on tower body along tower body with the tower body of the same side lightning conducter B.Drainage thread is arranged between tower leg down conductor from the tower top lightning conducter of weather-proof angle steel tower in the present invention, reduce weather-proof angle steel tower because direct impedance it is excessive caused by back flashover probability of malfunction.

Description

It is a kind of to be kept away for drawing formula in the weather-proof steel material angle steel tower of residential area and area with less lightning activities environment Thunder line ground structure
Technical field
It is specifically a kind of for the resistance to of residential area and area with less lightning activities environment the present invention relates to weather-proof angle steel tower technical field It waits in steel material angle steel tower and draws formula ground wire grounding structure.
Background technique
Environment-friendly type weathering steel is the low-alloy steel between ordinary steel and stainless steel, by the way that a small amount of alloy is added in steel Element makes it form protective layer in metal base surface, slows down corrosion and develops in depth and breadth to material, to improve the corrosion-resistant of steel Performance.With the continuous development of power industry and steel and iron industry, the reinforcement of environmental consciousness, tower structure uses environment-friendly type weathering steel Material has become a kind of trend, solves environmental problem brought by common steel tower anti-corrosion, has saved steel tower steel, eliminates anti- Rotten process, alleviates maintenance load.
For traditional circuit shaft tower, after lightning conducter or shaft tower meet with lightning stroke, lightning current leads to grounding body along shaft tower tower body. Since traditional zinc-plated steel rod tower tower body impedance is small, the tower top current potential that lightning current is formed after route thunderbolt is mainly by ground resistance shadow It rings.But it using the shaft tower of weather-proof steel material, is influenced by weathering steel surface corrosion layer, the gap impedance at weather-proof angle splice joint Greatly, tower body impedance is significantly higher than zinc-plated steel rod tower, when lightning conducter or shaft tower meet with lightning stroke and not formed effective lightning channel, Under the conditions of identical ground resistance, the tower top current potential that lightning current is formed on weather-proof steel material shaft tower is apparently higher than zinc-plated steel rod tower, So that the probability that back flashover flashover occurs for insulator on weather-proof steel material shaft tower significantly increases, lightning fault risk is larger.
Currently, the research of steel material shaft tower weather-proof for transmission line of electricity is concentrated mainly on mechanical performance, weldability both at home and abroad Energy, weather resistance etc., have no the research for weather-proof steel rod tower lightning protection properties.In the prior art, it is directed to keeping away for shaft tower Thunder design is main as follows:
(1) the common lightning protection measures of transmission line of electricity are to set up lightning conducter, setting ground line etc., but these measures are after erection To the weather-proof higher problem of angle steel tower direct impedance without being effectively improved, it only can be used as the lightning protection means of conventional galvanised steel shaft tower.
(2) though there is portion of techniques using insulating composite material as the shaft tower of tower head, by the way that thunder and lightning drainage thread mode is arranged, Such as: utilizing hollow tubulose tower body structure, thunder and lightning drainage thread is set along tower body inboard, upright;Or the ground wire at combination tower crown end One section of metal cross arm along conducting wire direction is drawn at metal tower body center below the center of cross-arm and compound tower head respectively, in metal The end of cross-arm is vertically arranged thunder and lightning drainage thread.But the shaft tower of weather-proof steel material can not form the tubulose tower body knot of hollow structure Structure, and the whole tower of weather-proof angle steel tower uses weather-proof Steel material (weathering steel is also metal material), and whole tower shows high-impedance state, with combination tower The case where upper end uses metal material using composite material, lower end is different, cannot achieve the downlead design using metal tower body.
Simultaneously as the characteristic of weather-proof steel material, mostly uses the shaft tower shape of angle steel tower (lattice form) in practical applications Formula, for the tower body structure of angle steel tower complexity, the country does not have the engineering construction example for completely using weathering steel angle steel tower, lacks Few relevant engineer application experience.It is especially applied to the weather-proof steel material angle steel tower of residential area, due to the lattice of its angle steel tower Structure type causes no image of Buddha traditional technology the same, carries out lead design using hollow tubulose tower body structure, the prior art The lightning Protection Design that research is also difficult for weather-proof steel rod tower provides effectively guidance.
