CN109657997A - A kind of wisdom power plant emergency preplan intelligence judgement and automatic push method - Google Patents

A kind of wisdom power plant emergency preplan intelligence judgement and automatic push method Download PDF

Info

Publication number
CN109657997A
CN109657997A CN201811589539.XA CN201811589539A CN109657997A CN 109657997 A CN109657997 A CN 109657997A CN 201811589539 A CN201811589539 A CN 201811589539A CN 109657997 A CN109657997 A CN 109657997A
Authority
CN
China
Prior art keywords
emergency
emergency preplan
preplan
power plant
automatic push
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811589539.XA
Other languages
Chinese (zh)
Inventor
杨忠伟
彭放
史坤涛
葛嘉
蒋杨
何建锋
赵小明
姚云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Guodian Dadu River Dagangshan Hydropower Development Co Ltd
Original Assignee
China Guodian Dadu River Dagangshan Hydropower Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Guodian Dadu River Dagangshan Hydropower Development Co Ltd filed Critical China Guodian Dadu River Dagangshan Hydropower Development Co Ltd
Priority to CN201811589539.XA priority Critical patent/CN109657997A/en
Publication of CN109657997A publication Critical patent/CN109657997A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/50Network services
    • H04L67/55Push-based network services
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W4/00Services specially adapted for wireless communication networks; Facilities therefor
    • H04W4/12Messaging; Mailboxes; Announcements
    • H04W4/14Short messaging services, e.g. short message services [SMS] or unstructured supplementary service data [USSD]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Educational Administration (AREA)
  • Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • Signal Processing (AREA)
  • Tourism & Hospitality (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Public Health (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Development Economics (AREA)
  • Water Supply & Treatment (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Alarm Systems (AREA)

Abstract

The invention discloses a kind of wisdom power plant emergency preplan intelligence judgement and automatic push methods, and method and step is as follows, and a. designs various emergency prediction scheme;B. data acquisition obtains corresponding data;C. start-up criterion;D.ONCALL SMS platform is pre-defined;E. system starts corresponding emergency preplan automatically;F. start emergency response, while the information content is pushed to related personnel;G. after the completion of all disposition, cancel emergency response automatically, hair ONCALL SMS platform breath of delivering letters informs all affected members.Compared with prior art, emergency disposal of the present invention is rapider, according to emergency preplan entry condition, independently judges whether to start emergency response, can shorten report and notice time, strives for the more time for emergency disposal.And the shortcomings that independently pushing emergency disposal main points, disposal personnel can be made evidence-based in emergency disposal, avoid relying on working experience, disposition accuracy rate and efficiency are improved, security risk is reduced.

Description

A kind of wisdom power plant emergency preplan intelligence judgement and automatic push method
Technical field
The present invention relates to a kind of power plant's emergency management systems more particularly to a kind of wisdom power plant emergency preplan intelligence to adjudicate And automatic push method.
Background technique
For power station, emergency preplan is pre- comprising flood control emergency preplan, water logging workshop emergency preplan, power cut of whole factory emergency The 40 various emergency prediction scheme such as case, Geological disaster prevention emergency preplan, emergency preplan are papery shelves, and editor binds into book form.Emergency preplan is annual Timing study rehearsal.
During the day-to-day operation of power station, when reaching appropriate level early-warning conditions, by (secondary group of flood control leading group group leader It is long) it orders to start emergency preplan according to prediction scheme relevant regulations, operation issues warning information by ONCALL SMS platform when value, prevents Office, flood leading group notifies each Emergency Response Team to enter preparation state of speedily carrying out rescue work accordingly.Each profession Emergency Response Team is connected to early warning letter After breath, requires to carry out the related works such as personnel placement, relief materials preparation according to warning level, prepare to carry out emergency repair at any time Rescue work.
Startup program is simplified as:
Dangerous situation occur → run it is on duty be worth to office, flood control leading group report → flood control leading group announce that starting is answered Anxious prediction scheme → operation when value by ONCALL SMS platform publication warning information → emergency repair rescue work → dangerous situation terminate → Flood control leading group declares the closing of emergency response → analysis assessment.
Need to carry out emergency disposal by person works' experience when appearance accident, emergency disposal slowly, convey inefficiency, can not Targetedly notify personnel at different levels, personnel's capability in handling accident at different levels limited, therefore there are larger security risks.
Based on the above issues, wisdom power plant of the invention focuses on the traditional mode of production management mode for changing power plant, uses data Carry out driven management, and carries out technology upgrading on the basis of intelligent power plant, all-round construction intelligent Power Station+wisdom management cloud electricity Factory.According to wisdom power plant construction theory, emergency disposal need to grow with each passing hour, and realize autonomous judgement, intelligently pushing.
Summary of the invention
It solves the above problems the object of the invention is that providing one kind, emergency is had developed based on unified platform Prediction scheme intelligent decision pushes platform, and alarm function is comprehensive, and combines the existing emergency preplan in power station and on-site emergency disposal scheme The emergency preplan intelligence judgement of wisdom power plant and automatic push method.
To achieve the goals above, the technical solution adopted by the present invention is that: a kind of wisdom power plant emergency preplan intelligence is sentenced Certainly and automatic push method, method and step is as follows,
A. various emergency prediction scheme is designed, each emergency preplan sets up corresponding rank and early-warning conditions;
B. it during the day-to-day operation of power station, is acquired by data and obtains the corresponding data of early-warning conditions;
C. collected data provide a judgment value according to the condition that emergency preplan starts, (such as flood control emergency preplan Starting needs " reservoir inflow > 4800m3/ s ", then 4800 are judgment values) start-up criterion as emergency preplan intelligent decision;
D.ONCALL SMS platform pre-defines the information content and push of emergency preplan starting according to emergency preplan type Personnel;
E. when power station meets start-up criterion in the process of running, system starts corresponding emergency preplan automatically, intelligently sentences Certainly prediction scheme starts, and shortens the accident treatment time;
F. start emergency response, while the information content is pushed to related personnel by ONCALL SMS platform, utilizes ONCALL SMS platform, fast and accurately automatic push information;
G. after the completion of all disposition, signal involution, work has restored, and cancels emergency response automatically, and hair ONCALL is short Letter platform deliver letters breath inform all affected members.
In step a, the emergency preplan includes that flood control emergency preplan, water logging workshop emergency preplan, power cut of whole factory emergency are pre- Case, Geological disaster prevention emergency preplan, power equipment emergency plan for accidents, stabilization of power grids malicious event emergency preplan, environmental pollution Emergency plan for accidents, earthquake-proof calamity emergency prediction scheme, the emergency plan for accidents that breaks down, hazardous chemical emergency plan for accidents etc. more than 40 Kind emergency preplan.
Preferably, the start-up criterion in emergency preplan are as follows:
Flood control emergency preplan entry condition is " reservoir inflow > 4800m3/s";
Water logging workshop emergency preplan entry condition is " movement of water logging workshop alarm signal ";
Power cut of whole factory emergency preplan entry condition is " I section of voltage=0 of 10kV station service;II section of voltage of 10kV station service= 0;III section of voltage=0 of station service;IV section of voltage=0 " of station service;
Power equipment emergency plan for accidents entry condition is that Level 1Alarming triggers in ON-CALL system.
Other prediction schemes such as Geological disaster prevention emergency preplan, environmental pollution accident emergency preplan are then by manually send first " XXXX emergency preplan starting." short message is as entry condition.
Preferably, the data source includes monitoring system, regimen system, access control system, industrial television in step b System etc..Such as: as the reservoir inflow in flood control emergency preplan is obtained from regimen system acquisition;And water logging workshop emergency preplan Alarm signal, the service power voltage of power cut of whole factory emergency preplan and the Level 1Alarming signal of power equipment accident be from monitoring be System acquisition.
Preferably, in every kind of emergency preplan, having formulated emergency response according to the job duty of different personnel in step d The action of Shi Butong sorts out the disposition main points of all personnel from prediction scheme, and compiles mould in ONCALL SMS platform Plate arranges all kinds of personnel in conjunction with the existing emergency preplan in power station and disposes main points realization precisely push;
