CN109654656A - Piping lane ventilation control method and device - Google Patents

Piping lane ventilation control method and device Download PDF

Info

Publication number
CN109654656A
CN109654656A CN201811509000.9A CN201811509000A CN109654656A CN 109654656 A CN109654656 A CN 109654656A CN 201811509000 A CN201811509000 A CN 201811509000A CN 109654656 A CN109654656 A CN 109654656A
Authority
CN
China
Prior art keywords
piping lane
duration
blower
current location
corridor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811509000.9A
Other languages
Chinese (zh)
Other versions
CN109654656B (en
Inventor
胡自翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING CERISTAR ELECTRIC Co Ltd
MCC Capital Engineering and Research Incorporation Ltd
Zhongye Jingcheng Engineering Technology Co Ltd
Original Assignee
BEIJING CERISTAR ELECTRIC Co Ltd
Zhongye Jingcheng Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING CERISTAR ELECTRIC Co Ltd, Zhongye Jingcheng Engineering Technology Co Ltd filed Critical BEIJING CERISTAR ELECTRIC Co Ltd
Priority to CN201811509000.9A priority Critical patent/CN109654656B/en
Publication of CN109654656A publication Critical patent/CN109654656A/en
Application granted granted Critical
Publication of CN109654656B publication Critical patent/CN109654656B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • F24F11/63Electronic processing
    • F24F11/64Electronic processing using pre-stored data
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/70Control systems characterised by their outputs; Constructional details thereof
    • F24F11/72Control systems characterised by their outputs; Constructional details thereof for controlling the supply of treated air, e.g. its pressure
    • F24F11/74Control systems characterised by their outputs; Constructional details thereof for controlling the supply of treated air, e.g. its pressure for controlling air flow rate or air velocity
    • F24F11/77Control systems characterised by their outputs; Constructional details thereof for controlling the supply of treated air, e.g. its pressure for controlling air flow rate or air velocity by controlling the speed of ventilators
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/88Electrical aspects, e.g. circuits
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2120/00Control inputs relating to users or occupants
    • F24F2120/20Feedback from users
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/70Efficient control or regulation technologies, e.g. for control of refrigerant flow, motor or heating

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Signal Processing (AREA)
  • Physics & Mathematics (AREA)
  • Fuzzy Systems (AREA)
  • Mathematical Physics (AREA)
  • Fluid Mechanics (AREA)
  • Ventilation (AREA)

Abstract

The present invention provides a kind of piping lane ventilation control method and devices, this method comprises: obtaining the current location into corridor personnel;According to the current location for entering corridor personnel, determine duration of the corridor personnel in piping lane subregion;According to duration and preset duration, the working condition of piping lane inner blower is controlled.The present invention provides a kind of piping lane ventilation control methods and device to formulate ventilation control method appropriate according to duration of the corridor personnel in piping lane subregion is entered, and reaches the balance between corridor person works' amenity safety and O&M cost economy.

