CN109657997A - A kind of wisdom power plant emergency preplan intelligence judgement and automatic push method - Google Patents
A kind of wisdom power plant emergency preplan intelligence judgement and automatic push method Download PDFInfo
- Publication number
- CN109657997A CN109657997A CN201811589539.XA CN201811589539A CN109657997A CN 109657997 A CN109657997 A CN 109657997A CN 201811589539 A CN201811589539 A CN 201811589539A CN 109657997 A CN109657997 A CN 109657997A
- Authority
- CN
- China
- Prior art keywords
- emergency
- emergency preplan
- preplan
- power plant
- automatic push
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0637—Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/50—Network services
- H04L67/55—Push-based network services
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W4/00—Services specially adapted for wireless communication networks; Facilities therefor
- H04W4/12—Messaging; Mailboxes; Announcements
- H04W4/14—Short messaging services, e.g. short message services [SMS] or unstructured supplementary service data [USSD]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Educational Administration (AREA)
- Physics & Mathematics (AREA)
- Entrepreneurship & Innovation (AREA)
- Computer Networks & Wireless Communication (AREA)
- Health & Medical Sciences (AREA)
- Marketing (AREA)
- Theoretical Computer Science (AREA)
- Signal Processing (AREA)
- Tourism & Hospitality (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Public Health (AREA)
- Primary Health Care (AREA)
- General Health & Medical Sciences (AREA)
- Development Economics (AREA)
- Water Supply & Treatment (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Alarm Systems (AREA)
Abstract
The invention discloses a kind of wisdom power plant emergency preplan intelligence judgement and automatic push methods, and method and step is as follows, and a. designs various emergency prediction scheme;B. data acquisition obtains corresponding data;C. start-up criterion;D.ONCALL SMS platform is pre-defined;E. system starts corresponding emergency preplan automatically;F. start emergency response, while the information content is pushed to related personnel;G. after the completion of all disposition, cancel emergency response automatically, hair ONCALL SMS platform breath of delivering letters informs all affected members.Compared with prior art, emergency disposal of the present invention is rapider, according to emergency preplan entry condition, independently judges whether to start emergency response, can shorten report and notice time, strives for the more time for emergency disposal.And the shortcomings that independently pushing emergency disposal main points, disposal personnel can be made evidence-based in emergency disposal, avoid relying on working experience, disposition accuracy rate and efficiency are improved, security risk is reduced.
Description
Technical field
The present invention relates to a kind of power plant's emergency management systems more particularly to a kind of wisdom power plant emergency preplan intelligence to adjudicate
And automatic push method.
Background technique
For power station, emergency preplan is pre- comprising flood control emergency preplan, water logging workshop emergency preplan, power cut of whole factory emergency
The 40 various emergency prediction scheme such as case, Geological disaster prevention emergency preplan, emergency preplan are papery shelves, and editor binds into book form.Emergency preplan is annual
Timing study rehearsal.
During the day-to-day operation of power station, when reaching appropriate level early-warning conditions, by (secondary group of flood control leading group group leader
It is long) it orders to start emergency preplan according to prediction scheme relevant regulations, operation issues warning information by ONCALL SMS platform when value, prevents
Office, flood leading group notifies each Emergency Response Team to enter preparation state of speedily carrying out rescue work accordingly.Each profession Emergency Response Team is connected to early warning letter
After breath, requires to carry out the related works such as personnel placement, relief materials preparation according to warning level, prepare to carry out emergency repair at any time
Rescue work.
Startup program is simplified as:
Dangerous situation occur → run it is on duty be worth to office, flood control leading group report → flood control leading group announce that starting is answered
Anxious prediction scheme → operation when value by ONCALL SMS platform publication warning information → emergency repair rescue work → dangerous situation terminate →
Flood control leading group declares the closing of emergency response → analysis assessment.
Need to carry out emergency disposal by person works' experience when appearance accident, emergency disposal slowly, convey inefficiency, can not
Targetedly notify personnel at different levels, personnel's capability in handling accident at different levels limited, therefore there are larger security risks.
Based on the above issues, wisdom power plant of the invention focuses on the traditional mode of production management mode for changing power plant, uses data
Carry out driven management, and carries out technology upgrading on the basis of intelligent power plant, all-round construction intelligent Power Station+wisdom management cloud electricity
Factory.According to wisdom power plant construction theory, emergency disposal need to grow with each passing hour, and realize autonomous judgement, intelligently pushing.