Therefore, how to develop a kind of lightning Protection Project for being directed to weather-proof steel material angle steel tower have become it is urgently to be solved Technical problem.
Summary of the invention
The purpose of the present invention is to solve there has been no be directed to weather-proof steel material angle steel tower to take shelter from the thunder in the prior art The defect of design provides a kind of for drawing formula ground wire grounding knot in the weather-proof steel material angle steel tower of residential area and area with less lightning activities environment Structure solves the above problems.
To achieve the goals above, technical scheme is as follows:
It is a kind of for drawing formula ground wire grounding structure in the weather-proof steel material angle steel tower of residential area and area with less lightning activities environment, including Weather-proof steel material angle steel tower, weather-proof steel material angle steel tower include tower body, and tower body is equipped with lightning conducter cross-arm, upper conducting wire from top to bottom Cross-arm, middle conducting wire cross-arm and lower wire cross-arm are equipped with two lightning conducters on lightning conducter cross-arm,
It further include drainage thread, the quantity of drainage thread is 4, and drainage thread A, drainage thread B are mounted on by parallel groove clamp respectively The enter line side of lightning conducter A, outgoing line side, drainage thread C, drainage thread D pass through respectively parallel groove clamp be mounted on lightning conducter B enter line side, Outgoing line side, drainage thread A, drainage thread B, drainage thread C and drainage thread D draw in tower body and are run through at the top of lightning conducter cross-arm It is connected respectively with grounding body after tower body by column foot grounding assembly, drainage thread A and drainage thread B are same with lightning conducter A along tower body The tower body of side arranges that drainage thread C and drainage thread D are arranged along tower body with the tower body of the same side lightning conducter B, drainage thread A, drainage thread B, drainage thread C and drainage thread D passes through the fixed armour clamp assembly of insulation and is mounted on tower body;
Drainage thread A, drainage thread B, drainage thread C and the drainage thread D passes through the fixed armour clamp assembly of insulation and is mounted on tower On the frame of body tabula, drainage thread A and drainage thread B are mounted on the combination position of tower body tabula and drainage thread C and drainage thread D is installed It is corresponding in mirror image in the combination position of tower body tabula.
The column foot grounding assembly includes band iron, and band iron is by the firm installation of column foot in weather-proof steel material angle steel tower Column foot on, drainage thread A is connect by ground terminal in one end of band iron, and the other end of band iron passes through ground lead and grounding body phase It connects.
The fixed armour clamp assembly of the insulation includes pillar, and the line seat material of pillar rear end is galvanized steel, the front of pillar It is fixed with weathering steel block, the material of part is insulating composite material, line between weathering steel block and line seat on pillar Folder is threadably mounted on line seat and drainage thread A is pressed on line seat by wire clamp, and the front end that weathering steel block is located on pillar is screw thread Structure, the front end of pillar are inserted on tower body and carry out screw thread installation.
Spacing positioned at tower body longitudinal direction same position, the adjacent fixed armour clamp assembly of two insulation is 2-3m.
The tower body tabula is fork type tabula or cross tabula.
The firm fitting of the column foot includes pressing plate and fixed plate, and pressing plate and fixed plate are L shape, pressing plate and fixed plate weight Folded installation, is equipped with felt pad between pressing plate and fixed plate.
Beneficial effect
Of the invention is a kind of for drawing formula ground wire grounding in the weather-proof steel material angle steel tower of residential area and area with less lightning activities environment Drainage thread is arranged between tower leg down conductor from the tower top lightning conducter of weather-proof angle steel tower compared with prior art in structure, drop Low weather-proof angle steel tower because direct impedance it is excessive caused by back flashover probability of malfunction.
The present invention is by carrying out insulating Design to fixed armour clamp assembly, so that drainage thread is formed with weather-proof steel material angle steel tower Insulating materials physical isolation avoids generation galvanic interaction from causing to corrode;Special mounting by drainage thread in tower body tabula is set Meter, so that 4 drainage threads are effectively fixed on the angle steel tower body of lattice form under the premise of meeting related electric specification.
