Specific embodiment
Below in conjunction with the attached drawing in the embodiment of the present disclosure, the technical solution in the embodiment of the present disclosure is carried out clear, complete
Site preparation description.Obviously, described embodiment is only the embodiment of disclosure a part, instead of all the embodiments.It is based on
Embodiment in the disclosure, those skilled in the art institute obtained under the premise of without creative (understand and learn) labour
There are other embodiments, belongs to the range of disclosure protection.
Firstly, describing the example of the infrastructure 10 according to the embodiment of the present disclosure referring to Fig.1.As shown in Figure 1, basis is set
It applies and refers to and provide the substance job facilities of public service for social production and resident living, be for guaranteeing country society
The public service system that economic activity is normally carried out.It is the general material conditions of social development of depending on for existence.
Infrastructure 10 includes traffic 11, post and telecommunications 12, water and electricity supply 13, commerce services 14, scientific research and technological service 15, garden
Municipal public engineerings facility and the public life service facilities such as woods greening 16, environmental protection 17, culture and education 18, hygiene industry 19
Deng.In modern society, economy is developed more, and the requirement to infrastructure is higher;Perfect infrastructure is to acceleration social economy
Activity promotes the differentiation of its spatial distribution form to play huge impetus.When establishing perfect infrastructure often needs longer
Between and huge investment.This just with greater need for whole life cycle of the mankind to infrastructure have more fully grasp and it is finer
Solution, to reduce cost and cut down expenses.
Infrastructure big data covers the whole life cycle of infrastructure, and infrastructure big data includes infrastructure
Data in construction project and the data during the operation management of infrastructure.In the project, infrastructure data includes, but
It is not limited only to, preconsolidation stress scheme, feasibility study are entered oneself for the examination, and environmental influence research report, preliminary project, Preliminary design are standby
Select the design calculation, CAD of scheme, surveying and mapping data, geologic data, vehicular traffic (stream of people's traffic) data on flows, each profession
Figure, BIM model, account valuation, construction speed duration, construction stage and final cost, construction method, installation specification of equipment and type
Number and completion be delivered for use.In operation management, infrastructure data is include but are not limited to, and the flow, train number in operation/
Flight number, equipment monitoring, maintenance, repair and replacement data run mark that is used in accident statistics and report, operation or being established
Quasi-, frame and process etc..
Infrastructure 10 can be divided as follows by region where it or character of use: rural infrastructure and city basis are set
It applies.
Referring to the relevant laws and regulations file of new-countryside construction in China, rural infrastructure includes four major class:
(1) agricultural modernization base and construction of water conservancy works agricultural production infrastructure: are referred mainly to;
(2) life in the countryside infrastructure: the bases such as safe drinking water, the production and use of marsh gas, road, rural power are referred mainly to and are set
Apply construction;
(3) protection of natural forest resources, shelterbelt network, seedling project construction, conservation of nature improvement of the ecological environment: are referred mainly to
Area's ecological protection and the peasants such as construction, wet land protection and construction, conceding the land to forestry have a meal, firewood, the current livelihood and long-range such as increase income
Development problem;
(4) infrastructure for being beneficial to Social undertakings in rural areas development, including agriculture rural society development infrastructure: are referred mainly to
Village's compulsory education, rural health, Rural Culture infrastructure etc..
Reinforce rural infrastructure development to increase farmers' income, reduces Rural-urban Gap, realize Rural Modernization have weigh
Want meaning.