Description

Piping lane ventilation control method and device
Technical field
The present invention relates to pipe gallery operation management field more particularly to a kind of piping lane ventilation control method and devices.
Background technique
Pipe gallery belongs to closed underground structure, and sluggish in air circulation, temperature is relatively stable, and humidity is big, pole of divulging information Difference is easy to breed the microorganisms such as dust mite, fungi in the case where not taking any venting practice, if there is life dirty in piping lane Water, organic waste etc. can generate many pernicious gases, such as CO, NH under microbial action3Deng, while can also cause in piping lane The reduction of oxygen content.In addition, power cable, the heat supply pipeline etc. that are laid in piping lane can all give out largely in use Heat, if being laid with natural gas cabin, it is also possible to will appear the dangerous situations such as natural gas leaking.Therefore, necessary ventilation Ventilation, is the guarantee to the patrol officer, maintenance personal and construction worker's health of human body and works fine environment for entering corridor.
It is existing " city integrated piping lane engineering legislation " in order to which above-mentioned necessary ventilation is protected It is provided in GB50838-2015:
1. the draft type that pipe gallery preferably uses natural air inlet and mechanical exhaust to combine.
2. the ventilation quantity of pipe gallery should according to ventilation section, sectional dimension and be computed determination, and following rule should be met Fixed: normal ventilation rate is no less than 2 times/h, and emergency ventilation rate of ventilation is no less than 6 times/h;Natural gas line cabin is just Normal ventilation rate is no less than 6 times/h, and emergency ventilation rate of ventilation is no less than 12 times/h.
3. concentration of natural gas greater than its concentration of lower explosive limit value, (when volume fraction > 20%, divide by Ying Qidong accident section in cabin The emergency ventilation equipment in area and its adjacent sectors.
Although rate of ventilation minimum in pipe gallery is given in specification, to provide suitable fresh air, it is ensured that Enter corridor personnel's personal safety, reduces accident rate.But the problem of will appear in varying degrees when practical O&M: if ventilation is changed The underfrequency of gas setting is merely able to meet minimum environmental requirement, Wu Fati in piping lane when only meeting specification lowest frequency time and requiring Feed the good working environment of corridor personnel;If the frequency of ventilation setting is excessively high, unnecessary energy waste will be caused, will be mentioned The operation cost of high pipe gallery.
So how while ensureing staff's personal safety into corridor inspection, and blower ventilating resource can be saved As urgent problem instantly.
Summary of the invention
In order to ensure the personal safety into corridor patrol officer and save ventilation energy resources, the embodiment of the invention provides one Kind piping lane ventilation control method and device.
In a first aspect, the present invention provides a kind of piping lane ventilation control methods, which comprises
Obtain the current location into corridor personnel;
According to it is described enter corridor personnel current location, determine enter duration of the corridor personnel in piping lane subregion;
According to the duration and preset duration, the working condition of piping lane inner blower is controlled.
Second aspect, the present invention provides a kind of piping lane air-changing control device, described device includes:
Current location module is obtained, for obtaining the current location into corridor personnel;
It determines duration module, for entering the current location of corridor personnel according to, determines corridor personnel in piping lane subregion Duration;
Blower fan module is controlled, for controlling the working condition of piping lane inner blower according to the duration and preset duration.
The third aspect, the present invention provides a kind of electronic equipment, including memory, processor and storage are on a memory and can The computer program run on a processor, the processor realize the piping lane ventilation that first aspect provides when executing described program The step of control method.
Fourth aspect, the present invention provide a kind of non-transient computer readable storage medium, are stored thereon with computer program, The step of piping lane ventilation control method that first aspect provides is realized when the computer program is executed by processor.
The present invention formulates ventilation control method appropriate, reaches according to duration of the corridor personnel in piping lane subregion is entered Enter the balance between corridor person works' amenity safety and O&M cost economy.
For above and other objects, features and advantages of the invention can be clearer and more comprehensible, preferred embodiment is cited below particularly, And cooperate institute's accompanying drawings, it is described in detail below.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with It obtains other drawings based on these drawings.
Fig. 1 is the flow chart of piping lane provided in an embodiment of the present invention ventilation control method;
Fig. 2 is the block diagram of piping lane air-changing control device provided in an embodiment of the present invention;
Fig. 3 is piping lane provided in an embodiment of the present invention ventilation control program flow chart;
Fig. 4 is electronic device block diagram provided in an embodiment of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
In the prior art, it takes a breath in pipe gallery and is based on " city integrated piping lane engineering legislation ", although rule Rate of ventilation minimum in pipe gallery is given in model, to provide suitable fresh air, it is ensured that enter corridor personnel's person peace Entirely, the problem of reducing accident rate, but will appear in varying degrees when practical O&M: if the frequency mistake of ventilation setting It is low, when only meeting specification lowest frequency time and requiring, it can not provide into the good working environment of corridor personnel;If ventilation setting Frequency is excessively high, will cause unnecessary energy waste, improves the operation cost of pipe gallery.To solve the above-mentioned problems, this hair Bright embodiment provides a kind of piping lane ventilation control method, and as shown in FIG. 1, FIG. 1 is piping lane provided in an embodiment of the present invention ventilations to control The flow chart of method processed, this method comprises:
Step 101, the current location into corridor personnel is obtained.