The present invention draws the design down toward grounding body by drainage thread out of tower body, reduces the insulation blocking model of tower body root It encloses, increases the difficulty of artificial destruction, adapted to the particular/special requirement that residential area tower body occupied area is small, facilities protection is difficult;Together When, according to the skin effect of electric current, drainage thread draw out of tower body under design, lightning protection effect is relatively poor, flat suitable for year The equal less area of thunderstorm days (area with less lightning activities) demand;But also just because of drawing lower design in its drainage thread, so that itself and power transmission line Line pole tower ladder position is different, is more convenient for overhauling;Therefore, the present invention is more suitable for residential area and the area with less lightning activities environment of crowd massing Under practice.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the structural schematic diagram of lightning conducter cross-arm and upper conducting wire cross-arm in the present invention;
Fig. 3 is the structural schematic diagram of middle conducting wire cross-arm and lower wire cross-arm of the invention;
Fig. 4 is the structural schematic diagram of fork type tabula in the present invention;
Fig. 5 is the structural schematic diagram of cross tabula in the present invention;
Fig. 6 is the structural schematic diagram of column foot grounding assembly in the present invention;
Fig. 7 is to insulate to fix the structural schematic diagram of armour clamp assembly in the present invention;
Fig. 8 is the structural schematic diagram of the firm fitting of column foot in the present invention;
Wherein, the weather-proof steel material angle steel tower of 1-, 2- tower body, 3- lightning conducter cross-arm, the upper conducting wire cross-arm of 4-, conducting wire is horizontal in 5- Load, the fixed armour clamp assembly of 6- lower wire cross-arm, 7- lightning conducter, 9- column foot grounding assembly, 10- insulation, 11- drainage thread A, 12- draw Streamline B, 13- drainage thread C, 14- drainage thread D, 15- tower body tabula, 16- frame, 17- parallel groove clamp, 18- lightning conducter A, 19- are kept away Thunder line B, 20- grounding body, 21- band iron, the firm fitting of 22- column foot, 23- ground terminal, 24- ground lead, 25- pressing plate, 26- are solid Fixed board, 27- felt pad, 31- pillar, 32- line seat, 33- weathering steel block, 34- wire clamp.
Specific embodiment
The effect of to make to structure feature of the invention and being reached, has a better understanding and awareness, to preferable Examples and drawings cooperation detailed description, is described as follows:
As shown in Figure 1, of the present invention a kind of in the weather-proof steel material angle steel tower of residential area and area with less lightning activities environment Draw formula ground wire grounding structure, including weather-proof steel material angle steel tower 1.As shown in Figures 2 and 3, weather-proof steel material angle steel tower 1 includes Tower body 2, tower body 2 are equipped with lightning conducter cross-arm 3, upper conducting wire cross-arm 4, middle conducting wire cross-arm 5 and lower wire cross-arm 6 from top to bottom, keep away Two lightning conducters 7 are installed, two lightning conducters 7 are respectively lightning conducter A18 and lightning conducter B19 on thunder line cross-arm 3.
Here, the design using drainage thread is grounded two lightning conducters 7.According to overvoltage protection, Insulation Coordination, electricity The basic principles such as Distribution of Magnetic Field, to shaft tower space lightning stroke electromagnetic field, tower body voltage and current point under different drainage thread quantity terms Cloth is calculated, it was demonstrated that setting drainage thread, which can be effectively controlled, reduces weather-proof steel rod tower current potential and voltage is born in insulation;In addition, considering bar Situations such as tower distributed inductance, electric current skin effect, engineering construction cost, the radical along the drainage thread of iron tower of power transmission line setting are got over More, lightning protection effect is more significant, but project cost gradually rises, and therefore, under general condition, comprehensively considers lightning protection effect and engineering Cost, in conjunction with the basic principle of optimization, after drainage thread quantity is more than four, lightning protection effect tends to definite value substantially, and engineering is made Valence continues to grow proportionately, therefore here, the quantity of drainage thread is 4.
