CN109655369A - A kind of engineering rock mass rock integrity and relaxation zone test method - Google Patents

A kind of engineering rock mass rock integrity and relaxation zone test method Download PDF

Info

Publication number
CN109655369A
CN109655369A CN201910059683.0A CN201910059683A CN109655369A CN 109655369 A CN109655369 A CN 109655369A CN 201910059683 A CN201910059683 A CN 201910059683A CN 109655369 A CN109655369 A CN 109655369A
Authority
CN
China
Prior art keywords
drilling
air bag
rock mass
closed section
rock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910059683.0A
Other languages
Chinese (zh)
Other versions
CN109655369B (en
Inventor
张晓君
李晓程
宋林波
李如峪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Technology
Original Assignee
Shandong University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Technology filed Critical Shandong University of Technology
Priority to CN201910059683.0A priority Critical patent/CN109655369B/en
Publication of CN109655369A publication Critical patent/CN109655369A/en
Application granted granted Critical
Publication of CN109655369B publication Critical patent/CN109655369B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N7/00Analysing materials by measuring the pressure or volume of a gas or vapour
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N21/00Investigating or analysing materials by the use of optical means, i.e. using sub-millimetre waves, infrared, visible or ultraviolet light
    • G01N21/84Systems specially adapted for particular applications
    • G01N21/88Investigating the presence of flaws or contamination
    • G01N21/8851Scan or image signal processing specially adapted therefor, e.g. for scan signal adjustment, for detecting different kinds of defects, for compensating for structures, markings, edges

Landscapes

  • Chemical & Material Sciences (AREA)
  • Biochemistry (AREA)
  • Pathology (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Immunology (AREA)
  • Analytical Chemistry (AREA)
  • General Physics & Mathematics (AREA)
  • General Health & Medical Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • Signal Processing (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Pipe Accessories (AREA)

Abstract

A kind of engineering rock mass rock integrity and relaxation zone test method belong to mining industry and geotechnical engineering safety detection and monitoring technology field.Including air bag test device and following steps: step 1001, opening up drilling;Step 1002, it is put into air bag test device;Step 1003, air bag (5) is inflated;Step 1004, it is inflated to closed section;Step 1005, judge the integrality of rock mass;Step 1006, judge whether current closed section is completed;Step 1007, judge whether Present Borehole (11) is completed;Step 1008, the test of next section in the drilling (11) is carried out;Step 1009, the test of other drillings (11) is carried out.This engineering rock mass rock integrity and relaxation zone test method have many advantages, such as that easy to operate, safe, reliable, environmentally friendly, economy, accuracy are high and have a wide range of application.

Description

A kind of engineering rock mass rock integrity and relaxation zone test method
Technical field
A kind of engineering rock mass rock integrity and relaxation zone test method belong to mining industry and geotechnical engineering safety detection and prison Control technical field.
Background technique
After engineering rock mass is excavated, surrouding rock stress is caused to increase, if the stress concentrated in country rock is more than its intensity, country rock It will destroy, the zone of fracture, plastic zone and elastic region will be presented from free face to rock mass deep, wherein the zone of fracture is known as country rock Relaxation zone, the supporting of breaking surrounding rock are the emphasis and difficult point of engineering rock mass safety and construction working, therefore the survey of wall rock loosening ring Examination is especially important, and the determination of wall rock loosening ring is for selecting reasonable support pattern and parameter and ahead work face supporting range to have It is significant.
At present wall rock loosening ring test method mainly have sonic method, multipoint displacement meter method, geological radar method, seismic wave method, Resistivity method and osmosis etc. mainly use sonic test method at present, and this method divides single-hole method and Two-port technique, existing main Wanting problem is, in testing, often to provide wind and water pipe, larger workload, using water as sonic probe and hole wall Coupling media, higher to the flow of water, pressure and water quality requirement, practical operation is difficult, and the frequent whole body of tester is done by water Wet, test process is influenced to cause test result inaccurate by coupling media, and the velocity of wave of many situations is also difficult to determine.
Summary of the invention
The technical problem to be solved by the present invention is overcoming the deficiencies of the prior art and provide a kind of by being formed in drilling Closed section, and be filled with gas into closed section, by being inflated to the filled volume after preset air pressure in closed section Rock Mass Integrality judged, has easy to operate, safe, reliable, environmentally friendly, economy, accuracy high and has a wide range of application etc. and is excellent The engineering rock mass rock integrity and relaxation zone test method of point.
The technical solution adopted by the present invention to solve the technical problems is: it is somebody's turn to do it is characterized by comprising air bag test device, Air bag test device includes spaced two air bags, the inflated airbag gas tube into air bag is provided with, after air bag inflation It is fitted closely with the inner wall of the drilling, two air bags interval in drilling forms closed section, is additionally provided with to closed section The drilling gas tube of middle inflation, test method include the following steps:
Step 1001, it is constructed at engineering rock mass country rock test using pore-forming drill, opens up the drilling to form test, bored Hole carries out borehole cleaning after opening up completion;
Step 1002, air bag test device is put into drilling, and the inner end of air bag test device is placed in using up for drilling first At head;
Step 1003, airbag inflation pipe is inflated, forms the closed section for test after air bag expansion in drilling;
Step 1004, the closed section into drilling is inflated, and is charged to preset air pressure and is recorded and be inflated to closed section Gas volume required for preset air pressure;
Step 1005, judge that process determines the integrality of rock mass in current closed section in drilling by Rock Mass Integrality;
Step 1006, judge whether current closed section is completed, if be completed, step 1007 is executed, if currently Test section is not detected and is finished, return step 1005;
Step 1007, whether the drilling where judging current closed section is completed, if be completed, executes step 1009, if finished when drilling does not detect, execute step 1008;
Step 1008, air bag test device is moved, and return step 1003 to outside the opening of drilling, is carried out next in the drilling The test of section;
Step 1009, Present Borehole is completed, and obtains integrity data whole in Present Borehole, is then tested air bag and is filled It sets and is taken out from the drilling, carry out the test of other drillings.
Preferably, it is connected to and in communication between two air bags by airbag inflation pipe and drilling gas tube, air bag fills Tracheae and drilling gas tube are connected to the end of any one air bag simultaneously and extend to drilling outside, and connect with gas source, The drilling inflation pipe surface of two air bags of connection is provided with drilling venthole.
Preferably, the inside air bag is provided with one group of inner tube, the both ends of inner tube are respectively with setting in balloon ends Connection end docking;
Inner tube is provided with two, respectively with outside air bag airbag inflation pipe and drilling gas tube it is corresponding, airbag inflation pipe with And drilling gas tube is realized with inner tube corresponding in air bag by connection end and is docked;In inner tube table corresponding with airbag inflation pipe Face offers air bag venthole.
Preferably, airbag inflation pipe valve is connected on the section outside drilling in airbag inflation pipe and air bag fills Tracheal pressure meter;It is located on the section outside drilling in drilling gas tube and is connected with drilling inflation tube valve, flowmeter and brill Inflate tube manometer in hole.
Preferably, the airbag inflation pipe and drilling gas tube are the multistage of docking, in airbag inflation pipe or/and The surface of drilling gas tube is provided with scale.
Preferably, Rock Mass Integrality described in step 1005 judges process, includes the following steps:
Step 1005-1 determines volume needed for the closed section of equal length reaches predetermined pressure under rockmassV 0
Step 1005-2 determines that current closed section reaches volume needed for predetermined pressure in drillingV p
Step 1005-3 obtains the parameter of Rock Mass Integrality according to volume parameterK 1 ,K 1 = V 0 /V p
Step 1005-4 shoots with video-corder the country rock of current closed section;
Step 1005-5 determines the surface area of current closed sectionS o
Step 1005-6 determines the surface area of burst region in current closed sectionS p
Step 1005-7, parameter obtains the parameter of Rock Mass Integrality according to areaK 2 ,K 2 =(S o - S p )/S o
Step 1005-8 obtains the parameter of Rock Mass IntegralityK, K=(K 1 + K 2 )/2;
Step 1005-9, according to parameterKNumerical value Rock Mass Integrality is defined.
Preferably, in the step 1005-9, Rock Mass Integrality defines criterion are as follows:
WhenKWhen > 0.75, the integrality of current closed section is defined as rockmass;
As 0.55 <KWhen < 0.75, the integrality of current closed section is defined as more complete rock mass;
As 0.35 <KWhen < 0.55, the integrality of current closed section is defined as compared with fragmented rock body;
As 0.15 <KWhen < 0.35, the integrality of current closed section is defined as fragmented rock body;
WhenKWhen < 0.15, the integrality of current closed section is defined as rock mass smashed to pieces.
Preferably, the diameter of the drilling is greater than 42mm, and the hole depth of drilling is greater than 2m.
Compared with prior art, the present invention has the beneficial effects that
1, in this engineering rock mass rock integrity and relaxation zone test method, by the closed section of formation in drilling, and to It is filled with gas in closed section, the Rock Mass Integrality in closed section is carried out by being inflated to the filled volume after preset air pressure Judgement has many advantages, such as that easy to operate, safe, reliable, environmentally friendly, economy, accuracy are high and have a wide range of application.
2, operation of the present invention and analysis are simple: being inflated, closed to two air bags by gas tube using inflator or air pump Then gas between two air bags is inflated into the drilling between two air bags, according to the reading of calm the anger table and gas flowmeter Number compares with rockmass situation, determines Rock Mass Integrality degree, volume needed for reaching same air pressure is bigger, then its integrality Poorer, vice versa, and high-definition night-viewing radio micro camera shoots with video-corder process and analysis also very simply.
3, rock integrity journey high degree of automation of the present invention: is determined according to the reading of calm the anger table and gas flowmeter Degree, high degree of automation save human and material resources.
4, the present invention is safe and reliable, economical and environmentally friendly: the present invention is using inflator or air pump by gas tube to two gas Inflation in drilling between intracapsular and two air bags, the blowing pressure is low, securely and reliably, using gas as test rock integrity Medium, it is inexhaustible and free from environmental pollution, it is very economical and environmentally friendly without buying high test equipment.
5, accuracy of the present invention is high: according to the pressure and volume of gas as judgment basis, test data is easy to get the present invention, Volume needed for reaching same air pressure is bigger or to reach same gas volume its air pressure smaller, illustrates that rock integrity is poorer, analyzes Process is simple, shoots with video-corder drilling country rock information summary comparative analysis with high-definition night-viewing radio micro camera and determines its integrality, quasi- True property is high.
6, the present invention has a wide range of application: the present invention is suitable for the domain engineerings rock mass such as hydraulic and hydroelectric engineering, traffic, mine and encloses The test of rock relaxation zone is suitable for any region of country rock.
7, the multisection type of docking can be used in airbag inflation pipe and drilling gas tube, therefore convenient for according to the depth of drilling Pipe range is adjusted.
Detailed description of the invention
Fig. 1 is engineering rock mass rock integrity and relaxation zone test method flow chart.
Fig. 2 is engineering rock mass rock integrity and relaxation zone test method air bag schematic structural diagram of testing device.
Wherein: 1, airbag inflation pipe valve 2, airbag inflation pipe pressure gauge 3, engineering rock mass 4, connection end 5, air bag 6, air bag venthole 7, camera 8, airbag inflation pipe 9, drilling gas tube 10, drilling venthole 11, drilling 12, drilling Inflate tube manometer 13, flowmeter 14, drilling inflation tube valve.
Specific embodiment
Fig. 1 ~ 2 are highly preferred embodiment of the present invention, and 1 ~ 2 the present invention will be further described with reference to the accompanying drawing.
As shown in Figure 1, a kind of engineering rock mass rock integrity and relaxation zone test method, include the following steps:
Step 1001, aperture and borehole cleaning are carried out at engineering rock mass country rock;
It is constructed at the country rock of engineering rock mass 3 using pore-forming drill, opens up the drilling 11 to form test, drilling 11 opens up Borehole cleaning is carried out after completing.Drilling 11 diameter be greater than 42mm, drill 11 hole depth be greater than 2m.
Step 1002, air bag test device is put into drilling 11 at the end;
Air bag test device is put into drilling 11, and the inner end of air bag test device is placed at the end of drilling 11 first.
As shown in Fig. 2, air bag test device includes spaced two air bags 5, inflated between two air bags 5 by air bag Pipe 8 and drilling gas tube 9 connect.The both ends of air bag 5 are provided with opening, are set respectively at each 5 both ends open of air bag It is equipped with connection end 4, one group of inner tube is provided in air bag 5, the connection end 4 at inner tube connection both ends simultaneously props up air bag 5 Support.The inner tube of air bag 5 includes two, wherein one corresponding with airbag inflation pipe 8, another corresponding with drilling gas tube 9.Air bag Gas tube 8 and drilling gas tube 9 and the connection end 4 of 5 end of air bag have been connected by conventional connection type (such as screw thread) It is docked respectively with inner tube corresponding in air bag 5 at airbag inflation pipe 8 later and drilling gas tube 9.
Assembling is realized in a manner of flexible connection airbag inflation pipe 8 and drilling gas tube 9 between two air bags 5, Therefore facilitate to select suitable spacing between two air bags 5 according to actual test situation, while convenient for various components after test Collection.Preferred spacing between two air bags 5 is 0.2m.Airbag inflation pipe 8 or drilling gas tube between two air bags 5 Camera 7 is further fixed on 9, camera 7 is realized using high-definition night-viewing radio micro camera.
In two inner tubes inside air bag 5, only at least one is opened up in an inner tube corresponding with airbag inflation pipe 8 A air bag venthole 6 is inflated air bag 5 by air bag venthole 6.It offers and drills out on drilling gas tube 9 Stomata 10, drilling venthole 10 is located on the drilling gas tube 9 between two air bags 5, in order to the brill between two air bags 5 Bore section is inflated.
After two air bags 5 are connected by airbag inflation pipe 8 and drilling gas tube 9, one of 5 end of air bag Connection end 4 blocked by plug, the connection end 4 of another 5 end of air bag is separately connected 8 He of airbag inflation pipe again Drill gas tube 9, and according to drilling 11 depth connection appropriate length airbag inflation pipe 8 and drilling gas tube 9(it is whole or A plurality of docking), to guarantee when air bag 5 to be sent at 11 ends of drilling, airbag inflation pipe 8 and drilling gas tube 9 can be certainly The opening of drilling 11 is stretched out.After airbag inflation pipe 8 and drilling gas tube 9 are stretched out from the opening of drilling 11 with it is external Inflator pump or gas source connection.
The surface of airbag inflation pipe 8 and the gas tube 9 that drills is provided with scale, in order to the depth for being sent into drilling 11 It measures;It is located on the section outside drilling 11 in airbag inflation pipe 8 and is connected with airbag inflation pipe valve 1 and air bag inflation Tube manometer 2;It is located on the section outside drilling 11 in drilling gas tube 9 and is connected with drilling inflation tube valve 14, flowmeter 13 And drilling inflation tube manometer 12.
Step 1003, air bag 5 is inflated, forms closed section in drilling 11;
It opens airbag inflation pipe valve 1 to inflate into airbag inflation pipe 8, the gas poured by airbag inflation pipe 8 passes through respectively The air bag venthole 6 being arranged in air bag 5, which enters in air bag 5, makes air bag 5 bulge, and the inner wall of drilling 11 is close to after 5 flatulence of air bag, To which interval forms the closed section in drilling 11 between two air bags 5, which is current test section.
To guarantee that the inner wall of air bag 5 and drilling 11 fits closely and plays obturation effect, show in airbag inflation pipe pressure gauge 2 Airbag inflation pipe valve 1 is closed when number is 0.2MPa, stops the inflation to air bag 5.
Step 1004, the closed section inflation into drilling 11;
It opens drilling inflation tube valve 14 to inflate to drilling gas tube 9, the gas entered by drilling gas tube 9 is by drilling venthole 10 flow out into the closed section between two air bags 5.
Step 1005, the integrality of rock mass in current closed section in drilling 11 is determined;
In this engineering rock mass rock integrity and relaxation zone test method, judge Rock Mass Integrality in current closed section according to According to are as follows: closed section under the premise of length and identical diameter, to rockmass reach the volume of predetermined pressure with it is current closed The bulking value that section reaches predetermined pressure is compared, and obtains the Rock Mass Integrality of current closed section, specific steps are as follows:
Step 1005-1 determines volume needed for the closed section of equal length reaches predetermined pressure under rockmassV 0
Step 1005-2 determines that current closed section reaches body needed for predetermined pressure in drilling 11 according to the reading of flowmeter 13 ProductV p
Step 1005-3 obtains the parameter of Rock Mass Integrality according to volume parameterK 1 ,K 1 = V 0 /V p
Step 1005-4 opens camera 7, shoots with video-corder to the country rock of current closed section;
Step 1005-5 determines the surface area of current closed sectionS o
Step 1005-6 determines the surface area of burst region in current closed sectionS p
Step 1005-7, parameter obtains the parameter of Rock Mass Integrality according to areaK 2 ,K 2 =(S o - S p )/S o
Step 1005-8 obtains the parameter of Rock Mass IntegralityK, K=(K 1 + K 2 )/2;
Step 1005-9 obtains the complete implementations of current closed section rock mass according to following criterion:
WhenKWhen > 0.75, the integrality of current closed section is defined as rockmass;
As 0.55 <KWhen < 0.75, the integrality of current closed section is defined as more complete rock mass;
As 0.35 <KWhen < 0.55, the integrality of current closed section is defined as compared with fragmented rock body;
As 0.15 <KWhen < 0.35, the integrality of current closed section is defined as fragmented rock body;
WhenKWhen < 0.15, the integrality of current closed section is defined as rock mass smashed to pieces.
Step 1006, whether current closed section is completed;
Judge whether current closed section is completed, if be completed, execute step 1007, if current test section is not Detection finishes, return step 1005;
Step 1007, whether the drilling 11 where current closed section is completed;
Whether the drilling 11 where judging current closed section is completed, if be completed, step 1009 is executed, if worked as Drilling 11, which does not detect, to be finished, and step 1008 is executed;
Step 1008, air bag test device is moved to outside 11 openings of drilling;
Airbag inflation pipe valve 1 is opened, the gas in two air bags 5 is discharged, and the opening to drilling 11 by air bag test device It is outer at mouthful to move, and return step 1003, carry out the test of next section in the drilling 11.The distance of shifting is outside air bag test device Spacing between the first two air bag 5, the distance of outer shifting is by being arranged in the scale of airbag inflation pipe 8 or 9 surface of gas tube that drills It determines.
After the integrity test for completing entire drilling 11, the integrality number within the scope of 11 different depths of drilling is obtained According to, according to the integrality changing rule from aperture to bottom hole determine this drilling region wall rock loosening ring range.
Step 1009, the test of other drillings 11 is carried out;
Present Borehole 11 is completed, and obtains integrity data whole in Present Borehole 11, then opens airbag inflation pipe valve Gas in two air bags 5 is discharged, and air bag test device is taken out from the drilling 11 by door 1, carries out other drillings 11 Test.
By air bag test device after being taken out in the drilling 11 for completing test, it is put into other drillings 11 and according to step 1001 ~ step 1008 completes the integrality and relaxation zone data of other drilling country rocks, finally obtains entire 3 country rock of engineering rock mass Integrality and relaxation zone data.
The above described is only a preferred embodiment of the present invention, being not that the invention has other forms of limitations, appoint What those skilled in the art changed or be modified as possibly also with the technology contents of the disclosure above equivalent variations etc. Imitate embodiment.But without departing from the technical solutions of the present invention, according to the technical essence of the invention to above embodiments institute Any simple modification, equivalent variations and the remodeling made, still fall within the protection scope of technical solution of the present invention.

Claims (8)

1. a kind of engineering rock mass rock integrity and relaxation zone test method, it is characterised in that: including air bag test device, air bag Test device includes spaced two air bags (5), is provided with inflated airbag gas tube (8), air bag in air bag (5) (5) inner wall after inflating with the drilling (11) fits closely, and two air bags (5) interval in drilling (11) forms citadel Section, is additionally provided with the drilling gas tube (9) inflated into closed section, test method includes the following steps:
Step 1001, it is constructed at engineering rock mass (3) country rock test using pore-forming drill, opens up the drilling to form test (11), drilling (11) carries out borehole cleaning after opening up completion;
Step 1002, air bag test device is put into drilling (11), and the inner end of air bag test device is placed in drilling first (11) at the end;
Step 1003, airbag inflation pipe (8) is inflated, is formed in drilling (11) for test after air bag (5) expansion Closed section;
Step 1004, the closed section into drilling (11) is inflated, and is charged to preset air pressure and is recorded and fill closed section Gas volume required for gas to preset air pressure;
Step 1005, judge that process determines the integrality of rock mass in current closed section in drilling (11) by Rock Mass Integrality;
Step 1006, judge whether current closed section is completed, if be completed, step 1007 is executed, if currently Test section is not detected and is finished, return step 1005;
Step 1007, whether the drilling (11) where judging current closed section is completed, if be completed, executes step 1009, if finished when drilling (11) does not detect, execute step 1008;
Step 1008, air bag test device is moved, and return step 1003 to outside the opening of drilling (11), carries out the drilling (11) test of next section in;
Step 1009, Present Borehole (11) is completed, and integrity data whole in Present Borehole (11) is obtained, then by gas Capsule test device is taken out from the drilling (11), carries out the test of other drillings (11).
2. engineering rock mass rock integrity according to claim 1 and relaxation zone test method, it is characterised in that: described It is connected to and in communication between two air bags (5) by airbag inflation pipe (8) and drilling gas tube (9), airbag inflation pipe (8) and brill Hole gas tube (9) is connected to the end of any one air bag (5) simultaneously and extends to drilling (11) outside, and connect with gas source, Drilling gas tube (9) surface for connecting two air bags (5) is provided with drilling venthole (10).
3. engineering rock mass rock integrity according to claim 1 and relaxation zone test method, it is characterised in that: described Air bag (5) be internally provided with one group of inner tube, the both ends of inner tube respectively with that connection end (4) at air bag (5) both ends is arranged is right It connects;
Inner tube is provided with two, corresponding with the external airbag inflation pipe (8) of air bag (5) and drilling gas tube (9) respectively, air bag Gas tube (8) and drilling gas tube (9), which are realized by connection end (4) with inner tube corresponding in air bag (5), docks;With gas The corresponding interior pipe surface of capsule gas tube (8) offers air bag venthole (6).
4. engineering rock mass rock integrity according to claim 2 and relaxation zone test method, it is characterised in that: in air bag Gas tube (8), which is located on the external section of drilling (11), is connected with airbag inflation pipe valve (1) and airbag inflation pipe pressure gauge (2);It is located on the external section of drilling (11) in drilling gas tube (9) and is connected with drilling inflation tube valve (14), flowmeter (13) and tube manometer (12) are inflated in drilling.
5. engineering rock mass rock integrity according to claim 2 and relaxation zone test method, it is characterised in that: described Airbag inflation pipe (8) and drilling gas tube (9) are the multistage of docking, in airbag inflation pipe (8) or/and drilling gas tube (9) surface is provided with scale.
6. engineering rock mass rock integrity according to claim 1 and relaxation zone test method, it is characterised in that: step Rock Mass Integrality described in 1005 judges process, includes the following steps:
Step 1005-1 determines volume needed for the closed section of equal length reaches predetermined pressure under rockmassV 0
Step 1005-2 determines that current closed section reaches volume needed for predetermined pressure in drilling (11)V p
Step 1005-3 obtains the parameter of Rock Mass Integrality according to volume parameterK 1 ,K 1 = V 0 /V p
Step 1005-4 shoots with video-corder the country rock of current closed section;
Step 1005-5 determines the surface area of current closed sectionS o
Step 1005-6 determines the surface area of burst region in current closed sectionS p
Step 1005-7, parameter obtains the parameter of Rock Mass Integrality according to areaK 2 ,K 2 =(S o - S p )/S o
Step 1005-8 obtains the parameter of Rock Mass IntegralityK, K=(K 1 + K 2 )/2;
Step 1005-9, according to parameterKNumerical value Rock Mass Integrality is defined.
7. engineering rock mass rock integrity according to claim 6 and relaxation zone test method, it is characterised in that: described Step 1005-9 in, Rock Mass Integrality defines criterion are as follows:
WhenKWhen > 0.75, the integrality of current closed section is defined as rockmass;
As 0.55 <KWhen < 0.75, the integrality of current closed section is defined as more complete rock mass;
As 0.35 <KWhen < 0.55, the integrality of current closed section is defined as compared with fragmented rock body;
As 0.15 <KWhen < 0.35, the integrality of current closed section is defined as fragmented rock body;
WhenKWhen < 0.15, the integrality of current closed section is defined as rock mass smashed to pieces.
8. engineering rock mass rock integrity according to claim 1 and relaxation zone test method, it is characterised in that: the brill The diameter in hole (11) is greater than 42mm, and the hole depth of drilling (11) is greater than 2m.
CN201910059683.0A 2019-01-22 2019-01-22 Method for testing integrity and loosening ring of surrounding rock of engineering rock mass Expired - Fee Related CN109655369B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910059683.0A CN109655369B (en) 2019-01-22 2019-01-22 Method for testing integrity and loosening ring of surrounding rock of engineering rock mass

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910059683.0A CN109655369B (en) 2019-01-22 2019-01-22 Method for testing integrity and loosening ring of surrounding rock of engineering rock mass

Publications (2)

Publication Number Publication Date
CN109655369A true CN109655369A (en) 2019-04-19
CN109655369B CN109655369B (en) 2021-05-25

Family

ID=66119333

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910059683.0A Expired - Fee Related CN109655369B (en) 2019-01-22 2019-01-22 Method for testing integrity and loosening ring of surrounding rock of engineering rock mass

Country Status (1)

Country Link
CN (1) CN109655369B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102562037A (en) * 2012-01-12 2012-07-11 山东科技大学 Quantitative judging method for damage range of coal mine tunnel
CN103217131A (en) * 2013-04-08 2013-07-24 中国矿业大学(北京) Method and device for testing loose circle of surrounding rock
CN104729969A (en) * 2015-03-23 2015-06-24 中国电建集团华东勘测设计研究院有限公司 Surrounding rock stress disturbing degree test device
CN104914484A (en) * 2015-05-31 2015-09-16 西安科技大学 Roadway surrounding rock stability combined testing device and testing method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102562037A (en) * 2012-01-12 2012-07-11 山东科技大学 Quantitative judging method for damage range of coal mine tunnel
CN103217131A (en) * 2013-04-08 2013-07-24 中国矿业大学(北京) Method and device for testing loose circle of surrounding rock
CN104729969A (en) * 2015-03-23 2015-06-24 中国电建集团华东勘测设计研究院有限公司 Surrounding rock stress disturbing degree test device
CN104914484A (en) * 2015-05-31 2015-09-16 西安科技大学 Roadway surrounding rock stability combined testing device and testing method
CN107765339A (en) * 2015-05-31 2018-03-06 西安科技大学 Improving stability of surrounding rocks in roadway joint test method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
中华人民共和国交通运输部发布: "《JTG/T D70-2010 公路隧道设计细则》", 30 June 2010, 人民交通出版社 *

Also Published As

Publication number Publication date
CN109655369B (en) 2021-05-25

Similar Documents

Publication Publication Date Title
CN103758513B (en) A kind of evaluation method simulating full-size well wall stability
CN103217131B (en) A kind of method of testing of wall rock loosening ring and testing apparatus
CN108952694B (en) Side pressure test device and method
CN201671622U (en) Coal mine cover rock water guide slit band uphole observation instrument
CN105334308A (en) Surrounding rock crack growth dynamic monitoring method and monitoring apparatus thereof
CN105318824A (en) A method for measuring loose circles of surrounding rocks based on distributed resistance strain gauges
CN212535644U (en) Drilling pile while-drilling stratum parameter measuring sleeve for judging boundary zone of soil-rock stratum
CN117418901A (en) Full-section loose coil acoustic wave method measuring device for roadway and chamber and using method
CN109162703A (en) A kind of soft suitable coal bed drilling multistage on-line pressure sealant pressure measuring unit of overlength and method
CN105756664B (en) Coiled tubing horizontal well test device
CN107642354B (en) Method for measuring length of drill hole after drill rod exits from drill hole
CA1331840C (en) Low-water-pressure controlled hydrologic test method
CN105507895A (en) Rock fracture detection sensor and using method
KR100869168B1 (en) Method for testing irrigration sensing temperature of tracer
CN109655369A (en) A kind of engineering rock mass rock integrity and relaxation zone test method
Pearson et al. Improvements in the Lugeon or packer permeability test
CN103091726B (en) The remote sensing and quantizing surveying method of fault with abundant ground water engineering geology ground
CN111622754A (en) Drilling pile while-drilling stratum parameter measuring sleeve for judging boundary zone of soil-rock stratum
CN114893145B (en) Water plugging device for drilling, stratum fracture crushing condition detection equipment and detection method
JP5155761B2 (en) Measuring device and measuring method of spring water pressure and amount
CN214503289U (en) Water pressure test device
CN104278983A (en) Coupling device for sound-wave all-around testing dry hole probe
CN215767467U (en) Chemical expansion rubber-pushing type hollow inclusion ground stress meter
CN212743988U (en) Drilling stratum leak source measuring apparatu
CN111219183B (en) Water volume and water pressure detection device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210525

CF01 Termination of patent right due to non-payment of annual fee