Summary of the invention
It solves the above problems the object of the invention is that providing one kind, emergency is had developed based on unified platform
Prediction scheme intelligent decision pushes platform, and alarm function is comprehensive, and combines the existing emergency preplan in power station and on-site emergency disposal scheme
The emergency preplan intelligence judgement of wisdom power plant and automatic push method.
To achieve the goals above, the technical solution adopted by the present invention is that: a kind of wisdom power plant emergency preplan intelligence is sentenced
Certainly and automatic push method, method and step is as follows,
A. various emergency prediction scheme is designed, each emergency preplan sets up corresponding rank and early-warning conditions;
B. it during the day-to-day operation of power station, is acquired by data and obtains the corresponding data of early-warning conditions;
C. collected data provide a judgment value according to the condition that emergency preplan starts, (such as flood control emergency preplan
Starting needs " reservoir inflow > 4800m3/ s ", then 4800 are judgment values) start-up criterion as emergency preplan intelligent decision;
D.ONCALL SMS platform pre-defines the information content and push of emergency preplan starting according to emergency preplan type
Personnel;
E. when power station meets start-up criterion in the process of running, system starts corresponding emergency preplan automatically, intelligently sentences
Certainly prediction scheme starts, and shortens the accident treatment time;
F. start emergency response, while the information content is pushed to related personnel by ONCALL SMS platform, utilizes ONCALL
SMS platform, fast and accurately automatic push information;
G. after the completion of all disposition, signal involution, work has restored, and cancels emergency response automatically, and hair ONCALL is short
Letter platform deliver letters breath inform all affected members.
In step a, the emergency preplan includes that flood control emergency preplan, water logging workshop emergency preplan, power cut of whole factory emergency are pre-
Case, Geological disaster prevention emergency preplan, power equipment emergency plan for accidents, stabilization of power grids malicious event emergency preplan, environmental pollution
Emergency plan for accidents, earthquake-proof calamity emergency prediction scheme, the emergency plan for accidents that breaks down, hazardous chemical emergency plan for accidents etc. more than 40
Kind emergency preplan.
Preferably, the start-up criterion in emergency preplan are as follows:
Flood control emergency preplan entry condition is " reservoir inflow > 4800m3/s";
Water logging workshop emergency preplan entry condition is " movement of water logging workshop alarm signal ";
Power cut of whole factory emergency preplan entry condition is " I section of voltage=0 of 10kV station service;II section of voltage of 10kV station service=
0;III section of voltage=0 of station service;IV section of voltage=0 " of station service;
Power equipment emergency plan for accidents entry condition is that Level 1Alarming triggers in ON-CALL system.
Other prediction schemes such as Geological disaster prevention emergency preplan, environmental pollution accident emergency preplan are then by manually send first
" XXXX emergency preplan starting." short message is as entry condition.
Preferably, the data source includes monitoring system, regimen system, access control system, industrial television in step b
System etc..Such as: as the reservoir inflow in flood control emergency preplan is obtained from regimen system acquisition;And water logging workshop emergency preplan
Alarm signal, the service power voltage of power cut of whole factory emergency preplan and the Level 1Alarming signal of power equipment accident be from monitoring be
System acquisition.
Preferably, in every kind of emergency preplan, having formulated emergency response according to the job duty of different personnel in step d
The action of Shi Butong sorts out the disposition main points of all personnel from prediction scheme, and compiles mould in ONCALL SMS platform
Plate arranges all kinds of personnel in conjunction with the existing emergency preplan in power station and disposes main points realization precisely push;
Preferably, having also set up a set of accident treatment experts database in step f, when emergency event occurs, will push away automatically
It send accident treatment instruction to related personnel, improves personnel's capability in handling accident at different levels.
Compared with the prior art, the advantages of the present invention are as follows: emergency disposal of the present invention is rapider, is started according to emergency preplan
Condition independently judges whether to start emergency response, can shorten report and notice time, strive for the more time for emergency disposal.
And emergency disposal main points are independently pushed, disposal personnel can be made evidence-based in emergency disposal, avoid relying on working experience
The shortcomings that, disposition accuracy rate and efficiency are improved, security risk is reduced.
Detailed description of the invention
Fig. 1 is the method for the present invention flow diagram.
Specific embodiment
The invention will be further described below.
Embodiment 1: referring to Fig. 1, the present invention successfully answers right flood control emergency IV to ring in Da Gang Mountain power station in June, 2018
It answers.