As shown in Fig. 2, drainage thread A11, drainage thread B12 pass through the inlet wire that parallel groove clamp 17 is mounted on lightning conducter A18 respectively Side, outgoing line side, the enter line side of lightning conducter A18, outgoing line side are two of lightning conducter A18 for being directed to weather-proof steel material angle steel tower 1 Side.In the prior art, traditional 110kV earth wire of power transmission line is generallyd use with for OPGW by base earthing mode.And it is directed to For weather-proof steel material angle steel tower 1, drainage thread connection is carried out for the two sides of lightning conducter A18, first is that in order to cooperate 4 drainage threads Connection design, second is that for the connection type of unified ground wire and optical cable, convenient for construction.Similarly, drainage thread C13, drainage thread D14 Enter line side, the outgoing line side of lightning conducter B19 are mounted on by parallel groove clamp respectively.
For traditional circuit shaft tower, after lightning conducter or shaft tower meet with lightning stroke, lightning current leads to ground connection along shaft tower tower body, by Small in zinc-plated steel rod tower tower body impedance, the tower top current potential that lightning current is formed after route thunderbolt is mainly influenced by ground resistance.It is weather-proof Steel is the low-alloy steel between ordinary steel and stainless steel, inside be good conductor, outside corrosion layer impedance it is high, therefore The place of two pieces of weathering steels splicing is in high-impedance state, and angle steel tower is that many pieces of weather-proof angle splice joints fit together, therefore weather-proof angle The tower body impedance of head tower is significantly higher than zinc-plated steel rod tower, after lightning conducter or shaft tower meet with lightning stroke, in identical ground resistance condition Under, the tower top current potential that lightning current is formed in weather-proof steel rod tower is apparently higher than zinc-plated steel rod tower, so that insulating in weather-proof steel rod tower The probability that back flashover flashover occurs for son significantly increases, and lightning fault risk is larger.Therefore, drainage thread A11, drainage thread B12, draw Streamline C13 and drainage thread D14 draws in tower body 2 from the top of lightning conducter cross-arm 3 and is grounded by column foot after tower body 2 Component 9 is connected with grounding body 20 respectively.
Wherein, drainage thread A11 and drainage thread B12 is arranged along tower body 2 with the tower body of the same side lightning conducter A18, that is, is drained Line A11 and drainage thread B12 is close to the side lightning conducter A18;Drainage thread C13 and drainage thread D14 are same with lightning conducter B19 along tower body 2 The tower body of side arranges that i.e. drainage thread C13 and drainage thread D14 are close to the same side lightning conducter B19.Positioned at the longitudinal same position of tower body It sets, the spacing of the adjacent two fixed armour clamp assemblies 10 that insulate is 2-3m.If drainage thread is arranged on the outside of the tower body, can with along tower body The ladder position of main material arrangement mutually conflicts, and is unfavorable for transporting the upper tower maintenance of inspection personnel.Meanwhile on city small towns or road periphery, if Drainage thread arranges that the protection scope area that then it certainly will be caused to cover when leading to underground conductor wire is larger, with city on the outside of tower body Township's electricity consumption occupied area principle as small as possible mutually conflicts.But the skin effect transmitted according to lightning current, drainage thread arrangement are got over Close to outside, lightning current protection effect is better, therefore, by drawing mode in tower body, is more suitable for area with less lightning activities and practices.
Different from the anti-corrosion measure of traditional Zinc-coated angle steel tower, weather-proof angle steel forms fine and close corrosion layer on surface by initial stage To have the function that prevent internal further corrode, on the one hand, if galvanized steel is contacted with weathering steel easily occurs galvanic effect, add The corrosion of fast galvanized steel, on the other hand, the easy ponding accelerated corrosion process of weathering steel surface corrosion layer.This phenomenon goes out in order to prevent Existing, drainage thread A11, drainage thread B12, drainage thread C13 and drainage thread D14 pass through the fixed armour clamp assembly 10 of insulation and are mounted on tower body On 2.
As shown in fig. 7, the fixed armour clamp assembly 10 that insulate includes pillar 31,32 material of line seat of 31 rear end of pillar is zinc-plated Steel, the front of pillar 31 are fixed with weathering steel block 33, and weathering steel block 33 on weather-proof steel material angle steel tower 1 for installing When, it is against on weather-proof steel material angle steel tower 1 and facilitates fixed use.On pillar 31 between weathering steel block 33 and line seat 32 The material divided is insulating composite material, is reached by the insulating composite material between weathering steel block 33 and line seat 32 and is dielectrically separated from Effect.Wire clamp 34 is threadably mounted on line seat 32 and drainage thread A11 is pressed on line seat 32 by wire clamp 34, and drainage thread is consolidated in formation Dingan County's dress.The front end for being located at weathering steel block 33 on pillar 31 is helicitic texture, and the front end of pillar 31 is inserted on tower body 2 and carries out Installation of the fixed armour clamp assembly 10 on tower body 2 of insulating is realized in screw thread installation.