Specifically, being set into corridor personnel positioning apparatus in pipe gallery, (device be can be used based on various wireless protocols Wireless aps technology or positioning label technique), to wear special equipment the corridor staff that enters positioned in real time.At this point, It is covered in piping lane by the wireless aps with positioning function, not only can guarantee the normal dialog of staff in piping lane, but also be able to achieve The function of tuning on-line patrol officer position.Simultaneously, moreover it is possible to identify that this enters corridor personnel identity information.
Step 102, according to the current location for entering corridor personnel, determine duration of the corridor personnel in piping lane subregion.
Specifically, the positioning device in piping lane feeds back the current location for entering corridor personnel to after operation platform, operation platform According to the real-time positioning to corridor personnel are entered, determine corridor personnel practical duration used in this section of piping lane subregion.
Step 103, according to duration and preset duration, the working condition of piping lane inner blower is controlled.
Specifically, being given by this section of piping lane subregion after which section piping lane subregion operation platform judgement discrepancy corridor personnel are in Preset duration range, such as: 10-15 minutes.Later according to entering practical duration of the corridor personnel in this section of piping lane subregion and pre- If duration, the working condition of piping lane inner blower is controlled.
The embodiment of the present invention formulates ventilation controlling party appropriate according to duration of the corridor personnel in piping lane subregion is entered Method reaches the balance between corridor person works' amenity safety and O&M cost economy.
Content based on the above embodiment, as a kind of alternative embodiment: according to duration and preset duration, controlling in piping lane The working condition of blower includes:
It is long at that time to be greater than preset duration, then it controls the blower in the piping lane subregion of current location and enters service intermittent shape State;
When duration is less than or equal to preset duration, then according to the moving direction for the position for entering corridor personnel, control current location Next piping lane subregion in blower enter starting working condition.
Specifically, when enter practical duration of the corridor personnel in piping lane subregion, greater than by this section of piping lane subregion it is default when When long, then illustrate this section of piping lane subregion failure abnormal conditions, the patrol officer for entering corridor needs to stay in the subregion for a long time Operation is carried out, needs to start blower at this time and enters service intermittent state.
When entering practical duration of the corridor personnel in piping lane subregion, less than or equal to the preset duration for passing through this section of piping lane subregion When, the real-time positioning information for entering corridor personnel obtained according to operation platform judges that this enters the position moving direction of corridor personnel, in advance The blower in the piping lane that corridor personnel will enter is opened, toxic gas etc. is excluded.
The embodiment of the present invention selectively controls wind by working condition of the discovery patrol officer in piping lane subregion in time Machine working condition improves oxygen content, excludes the gases such as toxic, inflammable, in order to create it is good enter corridor person works' environment.
Content based on the above embodiment, as a kind of alternative embodiment: further include:
When the current location for entering corridor personnel is located at piping lane end, then controls the blower in piping lane and enter low frequency ventilation state.
Specifically, operation platform enters corridor personnel current location according to what is obtained, judge whether the end for being in entire piping lane, If judgement learns that current location is located at piping lane end, illustrate that operation finishes into corridor personnel, after personnel withdraw from piping lane at this time, control Blower in piping lane enters low frequency ventilation state.
The embodiment of the present invention passes through in due course more ventilating fan function mode, achievees the effect that save ventilation resource.
Content based on the above embodiment, as a kind of alternative embodiment: further include:
Record the job information of piping lane inner blower;
Report data is generated according to the job information of piping lane inner blower.
Specifically, carrying out charge book to the fan operation state in different piping lane subregions, and charge book is deposited automatically Shelves, generate corresponding report data.
The embodiment of the present invention and generates report data by carrying out charge book to fan operation state, perfect synthesis The workflow management of piping lane O&M and basic data are collected.
According to another aspect of the present invention, the embodiment of the present invention also provides a kind of piping lane air-changing control device, referring to figure 2, Fig. 2 be the block diagram of piping lane air-changing control device provided in an embodiment of the present invention.The device be used in foregoing embodiments into The formation of row piping lane ventilation control.Therefore, the description and definition in the method for the piping lane ventilation control in foregoing embodiments, It can be used for the understanding of each execution module in the embodiment of the present invention.
As shown, the device includes:
Current location module 201 is obtained, for obtaining the current location into corridor personnel;
Duration module 202 is determined, for determining corridor personnel in piping lane subregion according to the current location for entering corridor personnel Duration;
Blower fan module 203 is controlled, for controlling the working condition of piping lane inner blower according to duration and preset duration.
The embodiment of the present invention formulates ventilation controlling party appropriate according to duration of the corridor personnel in piping lane subregion is entered Method reaches the balance between corridor person works' amenity safety and O&M cost economy.
Content based on the above embodiment, as a kind of alternative embodiment: control blower fan module 203, for according to Duration and preset duration control the working condition of piping lane inner blower further include:
It is long at that time to be greater than preset duration, then it controls the blower in the piping lane subregion of current location and enters service intermittent shape State;
When duration is less than preset duration, then basis enters the moving direction of the position of corridor personnel, controls the next of current location Blower in a piping lane subregion enters starting working condition.
The embodiment of the present invention selectively controls wind by working condition of the discovery patrol officer in piping lane subregion in time Machine working condition improves oxygen content, excludes the gases such as toxic, inflammable, in order to create it is good enter corridor person works' environment.
Content based on the above embodiment, as a kind of alternative embodiment: control blower fan module, for according to the duration And preset duration, control the working condition of piping lane inner blower further include:
When the current location for entering corridor personnel is located at piping lane end, then controls the blower in piping lane and enter low frequency ventilation state.
The embodiment of the present invention passes through in due course more ventilating fan function mode, achievees the effect that save ventilation resource.
Content based on the above embodiment, as a kind of alternative embodiment: further include:
Operation module is recorded, for recording the job information of piping lane inner blower;
Data module is generated, for generating report data according to the job information of piping lane inner blower.
The embodiment of the present invention and generates report data by carrying out charge book to fan operation state, perfect synthesis The workflow management of piping lane O&M and basic data are collected.
Content based on the above embodiment, as a kind of alternative embodiment: the embodiment of the present invention provides a kind of based on personnel The piping lane ventilation control program of positioning, as shown in figure 3, Fig. 3 is piping lane provided in an embodiment of the present invention ventilation control program process Figure.It is as shown in the figure:
1. operating personnel enters before pipe gallery progress inspection or construction operation, should be put on record with piping lane management unit Registration, unified wearer location equipment.
2. being positioned in time by the personnel positioning equipment in pipe gallery into corridor personnel position, and it is flat to feed back O&M Platform.
Piping lane cabin and subregion where 3. operation platform determines corridor personnel, linkage, which controls adjacent personnel, to be entered Piping lane cabin and subregion blower start work, exclude imflammable gas, the toxic gas in adjacent piping lane fire compartment in time, Oxygen content is improved, is suitable for the corridor body environment entered into corridor personnel in order to create in advance.
4. when positioning system, which is detected, rests on a certain piping lane cabin and subregion progress long working into corridor personnel, fortune Tie up the platform linkage control piping lane cabin and the intermittent starting work of subregion inner blower, in order to create it is good enter corridor personnel's work Make environment.
5. operation platform rationally opens the blower that the work for entering corridor operating personnel carries out all-the-way tracking and manages region within the jurisdiction It stops work and makees, until operation finishes, after personnel withdraw from piping lane, restore minimum ventilation frequency.
It carries out information record and achieves automatically to generate report 6. operation management platform enters corridor operation to this;This enters corridor operation Information does not singly include the operating state of piping lane inner blower, further includes entering corridor personnel's job information in addition to blower running.
Fig. 4 is electronic device block diagram provided in an embodiment of the present invention, as shown in figure 4, the equipment includes: processor 401, deposits Reservoir 402 and bus 403;
Wherein, processor 401 and memory 402 complete mutual communication by bus 403 respectively;Processor 401 is used In calling the program instruction in memory 402, to execute the ventilation control method of piping lane provided by above-described embodiment, such as wrap It includes: obtaining the current location into corridor personnel;According to the current location for entering corridor personnel, determine corridor personnel in piping lane subregion when It is long;According to duration and preset duration, the working condition of piping lane inner blower is controlled.
The embodiment of the present invention provides a kind of non-transient computer readable storage medium, is stored thereon with computer program, should The step of piping lane ventilation control method is realized when computer program is executed by processor.For example, obtain working as into corridor personnel Front position;According to the current location for entering corridor personnel, determine duration of the corridor personnel in piping lane subregion;According to duration and it is default when It is long, control the working condition of piping lane inner blower.
The apparatus embodiments described above are merely exemplary, wherein unit can be as illustrated by the separation member Or may not be and be physically separated, component shown as a unit may or may not be physical unit, i.e., It can be located in one place, or may be distributed over multiple network units.It can select according to the actual needs therein Some or all of the modules achieves the purpose of the solution of this embodiment.Those of ordinary skill in the art are not paying creative labor In the case where dynamic, it can understand and implement.
Through the above description of the embodiments, those skilled in the art can be understood that each embodiment can It realizes by means of software and necessary general hardware platform, naturally it is also possible to pass through hardware.Based on this understanding, on Stating technical solution, substantially the part that contributes to existing technology can be embodied in the form of software products in other words, should Computer software product may be stored in a computer readable storage medium, such as ROM/RAM, magnetic disk, CD, including several fingers It enables and using so that a computer equipment (can be personal computer, server or the network equipment etc.) executes each implementation The method of certain parts of example or embodiment.
Finally, applying specific embodiment in the present invention, principle and implementation of the present invention are described, above The explanation of embodiment is merely used to help understand method and its core concept of the invention;Meanwhile for the general skill of this field Art personnel, according to the thought of the present invention, there will be changes in the specific implementation manner and application range, in conclusion this Description should not be construed as limiting the invention.