Urban infrastructure, which refers to, provides common conditions and public service for the direct production division in city and resident living
Job facilities are city survival and development, go on smoothly various economic activities and the prerequisite engineering of other social activitieies
The general name of property infrastructure and social infrastructure.It is particularly important to production unit, is that it reaches economic benefit, Environmental Effect
One of the necessary condition of benefit and social benefit.Generally, urban infrastructure specifically includes that
1. the residential architectures facility such as residential quarter, villa, apartment
2. hotel, market, office building, the office commercial building facility such as office building
3. the energy source and powers facility such as petroleum, coal, natural gas, electric power
4. traffic transporting facilities such as railway, highway, aviation, water transport, bridge, tunnel, harbours
5. the environmental protection water conservancy projects such as reservoir, dam, sewage treatment, air cleaning
6. post and telecommunications facilities such as telecommunications, communication, information networks
7. the water supply and drainage facility such as fwaater resources protection, waterworks, water supply network, draining and sewage treatment
8. the environment-friendlies facility such as afforestation, garbage collection and processing, pollution control
The safety devices 9. defence such as fire-fighting, flood control, shockproof, typhoon protection, sand-proof, anti-surface subsidence, air defense are taken precautions against natural calamities
Fig. 2 is the example according to the life cycle of the infrastructure of the embodiment of the present disclosure.As shown in Fig. 2, infrastructure
Whole life cycle includes planning, scheme, design, construction, operation, maintenance, reparation, is met an urgent need and its respective standard and specification.
The disclosure relates generally to provide its collection in relation to data, storage, classification, rope in the life cycle of infrastructure
Draw foundation, inquiry, displaying, it is shared show, inquire and share with the method for trustship and cloud computing, the data of user terminal, the world
The three of the application of earth coordinates and geographical location information, sequence and inquiry and local coordinate system and world geodetic system
The technical fields such as dimension conversion.
The operating method of server-side:
The method for carrying out infrastructure data management by server-side according to the embodiment of the present disclosure is described referring to Fig. 3
Flow chart.
As shown in figure 3, in step s101, server-side collects infrastructure data and its attribute data and geographical location number
According to.
Server-side can collect infrastructure data and its attribute data and geographical position from user terminal or other server-sides
Data are set, alternatively, server-side oneself can also collect infrastructure data and its attribute data and geographic position data.
For example, the infrastructure data can be the data of the directly reaction infrastructure such as design drawing.For example, should
The attribute data of infrastructure data can be the facility class of aviation as shown in Figure 2, highway, railway, bridge, urban transportation etc.
The data attribute information of type, timestamp, staff, completion equipment etc.;Further, infrastructure data can be a certain basis
Data in facility life cycle, for example, it may be construction or the operation data of highway.For example, the geographical position of the infrastructure
Set can be by referring to local location reference system or geodetic coordinates reference system acquisition.It should be noted that above-mentioned
The mode for obtaining the geographical location of infrastructure is only an example, and the geographical location of infrastructure is also possible to according to other
What reference system obtained.
In step s 102, the infrastructure data and its attribute data and geographic position data are achieved and is transformed into
World geodetic system classifies and establishes index, generates infrastructure big data.
Wherein, current geographic position data include coordinate, elevation, building of the current infrastructure in its local coordinate system
Object column net, baseline (linear referencing system), pile No., offset distance and in the world geodetic system coordinate, in longitude and latitude extremely
Few one kind.
Fig. 4 is according to the embodiment of the present disclosure by infrastructure local reference system and world geodetic system opening relationships
Schematic diagram.
As shown in figure 4, in construction and when application foundation facility, no matter type, profession, age or region, office must be established
Portion's reference system, but according to the type of infrastructure, in relation to profession, construction age and place region, the part ginseng established
How different lighting system is.For example, road, subway and pipeline-like linear infrastructure, generally use Linear referencing system
(LRS), the infrastructure of terminal, oil plant and the building at station species generally uses Grid Reference System, i.e. column net, and example
Such as, modern age mapping rectangular coordinate system, " well-field system " is used in ancient times plot, and postal postcode and destination address, is belonged to
In this all professional domain of the reference system established in various years and professional domain " professional etiquette ", nothing more than being in industry
Reference system, and be properly termed as " map " inside industry, i.e. local reference system.However, change the reference system of an industry,
As changed this industry, the short time is impossible.