Since the cross section of angle steel tower is lattice pattern, and drainage thread A11, drainage thread B12, drainage thread C13 and drainage thread Under D14 draws from the top of lightning conducter cross-arm 3 and from inside, therefore, four drainage threads how to be effectively fixed as on tower body compared with For difficult technical detail.According to the basic principle of skin effect, when drainage thread is along tower body disposed inboard, should be use up between drainage thread Amount increases spacing, to increase lightning protection effect;Meanwhile it being based on galvanic effect, drainage thread should avoid as far as possible and weathering steel Directly contact.
Based on this, drainage thread A11, drainage thread B12, drainage thread C13 and drainage thread D14 are passed through to the fixed fitting group of insulation Part 10 is mounted on the frame 16 of tower body tabula 15, and drainage thread A11 and drainage thread B12 are mounted on the combination position of tower body tabula 15 The combination position of tower body tabula 15 is mounted in mirror symmetry with drainage thread C13 and drainage thread D14.It is fork with tower body tabula 15 For type tabula, as shown in figure 4, the insulation for installing drainage thread A11, drainage thread B12, drainage thread C13 or drainage thread D14 is fixed Armour clamp assembly 10 is fixed on frame 16, so that between drainage thread A11 and drainage thread C13, drainage thread B12 and drainage thread D14 Distance is maximum, to meet the related request of electric current.Equally, by taking tower body tabula 15 is cross tabula as an example, as shown in figure 5, The distance between the fixed armour clamp assembly 10 of opposite insulation maximum.Again by taking grid type cross-arm as an example, structure is increasingly complex, and more Drainage thread is mounted on the frame of grid type cross-arm by the fixed armour clamp assembly that insulate, then can be guaranteed bigger between drainage thread Spacing.
As shown in fig. 6, column foot grounding assembly 9 includes band iron 21, band iron 21 is mounted on weather-proof by the firm fitting 22 of column foot On the column foot of steel material angle steel tower 1.The firm fitting 22 of column foot can be traditional fixation fitting, but in order to guarantee insulating properties, such as Shown in Fig. 8, the firm fitting 22 of column foot may include pressing plate 25 and fixed plate 26, and pressing plate 25 and fixed plate 26 are L shape, pressing plate 25 Installation Chong Die with fixed plate 26, felt pad 27 is equipped between pressing plate 25 and fixed plate 26, is played absolutely by felt pad 27 Edge effect.Drainage thread A11 is connect by ground terminal 23 in one end of band iron 21, the other end of band iron 21 by ground lead 24 with Grounding body 20 connects.
Here, the ground line of transmission line of electricity is provided with both direction, on the outside of tower body or on the inside of tower body, i.e., with the prior art For, grounding body 20 is set on the outside of tower body or inside, only need in a traditional way using transition member avoid ground line with Tower body, which directly contacts, leads to corrosion.Here, by taking grounding body 20 is set on the outside of tower body as an example, to avoid ground line and tower body Directly contact causes to corrode, and using structure shown in Fig. 6, when grounding body is located on the outside of tower body, band iron 21 is located on the outside of tower body, on Drainage thread (drainage thread carries out interior to outer conversion using traditional fitting) is terminated, lower termination ground lead 24 leads to grounding body 20.
In actual use, when lightning conducter A18 or lightning conducter B19 meets with lightning stroke, according to different lightning stroke positions and electricity It makes leave with rage to drainage thread A11, drainage thread B12, drainage thread C13 or drainage thread D14, which will shock by electricity, to be drawn inside tower body 2 down toward grounding body 20 carry out lightning protection earthing, ensure that line security.
The basic principles, main features and advantages of the present invention have been shown and described above.The technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and what is described in the above embodiment and the description is only the present invention Principle, various changes and improvements may be made to the invention without departing from the spirit and scope of the present invention, these variation and Improvement is both fallen in the range of claimed invention.The present invention claims protection scope by appended claims and its Equivalent defines.