Claims (10)

  1. The control method 1. a kind of piping lane is taken a breath, which is characterized in that the described method includes:
    Obtain the current location into corridor personnel;
    According to it is described enter corridor personnel current location, determine enter duration of the corridor personnel in piping lane subregion;
    According to the duration and preset duration, the working condition of piping lane inner blower is controlled.
  2. 2. the method according to claim 1, wherein described according to the duration and preset duration, control piping lane The working condition of inner blower includes:
    When the duration be greater than preset duration, then control the blower in the piping lane subregion of current location and enter service intermittent shape State;
    When the duration is less than or equal to preset duration, then according to the moving direction for the position for entering corridor personnel, control current location Next piping lane subregion in blower enter starting working condition.
  3. 3. the method according to claim 1, wherein further include:
    When it is described enter corridor personnel current location be located at piping lane end, then control the blower in piping lane and enter low frequency ventilation state.
  4. 4. the method according to claim 1, wherein further include:
    Record the job information of piping lane inner blower;
    Report data is generated according to the job information of the piping lane inner blower.
  5. 5. a kind of piping lane air-changing control device, which is characterized in that described device includes:
    Current location module is obtained, for obtaining the current location into corridor personnel;
    Determine duration module, for entering the current location of corridor personnel according to, determine corridor personnel in piping lane subregion when It is long;
    Blower fan module is controlled, for controlling the working condition of piping lane inner blower according to the duration and preset duration.
  6. 6. device according to claim 5, which is characterized in that the control blower fan module, for according to the duration and Preset duration controls the working condition of piping lane inner blower further include:
    When the duration be greater than preset duration, then control the blower in the piping lane subregion of current location and enter service intermittent shape State;
    When the duration is less than or equal to preset duration, then according to the moving direction for the position for entering corridor personnel, control current location Next piping lane subregion in blower enter starting working condition.
  7. 7. device according to claim 5, which is characterized in that the control blower fan module, for according to the duration and Preset duration controls the working condition of piping lane inner blower further include:
    When it is described enter corridor personnel current location be located at piping lane end, then control the blower in piping lane and enter low frequency ventilation state.
  8. 8. device according to claim 5, which is characterized in that further include:
    Operation module is recorded, for recording the job information of piping lane inner blower;
    Data module is generated, for generating report data according to the job information of the piping lane inner blower.
  9. 9. a kind of electronic equipment including memory, processor and stores the calculating that can be run on a memory and on a processor Machine program, which is characterized in that realize that the piping lane as described in any one of Claims 1-4 changes when the processor executes described program The step of pneumatic control method.
  10. 10. a kind of non-transient computer readable storage medium, is stored thereon with computer program, which is characterized in that the computer The step of piping lane ventilation control method as described in any one of Claims 1-4 is realized when program is executed by processor.
CN201811509000.9A 2018-12-11 2018-12-11 Pipe gallery air exchange control method and device Active CN109654656B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811509000.9A CN109654656B (en) 2018-12-11 2018-12-11 Pipe gallery air exchange control method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811509000.9A CN109654656B (en) 2018-12-11 2018-12-11 Pipe gallery air exchange control method and device

Publications (2)

Publication Number Publication Date
CN109654656A true CN109654656A (en) 2019-04-19
CN109654656B CN109654656B (en) 2020-11-27

Family

ID=66113726

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811509000.9A Active CN109654656B (en) 2018-12-11 2018-12-11 Pipe gallery air exchange control method and device

Country Status (1)

Country Link
CN (1) CN109654656B (en)

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050257540A1 (en) * 2004-05-21 2005-11-24 Lg Electronics Inc. Air conditioning system and method for controlling the same
WO2007114985A2 (en) * 2006-03-31 2007-10-11 Ranco Incorporated Of Delaware Occupancy-based zoning climate control system and method
CN101842553A (en) * 2007-08-31 2010-09-22 Simsmart工艺公司 The mine ventilation system of optimizing
CN104102246A (en) * 2013-04-11 2014-10-15 霍尼韦尔国际公司 System and method with GEO location triggering automatic action
WO2015172245A1 (en) * 2014-05-11 2015-11-19 Simsmart Technologies Inc. Modular controlling system for ventilation equipment and methods of using the same
US20160054019A1 (en) * 2014-08-21 2016-02-25 Samsung Electronics Co., Ltd. Temperature Adjustment Method and Apparatus
CN106556125A (en) * 2016-12-08 2017-04-05 华北电力大学(保定) A kind of GIS room ventilations illumination intelligence control system
CN106705370A (en) * 2016-12-30 2017-05-24 安徽育安实验室装备有限公司 Intelligent ventilation control system of laboratory
CN106765891A (en) * 2016-11-30 2017-05-31 北京联合大学 Air-conditioning induced draught control system
CN108388986A (en) * 2018-02-12 2018-08-10 国家电网公司 A kind of personnel positioning for GIL piping lanes manages system
CN108518810A (en) * 2018-03-07 2018-09-11 青岛海尔空调器有限总公司 Method and apparatus, computer readable storage medium for controlling air conditioner
CN108628237A (en) * 2018-07-02 2018-10-09 青岛华高物联网科技有限公司 A kind of underground pipe gallery environmental unit operation monitoring system
CN108810162A (en) * 2018-06-27 2018-11-13 四川君逸数码科技股份有限公司 Urban Underground piping lane comprehensive management platform
CN208139525U (en) * 2018-04-22 2018-11-23 河北建筑工程学院 A kind of intelligence piping lane ventilating system