Preferably, having also set up a set of accident treatment experts database in step f, when emergency event occurs, will push away automatically It send accident treatment instruction to related personnel, improves personnel's capability in handling accident at different levels.
Compared with the prior art, the advantages of the present invention are as follows: emergency disposal of the present invention is rapider, is started according to emergency preplan Condition independently judges whether to start emergency response, can shorten report and notice time, strive for the more time for emergency disposal. And emergency disposal main points are independently pushed, disposal personnel can be made evidence-based in emergency disposal, avoid relying on working experience The shortcomings that, disposition accuracy rate and efficiency are improved, security risk is reduced.
Detailed description of the invention
Fig. 1 is the method for the present invention flow diagram.
Specific embodiment
The invention will be further described below.
Embodiment 1: referring to Fig. 1, the present invention successfully answers right flood control emergency IV to ring in Da Gang Mountain power station in June, 2018 It answers.
When collecting reservoir inflow and reaching 4800, according to flood control case in advance, flood control IV grade of automatic starting is responded.System is automatic Send " XX:XX generation plant area's hydraulic structure experience warning flood discharge 4800m3/ s to 6560m3/ s event, starting burst thing The comprehensive emergency preplan IV grades of response of part." information give corresponding personnel.
Instruction is pushed to corresponding personnel simultaneously:
1. looking over one's shoulder generation and supply electric equipment and main auxiliary equipment operating condition (each portion's bearing temperature of unit, main transformer temperature Degree, sump and draft tube gate chamber, tail tune room water level, draining pump running current, temperature, pressure and flow etc.), emphasis equipment touring time Number doubles, and thunderstorm weather will pay close attention to route protection, outlet field device has without exception, finds the problem and notifies processing at once.
2: reinforcing seepage from powerhouse sump, seepage of dam sump, cushion pool leakage sump, three layers of underground power house draining Gallery and each cavern gutter, the building GIS gutter, unit top cover drainage system, elevator catch pit, main transformer (reactor) accident The inspection monitoring of oil sump, turbine oil depot emergency oil pond, timely arrangement personnel processing of finding the problem, it is ensured that drainage system is run just Often.
3. in time to release floodwatering facility electromechanical equipment, water levels of upstream and downstream measuring system, dam body sump draining pump, cushion pool collection Well draining pump, workshop sump diving deep well pump, proof submersible sand discharging pump, redundant sump pump etc. carry out defeat elimination, it is ensured that equipment Normal operation.
4. reinforcing flood control backup power source (flood discharging tunnel, dam area diesel-driven generator and 110kV substation) checks monitoring, start bavin Oily generator inspection answers normal operation, and diesel-driven generator failure should notify maintenance to handle immediately, and reports flood control leading group and do Public room.
5. meet with regional extra torrential rain, intentinonally descend main building traffic hole, tail tune traffic hole, underground power house into Wind-tunnel mouth, underground power house air draft hole (underground power house exhaust fan room and dam diesel generator room), the room GIS front door prison Depending on noting abnormalities and reporting commander immediately, organizational strength carries out emergency disposal, prevents ponding from flowing backward and enters workshop." to O&M Place;
Push " O&M of emergency team, which is speedily carried out rescue work group, receives to run value arrangement on duty, be mainly responsible for equipment inspection, monitoring, operation, Defect elimination work;The organ raw skill personnel that speedily carry out rescue work group are responsible for checking flood fighting materials situation, diesel-driven generator starting situation in place, carry out flood Feelings, the condition of a disaster collect record, coordinate, operation maintenance personnel is instructed to carry out inspection and emergency disposal to live keypoint part;Safety supervision personnel connection It is that private fire brigade and security troop set up emergency team 5 and stand ready that (private fire brigade awaits orders in fire station, and security troop exists Await orders in campsite), while on-the-spot make an inspection tour instructs emergency repair, issues danger sources information, it is ensured that personnel, equipment safety.People from office Member mainly carries out communications and reports and Rear-Service Support.To prevent from entering main building into the unexpected water of factory's access tunnel, O&M is speedily carried out rescue work Group also Ying Jin factory access tunnel expanding reach carries out water blocking, draining emergency measure: building firm water-blocking bank with sandbag and (is not less than 0.5m);It opens into 3 pieces of trench cover of factory's access tunnel expanding reach right-side cable, and is arranged and blocks, prevent personnel to be strayed into and fall;In electricity Installing submersible pump in cable ditch is drained to clipping room middle layer collector drain;Direct current panel takes waterproof measure under clipping room;Direct current cabinet Cable cover is all opened by disk, assists draining, and be arranged and block." to flood control team;
" personnel are responsible for flood fighting materials at production technology and spare unit, material purchases work, connection equipment manufacturer carry out skill for push Art is supported, operation and maintenance group is instructed to carry out the work of equipment operation maintenance defect elimination.It is responsible for contacting with local weather authorities, grasps water Feelings, rain condition variation, issue great Weather information.Live the condition of a disaster, dangerous situation record are carried out, the instruction of flood control leading group is conveyed." extremely raw Produce technical office.
Above to a kind of wisdom power plant emergency preplan intelligence judgement provided by the present invention and automatic push method, carry out Exhaustive presentation, used herein a specific example illustrates the principle and implementation of the invention, above embodiments Explanation be merely used to help understand method and its core concept of the invention;At the same time, for those skilled in the art, According to the thought of the present invention, there will be changes in the specific implementation manner and application range, to change of the invention and changes Into that will be possible, without exceeding accessory claim defined conception and scope, in conclusion the content of the present specification be not It is interpreted as limitation of the present invention.