Claims (6)

1. a kind of for drawing formula ground wire grounding structure in the weather-proof steel material angle steel tower of residential area and area with less lightning activities environment including resistance to It waits steel material angle steel tower (1), weather-proof steel material angle steel tower (1) includes tower body (2), and tower body (2) is equipped with lightning conducter from top to bottom Cross-arm (3), upper conducting wire cross-arm (4), middle conducting wire cross-arm (5) and lower wire cross-arm (6), lightning conducter cross-arm are equipped with two on (3) Lightning conducter (7), it is characterised in that:
It further include drainage thread, the quantity of drainage thread is 4, and drainage thread A (11), drainage thread B (12) pass through parallel groove clamp respectively (17) it is mounted on enter line side, the outgoing line side of (18) lightning conducter A, drainage thread C (13), drainage thread D (14) pass through parallel groove clamp respectively (17) it is mounted on enter line side, the outgoing line side of (19) lightning conducter B, drainage thread A (11), drainage thread B (12), drainage thread C (13) and draws Streamline D (14) draws in tower body (2) at the top of lightning conducter cross-arm (3) and is grounded group by column foot afterwards through tower body (2) Part (9) is connected with grounding body (20) respectively, and drainage thread A (11) and drainage thread B (12) are same with lightning conducter A (18) in tower body (2) The tower body of side arranges that drainage thread C (13) and drainage thread D (14) are along the interior tower body cloth with lightning conducter B (19) the same side of tower body (2) It sets, drainage thread A (11), drainage thread B (12), drainage thread C (13) and drainage thread D (14) pass through insulate fixed armour clamp assembly (10) It is mounted on tower body (2);
Drainage thread A (11), drainage thread B (12), drainage thread C (13) and the drainage thread D (14) passes through the fixed fitting that insulate Component (10) is mounted on the frame (16) of tower body tabula (15), and drainage thread A (11) and drainage thread B (12) are mounted on tower body tabula (15) combination position and drainage thread C (13) and drainage thread D (14) is mounted on the combination position of tower body tabula (15) in mirror image pair It answers.
It a kind of is kept away for drawing formula in the weather-proof steel material angle steel tower of residential area and area with less lightning activities environment 2. according to claim 1 Thunder line ground structure, it is characterised in that: the column foot grounding assembly (9) includes band iron (21), and band iron (21) passes through column foot heavily fortified point Gu fitting (22) is mounted on the column foot of weather-proof steel material angle steel tower (1), drainage thread A (11) is connect by ground terminal (23) flat The other end of one end of iron (21), band iron (21) is connected by ground lead (24) with grounding body (20).
It a kind of is kept away for drawing formula in the weather-proof steel material angle steel tower of residential area and area with less lightning activities environment 3. according to claim 1 Thunder line ground structure, it is characterised in that: the insulation fixed armour clamp assembly (10) includes pillar (31), pillar (31) rear end Line seat (32) material is galvanized steel, and the front of pillar (31) is fixed with weathering steel block (33), is located on pillar (31) weather-proof The material of part is insulating composite material between steel block (33) and line seat (32), and wire clamp (34) is threadably mounted on line seat (32) And drainage thread A (11) is pressed on line seat (32) by wire clamp (34), the front end on pillar (31) positioned at weathering steel block (33) is spiral shell Line structure, the front end of pillar (31) are inserted on tower body (2) and carry out screw thread installation.
It a kind of is kept away for drawing formula in the weather-proof steel material angle steel tower of residential area and area with less lightning activities environment 4. according to claim 1 Thunder line ground structure, it is characterised in that: insulate fixed armour clamp assembly (10) positioned at tower body longitudinal direction same position, adjacent two Spacing is 2-3m.
It a kind of is kept away for drawing formula in the weather-proof steel material angle steel tower of residential area and area with less lightning activities environment 5. according to claim 1 Thunder line ground structure, it is characterised in that: the tower body tabula (15) is fork type tabula or cross tabula.
It a kind of is kept away for drawing formula in the weather-proof steel material angle steel tower of residential area and area with less lightning activities environment 6. according to claim 2 Thunder line ground structure, it is characterised in that: the firm fitting of the column foot (22) includes pressing plate (25) and fixed plate (26), pressing plate (25) and fixed plate (26) is L shape, and pressing plate (25) installation Chong Die with fixed plate (26) is located at pressing plate (25) and fixed plate (26) Between felt pad (27) are installed.
CN201910024971.2A 2019-01-11 2019-01-11 A fire-resistant steel angle steel tower internal leading type lightning conductor grounding structure for living area and few thunder district environment Active CN109672137B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910024971.2A CN109672137B (en) 2019-01-11 2019-01-11 A fire-resistant steel angle steel tower internal leading type lightning conductor grounding structure for living area and few thunder district environment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910024971.2A CN109672137B (en) 2019-01-11 2019-01-11 A fire-resistant steel angle steel tower internal leading type lightning conductor grounding structure for living area and few thunder district environment