Therefore, it is necessary to design and establish the converter of reference system, i.e., all reference systems are transformed into a unified ginseng
" where all objects all have " according to fastening, and then in the management of optimized integration facility data.
World geodetic system refer to using global observation data by synthesis calculate establish a kind of terrestrial reference system and
Geocentric coordinate system comprising WGS60, WGS66, WGS72, WGS84 etc. are the Reference Architectures of global positioning system (GPS), at present
The newest world geodetic system in the whole world is WGS84, herein includes above-mentioned all world geodetic systems and other provincialism
The conversion of coordinate system and WGS84, wherein global positioning system (GPS) is a general designation comprising the GPS in the U.S., European Union
The systems such as Galileo, the GLONASS of Russia, the Beidou (BeiDou) of China, the NAVIC of India, Japanese QZSS.
For example, can be using world geodetic system as unified reference system, i.e., the definition of current latest edition is WGS84.
It is also global positioning system, the Galileo of GPS, European Union including the U.S., the GLONASS of Russia, Chinese Beidou
(BeiDou), the Reference Architecture of the systems such as the NAVIC of India, Japanese QZSS.Basis can be established by infrastructure data
Facility big data platform, and configure infrastructure big data platform to local location reference system and world's geodetic coordinates
Bidirectional transducer, for example, these converters can be mathematical formulae group a bit, such as local XYZ coordinate and world's geodetic coordinates
Seven-parameter transformation, some then can be table lookup, such as the conversion of destination address and world's geodetic coordinates.
Therefore, when current geographic position data are obtained referring to local location reference system, by the current geographic position
Data save and are converted to world geodetic system.It should be noted that above-mentioned local reference system system is only an example,
It can according to need and united using other local reference systems.Next, server-side be based on infrastructure data and its attribute data and
Geographic position data carries out professional classification to infrastructure big data, establishes and index by geographical location, generates the big number of infrastructure
According to.
Wherein, infrastructure includes planning, building, structure, municipal administration, electrical, fire-fighting, ground, the hydrology, machinery, HVAC, survey
It draws and the subjects such as geology and professional classification.Index foundation includes establishing rope to the classification of subject, profession and other data attributes
Draw.Wherein the attribute data of infrastructure data includes data acquisition and/or the team generated and its qualification, the profession that is followed
Standards and specifications, device therefor and software, data acquisition and/or the initial purpose generated and the application method drawn game suggested
It is sex-limited etc.;The attribute data of infrastructure data be based on contract require, the form of professional standard and specification to illustrate or report,
It is submitted together together with specific data.
Infrastructure is present in the three-dimensional space of human survival, and each infrastructure element, a such as bridge, an inspection
Cha Jing or valve only has the unit, the i.e. uniqueness of infrastructure element in position in the position.Server-side passes through base
Infrastructure big data is generated in infrastructure data and its attribute data and geographic position data, all infrastructure
Data or data acquisition system together, no matter its type, profession, region and acquisition (or generation) method, in addition world's geodetic coordinates,
Entire infrastructure large database concept can be generated, wherein the corresponding data comprising infrastructure and its attribute and current location,
Realize above-mentioned " where all objects all have ".
In addition, again combining infrastructure with the time of acquisition, i.e., timestamp is assigned to infrastructure again, " all objects "
State recording, to ensure the uniqueness of data.In step s 103, the infrastructure big data is stored.
For example, the infrastructure big data of generation is stored in the corresponding position of infrastructure database by server-side.
Further, it is possible to provide the infrastructure big data to user terminal in response to the inquiry request from user terminal.
Here it is possible to be each data cell in basic facility big data and each map layer setting information access right
Limit, and user is set for each user, the user group including multiple users and the user facility including multiple user groups and is visited
Ask permission.
When inquiry request is the inquiry request based on infrastructure development project, to the user terminal in the form of map layer
The infrastructure big data for project of providing infrastructures.
For example, infrastructure big data may include multiple subgraph layers, each subgraph layer includes a part of infrastructure
The set of attribute data.
For example, infrastructure big data management in, data can according to the type, profession, acquisition means of infrastructure with
And the classification such as document format.When needing to inquire required data, the data query result of each type can be with the shape of figure layer
Formula reflects.Big data in infrastructure can be the entry of data, is also possible to data set, i.e. homogeneous data, may be used also
To be the set of data set, all data as needed for a project.The collection and set of data are only needed current geographic position
Information and timestamp are associated with it, can regard it as a kind of new data entry.For example, working as infrastructure as described above
Infrastructure definition and planning, building, structure, municipal administration, electrically, fire-fighting, ground, the hydrology, machinery, HVAC, mapping etc. it is professional
When being classified, it can establish and index according to above-mentioned classification in the management of infrastructure big data, required for needing to inquire
When data, the data query result of each classification can equally be reflected in the form of above-mentioned figure layer.
Alternatively, it can establish and index according to geographical location in the management of infrastructure big data, be in inquiry request
When inquiry request based on geographical location, infrastructure big data relevant to the geographical location is provided to user terminal.
The inquiry request based on geographical location includes being based on the interested point of user terminal, interested line or interested
The inquiry request of range, wherein to user terminal provide infrastructure big data uniqueness be by infrastructure in position
What uniqueness and timestamp determined.
As shown in Figure 5 for according to the schematic diagram of the embodiment of the present disclosure inquired based on the interested point of user terminal.Such as
Shown in Fig. 5, when user wants to inquire some interested point or position (LOI, location of interest), in the base
The corresponding position 81 of Infrastructure big data platform inputs interested position, then on the associated map of infrastructure big data
Can occur multiple search results 82 in the form of data Layer, or occur multiple search results 83 in the form of map layer.This
Outside, for each search result 83 occurred in the form of map layer, which can also mention to user
For the summary 84 about user's search result 83, for example, the summary 84 may include the title, creation time, wound of search result
The person of building etc..It further, can also include that the respective links 85 of the details of search result 83, user are provided in the summary 84
By clicking the link 85, the details of the search result 83 can be browsed.
It may, furthermore, provide interface system is integrated with other data and information system, " existing information system is realized
It is integrated ".To the management of optimized integration facility multiple integration.
The infrastructure data of the disclosure can be integrated with any system for information about, to accomplish wider number
According to information exchange with it is shared.For example, can be integrated in the following manner: providing index field for interface system, build
Stand the geographical reference of other data and information system and the world geodetic system;It is received via interface system and comes from other numbers
According to the inquiry request with information system;Based on geographical reference, the inquiry request from other data and information system is converted to
The inquiry request of world geodetic system;In response to inquiry request, provided via interface system to other data and information system
Infrastructure big data.It is integrated by this, when needing query-related information, optimized integration facility big data platform and information system
The bidirectional inquiry of system simultaneously completes its function using platform outer welding system.
It is as shown in Figure 6 that integrated schematic diagram is carried out according to the infrastructure data and information system of the embodiment of the present disclosure.
As shown in fig. 6, ICDM 63 indicates integrated cloud data management, the basic training of 61 expression infrastructure big data platforms on the left of Fig. 6
Can, for example, the functions such as air map, video, drawing, right side 62 indicates that integrated information system can be carried out with infrastructure big data
System, for example, enterprise performance management system, operation maintenance management system etc..As shown in fig. 6, by infrastructure big data with it is other
Information system is integrated, can be easily by by the geography informatization of the tie point 64 in interface system data library
The relationship that all platform datas are found out using geographical location and interested position (LOI), not only can reach basis and set
It applies big data and different information and is shared and merged by geographical location with the information of interface system, and may also reach up across more
The shared technical effect of metamessage system.
It should be appreciated that in the disclosure by server-side carry out infrastructure data management include to comprising planning, scheme, set
Meter, construction, operation, maintenance, repair, emergency infrastructure life cycle in data be managed.
The operating method of user terminal:
Next, with reference to Fig. 7 description according to the side for carrying out infrastructure data management by user terminal of the embodiment of the present disclosure
Method.Fig. 7 is the flow chart according to the method for carrying out infrastructure data management by user terminal of the embodiment of the present disclosure.
As shown in fig. 7, in step s 201, acquiring infrastructure data and its attribute data and geographic position data.
For example, can be taken pictures by user to infrastructure, so realize by user terminal to infrastructure data and its
The acquisition of attribute data and geographic position data.
The builder of infrastructure is thousands of, and user is almost the whole mankind, and all builders and user are again
The producer of infrastructure big data.So huge group and data volume, by the acquisition of professional person, processing and analysis
It is not able to satisfy growing demand, this will lean on the strength of all practitioner and the whole society.For example, high-precision measurement
Professional is needed with geological prospecting to complete;And the sidewalk sedimentation in cell may need to be reported by neighbouring resident.Today
Smart phone has almost equiped with arms each user.The data acquisition that infrastructure is carried out by smart phone, for example, basis is set
The acquisition of the position and photo applied can greatly improve the working efficiency of infrastructure guardian.The infrastructure of the disclosure
Data managing method is just built upon on the basis of " everybody can all issue ".
It should be appreciated that above-mentioned acquisition infrastructure data and its attribute data and geographic position data are only one and show
Example, can according to need and be acquired using other methods.
In step S202, infrastructure data collected and its attribute data are shared into net with geographic position data
Network platform.
It can be by network address associated with infrastructure data and its attribute data and geographic position data, by base
Infrastructure data and its attribute data share the network platform with geographic position data.
In the disclosure, infrastructure big data platform can be established by infrastructure data management.Infrastructure is big
One function of data platform is that the interface that data and information are issued is provided to all users.In the infrastructure big data platform
In, each data strip (or set) needs a unique lead, i.e. uniform resource locator (URL) links in publication.
By the infrastructure data of publication and its attribute data and geography and to link imparting world's geodetic coordinates and timestamp
Position data is archived in platform data manager.Alternatively, can effectively share in a safe cloud (or Intranet)
Data realize " existing data of information system is shared ".
As described above, server-side can each data cell based in facility big data and the setting of each map layer
Information access rights, and be each user, the user group including multiple users and the user facility including multiple user groups
Access privilege is set.Therefore, the inquiry of big data needed for user can be carried out based on the access authority.
For example, server-side is when the inquiry request of user terminal is the inquiry request based on infrastructure development project with ground
Figure layer form is provided infrastructures the infrastructure big data of project to the user terminal.
As described above, data can be according to the type of infrastructure, profession, acquisition hand in the management of infrastructure big data
The classification such as section and document format.When needing to inquire required data, the data query result of each type can be with figure layer
Form reflect.Big data in infrastructure can be the entry of data, can also be data set, i.e. homogeneous data,
The set that can also be data set, all data as needed for a project.The collection and set of data are only needed current geographic
Location information and timestamp are associated with it, can regard it as a kind of new data entry.
Alternatively, when the inquiry request of user terminal is the inquiry request based on geographical location, server-side provides and institute
State the relevant infrastructure big data in geographical location, " the geographical location inquiry " of optimized integration facility data management.
The inquiry request based on geographical location includes being based on the interested point of user terminal, interested line or interested
The inquiry request of range, wherein to user terminal provide infrastructure big data uniqueness be by infrastructure in position
What uniqueness and timestamp determined.
The inquiry of the uniqueness in three-dimensional space position based on infrastructure data, data can be complete based on geographical location
At, can greatly reduce the data volume of each query result in this way, so as to shorten result retrieval and further screen
Workload.
Further, when the data integration in the network platform is to other information systems, with geographical location interested or basis
The project of facility is that index scans for the information system.
As described above, the infrastructure data of the disclosure can be integrated with any system for information about, to accomplish
The exchange of wider data and information and shared, realization " existing information system integrated ".Data set in the network platform
It can be that index search the information system with the project of geographical location or infrastructure when at arriving other information system
Rope realizes bidirectional inquiry.
It should be appreciated that in the disclosure by user terminal carry out infrastructure data processing include to comprising planning, scheme, set
Meter, construction, operation, maintenance, repair, emergency infrastructure life cycle in data handled.
Service terminal device
In the following, describing the dress for carrying out infrastructure data management by server-side according to the embodiment of the present disclosure referring to Fig. 8
It sets.Fig. 8 is the schematic diagram according to the device for carrying out infrastructure data management by server-side of the embodiment of the present disclosure.Due to this reality
Apply the thin of function and the method that describes above with reference to Fig. 3 of the device that infrastructure data management is carried out by server-side of example
It saves identical, therefore herein for simplicity, omits the detailed description to identical content.
As shown in figure 8, including collector unit 1101 by the device 1100 that server-side carries out infrastructure data management, generating
Unit 1102, storage unit 1103, taxon 1104, index establish unit 1105, data providing unit 1106 and interface system
System unit 1107.It should be noted that although being shown in fig. 8 by the device 1100 that server-side carries out infrastructure data management
Out to only include 7 devices, but this is only schematical, can also by the device 1100 that server-side carries out infrastructure data management
To include other one or more devices, these devices are unrelated with inventive concept, therefore are omitted herein.
The device 1100 by server-side progress infrastructure data management of the disclosure includes: collector unit 1101, configuration
To collect infrastructure data and its attribute data and geographic position data;Generation unit 1102 is configured to infrastructure number
According to and its attribute data and geographic position data be transformed into world geodetic system, generate the big number of infrastructure of infrastructure
According to;Taxon 1104 is configured to the infrastructure big data and classifies;Index establishes unit 1105, is configured to described
Infrastructure big data establishes index by world's geodetic coordinates;And storage unit 1103, it is configured to store the infrastructure
Big data.
Firstly, collector unit 1101 collects infrastructure data and its attribute data and geographic position data.
For example, collector unit 1101 can obtain the attribute data and base of infrastructure from user terminal or other server-sides
The geographical location of Infrastructure.
Collector unit 1101 can be collected from user terminal or other server-sides infrastructure data and its attribute data and
Geographic position data, alternatively, collector unit 1101 oneself can also collect infrastructure data and its attribute data and ground
Manage position data.
For example, the infrastructure data can be the data of the directly reaction infrastructure such as design drawing.For example, should
The attribute data of infrastructure can be the timestamp of aviation as shown in Figure 2, highway, railway, bridge, urban transportation etc., work
Make the data information of personnel, completion equipment etc.;Further, the attribute data of infrastructure can be a certain infrastructure Life Cycle
Data in phase, for example, it may be construction or the operation data of highway.For example, the geographical location of the infrastructure can be it is logical
It crosses and obtains referring to local location reference system or geodetic coordinates reference system.It should be noted that above-mentioned acquisition basis is set
The mode in the geographical location applied is only an example, and the geographical location of infrastructure is also possible to be obtained according to other reference systems
?.
Next, infrastructure data and its attribute data and geographic position data are transformed into the world by generation unit 1102
Earth coordinates generate the infrastructure big data of infrastructure.
Wherein, current geographic position data include coordinate, elevation, building of the current infrastructure in its local coordinate system
Object column net, baseline (linear referencing system), pile No., offset distance and in the world geodetic system coordinate, in longitude and latitude extremely
Few one kind.
When current geographic position data are obtained referring to local location reference system, the current geographic position data are turned
It is changed to world geodetic system.
Next, server-side is based on infrastructure data and its attribute data and geographic position data generation infrastructure is big
Data.
Next, taxon 1104 is that basic facility big data is classified.
Wherein, infrastructure include: aviation, bridge, dam, tap water, the energy, hazardous waste, river, dyke, harbour,
The infrastructure such as park, railway, highway, school, solid waste, urban transportation, sewage treatment.The classification includes above-mentioned basis
Facility definition and the professional classifications such as planning, building, structure, municipal administration, electrical, fire-fighting, ground, the hydrology, machinery, HVAC, mapping.
Then, index establishes unit 1105 and establishes index by world's geodetic coordinates for basic facility big data.Wherein, the rope
Draw establish unit 1105 can by above-mentioned classification establish index and by geographical location establish index.For having established the process of index
It is described in detail in the above content, therefore, details are not described herein.
Next, 1103 storage infrastructure big data of storage unit.
The infrastructure big data of generation is stored in the corresponding position of infrastructure database by storage unit 1103.
Further, data providing unit 1106 can provide institute to user terminal in response to the inquiry request from user terminal
State infrastructure big data.
Here, data providing unit 1106 can each data cell based in facility big data and each map
Layer setting information access authority, and be each user, the user group including multiple users and the use including multiple user groups
Access privilege is arranged in family mechanism.
When inquiry request is the inquiry request based on infrastructure development project, data providing unit 1106 is with map layer
Form is provided infrastructures the infrastructure big data of project to the user terminal.
For example, infrastructure big data may include multiple subgraph layers, each subgraph layer includes a part of infrastructure
The set of attribute data.
For example, infrastructure big data management in, data can according to the type, profession, acquisition means of infrastructure with
And the classification such as document format.When needing to inquire required data, the data query result of each type can be with the shape of figure layer
Formula reflects.Big data in infrastructure can be the entry of data, is also possible to data set, i.e. homogeneous data, may be used also
To be the set of data set, all data as needed for a project.The collection and set of data are only needed current geographic position
Information and timestamp are associated with it, can regard it as a kind of new data entry.
Alternatively, when inquiry request is inquiry request based on geographical location, data providing unit 1106 can be to
User terminal provides infrastructure big data relevant to the geographical location.
The inquiry request based on geographical location includes being based on the interested point of user terminal, interested line or interested
The inquiry request of range, wherein to user terminal provide infrastructure big data uniqueness be by infrastructure in position
What uniqueness and timestamp determined.
It is integrated in addition, interface system unit 1107 can also provide interface system with other data and information system,
Realize " existing information system integrated ".
The infrastructure data of the disclosure can be integrated with any system for information about, to accomplish wider number
According to information exchange with it is shared.For example, can be integrated in the following manner: providing index field for interface system, build
Stand the geographical reference of other data and information system and the world geodetic system;It is received via interface system and comes from other numbers
According to the inquiry request with information system;Based on geographical reference, the inquiry request from other data and information system is converted to
The inquiry request of world geodetic system;In response to inquiry request, provided via interface system to other data and information system
Infrastructure big data.It is integrated by this, when needing query-related information, optimized integration facility big data platform and information system
The bidirectional inquiry of system simultaneously completes its function using platform outer welding system.
It, not only can by the information of interface system by integrating infrastructure big data and other information system
Physics and chemistry, and the information that can achieve infrastructure big data and information and interface system is shared by geographical location, can also reach
To sharing across Multielement Information System.
It should be appreciated that in the disclosure by server-side carry out infrastructure data management include to comprising planning, scheme, set
Meter, construction, operation, maintenance, repair, emergency infrastructure life cycle in data be managed.
The overall flow of user terminal and server-side:
In the following, describing infrastructure data management method referring to Fig. 9.
As shown in figure 9, the management method of infrastructure includes: to acquire infrastructure data and its attribute data by user terminal
With geographic position data (S301);By user terminal by infrastructure data collected and its attribute data and geographical location number
According to being sent to server-side (S302);By the server-side by the infrastructure data and its attribute data and geographic position data
It achieves, be transformed into world geodetic system, classify and establish index, generate infrastructure big data (S303);It is deposited by server-side
The infrastructure big data (S304) is stored up, and provides displaying, sharing, carrying, inquiry, management and and phase relation by server-side
The functions (S305) such as system is integrated.
Figure 10 is the data flowchart that platform is managed according to the infrastructure data of the embodiment of the present disclosure.As shown in Figure 10,
Firstly, acquire infrastructure data and its attribute data and geographic position data by professional or user etc., which can be with
It is the hash 90 of such as project data, is also possible to the regular data information 92 of such as business administration data;Pass through
Infrastructure data collected and its attribute data and geographic position data are sent server-side by user terminal, and in server-side
On 93 are reflected in the form of map, it is (or interior to cloud platform which also can connect (arrow 90 and 99 in such as figure)
Net) 94;Then infrastructure data management platform response provides the base to user terminal in the inquiry request from user terminal
Infrastructure big data, for example, when inquiry request is inquiry request based on infrastructure development project, in the form of map layer to
User terminal provides the infrastructure big data of 96 infrastructure projects;And it is asked in inquiry request for the inquiry based on geographical location
When asking, 97 infrastructure big datas relevant to the geographical location are provided to user terminal.It is worth noting that project data 90
Interaction with business data information 92 utilizes, and at present in all infrastructure industries, is substantially also manually performed.This
Exactly it is described in the background be less than 10% project data can be efficiently applied to operation, maintenance, repair and emergency
Need the main reason for middle.
This disclosure relates to provide its collection in relation to data in the life cycle of infrastructure, storage, inquiry, displaying, be total to
Enjoy show, inquire and share with the method for trustship and cloud computing, the data of user terminal, earth coordinates and geographical location letter
The technical fields such as application, sequence and the inquiry of breath and the three-dimensional conversion of local coordinate system and earth coordinates, realize " all
Where object all has ", " everybody can all issue ", " geographical location inquiry " and " existing integration of information system " technical effect.
It will be understood by those skilled in the art that the various aspects of the application can by several types with patentability or
Situation is illustrated and described, the combination including any new and useful process, machine, product or substance, or to theirs
Any new and useful improvement.Correspondingly, the various aspects of the application can completely by hardware execute, can be completely by software
(including firmware, resident software, microcode etc.) is executed, can also be executed by combination of hardware.Hardware above or software
Referred to as " data block ", " module ", " engine ", " unit ", " component " or " system ".In addition, the various aspects of the application may table
It is now the computer product in one or more computer-readable mediums, which includes computer-readable program coding.
The application has used particular words to describe embodiments herein.As " one embodiment ", " embodiment ",
And/or " some embodiments " means a certain feature relevant at least one embodiment of the application, structure or feature.Therefore, it answers
Emphasize and it is noted that " embodiment " or " one embodiment " that is referred to twice or repeatedly in this specification in different location or
" alternate embodiment " is not necessarily meant to refer to the same embodiment.In addition, certain in one or more embodiments of the application
Feature, structure or feature can carry out combination appropriate.
Unless otherwise defined, all terms (including technical and scientific term) used herein have leads with belonging to the disclosure
The identical meanings that the those of ordinary skill in domain is commonly understood by.It is also understood that those of definition term such as in usual dictionary
The meaning consistent with their meanings in the context of the relevant technologies should be interpreted as having, without application idealization or
The meaning of extremely formalization explains, unless being clearly defined herein.
It is illustrative of the present disclosure above, and is not considered as limitation ot it.Notwithstanding the several of the disclosure
Exemplary embodiment, but those skilled in the art will readily appreciate that, before without departing substantially from the teaching of the disclosure and advantage
Many modifications can be carried out to exemplary embodiment by putting.Therefore, all such modifications are intended to be included in claims institute
Within the scope of the disclosure of restriction.It should be appreciated that being illustrative of the present disclosure above, and it should not be considered limited to disclosed spy
Determine embodiment, and the model in the appended claims is intended to encompass to the modification of the disclosed embodiments and other embodiments
In enclosing.The disclosure is limited by claims and its equivalent.