Claims (6)

1. a kind of wisdom power plant emergency preplan intelligence judgement and automatic push method, it is characterised in that: method and step is as follows,
A. various emergency prediction scheme is designed, each emergency preplan sets up corresponding rank and early-warning conditions;
B. it during the day-to-day operation of power station, is acquired by data and obtains the corresponding data of early-warning conditions;
C. collected data provide a judgment value according to the condition that emergency preplan starts, as emergency preplan intelligent decision Start-up criterion;
D. SMS platform pre-defines the information content and the push personnel of emergency preplan starting according to emergency preplan type;
E. when power station meets start-up criterion in the process of running, system starts corresponding emergency preplan automatically;
F. start emergency response, while the information content is pushed to related personnel by SMS platform;
G. after the completion of all disposition, signal involution, work has restored, and cancels emergency response automatically, and hair ONCALL short message is flat Platform deliver letters breath inform all affected members.
2. a kind of wisdom power plant emergency preplan intelligence judgement according to claim 1 and automatic push method, feature Be: in step a, the emergency preplan include flood control emergency preplan, water logging workshop emergency preplan, power cut of whole factory emergency preplan, Geological disaster prevention emergency preplan, power equipment emergency plan for accidents, stabilization of power grids malicious event emergency preplan, environmental pollution accident Emergency preplan, earthquake-proof calamity emergency prediction scheme, the emergency plan for accidents that breaks down, hazardous chemical emergency plan for accidents.
3. a kind of wisdom power plant emergency preplan intelligence judgement according to claim 2 and automatic push method, feature It is: the start-up criterion in emergency preplan are as follows:
Flood control emergency preplan entry condition is " reservoir inflow > 4800m3/s";
Water logging workshop emergency preplan entry condition is " movement of water logging workshop alarm signal ";
Power cut of whole factory emergency preplan entry condition is " I section of voltage=0 of 10kV station service;II section of voltage=0 of 10kV station service;Factory III section of voltage=0 of electricity consumption;IV section of voltage=0 " of station service;
Power equipment emergency plan for accidents entry condition is that Level 1Alarming triggers in ON-CALL system;
Other prediction schemes are then by first " starting of XXXX emergency preplan " short message manually sending as entry condition.
4. a kind of wisdom power plant emergency preplan intelligence judgement according to claim 1 and automatic push method, feature Be: in step b, the data source includes monitoring system, regimen system, access control system, closed-circuit TV system.
5. a kind of wisdom power plant emergency preplan intelligence judgement according to claim 1 and automatic push method, feature It is: in step d, in every kind of emergency preplan, different work when having formulated emergency response according to the job duty of different personnel Content sorts out the disposition main points of all personnel from prediction scheme, and compiles template in SMS platform.
6. a kind of wisdom power plant emergency preplan intelligence judgement according to claim 1 and automatic push method, feature It is: in step f, has also set up a set of accident treatment experts database, when emergency event occurs, automatic push accident treatment is referred to Opinion is led to related personnel.
CN201811589539.XA 2018-12-25 2018-12-25 A kind of wisdom power plant emergency preplan intelligence judgement and automatic push method Pending CN109657997A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811589539.XA CN109657997A (en) 2018-12-25 2018-12-25 A kind of wisdom power plant emergency preplan intelligence judgement and automatic push method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811589539.XA CN109657997A (en) 2018-12-25 2018-12-25 A kind of wisdom power plant emergency preplan intelligence judgement and automatic push method

Publications (1)

Publication Number Publication Date
CN109657997A true CN109657997A (en) 2019-04-19

Family

ID=66116386

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811589539.XA Pending CN109657997A (en) 2018-12-25 2018-12-25 A kind of wisdom power plant emergency preplan intelligence judgement and automatic push method

Country Status (1)

Country Link
CN (1) CN109657997A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111539618A (en) * 2020-04-21 2020-08-14 全球能源互联网研究院有限公司 Emergent scheme system of electric power wisdom
CN116345661A (en) * 2022-12-19 2023-06-27 阳江蓄能发电有限公司 Minimum system emergency control method for pumping and storing power station

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010246306A (en) * 2009-04-08 2010-10-28 Ntt Facilities Inc Device, method and system for controlling power supply
CN103500423A (en) * 2013-09-26 2014-01-08 国家电网公司 Case adaptation and decision method for power emergency events
CN105005827A (en) * 2015-07-28 2015-10-28 济南创智电气科技有限公司 Emergency response warning method based on electricity emergency
CN105844407A (en) * 2016-03-24 2016-08-10 西南科技大学 Nuclear emergency decision-making system based on expert knowledge base
CN108805441A (en) * 2018-06-06 2018-11-13 广西桂冠电力股份有限公司 power emergency command system
CN108988334A (en) * 2018-08-03 2018-12-11 广东电网有限责任公司 Electric network fault grade dissemination method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010246306A (en) * 2009-04-08 2010-10-28 Ntt Facilities Inc Device, method and system for controlling power supply
CN103500423A (en) * 2013-09-26 2014-01-08 国家电网公司 Case adaptation and decision method for power emergency events
CN105005827A (en) * 2015-07-28 2015-10-28 济南创智电气科技有限公司 Emergency response warning method based on electricity emergency
CN105844407A (en) * 2016-03-24 2016-08-10 西南科技大学 Nuclear emergency decision-making system based on expert knowledge base
CN108805441A (en) * 2018-06-06 2018-11-13 广西桂冠电力股份有限公司 power emergency command system
CN108988334A (en) * 2018-08-03 2018-12-11 广东电网有限责任公司 Electric network fault grade dissemination method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111539618A (en) * 2020-04-21 2020-08-14 全球能源互联网研究院有限公司 Emergent scheme system of electric power wisdom
CN116345661A (en) * 2022-12-19 2023-06-27 阳江蓄能发电有限公司 Minimum system emergency control method for pumping and storing power station
CN116345661B (en) * 2022-12-19 2024-04-02 阳江蓄能发电有限公司 Minimum system emergency control method for pumping and storing power station

Similar Documents

Publication Publication Date Title
CN107632581B (en) Underground pipe gallery's control management system
CN104267704B (en) Tunnel monitoring system
CN110675038B (en) Urban underground comprehensive pipe gallery risk assessment method based on control force
CN103775099B (en) 3+X city main pipeline network system
CN107059919A (en) A kind of underground pipe gallery
CN103955609B (en) A kind of forecast failure collection automatic generation method based on typhoon model
CN115330163A (en) Urban power grid multi-disaster accident prevention and early warning emergency platform based on big data
CN109657997A (en) A kind of wisdom power plant emergency preplan intelligence judgement and automatic push method
CN106845780B (en) System and method for analyzing operating conditions of generator set
CN111738612A (en) Comprehensive pipe rack operation management safety evaluation method
Wang et al. Research on the integration of fire water supply
Liu et al. City pipe network intelligent service based on GIS and internet of things
CN204376958U (en) Based on Big Dipper location and the railway Landslide Forecast System of Minimal routing jumping figure agreement
Schiff The Whittier Narrows, California earthquake of October 1, 1987—Response of lifelines and their effect on emergency response
Bobylev Sustainability and vulnerability analysis of critical underground infrastructure
CN112732822B (en) Intelligent comprehensive drainage management system
CN211956692U (en) Hidden culvert water level and gas monitoring alarm device
CN110630324A (en) Mine intelligent drainage management method and mine intelligent drainage management system
KR102527583B1 (en) Disaster response method for environmental facilities based on code system and server for the same
Zhou Enlightenment to the construction of resilient cities from the extraordinary rainstorm disaster in Zhengzhou, China
KR102355696B1 (en) System for evaluating performance of disaster response system by adjusting input data
CN216342320U (en) Subway tunnel water logging prevention early warning and controlling means
CN216052713U (en) Intelligent rainwater pump station for urban underpass tunnel and intelligent control system
Bastin et al. You Can Dig It, But Can You Operate It? Proactive CSO Tunnel Operational Planning
CN116665408A (en) Underground comprehensive pipe gallery storm warning method and system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190419

RJ01 Rejection of invention patent application after publication