Publications (2)

Publication Number Publication Date
CN109672137A true CN109672137A (en) 2019-04-23
CN109672137B CN109672137B (en) 2024-05-14

Family

ID=66149379

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910024971.2A Active CN109672137B (en) 2019-01-11 2019-01-11 A fire-resistant steel angle steel tower internal leading type lightning conductor grounding structure for living area and few thunder district environment

Country Status (1)

Country Link
CN (1) CN109672137B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201256276Y (en) * 2008-09-25 2009-06-10 张俊奇 Overhead transmission line surround thunder-proof lightning arrester
CN101692545A (en) * 2009-09-08 2010-04-07 国网电力科学研究院 Vertically grounding down-leading method for internal side of composite material tower and tower thereof
CN103993772A (en) * 2014-06-05 2014-08-20 国家电网公司 110kV lattice composite tower
CN107196266A (en) * 2016-03-15 2017-09-22 深圳带路科技有限公司 A kind of lightning conducter Double safety device
CN209344740U (en) * 2019-01-11 2019-09-03 安徽华电工程咨询设计有限公司 It is a kind of for drawing formula ground wire grounding structure in the weather-proof steel material angle steel tower of residential area and area with less lightning activities environment

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201256276Y (en) * 2008-09-25 2009-06-10 张俊奇 Overhead transmission line surround thunder-proof lightning arrester
CN101692545A (en) * 2009-09-08 2010-04-07 国网电力科学研究院 Vertically grounding down-leading method for internal side of composite material tower and tower thereof
CN102064509A (en) * 2009-09-08 2011-05-18 国网电力科学研究院 Method for vertical grounding down-leading on inner side of composite material pole tower and pole tower thereof
CN103993772A (en) * 2014-06-05 2014-08-20 国家电网公司 110kV lattice composite tower
CN107196266A (en) * 2016-03-15 2017-09-22 深圳带路科技有限公司 A kind of lightning conducter Double safety device
CN209344740U (en) * 2019-01-11 2019-09-03 安徽华电工程咨询设计有限公司 It is a kind of for drawing formula ground wire grounding structure in the weather-proof steel material angle steel tower of residential area and area with less lightning activities environment

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李志军;陈维江;姜文东;王灿灿;戴敏;刘宗喜;: "110kV双回线路格构式复合材料杆塔雷电防护研究", 高电压技术, no. 01, 31 January 2015 (2015-01-31) *

Also Published As

Publication number Publication date
CN109672137B (en) 2024-05-14

Similar Documents

Publication Publication Date Title
CN209344740U (en) It is a kind of for drawing formula ground wire grounding structure in the weather-proof steel material angle steel tower of residential area and area with less lightning activities environment
CN101672124A (en) Compound material pole tower
CN109586235A (en) A kind of weather-proof angle steel tower exogenous ground wire grounding structure for spacious area and area with more lightning activities environment
CN209344742U (en) A kind of weather-proof angle steel tower exogenous ground wire grounding structure for spacious area and area with more lightning activities environment
CN104763208A (en) 110kV dual-loop novel butterfly-shaped penetrating and spanning tower in high-altitude area
CN109672137A (en) It is a kind of for drawing formula ground wire grounding structure in the weather-proof steel material angle steel tower of residential area and area with less lightning activities environment
CN204691370U (en) The novel butterfly in 110kV double loop, high altitude localities bores more tower
CN209344741U (en) A kind of ladder lead type ground wire grounding structure for weather-proof steel tube tower
CN105113841B (en) A kind of 35kV double loops cast composite material pole tower
CN208570190U (en) The anti-interference aerial cable of 10kV graphene composite shielding low noise weatherability
CN207260730U (en) A kind of double loop cable termination tower
CN207847235U (en) No ground pole DC transmission line line pole tower
CN109672136A (en) A kind of ladder lead type ground wire grounding structure for weather-proof steel tube tower
CN108386056A (en) A kind of insulation head of 10kV high-tension lines
CN109826482A (en) A kind of anti-lightning strike shaft tower of composite construction
CN208618911U (en) A kind of insulation head of 10kV high-tension line
CN204343772U (en) Narrow base cable shoe steel tube tower under four return cable
CN209293540U (en) A kind of compound cross-arm power transmission tower of 110kV common-tower double-return road lattice
CN107294034A (en) cable terminal pole
CN209168898U (en) A kind of transformer coil support construction
CN101425666B (en) Common phase sequence common-tower common-window dual loop transmission line
CN201507140U (en) Composite material pole tower
CN103993772A (en) 110kV lattice composite tower
CN204920418U (en) Two loop pipe type combined material shaft towers of 35kV
CN210724148U (en) Single-circuit cable down-lead rod

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant