CN109653792A - A kind of construction machinery backfilling coal cutting roadway - Google Patents

A kind of construction machinery backfilling coal cutting roadway Download PDF

Info

Publication number
CN109653792A
CN109653792A CN201910143639.8A CN201910143639A CN109653792A CN 109653792 A CN109653792 A CN 109653792A CN 201910143639 A CN201910143639 A CN 201910143639A CN 109653792 A CN109653792 A CN 109653792A
Authority
CN
China
Prior art keywords
coal cutting
cutting roadway
baffle
concrete
construction machinery
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910143639.8A
Other languages
Chinese (zh)
Inventor
闫红世
闫桂烊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inner Mongolia Zhongke Intelligent Mine Technology Co Ltd
Original Assignee
Inner Mongolia Zhongke Intelligent Mine Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inner Mongolia Zhongke Intelligent Mine Technology Co Ltd filed Critical Inner Mongolia Zhongke Intelligent Mine Technology Co Ltd
Priority to CN201910143639.8A priority Critical patent/CN109653792A/en
Publication of CN109653792A publication Critical patent/CN109653792A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • E21F15/08Filling-up hydraulically or pneumatically
    • E21F15/10Hydraulic or pneumatic filling-up machines
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor

Abstract

A kind of construction machinery and its method for filling coal cutting roadway, belong to coal cutting roadway backfill technical field, the construction machinery includes forklift, pulverizer, blender, belt conveyor, grouting vehicle, with forklift to filler material on the feed inlet of the pulverizer, the discharge port of pulverizer is coupled by way of chute or Belt Conveying with the feed inlet of blender, the discharge port of blender is coupled by way of Belt Conveying with the tail of belt conveyor, the feed inlet of the feed hopper of the concrete pump of the blanking port and grouting vehicle of the material-falling hopper of the head of belt conveyor penetrates through, the delivery pipe of concrete pump is connected to by the grouting port on baffle with the refill spaces in front of baffle;The machinery, which provides one kind, largely to use gangue to be filled as the major ingredient of filler, the filler material of fill area is set to be shaped to obturator and hydraulic cylinder promotion baffle extrusion packing body by baffle, filling gap is eliminated, the machinery of the intensity of obturator and the filling coal cutting roadway of compactness is greatly strengthened.

Description

A kind of construction machinery backfilling coal cutting roadway
Technical field
The invention belongs to coal cutting roadway backfill technical field, specifically it is a kind of backfill coal cutting roadway construction machinery with And construction method.
Background technique
Coal cutting roadway backfill is to solve mining subsidence to above ground structure, industrial and agricultural production and gangue in ground stacking pair The influence of environmental danger and be coal to the backfill problem after " under three " (underwater, under road, under building) mining pressed coal The general character problem that charcoal industry faces.
Currently, the general method using bored grouting carries out to the backfill after coal cutting roadway exploitation.Although this method solves The backfill problem in goaf, but this method backfill is used to form taper obturator easily in goaf, form huge fills out Gap is filled, gob collapse is caused, influences the control in later period;Furthermore the utilization rate of gangue is not high, causes to environment Harm;Three, even if filling is complete, but the compactness of obturator and intensity is not high, is also formed easily goaf and collapsed, influenced The control in later period.
Summary of the invention
It is an object of the invention to overcome shortcoming in the prior art, bastard coal masonry can largely be used by providing one kind Backfilled for the major ingredient of filler, can make fill space in stirred as gangue made of concrete extrusion form, eliminate Filling gap in filling space greatly strengthens obturator compactness in filling space, improves the intensity of obturator Backfill the construction machinery and construction method of coal cutting roadway.
In order to achieve the object of the present invention, we will adopt the following technical scheme that and be implemented.
A kind of construction machinery backfilling coal cutting roadway, it is characterised in that: the construction machinery includes forklift, pulverizer, stirring Machine, belt conveyor, grouting vehicle, with the forklift to filler material on the feed inlet of the pulverizer, the discharging of the pulverizer Mouth is coupled by way of chute or Belt Conveying with the feed inlet of the blender, and the discharge port of the blender passes through belt The mode of conveying couples with the tail of the belt conveyor, the blanking port of the material-falling hopper of the head of the belt conveyor and institute The feed inlet perforation of the feed hopper of the concrete pump of grouting vehicle is stated, the delivery pipe of the concrete pump passes through the note on the baffle Slurry mouth is connected to the refill spaces in front of the baffle.
Preferably, the grouting vehicle includes crawler type walking mechanism, concrete pump, hydraulic cylinder and baffle, the crawler belt Installation settings has a hydraulic cylinder on the vehicle frame of formula walking mechanism, the telescopic end of the hydraulic cylinder be located at the crawler-type traveling Baffle connection in front of mechanism, working face, top plate and bottom plate and the left and right sidewall structure of the baffle and the coal cutting roadway in front of it At a filling space, also installation settings has concrete pump on the vehicle frame, and the concrete pump has feed hopper, the concrete The delivery pipe of pump is connected to by the grouting port that the baffle top is arranged with the filling space.
Preferably, the construction machinery also has remote monitoring system, and the remote monitoring system is described for monitoring Each mechanism operating condition in construction machinery.
Preferably, the construction machinery also has tele-control system, and the tele-control system includes Electric control system System and hydraulic control system, the electric control system are the power supplies for controlling each mechanism in the construction machinery 's;The hydraulic control system is run for controlling the hydraulic execution unit of each mechanism in the construction machinery.
Preferably, the pulverizer includes Roughpulverizer and slimer, and the forklift gives the charging of the Roughpulverizer Filler material on mouth, the discharge port of the Roughpulverizer couple with the feed inlet of the slimer, the discharging of the slimer Mouth couples with the feed inlet of the blender.
Preferably, the rear end of the vehicle frame of the grouting vehicle and the front end of rack of the belt conveyor are fixedly connected.
A kind of construction method backfilling coal cutting roadway, it is characterised in that: the construction method includes the following steps:
(1), pulverizer is shipped for scraper (or dig and transport) mechanical act the gangue for being deposited in former laydown area shovel (digging) It is crushed;
(2), it is conveyed to blender through the smashed gangue of pulverizer, by weight addition water and gelling in blender Material stirs into concrete;
(3), concrete conveyance made of agitated machine stirring is to belt conveyor;
(4), for belt conveyor by concrete conveyance to the concrete pump of grouting vehicle, concrete pump injects High Pressure Reinforced Concrete Coal cutting roadway innermost end is made of working face, top plate and bottom plate and the two sidewalls of the baffle of grouting vehicle and the coal cutting roadway In one refill spaces, until filling;
(5), after refill spaces fill concrete, the hydraulic cylinder of grouting vehicle pushes baffle to squeeze the coagulation in refill spaces Soil, so that concrete tightly connects top;
(6), after the completion of to be extruded, belt conveyor and grouting vehicle withdraw a distance backward in coal cutting roadway, so that Second refill spaces, then the step of successively implementing first five step are formed between the baffle and concrete extrusion face of grouting vehicle, in this way It moves in circles until the backfill of entire coal cutting roadway finishes.
Preferably, the diameter≤25mm through the smashed coal gangue particle of pulverizer.
Preferably, the distance of the baffle for constituting refill spaces to coal cutting roadway working face is 5-10m.
Preferably, it is described stirred with blender made of concrete by weight calculate include 80-90% gangue, 5- 10% water, surplus are cementitious material.
Beneficial effect
Filler material high pressure can be injected filling space by the concrete pump of grouting vehicle in construction machinery of the present invention, favorably The packed density in space is being filled in improving filler material, then the filling in injection filling space can be made by the extruding of hydraulic cylinder Material tightly connect top, can eliminate filling gap and further increase filling space in formation obturator compactness with by force Degree;After the pulverizer of construction machinery of the present invention pulverizes coal gangue, agitated machine stirs into concrete, the concrete It is gangue containing 80-90%, therefore can largely uses gangue to carry out backfill operation as the major ingredient of filler material, can disappears In addition to gangue stacks the influence to environment;The construction machinery also has remote monitoring system and a tele-control system, can The automation control to the construction machinery is realized, so that the backfill efficiency of gangue greatly improves;Backfilling coal cutting roadway can To reduce the extent of the destruction mined to formation rock, slows down mining damage and above ground structure and industrial or agricultural bring is endangered, It will can carry out new approach to the mining belt in China " under three " coal seam, this measure will generate extremely considerable economic benefit, Environmental Effect Benefit and social benefit.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of construction machinery of the present invention;
Fig. 2 is the structural schematic diagram of grouting vehicle of the present invention;
Fig. 3 is the connection schematic diagram of the Roughpulverizer and slimer and blender.
Specific embodiment
In conjunction with the accompanying drawings and embodiments, the present invention is described further.
In one embodiment, as shown in Figs. 1-2, a kind of construction machinery backfilling coal cutting roadway, including as described below Mechanical: forklift 1, pulverizer 2, blender 3, belt conveyor 4, grouting vehicle 5 give the charging of the pulverizer 2 with the forklift 1 The discharge port of filler material on mouth, the pulverizer 2 is connect by chute with the feed inlet of the blender 3, the blender 3 Discharge port is coupled by conveyor belt with the tail 41 of the belt conveyor 4, the blanking of the head 42 of the belt conveyor 4 The blanking port of bucket 43 is connected to the feed inlet of the feed hopper 521 of the concrete pump 52 of the grouting vehicle 5, the concrete pump 52 Delivery pipe 522 is connected to by the grouting port on the baffle 54 with the refill spaces in 54 front of baffle.
In one embodiment, as shown in Fig. 2, the grouting vehicle 5 include crawler type walking mechanism 51, concrete pump 52, The front installation settings of hydraulic cylinder 53 and baffle 54, the top of the vehicle frame 511 of the crawler type walking mechanism 51 has hydraulic oil Cylinder 53, the telescopic end of the hydraulic cylinder 53 couples with the baffle 54 for being set to 51 front of crawler type walking mechanism, described The working face of baffle 54 and the coal cutting roadway in front of it, top plate and bottom plate and left and right sidewall constitute a filling space, the vehicle frame Also installation settings has concrete pump 52 on 511, and the concrete pump 52 has feed hopper, the delivery pipe of the concrete pump 52 522 are connected to by the grouting port that 54 top of baffle is arranged with the filling space.
In one embodiment, which also has remote monitoring system, and the remote monitoring system is for supervising Control each mechanical movement situation in the construction machinery.
In one embodiment, which also has tele-control system, and the tele-control system includes electric power Control system and hydraulic control system, the electric control system are the electric power for controlling each machinery in the construction machinery Supply;The hydraulic control system is run for controlling the hydraulic execution unit of each machinery in the construction machinery.
In one embodiment, as shown in figure 3, the pulverizer 2 includes Roughpulverizer 21 and slimer 22, the shovel Vehicle 1 passes through chute and the fine powder to filler material on the feed inlet of the Roughpulverizer 21, the discharge port of the Roughpulverizer 21 The feed inlet of broken machine 22 couples, and the discharge port of the slimer 22 is coupled by chute with the feed inlet of the blender 3.
In one embodiment, as shown in Figure 1, the rear end of the vehicle frame 511 of the grouting vehicle 5 and the belt conveyor 4 44 front end of rack be fixedly connected, it is intended to hydraulic cylinder 53 push baffle 54 squeeze refill spaces in concrete when, resist Reaction force of the concrete for hydraulic cylinder 53 and the conveying convenient for concrete.
The belt conveyor 4 is adjustable belt conveyer or walking belt conveyor.
In one embodiment, a kind of construction method backfilling coal cutting roadway as shown in Figs. 1-2, it is characterised in that: this is applied Work method includes the following steps:
(1), the gangue for being deposited in former laydown area is scooped up with forklift 1 and is shipped for pulverizer 2 and crushes;
(2), be conveyed to blender 3 through the smashed gangue of pulverizer 2, in blender 3 by weight addition water and Cementitious material stirs into concrete;
(3), concrete conveyance made of agitated machine 3 stirs is to belt conveyor 4;
(4), belt conveyor 4 is by concrete conveyance to the concrete pump 52 of grouting vehicle 5, and concrete pump 52 is by concrete height Pressure injection enters coal cutting roadway innermost end by the baffle 54 of grouting vehicle 5 and working face, top plate and bottom plate and the two sides of the coal cutting roadway In the refill spaces that wall is constituted, until filling;
(5), after refill spaces fill concrete, the hydraulic cylinder 53 of grouting vehicle 5 pushes baffle 54 to squeeze in refill spaces Concrete so that concrete tightly connects top;
(6), after the completion of to be extruded, belt conveyor 4 and grouting vehicle 5 withdraw a distance backward in coal cutting roadway, make It obtains and forms second refill spaces, then the step of successively implementing first five step between the baffle 54 and concrete extrusion face of grouting vehicle 5, It is moved in circles until the backfill of entire coal cutting roadway finishes in this way.
In one embodiment, as shown in Fig. 1 or 3, the diameter through the smashed coal gangue particle of pulverizer 2≤ 25mm。
In one embodiment, as shown in Figure 1, the baffle 54 for constituting refill spaces to coal cutting roadway working face away from From for 5-10m.
In one embodiment, as shown in Fig. 1 or 3, concrete made of the stirring with blender 3 is by weight calculating It is cementitious material comprising 85% gangue, 10% water, surplus.

Claims (10)

1. it is a kind of backfill coal cutting roadway construction machinery, it is characterised in that: the construction machinery include forklift, pulverizer, blender, Belt conveyor, grouting vehicle, with the forklift to filler material on the feed inlet of the pulverizer, the discharge port of the pulverizer is logical The mode for crossing chute or Belt Conveying couples with the feed inlet of the blender, and the discharge port of the blender passes through Belt Conveying Mode couple with the tail of the belt conveyor, the blanking port of the material-falling hopper of the head of the belt conveyor and the note The feed inlet connection of the feed hopper of the concrete pump of vehicle is starched, the delivery pipe of the concrete pump passes through the grouting port on the baffle It is connected to the baffle with the filling space that the working face of the coal cutting roadway in front of it, top plate and bottom plate and left and right sidewall are constituted.
2. a kind of construction machinery for backfilling coal cutting roadway according to claim 1, it is characterised in that: the grouting vehicle includes Crawler type walking mechanism, concrete pump, hydraulic cylinder and baffle, installation settings has liquid on the vehicle frame of the crawler type walking mechanism Compressing cylinder, the telescopic end of the hydraulic cylinder be located at the crawler type walking mechanism in front of baffle couple, the baffle and Working face, top plate and bottom plate and the left and right sidewall of coal cutting roadway in front of it constitute a filling space, also install on the vehicle frame It is provided with concrete pump, the concrete pump has feed hopper, and the delivery pipe of the concrete pump is set by the baffle top The grouting port set is connected to the filling space.
3. a kind of construction machinery for backfilling coal cutting roadway according to claim 1, it is characterised in that: also have long-range monitoring System, the remote monitoring system are for monitoring each mechanism operating condition in the construction machinery.
4. a kind of construction machinery for backfilling coal cutting roadway according to claim 1, it is characterised in that: also have long-range control System, the tele-control system include electric control system and hydraulic control system, and the electric control system is for controlling Make the power supply of each mechanism in the construction machinery;The hydraulic control system is for controlling in the construction machinery The hydraulic execution unit operation of each mechanism.
5. a kind of construction machinery for backfilling coal cutting roadway according to claim 1, it is characterised in that: the pulverizer includes Roughpulverizer and slimer, the forklift is to filler material on the feed inlet of the Roughpulverizer, the discharging of the Roughpulverizer Mouth couples with the feed inlet of the slimer, and the discharge port of the slimer couples with the feed inlet of the blender.
6. a kind of construction machinery for backfilling coal cutting roadway according to claim 2, it is characterised in that: the vehicle of the grouting vehicle The rear end of frame and the front end of rack of the belt conveyor are fixedly connected.
7. a kind of construction method for backfilling coal cutting roadway, it is characterised in that: the construction method includes the following steps:
(1), the gangue for being deposited in former laydown area shovel (digging) pulverizer is shipped for scraper (or dig and transport) machinery to carry out It crushes;
(2), it is conveyed to blender through the smashed gangue of pulverizer, by weight addition water and cementitious material in blender Stir into concrete;
(3), concrete conveyance made of agitated machine stirring is to belt conveyor;
(4), by concrete conveyance to the concrete pump of grouting vehicle, concrete pump injects High Pressure Reinforced Concrete mines belt conveyor Be made of working face, top plate and bottom plate and the two sidewalls of the baffle of grouting vehicle and the coal cutting roadway one of tunnel innermost end In refill spaces, until filling;
(5), after refill spaces fill concrete, the hydraulic cylinder of grouting vehicle pushes baffle to squeeze the concrete in refill spaces, So that concrete tightly connects top;
(6), after the completion of to be extruded, belt conveyor and grouting vehicle withdraw a distance backward in coal cutting roadway, so that slip casting Second refill spaces, then the step of successively implementing first five step are formed between the baffle and concrete extrusion working face of vehicle, in this way It moves in circles until the backfill of entire coal cutting roadway finishes.
8. a kind of construction method for backfilling coal cutting roadway according to claim 7, it is characterised in that: described through pulverizer powder Diameter≤25mm of coal gangue particle after broken.
9. a kind of construction method for backfilling coal cutting roadway according to claim 1 or 2 or 7, it is characterised in that: the composition The distance of the baffle of refill spaces to coal cutting roadway working face is 5-10m.
10. a kind of construction method for backfilling coal cutting roadway according to claim 7, it is characterised in that: described to use blender Concrete made of stirring is cementitious material by weight calculating comprising the gangue of 80-90%, the water of 5-10%, surplus.
CN201910143639.8A 2019-02-25 2019-02-25 A kind of construction machinery backfilling coal cutting roadway Pending CN109653792A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910143639.8A CN109653792A (en) 2019-02-25 2019-02-25 A kind of construction machinery backfilling coal cutting roadway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910143639.8A CN109653792A (en) 2019-02-25 2019-02-25 A kind of construction machinery backfilling coal cutting roadway

Publications (1)

Publication Number Publication Date
CN109653792A true CN109653792A (en) 2019-04-19

Family

ID=66123856

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910143639.8A Pending CN109653792A (en) 2019-02-25 2019-02-25 A kind of construction machinery backfilling coal cutting roadway

Country Status (1)

Country Link
CN (1) CN109653792A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0364149A1 (en) * 1988-10-03 1990-04-18 Fosroc International Limited Grouting method and apparatus
CN201358813Y (en) * 2009-03-06 2009-12-09 江苏鼎甲科技有限公司 Cast filling compacting equipment for waste rock in mine
CN201606111U (en) * 2009-12-28 2010-10-13 三一重型装备有限公司 Crushing, pumping and filling system under gangue mine
CN107131000A (en) * 2017-06-23 2017-09-05 中煤能源研究院有限责任公司 A kind of underground coal mine intellectuality injection filling mining equipment
CN108060922A (en) * 2018-01-09 2018-05-22 中国矿业大学 A kind of exploitation-supporting-transport-filling integration coalcutter and its process for stoping

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0364149A1 (en) * 1988-10-03 1990-04-18 Fosroc International Limited Grouting method and apparatus
CN201358813Y (en) * 2009-03-06 2009-12-09 江苏鼎甲科技有限公司 Cast filling compacting equipment for waste rock in mine
CN201606111U (en) * 2009-12-28 2010-10-13 三一重型装备有限公司 Crushing, pumping and filling system under gangue mine
CN107131000A (en) * 2017-06-23 2017-09-05 中煤能源研究院有限责任公司 A kind of underground coal mine intellectuality injection filling mining equipment
CN108060922A (en) * 2018-01-09 2018-05-22 中国矿业大学 A kind of exploitation-supporting-transport-filling integration coalcutter and its process for stoping

Similar Documents

Publication Publication Date Title
CN101424195B (en) Method for digging gangue and filling tunnel for coal mine coal-rock drift
CN107246279B (en) Underground, which picks up sieve and mixes, fills the cementing construction filling system of integrated spoil and method
CN101586460B (en) Coal mining solid filling method
CN108915765B (en) Underground full tailing-waste stone paste filling system and filling method
CN109882239B (en) Open-pit end slope coal-pressing radial filling mining method
CN105507947B (en) A kind of networking waste filling method
WO2018176892A1 (en) Network integrated and coordinated control system and method for thin coal seam comprehensive mining and gas control
CN101215976B (en) Down-hole gangue pump packing system and method
CN103590851A (en) Underground waste-rock concrete preparation, pumping and filling system and method
CN107893658A (en) Big thick ore body stage open stope afterwards filling mining methods in pole under strong ground pressure ring border
CN104564137A (en) Handling method and device for double-medium stacked supporting and hard top plate type mined-out area
CN111608726A (en) Method for reducing damage of spaced overlying rock crushed-expansion filling steel reinforcement cage bag by grouting
CN201982137U (en) Underground preparation device taking waste rock as aggregate concrete filling material
CN102285772A (en) Coal-gangue processing method, coal-gangue foamed concrete and laneway backfilling method
CN103161498B (en) Half-edge coal seam section coal pillar roadside packing method
CN109667618A (en) A kind of grouting vehicle backfilling coal cutting roadway
CN210141130U (en) Slurry shield machine based on efficient gravel box
CN213928441U (en) Complete equipment for backfilling from top to bottom of well suitable for promoting ecological management in mine area waste rock treatment
CN105971605A (en) A non-waste mining method for underground mines
CN109653792A (en) A kind of construction machinery backfilling coal cutting roadway
CN112593939A (en) Method for mining 'three lower' coal seam by replacing all coal pillars through gangue double filling
CN209959291U (en) Grouting vehicle for backfilling coal mining roadway
CN109973142A (en) A kind of pair of underworkings carries out the method and filling system of sold stowing
CN114961726B (en) Coal seam filling and re-mining method for small kiln damage area
CN116378750A (en) Underground dynamic filling method for gangue paste

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190419

RJ01 Rejection of invention patent application after publication