When collecting reservoir inflow and reaching 4800, according to flood control case in advance, flood control IV grade of automatic starting is responded.System is automatic
Send " XX:XX generation plant area's hydraulic structure experience warning flood discharge 4800m3/ s to 6560m3/ s event, starting burst thing
The comprehensive emergency preplan IV grades of response of part." information give corresponding personnel.
Instruction is pushed to corresponding personnel simultaneously:
1. looking over one's shoulder generation and supply electric equipment and main auxiliary equipment operating condition (each portion's bearing temperature of unit, main transformer temperature
Degree, sump and draft tube gate chamber, tail tune room water level, draining pump running current, temperature, pressure and flow etc.), emphasis equipment touring time
Number doubles, and thunderstorm weather will pay close attention to route protection, outlet field device has without exception, finds the problem and notifies processing at once.
2: reinforcing seepage from powerhouse sump, seepage of dam sump, cushion pool leakage sump, three layers of underground power house draining
Gallery and each cavern gutter, the building GIS gutter, unit top cover drainage system, elevator catch pit, main transformer (reactor) accident
The inspection monitoring of oil sump, turbine oil depot emergency oil pond, timely arrangement personnel processing of finding the problem, it is ensured that drainage system is run just
Often.
3. in time to release floodwatering facility electromechanical equipment, water levels of upstream and downstream measuring system, dam body sump draining pump, cushion pool collection
Well draining pump, workshop sump diving deep well pump, proof submersible sand discharging pump, redundant sump pump etc. carry out defeat elimination, it is ensured that equipment
Normal operation.
4. reinforcing flood control backup power source (flood discharging tunnel, dam area diesel-driven generator and 110kV substation) checks monitoring, start bavin
Oily generator inspection answers normal operation, and diesel-driven generator failure should notify maintenance to handle immediately, and reports flood control leading group and do
Public room.
5. meet with regional extra torrential rain, intentinonally descend main building traffic hole, tail tune traffic hole, underground power house into
Wind-tunnel mouth, underground power house air draft hole (underground power house exhaust fan room and dam diesel generator room), the room GIS front door prison
Depending on noting abnormalities and reporting commander immediately, organizational strength carries out emergency disposal, prevents ponding from flowing backward and enters workshop." to O&M
Place;
Push " O&M of emergency team, which is speedily carried out rescue work group, receives to run value arrangement on duty, be mainly responsible for equipment inspection, monitoring, operation,
Defect elimination work;The organ raw skill personnel that speedily carry out rescue work group are responsible for checking flood fighting materials situation, diesel-driven generator starting situation in place, carry out flood
Feelings, the condition of a disaster collect record, coordinate, operation maintenance personnel is instructed to carry out inspection and emergency disposal to live keypoint part;Safety supervision personnel connection
It is that private fire brigade and security troop set up emergency team 5 and stand ready that (private fire brigade awaits orders in fire station, and security troop exists
Await orders in campsite), while on-the-spot make an inspection tour instructs emergency repair, issues danger sources information, it is ensured that personnel, equipment safety.People from office
Member mainly carries out communications and reports and Rear-Service Support.To prevent from entering main building into the unexpected water of factory's access tunnel, O&M is speedily carried out rescue work
Group also Ying Jin factory access tunnel expanding reach carries out water blocking, draining emergency measure: building firm water-blocking bank with sandbag and (is not less than
0.5m);It opens into 3 pieces of trench cover of factory's access tunnel expanding reach right-side cable, and is arranged and blocks, prevent personnel to be strayed into and fall;In electricity
Installing submersible pump in cable ditch is drained to clipping room middle layer collector drain;Direct current panel takes waterproof measure under clipping room;Direct current cabinet
Cable cover is all opened by disk, assists draining, and be arranged and block." to flood control team;
" personnel are responsible for flood fighting materials at production technology and spare unit, material purchases work, connection equipment manufacturer carry out skill for push
Art is supported, operation and maintenance group is instructed to carry out the work of equipment operation maintenance defect elimination.It is responsible for contacting with local weather authorities, grasps water
Feelings, rain condition variation, issue great Weather information.Live the condition of a disaster, dangerous situation record are carried out, the instruction of flood control leading group is conveyed." extremely raw
Produce technical office.