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050257540A1 (en) * 2004-05-21 2005-11-24 Lg Electronics Inc. Air conditioning system and method for controlling the same
WO2007114985A2 (en) * 2006-03-31 2007-10-11 Ranco Incorporated Of Delaware Occupancy-based zoning climate control system and method
CN101842553A (en) * 2007-08-31 2010-09-22 Simsmart工艺公司 The mine ventilation system of optimizing
CN104102246A (en) * 2013-04-11 2014-10-15 霍尼韦尔国际公司 System and method with GEO location triggering automatic action
WO2015172245A1 (en) * 2014-05-11 2015-11-19 Simsmart Technologies Inc. Modular controlling system for ventilation equipment and methods of using the same
US20160054019A1 (en) * 2014-08-21 2016-02-25 Samsung Electronics Co., Ltd. Temperature Adjustment Method and Apparatus
CN106765891A (en) * 2016-11-30 2017-05-31 北京联合大学 Air-conditioning induced draught control system
CN106556125A (en) * 2016-12-08 2017-04-05 华北电力大学(保定) A kind of GIS room ventilations illumination intelligence control system
CN106705370A (en) * 2016-12-30 2017-05-24 安徽育安实验室装备有限公司 Intelligent ventilation control system of laboratory
CN108388986A (en) * 2018-02-12 2018-08-10 国家电网公司 A kind of personnel positioning for GIL piping lanes manages system
CN108518810A (en) * 2018-03-07 2018-09-11 青岛海尔空调器有限总公司 Method and apparatus, computer readable storage medium for controlling air conditioner
CN208139525U (en) * 2018-04-22 2018-11-23 河北建筑工程学院 A kind of intelligence piping lane ventilating system
CN108810162A (en) * 2018-06-27 2018-11-13 四川君逸数码科技股份有限公司 Urban Underground piping lane comprehensive management platform
CN108628237A (en) * 2018-07-02 2018-10-09 青岛华高物联网科技有限公司 A kind of underground pipe gallery environmental unit operation monitoring system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杨冬虎等: "某高校校园综合管廊工程设计探讨", 《给水排水》 *

Also Published As

Publication number Publication date
CN109654656B (en) 2020-11-27

Similar Documents

Publication Publication Date Title
WO2021120765A1 (en) Dynamic emergency early-warning assessment and decision-making support method and system for sudden atmospheric pollution accident
CN105938501A (en) Method of evaluating a part
CN106447107B (en) Maintenance method based on aircraft structure health monitoring
Gehandler et al. Performance-based design of road tunnel fire safety: Proposal of new Swedish framework
WO2014173270A1 (en) Human-machine interface detection method and system
CN109146393B (en) Human injury investigation information processing method and system
CN110445939A (en) The prediction technique and device of capacity resource
CN115983536A (en) Emergency police force scheduling method and system based on digital twin
Vinod et al. New approach for risk based inspection of H2S based process plants
CN109654656A (en) Piping lane ventilation control method and device
CN113391704A (en) Digital smart power plant virtual reality display method and system
CN104636851A (en) System and method for managing efficiency
CN112650335A (en) Intelligent energy consumption management and control system and method based on big data mining
CN114912847A (en) Land universe renovation online supervision method and system
EP3716238B1 (en) Method for determining an evacuation strategy for evacuation of a building
CN114462828A (en) Safety early warning supervision system for engineering construction and supervision method thereof
Tseng et al. Theory establishment and data preparedness for modeling emergency medical service in case of a mass casualty incidents in road tunnels
Licitra Special Issue on Environmental noise aspects in EU funded projects
CN110717728A (en) Gas monitoring integrated management method, platform and computer storage medium
CN111291986A (en) Air defense reverse guidance operation action accurate equipment guarantee scheme planning system
CN117526562A (en) Auxiliary equipment monitoring system of electric power internet of things substation
Omar et al. Fire Safety Index for High-Rise Buildings in the Emirate of Sharjah, UAE. Fire 2023, 6, 51
RU19600U1 (en) CHERNYAKOV-PETRUSHIN DEVICE FOR EVALUATING THE EFFICIENCY OF ORGANIZATIONAL-TECHNICAL SYSTEMS
CN106909976A (en) A kind of intelligent building facilities management system
CN117764386A (en) Data center network security operation and maintenance management method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant