A kind of engineering rock mass rock integrity and relaxation zone test method Download PDFInfo
- Publication number
- CN109655369A CN109655369A CN201910059683.0A CN201910059683A CN109655369A CN 109655369 A CN109655369 A CN 109655369A CN 201910059683 A CN201910059683 A CN 201910059683A CN 109655369 A CN109655369 A CN 109655369A
- Authority
- CN
- China
- Prior art keywords
- drilling
- air bag
- rock mass
- closed section
- rock
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000011435 rock Substances 0.000 title claims abstract description 111
- 238000010998 test method Methods 0.000 title claims abstract description 23
- 238000005553 drilling Methods 0.000 claims abstract description 132
- 238000012360 testing method Methods 0.000 claims abstract description 54
- 238000000034 method Methods 0.000 claims description 16
- 238000003032 molecular docking Methods 0.000 claims description 5
- 241001074085 Scophthalmus aquosus Species 0.000 claims description 4
- 238000004140 cleaning Methods 0.000 claims description 4
- 238000004891 communication Methods 0.000 claims description 2
- 239000002775 capsule Substances 0.000 claims 2
- 239000004047 hole gas Substances 0.000 claims 1
- 238000001514 detection method Methods 0.000 abstract description 3
- 238000005516 engineering process Methods 0.000 abstract description 2
- 238000005065 mining Methods 0.000 abstract description 2
- 238000012544 monitoring process Methods 0.000 abstract 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 5
- 230000008878 coupling Effects 0.000 description 2
- 238000010168 coupling process Methods 0.000 description 2
- 238000005859 coupling reaction Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000007664 blowing Methods 0.000 description 1
- 238000010835 comparative analysis Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000003912 environmental pollution Methods 0.000 description 1
- 206010016766 flatulence Diseases 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000007634 remodeling Methods 0.000 description 1
- 239000000523 sample Substances 0.000 description 1
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N7/00—Analysing materials by measuring the pressure or volume of a gas or vapour
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N21/00—Investigating or analysing materials by the use of optical means, i.e. using sub-millimetre waves, infrared, visible or ultraviolet light
- G01N21/84—Systems specially adapted for particular applications
- G01N21/88—Investigating the presence of flaws or contamination
- G01N21/8851—Scan or image signal processing specially adapted therefor, e.g. for scan signal adjustment, for detecting different kinds of defects, for compensating for structures, markings, edges
Landscapes
- Chemical & Material Sciences (AREA)
- Biochemistry (AREA)
- Pathology (AREA)
- Physics & Mathematics (AREA)
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Immunology (AREA)
- Analytical Chemistry (AREA)
- General Physics & Mathematics (AREA)
- General Health & Medical Sciences (AREA)
- Engineering & Computer Science (AREA)
- Computer Vision & Pattern Recognition (AREA)
- Signal Processing (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Pipe Accessories (AREA)
Abstract
A kind of engineering rock mass rock integrity and relaxation zone test method belong to mining industry and geotechnical engineering safety detection and monitoring technology field.Including air bag test device and following steps: step 1001, opening up drilling;Step 1002, it is put into air bag test device;Step 1003, air bag (5) is inflated;Step 1004, it is inflated to closed section;Step 1005, judge the integrality of rock mass;Step 1006, judge whether current closed section is completed;Step 1007, judge whether Present Borehole (11) is completed;Step 1008, the test of next section in the drilling (11) is carried out;Step 1009, the test of other drillings (11) is carried out.This engineering rock mass rock integrity and relaxation zone test method have many advantages, such as that easy to operate, safe, reliable, environmentally friendly, economy, accuracy are high and have a wide range of application.
Description
Technical field
A kind of engineering rock mass rock integrity and relaxation zone test method belong to mining industry and geotechnical engineering safety detection and prison
Control technical field.
Background technique
After engineering rock mass is excavated, surrouding rock stress is caused to increase, if the stress concentrated in country rock is more than its intensity, country rock
It will destroy, the zone of fracture, plastic zone and elastic region will be presented from free face to rock mass deep, wherein the zone of fracture is known as country rock
Relaxation zone, the supporting of breaking surrounding rock are the emphasis and difficult point of engineering rock mass safety and construction working, therefore the survey of wall rock loosening ring
Examination is especially important, and the determination of wall rock loosening ring is for selecting reasonable support pattern and parameter and ahead work face supporting range to have
It is significant.
At present wall rock loosening ring test method mainly have sonic method, multipoint displacement meter method, geological radar method, seismic wave method,
Resistivity method and osmosis etc. mainly use sonic test method at present, and this method divides single-hole method and Two-port technique, existing main
Wanting problem is, in testing, often to provide wind and water pipe, larger workload, using water as sonic probe and hole wall
Coupling media, higher to the flow of water, pressure and water quality requirement, practical operation is difficult, and the frequent whole body of tester is done by water
Wet, test process is influenced to cause test result inaccurate by coupling media, and the velocity of wave of many situations is also difficult to determine.
Summary of the invention
The technical problem to be solved by the present invention is overcoming the deficiencies of the prior art and provide a kind of by being formed in drilling
Closed section, and be filled with gas into closed section, by being inflated to the filled volume after preset air pressure in closed section
Rock Mass Integrality judged, has easy to operate, safe, reliable, environmentally friendly, economy, accuracy high and has a wide range of application etc. and is excellent
The engineering rock mass rock integrity and relaxation zone test method of point.
The technical solution adopted by the present invention to solve the technical problems is: it is somebody's turn to do it is characterized by comprising air bag test device,
Air bag test device includes spaced two air bags, the inflated airbag gas tube into air bag is provided with, after air bag inflation
It is fitted closely with the inner wall of the drilling, two air bags interval in drilling forms closed section, is additionally provided with to closed section
The drilling gas tube of middle inflation, test method include the following steps:
Step 1001, it is constructed at engineering rock mass country rock test using pore-forming drill, opens up the drilling to form test, bored
Hole carries out borehole cleaning after opening up completion;
Step 1002, air bag test device is put into drilling, and the inner end of air bag test device is placed in using up for drilling first
At head;
Step 1003, airbag inflation pipe is inflated, forms the closed section for test after air bag expansion in drilling;
Step 1004, the closed section into drilling is inflated, and is charged to preset air pressure and is recorded and be inflated to closed section
Gas volume required for preset air pressure;
Step 1005, judge that process determines the integrality of rock mass in current closed section in drilling by Rock Mass Integrality;
Step 1006, judge whether current closed section is completed, if be completed, step 1007 is executed, if currently
Test section is not detected and is finished, return step 1005;
Step 1007, whether the drilling where judging current closed section is completed, if be completed, executes step
1009, if finished when drilling does not detect, execute step 1008;
Step 1008, air bag test device is moved, and return step 1003 to outside the opening of drilling, is carried out next in the drilling
The test of section;
Step 1009, Present Borehole is completed, and obtains integrity data whole in Present Borehole, is then tested air bag and is filled
It sets and is taken out from the drilling, carry out the test of other drillings.
Preferably, it is connected to and in communication between two air bags by airbag inflation pipe and drilling gas tube, air bag fills
Tracheae and drilling gas tube are connected to the end of any one air bag simultaneously and extend to drilling outside, and connect with gas source,
The drilling inflation pipe surface of two air bags of connection is provided with drilling venthole.
Preferably, the inside air bag is provided with one group of inner tube, the both ends of inner tube are respectively with setting in balloon ends
Connection end docking;
Inner tube is provided with two, respectively with outside air bag airbag inflation pipe and drilling gas tube it is corresponding, airbag inflation pipe with
And drilling gas tube is realized with inner tube corresponding in air bag by connection end and is docked;In inner tube table corresponding with airbag inflation pipe
Face offers air bag venthole.
Preferably, airbag inflation pipe valve is connected on the section outside drilling in airbag inflation pipe and air bag fills
Tracheal pressure meter;It is located on the section outside drilling in drilling gas tube and is connected with drilling inflation tube valve, flowmeter and brill
Inflate tube manometer in hole.
Preferably, the airbag inflation pipe and drilling gas tube are the multistage of docking, in airbag inflation pipe or/and
The surface of drilling gas tube is provided with scale.
Preferably, Rock Mass Integrality described in step 1005 judges process, includes the following steps:
Step 1005-1 determines volume needed for the closed section of equal length reaches predetermined pressure under rockmassV 0 ;
Step 1005-2 determines that current closed section reaches volume needed for predetermined pressure in drillingV p ;
Step 1005-3 obtains the parameter of Rock Mass Integrality according to volume parameterK 1 ,K 1 = V 0 /V p ;
Step 1005-4 shoots with video-corder the country rock of current closed section;
Step 1005-5 determines the surface area of current closed sectionS o ;
Step 1005-6 determines the surface area of burst region in current closed sectionS p ;
Step 1005-7, parameter obtains the parameter of Rock Mass Integrality according to areaK 2 ,K 2 =(S o - S p )/S o ;
Step 1005-8 obtains the parameter of Rock Mass IntegralityK, K=(K 1 + K 2 )/2;
Step 1005-9, according to parameterKNumerical value Rock Mass Integrality is defined.
Preferably, in the step 1005-9, Rock Mass Integrality defines criterion are as follows:
WhenKWhen > 0.75, the integrality of current closed section is defined as rockmass;
As 0.55 <KWhen < 0.75, the integrality of current closed section is defined as more complete rock mass;
As 0.35 <KWhen < 0.55, the integrality of current closed section is defined as compared with fragmented rock body;
As 0.15 <KWhen < 0.35, the integrality of current closed section is defined as fragmented rock body;
WhenKWhen < 0.15, the integrality of current closed section is defined as rock mass smashed to pieces.
Preferably, the diameter of the drilling is greater than 42mm, and the hole depth of drilling is greater than 2m.
Compared with prior art, the present invention has the beneficial effects that
1, in this engineering rock mass rock integrity and relaxation zone test method, by the closed section of formation in drilling, and to
It is filled with gas in closed section, the Rock Mass Integrality in closed section is carried out by being inflated to the filled volume after preset air pressure
Judgement has many advantages, such as that easy to operate, safe, reliable, environmentally friendly, economy, accuracy are high and have a wide range of application.
2, operation of the present invention and analysis are simple: being inflated, closed to two air bags by gas tube using inflator or air pump
Then gas between two air bags is inflated into the drilling between two air bags, according to the reading of calm the anger table and gas flowmeter
Number compares with rockmass situation, determines Rock Mass Integrality degree, volume needed for reaching same air pressure is bigger, then its integrality
Poorer, vice versa, and high-definition night-viewing radio micro camera shoots with video-corder process and analysis also very simply.
3, rock integrity journey high degree of automation of the present invention: is determined according to the reading of calm the anger table and gas flowmeter
Degree, high degree of automation save human and material resources.
4, the present invention is safe and reliable, economical and environmentally friendly: the present invention is using inflator or air pump by gas tube to two gas
Inflation in drilling between intracapsular and two air bags, the blowing pressure is low, securely and reliably, using gas as test rock integrity
Medium, it is inexhaustible and free from environmental pollution, it is very economical and environmentally friendly without buying high test equipment.
5, accuracy of the present invention is high: according to the pressure and volume of gas as judgment basis, test data is easy to get the present invention,
Volume needed for reaching same air pressure is bigger or to reach same gas volume its air pressure smaller, illustrates that rock integrity is poorer, analyzes
Process is simple, shoots with video-corder drilling country rock information summary comparative analysis with high-definition night-viewing radio micro camera and determines its integrality, quasi-
True property is high.
6, the present invention has a wide range of application: the present invention is suitable for the domain engineerings rock mass such as hydraulic and hydroelectric engineering, traffic, mine and encloses
The test of rock relaxation zone is suitable for any region of country rock.
7, the multisection type of docking can be used in airbag inflation pipe and drilling gas tube, therefore convenient for according to the depth of drilling
Pipe range is adjusted.
Detailed description of the invention
Fig. 1 is engineering rock mass rock integrity and relaxation zone test method flow chart.
Fig. 2 is engineering rock mass rock integrity and relaxation zone test method air bag schematic structural diagram of testing device.
Wherein: 1, airbag inflation pipe valve 2, airbag inflation pipe pressure gauge 3, engineering rock mass 4, connection end 5, air bag
6, air bag venthole 7, camera 8, airbag inflation pipe 9, drilling gas tube 10, drilling venthole 11, drilling 12, drilling
Inflate tube manometer 13, flowmeter 14, drilling inflation tube valve.
Specific embodiment
Fig. 1 ~ 2 are highly preferred embodiment of the present invention, and 1 ~ 2 the present invention will be further described with reference to the accompanying drawing.
As shown in Figure 1, a kind of engineering rock mass rock integrity and relaxation zone test method, include the following steps:
Step 1001, aperture and borehole cleaning are carried out at engineering rock mass country rock;
It is constructed at the country rock of engineering rock mass 3 using pore-forming drill, opens up the drilling 11 to form test, drilling 11 opens up
Borehole cleaning is carried out after completing.Drilling 11 diameter be greater than 42mm, drill 11 hole depth be greater than 2m.
Step 1002, air bag test device is put into drilling 11 at the end;
Air bag test device is put into drilling 11, and the inner end of air bag test device is placed at the end of drilling 11 first.
As shown in Fig. 2, air bag test device includes spaced two air bags 5, inflated between two air bags 5 by air bag
Pipe 8 and drilling gas tube 9 connect.The both ends of air bag 5 are provided with opening, are set respectively at each 5 both ends open of air bag
It is equipped with connection end 4, one group of inner tube is provided in air bag 5, the connection end 4 at inner tube connection both ends simultaneously props up air bag 5
Support.The inner tube of air bag 5 includes two, wherein one corresponding with airbag inflation pipe 8, another corresponding with drilling gas tube 9.Air bag
Gas tube 8 and drilling gas tube 9 and the connection end 4 of 5 end of air bag have been connected by conventional connection type (such as screw thread)
It is docked respectively with inner tube corresponding in air bag 5 at airbag inflation pipe 8 later and drilling gas tube 9.
Assembling is realized in a manner of flexible connection airbag inflation pipe 8 and drilling gas tube 9 between two air bags 5,
Therefore facilitate to select suitable spacing between two air bags 5 according to actual test situation, while convenient for various components after test
Collection.Preferred spacing between two air bags 5 is 0.2m.Airbag inflation pipe 8 or drilling gas tube between two air bags 5
Camera 7 is further fixed on 9, camera 7 is realized using high-definition night-viewing radio micro camera.
In two inner tubes inside air bag 5, only at least one is opened up in an inner tube corresponding with airbag inflation pipe 8
A air bag venthole 6 is inflated air bag 5 by air bag venthole 6.It offers and drills out on drilling gas tube 9
Stomata 10, drilling venthole 10 is located on the drilling gas tube 9 between two air bags 5, in order to the brill between two air bags 5
Bore section is inflated.
After two air bags 5 are connected by airbag inflation pipe 8 and drilling gas tube 9, one of 5 end of air bag
Connection end 4 blocked by plug, the connection end 4 of another 5 end of air bag is separately connected 8 He of airbag inflation pipe again
Drill gas tube 9, and according to drilling 11 depth connection appropriate length airbag inflation pipe 8 and drilling gas tube 9(it is whole or
A plurality of docking), to guarantee when air bag 5 to be sent at 11 ends of drilling, airbag inflation pipe 8 and drilling gas tube 9 can be certainly
The opening of drilling 11 is stretched out.After airbag inflation pipe 8 and drilling gas tube 9 are stretched out from the opening of drilling 11 with it is external
Inflator pump or gas source connection.
The surface of airbag inflation pipe 8 and the gas tube 9 that drills is provided with scale, in order to the depth for being sent into drilling 11
It measures;It is located on the section outside drilling 11 in airbag inflation pipe 8 and is connected with airbag inflation pipe valve 1 and air bag inflation
Tube manometer 2;It is located on the section outside drilling 11 in drilling gas tube 9 and is connected with drilling inflation tube valve 14, flowmeter 13
And drilling inflation tube manometer 12.
Step 1003, air bag 5 is inflated, forms closed section in drilling 11;
It opens airbag inflation pipe valve 1 to inflate into airbag inflation pipe 8, the gas poured by airbag inflation pipe 8 passes through respectively
The air bag venthole 6 being arranged in air bag 5, which enters in air bag 5, makes air bag 5 bulge, and the inner wall of drilling 11 is close to after 5 flatulence of air bag,
To which interval forms the closed section in drilling 11 between two air bags 5, which is current test section.
To guarantee that the inner wall of air bag 5 and drilling 11 fits closely and plays obturation effect, show in airbag inflation pipe pressure gauge 2
Airbag inflation pipe valve 1 is closed when number is 0.2MPa, stops the inflation to air bag 5.
Step 1004, the closed section inflation into drilling 11;
It opens drilling inflation tube valve 14 to inflate to drilling gas tube 9, the gas entered by drilling gas tube 9 is by drilling venthole
10 flow out into the closed section between two air bags 5.
Step 1005, the integrality of rock mass in current closed section in drilling 11 is determined;
In this engineering rock mass rock integrity and relaxation zone test method, judge Rock Mass Integrality in current closed section according to
According to are as follows: closed section under the premise of length and identical diameter, to rockmass reach the volume of predetermined pressure with it is current closed
The bulking value that section reaches predetermined pressure is compared, and obtains the Rock Mass Integrality of current closed section, specific steps are as follows:
Step 1005-1 determines volume needed for the closed section of equal length reaches predetermined pressure under rockmassV 0 ;
Step 1005-2 determines that current closed section reaches body needed for predetermined pressure in drilling 11 according to the reading of flowmeter 13
ProductV p ;
Step 1005-3 obtains the parameter of Rock Mass Integrality according to volume parameterK 1 ,K 1 = V 0 /V p ;
Step 1005-4 opens camera 7, shoots with video-corder to the country rock of current closed section;
Step 1005-5 determines the surface area of current closed sectionS o ;
Step 1005-6 determines the surface area of burst region in current closed sectionS p ;
Step 1005-7, parameter obtains the parameter of Rock Mass Integrality according to areaK 2 ,K 2 =(S o - S p )/S o ;
Step 1005-8 obtains the parameter of Rock Mass IntegralityK, K=(K 1 + K 2 )/2;
Step 1005-9 obtains the complete implementations of current closed section rock mass according to following criterion:
WhenKWhen > 0.75, the integrality of current closed section is defined as rockmass;
As 0.55 <KWhen < 0.75, the integrality of current closed section is defined as more complete rock mass;
As 0.35 <KWhen < 0.55, the integrality of current closed section is defined as compared with fragmented rock body;
As 0.15 <KWhen < 0.35, the integrality of current closed section is defined as fragmented rock body;
WhenKWhen < 0.15, the integrality of current closed section is defined as rock mass smashed to pieces.
Step 1006, whether current closed section is completed;
Judge whether current closed section is completed, if be completed, execute step 1007, if current test section is not
Detection finishes, return step 1005;
Step 1007, whether the drilling 11 where current closed section is completed;
Whether the drilling 11 where judging current closed section is completed, if be completed, step 1009 is executed, if worked as
Drilling 11, which does not detect, to be finished, and step 1008 is executed;
Step 1008, air bag test device is moved to outside 11 openings of drilling;
Airbag inflation pipe valve 1 is opened, the gas in two air bags 5 is discharged, and the opening to drilling 11 by air bag test device
It is outer at mouthful to move, and return step 1003, carry out the test of next section in the drilling 11.The distance of shifting is outside air bag test device
Spacing between the first two air bag 5, the distance of outer shifting is by being arranged in the scale of airbag inflation pipe 8 or 9 surface of gas tube that drills
It determines.
After the integrity test for completing entire drilling 11, the integrality number within the scope of 11 different depths of drilling is obtained
According to, according to the integrality changing rule from aperture to bottom hole determine this drilling region wall rock loosening ring range.
Step 1009, the test of other drillings 11 is carried out;
Present Borehole 11 is completed, and obtains integrity data whole in Present Borehole 11, then opens airbag inflation pipe valve
Gas in two air bags 5 is discharged, and air bag test device is taken out from the drilling 11 by door 1, carries out other drillings 11
Test.
By air bag test device after being taken out in the drilling 11 for completing test, it is put into other drillings 11 and according to step
1001 ~ step 1008 completes the integrality and relaxation zone data of other drilling country rocks, finally obtains entire 3 country rock of engineering rock mass
Integrality and relaxation zone data.
The above described is only a preferred embodiment of the present invention, being not that the invention has other forms of limitations, appoint
What those skilled in the art changed or be modified as possibly also with the technology contents of the disclosure above equivalent variations etc.
Imitate embodiment.But without departing from the technical solutions of the present invention, according to the technical essence of the invention to above embodiments institute
Any simple modification, equivalent variations and the remodeling made, still fall within the protection scope of technical solution of the present invention.
Claims (8)
1. a kind of engineering rock mass rock integrity and relaxation zone test method, it is characterised in that: including air bag test device, air bag
Test device includes spaced two air bags (5), is provided with inflated airbag gas tube (8), air bag in air bag (5)
(5) inner wall after inflating with the drilling (11) fits closely, and two air bags (5) interval in drilling (11) forms citadel
Section, is additionally provided with the drilling gas tube (9) inflated into closed section, test method includes the following steps:
Step 1001, it is constructed at engineering rock mass (3) country rock test using pore-forming drill, opens up the drilling to form test
(11), drilling (11) carries out borehole cleaning after opening up completion;
Step 1002, air bag test device is put into drilling (11), and the inner end of air bag test device is placed in drilling first
(11) at the end;
Step 1003, airbag inflation pipe (8) is inflated, is formed in drilling (11) for test after air bag (5) expansion
Closed section;
Step 1004, the closed section into drilling (11) is inflated, and is charged to preset air pressure and is recorded and fill closed section
Gas volume required for gas to preset air pressure;
Step 1005, judge that process determines the integrality of rock mass in current closed section in drilling (11) by Rock Mass Integrality;
Step 1006, judge whether current closed section is completed, if be completed, step 1007 is executed, if currently
Test section is not detected and is finished, return step 1005;
Step 1007, whether the drilling (11) where judging current closed section is completed, if be completed, executes step
1009, if finished when drilling (11) does not detect, execute step 1008;
Step 1008, air bag test device is moved, and return step 1003 to outside the opening of drilling (11), carries out the drilling
(11) test of next section in;
Step 1009, Present Borehole (11) is completed, and integrity data whole in Present Borehole (11) is obtained, then by gas
Capsule test device is taken out from the drilling (11), carries out the test of other drillings (11).
2. engineering rock mass rock integrity according to claim 1 and relaxation zone test method, it is characterised in that: described
It is connected to and in communication between two air bags (5) by airbag inflation pipe (8) and drilling gas tube (9), airbag inflation pipe (8) and brill
Hole gas tube (9) is connected to the end of any one air bag (5) simultaneously and extends to drilling (11) outside, and connect with gas source,
Drilling gas tube (9) surface for connecting two air bags (5) is provided with drilling venthole (10).
3. engineering rock mass rock integrity according to claim 1 and relaxation zone test method, it is characterised in that: described
Air bag (5) be internally provided with one group of inner tube, the both ends of inner tube respectively with that connection end (4) at air bag (5) both ends is arranged is right
It connects;
Inner tube is provided with two, corresponding with the external airbag inflation pipe (8) of air bag (5) and drilling gas tube (9) respectively, air bag
Gas tube (8) and drilling gas tube (9), which are realized by connection end (4) with inner tube corresponding in air bag (5), docks;With gas
The corresponding interior pipe surface of capsule gas tube (8) offers air bag venthole (6).
4. engineering rock mass rock integrity according to claim 2 and relaxation zone test method, it is characterised in that: in air bag
Gas tube (8), which is located on the external section of drilling (11), is connected with airbag inflation pipe valve (1) and airbag inflation pipe pressure gauge
(2);It is located on the external section of drilling (11) in drilling gas tube (9) and is connected with drilling inflation tube valve (14), flowmeter
(13) and tube manometer (12) are inflated in drilling.
5. engineering rock mass rock integrity according to claim 2 and relaxation zone test method, it is characterised in that: described
Airbag inflation pipe (8) and drilling gas tube (9) are the multistage of docking, in airbag inflation pipe (8) or/and drilling gas tube
(9) surface is provided with scale.
6. engineering rock mass rock integrity according to claim 1 and relaxation zone test method, it is characterised in that: step
Rock Mass Integrality described in 1005 judges process, includes the following steps:
Step 1005-1 determines volume needed for the closed section of equal length reaches predetermined pressure under rockmassV 0 ;
Step 1005-2 determines that current closed section reaches volume needed for predetermined pressure in drilling (11)V p ;
Step 1005-3 obtains the parameter of Rock Mass Integrality according to volume parameterK 1 ,K 1 = V 0 /V p ;
Step 1005-4 shoots with video-corder the country rock of current closed section;
Step 1005-5 determines the surface area of current closed sectionS o ;
Step 1005-6 determines the surface area of burst region in current closed sectionS p ;
Step 1005-7, parameter obtains the parameter of Rock Mass Integrality according to areaK 2 ,K 2 =(S o - S p )/S o ;
Step 1005-8 obtains the parameter of Rock Mass IntegralityK, K=(K 1 + K 2 )/2;
Step 1005-9, according to parameterKNumerical value Rock Mass Integrality is defined.
7. engineering rock mass rock integrity according to claim 6 and relaxation zone test method, it is characterised in that: described
Step 1005-9 in, Rock Mass Integrality defines criterion are as follows:
WhenKWhen > 0.75, the integrality of current closed section is defined as rockmass;
As 0.55 <KWhen < 0.75, the integrality of current closed section is defined as more complete rock mass;
As 0.35 <KWhen < 0.55, the integrality of current closed section is defined as compared with fragmented rock body;
As 0.15 <KWhen < 0.35, the integrality of current closed section is defined as fragmented rock body;
WhenKWhen < 0.15, the integrality of current closed section is defined as rock mass smashed to pieces.
8. engineering rock mass rock integrity according to claim 1 and relaxation zone test method, it is characterised in that: the brill
The diameter in hole (11) is greater than 42mm, and the hole depth of drilling (11) is greater than 2m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910059683.0A CN109655369B (en) | 2019-01-22 | 2019-01-22 | Method for testing integrity and loosening ring of surrounding rock of engineering rock mass |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910059683.0A CN109655369B (en) | 2019-01-22 | 2019-01-22 | Method for testing integrity and loosening ring of surrounding rock of engineering rock mass |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109655369A true CN109655369A (en) | 2019-04-19 |
CN109655369B CN109655369B (en) | 2021-05-25 |
Family
ID=66119333
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910059683.0A Expired - Fee Related CN109655369B (en) | 2019-01-22 | 2019-01-22 | Method for testing integrity and loosening ring of surrounding rock of engineering rock mass |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109655369B (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102562037A (en) * | 2012-01-12 | 2012-07-11 | 山东科技大学 | Quantitative judging method for damage range of coal mine tunnel |
CN103217131A (en) * | 2013-04-08 | 2013-07-24 | 中国矿业大学(北京) | Method and device for testing loose circle of surrounding rock |
CN104729969A (en) * | 2015-03-23 | 2015-06-24 | 中国电建集团华东勘测设计研究院有限公司 | Surrounding rock stress disturbing degree test device |
CN104914484A (en) * | 2015-05-31 | 2015-09-16 | 西安科技大学 | Roadway surrounding rock stability combined testing device and testing method |
-
2019
- 2019-01-22 CN CN201910059683.0A patent/CN109655369B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102562037A (en) * | 2012-01-12 | 2012-07-11 | 山东科技大学 | Quantitative judging method for damage range of coal mine tunnel |
CN103217131A (en) * | 2013-04-08 | 2013-07-24 | 中国矿业大学(北京) | Method and device for testing loose circle of surrounding rock |
CN104729969A (en) * | 2015-03-23 | 2015-06-24 | 中国电建集团华东勘测设计研究院有限公司 | Surrounding rock stress disturbing degree test device |
CN104914484A (en) * | 2015-05-31 | 2015-09-16 | 西安科技大学 | Roadway surrounding rock stability combined testing device and testing method |
CN107765339A (en) * | 2015-05-31 | 2018-03-06 | 西安科技大学 | Improving stability of surrounding rocks in roadway joint test method |
Non-Patent Citations (1)
Title |
---|
中华人民共和国交通运输部发布: "《JTG/T D70-2010 公路隧道设计细则》", 30 June 2010, 人民交通出版社 * |
Also Published As
Publication number | Publication date |
---|---|
CN109655369B (en) | 2021-05-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103758513B (en) | A kind of evaluation method simulating full-size well wall stability | |
CN103217131B (en) | A kind of method of testing of wall rock loosening ring and testing apparatus | |
CN108952694B (en) | Side pressure test device and method | |
CN201671622U (en) | Coal mine cover rock water guide slit band uphole observation instrument | |
CN105334308A (en) | Surrounding rock crack growth dynamic monitoring method and monitoring apparatus thereof | |
CN105318824A (en) | A method for measuring loose circles of surrounding rocks based on distributed resistance strain gauges | |
CN212535644U (en) | Drilling pile while-drilling stratum parameter measuring sleeve for judging boundary zone of soil-rock stratum | |
CN117418901A (en) | Full-section loose coil acoustic wave method measuring device for roadway and chamber and using method | |
CN109162703A (en) | A kind of soft suitable coal bed drilling multistage on-line pressure sealant pressure measuring unit of overlength and method | |
CN105756664B (en) | Coiled tubing horizontal well test device | |
CN107642354B (en) | Method for measuring length of drill hole after drill rod exits from drill hole | |
CA1331840C (en) | Low-water-pressure controlled hydrologic test method | |
CN105507895A (en) | Rock fracture detection sensor and using method | |
KR100869168B1 (en) | Method for testing irrigration sensing temperature of tracer | |
CN109655369A (en) | A kind of engineering rock mass rock integrity and relaxation zone test method | |
Pearson et al. | Improvements in the Lugeon or packer permeability test | |
CN103091726B (en) | The remote sensing and quantizing surveying method of fault with abundant ground water engineering geology ground | |
CN111622754A (en) | Drilling pile while-drilling stratum parameter measuring sleeve for judging boundary zone of soil-rock stratum | |
CN114893145B (en) | Water plugging device for drilling, stratum fracture crushing condition detection equipment and detection method | |
JP5155761B2 (en) | Measuring device and measuring method of spring water pressure and amount | |
CN214503289U (en) | Water pressure test device | |
CN104278983A (en) | Coupling device for sound-wave all-around testing dry hole probe | |
CN215767467U (en) | Chemical expansion rubber-pushing type hollow inclusion ground stress meter | |
CN212743988U (en) | Drilling stratum leak source measuring apparatu | |
CN111219183B (en) | Water volume and water pressure detection device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210525 |
|
CF01 | Termination of patent right due to non-payment of annual fee |