Above to a kind of wisdom power plant emergency preplan intelligence judgement provided by the present invention and automatic push method, carry out
Exhaustive presentation, used herein a specific example illustrates the principle and implementation of the invention, above embodiments
Explanation be merely used to help understand method and its core concept of the invention;At the same time, for those skilled in the art,
According to the thought of the present invention, there will be changes in the specific implementation manner and application range, to change of the invention and changes
Into that will be possible, without exceeding accessory claim defined conception and scope, in conclusion the content of the present specification be not
It is interpreted as limitation of the present invention.
Claims (6)
1. a kind of wisdom power plant emergency preplan intelligence judgement and automatic push method, it is characterised in that: method and step is as follows,
A. various emergency prediction scheme is designed, each emergency preplan sets up corresponding rank and early-warning conditions;
B. it during the day-to-day operation of power station, is acquired by data and obtains the corresponding data of early-warning conditions;
C. collected data provide a judgment value according to the condition that emergency preplan starts, as emergency preplan intelligent decision
Start-up criterion;
D. SMS platform pre-defines the information content and the push personnel of emergency preplan starting according to emergency preplan type;
E. when power station meets start-up criterion in the process of running, system starts corresponding emergency preplan automatically;
F. start emergency response, while the information content is pushed to related personnel by SMS platform;
G. after the completion of all disposition, signal involution, work has restored, and cancels emergency response automatically, and hair ONCALL short message is flat
Platform deliver letters breath inform all affected members.
2. a kind of wisdom power plant emergency preplan intelligence judgement according to claim 1 and automatic push method, feature
Be: in step a, the emergency preplan include flood control emergency preplan, water logging workshop emergency preplan, power cut of whole factory emergency preplan,
Geological disaster prevention emergency preplan, power equipment emergency plan for accidents, stabilization of power grids malicious event emergency preplan, environmental pollution accident
Emergency preplan, earthquake-proof calamity emergency prediction scheme, the emergency plan for accidents that breaks down, hazardous chemical emergency plan for accidents.
3. a kind of wisdom power plant emergency preplan intelligence judgement according to claim 2 and automatic push method, feature
It is: the start-up criterion in emergency preplan are as follows:
Flood control emergency preplan entry condition is " reservoir inflow > 4800m3/s";
Water logging workshop emergency preplan entry condition is " movement of water logging workshop alarm signal ";
Power cut of whole factory emergency preplan entry condition is " I section of voltage=0 of 10kV station service;II section of voltage=0 of 10kV station service;Factory
III section of voltage=0 of electricity consumption;IV section of voltage=0 " of station service;
Power equipment emergency plan for accidents entry condition is that Level 1Alarming triggers in ON-CALL system;
Other prediction schemes are then by first " starting of XXXX emergency preplan " short message manually sending as entry condition.
4. a kind of wisdom power plant emergency preplan intelligence judgement according to claim 1 and automatic push method, feature
Be: in step b, the data source includes monitoring system, regimen system, access control system, closed-circuit TV system.
5. a kind of wisdom power plant emergency preplan intelligence judgement according to claim 1 and automatic push method, feature
It is: in step d, in every kind of emergency preplan, different work when having formulated emergency response according to the job duty of different personnel
Content sorts out the disposition main points of all personnel from prediction scheme, and compiles template in SMS platform.
6. a kind of wisdom power plant emergency preplan intelligence judgement according to claim 1 and automatic push method, feature
It is: in step f, has also set up a set of accident treatment experts database, when emergency event occurs, automatic push accident treatment is referred to
Opinion is led to related personnel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811589539.XA CN109657997A (en) | 2018-12-25 | 2018-12-25 | A kind of wisdom power plant emergency preplan intelligence judgement and automatic push method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811589539.XA CN109657997A (en) | 2018-12-25 | 2018-12-25 | A kind of wisdom power plant emergency preplan intelligence judgement and automatic push method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109657997A true CN109657997A (en) | 2019-04-19 |
Family
ID=66116386
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811589539.XA Pending CN109657997A (en) | 2018-12-25 | 2018-12-25 | A kind of wisdom power plant emergency preplan intelligence judgement and automatic push method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109657997A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111539618A (en) * | 2020-04-21 | 2020-08-14 | 全球能源互联网研究院有限公司 | Emergent scheme system of electric power wisdom |
CN116345661A (en) * | 2022-12-19 | 2023-06-27 | 阳江蓄能发电有限公司 | Minimum system emergency control method for pumping and storing power station |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010246306A (en) * | 2009-04-08 | 2010-10-28 | Ntt Facilities Inc | Device, method and system for controlling power supply |
CN103500423A (en) * | 2013-09-26 | 2014-01-08 | 国家电网公司 | Case adaptation and decision method for power emergency events |
CN105005827A (en) * | 2015-07-28 | 2015-10-28 | 济南创智电气科技有限公司 | Emergency response warning method based on electricity emergency |
CN105844407A (en) * | 2016-03-24 | 2016-08-10 | 西南科技大学 | Nuclear emergency decision-making system based on expert knowledge base |
CN108805441A (en) * | 2018-06-06 | 2018-11-13 | 广西桂冠电力股份有限公司 | power emergency command system |
CN108988334A (en) * | 2018-08-03 | 2018-12-11 | 广东电网有限责任公司 | Electric network fault grade dissemination method |
-
2018
- 2018-12-25 CN CN201811589539.XA patent/CN109657997A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010246306A (en) * | 2009-04-08 | 2010-10-28 | Ntt Facilities Inc | Device, method and system for controlling power supply |
CN103500423A (en) * | 2013-09-26 | 2014-01-08 | 国家电网公司 | Case adaptation and decision method for power emergency events |
CN105005827A (en) * | 2015-07-28 | 2015-10-28 | 济南创智电气科技有限公司 | Emergency response warning method based on electricity emergency |
CN105844407A (en) * | 2016-03-24 | 2016-08-10 | 西南科技大学 | Nuclear emergency decision-making system based on expert knowledge base |
CN108805441A (en) * | 2018-06-06 | 2018-11-13 | 广西桂冠电力股份有限公司 | power emergency command system |
CN108988334A (en) * | 2018-08-03 | 2018-12-11 | 广东电网有限责任公司 | Electric network fault grade dissemination method |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111539618A (en) * | 2020-04-21 | 2020-08-14 | 全球能源互联网研究院有限公司 | Emergent scheme system of electric power wisdom |
CN116345661A (en) * | 2022-12-19 | 2023-06-27 | 阳江蓄能发电有限公司 | Minimum system emergency control method for pumping and storing power station |
CN116345661B (en) * | 2022-12-19 | 2024-04-02 | 阳江蓄能发电有限公司 | Minimum system emergency control method for pumping and storing power station |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107632581B (en) | Underground pipe gallery's control management system | |
CN104267704B (en) | Tunnel monitoring system | |
CN110675038B (en) | Urban underground comprehensive pipe gallery risk assessment method based on control force | |
CN103775099B (en) | 3+X city main pipeline network system | |
CN107059919A (en) | A kind of underground pipe gallery | |
CN103955609B (en) | A kind of forecast failure collection automatic generation method based on typhoon model | |
CN115330163A (en) | Urban power grid multi-disaster accident prevention and early warning emergency platform based on big data | |
CN109657997A (en) | A kind of wisdom power plant emergency preplan intelligence judgement and automatic push method | |
CN106845780B (en) | System and method for analyzing operating conditions of generator set | |
CN111738612A (en) | Comprehensive pipe rack operation management safety evaluation method | |
Wang et al. | Research on the integration of fire water supply | |
Liu et al. | City pipe network intelligent service based on GIS and internet of things | |
CN204376958U (en) | Based on Big Dipper location and the railway Landslide Forecast System of Minimal routing jumping figure agreement | |
Schiff | The Whittier Narrows, California earthquake of October 1, 1987—Response of lifelines and their effect on emergency response | |
Bobylev | Sustainability and vulnerability analysis of critical underground infrastructure | |
CN112732822B (en) | Intelligent comprehensive drainage management system | |
CN211956692U (en) | Hidden culvert water level and gas monitoring alarm device | |
CN110630324A (en) | Mine intelligent drainage management method and mine intelligent drainage management system | |
KR102527583B1 (en) | Disaster response method for environmental facilities based on code system and server for the same | |
Zhou | Enlightenment to the construction of resilient cities from the extraordinary rainstorm disaster in Zhengzhou, China | |
KR102355696B1 (en) | System for evaluating performance of disaster response system by adjusting input data | |
CN216342320U (en) | Subway tunnel water logging prevention early warning and controlling means | |
CN216052713U (en) | Intelligent rainwater pump station for urban underpass tunnel and intelligent control system | |
Bastin et al. | You Can Dig It, But Can You Operate It? Proactive CSO Tunnel Operational Planning | |
CN116665408A (en) | Underground comprehensive pipe gallery storm warning method and system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190419 |
|
RJ01 | Rejection of invention patent application after publication |