CN109646932A - A kind of production method of the permanent line in laterite athletic ground - Google Patents

A kind of production method of the permanent line in laterite athletic ground Download PDF

Info

Publication number
CN109646932A
CN109646932A CN201811549431.8A CN201811549431A CN109646932A CN 109646932 A CN109646932 A CN 109646932A CN 201811549431 A CN201811549431 A CN 201811549431A CN 109646932 A CN109646932 A CN 109646932A
Authority
CN
China
Prior art keywords
line
soil
laterite
slot
athletic ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811549431.8A
Other languages
Chinese (zh)
Other versions
CN109646932B (en
Inventor
孔明越
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kong Ming Yue
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201811549431.8A priority Critical patent/CN109646932B/en
Publication of CN109646932A publication Critical patent/CN109646932A/en
Application granted granted Critical
Publication of CN109646932B publication Critical patent/CN109646932B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63CSKATES; SKIS; ROLLER SKATES; DESIGN OR LAYOUT OF COURTS, RINKS OR THE LIKE
    • A63C19/00Design or layout of playing courts, rinks, bowling greens or areas for water-skiing; Covers therefor
    • A63C19/06Apparatus for setting-out or dividing courts
    • A63C19/065Line markings, e.g. tapes; Methods therefor

Abstract

The present invention provides a kind of production method of permanent line on laterite or sandy soil athletic ground, is related to indoor and outdoor laterite or sandy soil athletic ground;It is mainly used for building tennis court, gate ball court, softball field and ball park.Permanent line method of construction of the invention is on the laterite or sandy soil tennis court built up, pass through field positioning, fluting, take soil, inserting slot does protective edge, it is fixedly connected with net, PU(silicon PU or polyurethane) pour wire casing, then it modifies, the line of pouring molding is fixed on place by the processes such as setting-out, it is stepped on as not being afraid of, it is not squashy, it is indeformable, it should not wear, elasticity close and durable place line that can be kept for a long time with soil site, it has well solved laterite or sandy soil tennis field wire is unclear, it is lack of standardization, the problem of often drawing lines and be hard to keep, it can accomplish the clear beautiful deep welcome by tennis enthusiast.

Description

A kind of production method of the permanent line in laterite athletic ground
Technical field
The present invention relates to indoor or outdoors place fields, and in particular to a kind of laterite or the permanent line in sandy soil athletic ground Production method.
Background technique
The always global problem the problem of line of clay court place for a long time, laterite court is for activity It is i.e. environmentally friendly and comfortable for person, smaller to human synovial injury, so very by the welcome of participant, but clay court draws lines Hardly possible is kept for the problem of hardly possible, Maintenance Difficulty annoying people always, wherein most troubling thing is exactly dashing work, i.e., it is time-consuming It is not easy to draw neat and beauty again, due to frequent pipeline purging and scribing line, it is easy to cause local uneven, the ball to draw lines on place Irregular movement can be generated in these places by beating, and greatly affected the mood of activity personnel, while also influencing laterite It the popularization in place and generally uses.
The release of permanent Wiring technology has well solved online unclear, lack of standardization, the normal setting-out in laterite court and has been hard to keep Problem.It can accomplish to keep for a long time using the place of permanent line technology, need to only cross within 2 years primary.
Summary of the invention
The present invention is to provide the manufacture craft of the permanent line of a kind of both beautiful and practical laterite or sandy soil athletic ground, can Thoroughly to solve the problems, such as that the setting-out of laterite athletic ground is difficult, keep difficult, Maintenance Difficulty, changes people and laterite or sandy soil are moved The idea of place difficulty maintenance, plays a positive role to the popularization on laterite athletic ground.
In order to achieve the above object, technical solution of the present invention is as follows:
The production method of permanent line on a kind of laterite or sandy soil athletic ground, be and the athletic ground built up on pass through place Position, slot, take soil, inserting slot do protective edge, be fixedly connected net, pour wire casing, then finishing, setting-out etc. processes secure the wire in field On the ground, it is allowed to should not to wear, is durable and can be kept fixed for a long time constant, the specific steps are as follows:
A, field positioning: field positioning is carried out according to the rule that International Tennis Federation formulates on molding athletic ground, is determined The position of line and width, wherein baseline 10cm wide, other line 5cm wide;It is fixed that snap the line is carried out using line bag or ink fountain that lime is housed Position;
B, slot: using self-control or the cutting machine directly bought by wired part cutting fluting, the depth of cutting is in 10mm The protective edge of customization is bumped among joint-cutting by left and right while fluting, it should be noted that flatness and straight degree;
C, it takes soil: the soil being bumped into the slot of protective edge is taken away, the depth of soil is taken to rest between 6mm -8mm, soil is taken in slot Depth is wanted almost the same and is accomplished straight;
D, do protective edge: the two sides of slot are protected using the high molecular polythene flat bar material of customization or the high-intensitive strap of purchase Shield;
E, it is fixedly connected: two-row spacing 12cm or so being divided into using the nail of 7cm and is fixed in wire casing, then with No. 14 iron wires Carry out interconnection, make an entirety, the height of iron nail need to below wire casing 2mm;
F, it pours wire casing: being cast in wire casing after mixing evenly using PU or silicon PU or polyurethane material according to match ratio;
G, recondition: permanent line requirement after molding is straight, to carry out recondition to the place not reached requirement;
H, draw lines: striping jobs can just be carried out by determining that there is no problem by the finishing to line after the molding of PU material, be drawn lines Paint will be using mating setting-out Qi Jinhang setting-out consistent with PU material properties, to keep the clear and durable of line.
The production method is mainly used for building tennis court, gate ball court, softball field and ball park.
The utility model has the advantages that have well solved laterite sports ground ground wire unclear, lack of standardization, normal for the permanent line method of construction of the present invention The problem of drawing lines and being hard to keep can accomplish the clear beautiful deep welcome by tennis enthusiast.The permanent line built, which is not afraid of, to be stepped on, no It is squashy, indeformable, should not wear, elasticity with soil site the close and durable place line that can be kept for a long time.
Specific embodiment
The present invention is described below with reference to specific embodiments.It will be appreciated by those skilled in the art that these embodiments are only For illustrating the present invention, do not limit the scope of the invention in any way.
The production method of permanent line on a kind of laterite or sandy soil athletic ground, be and the athletic ground built up on pass through Field positioning, slot, take soil, inserting slot do protective edge, be fixedly connected net, pour wire casing, then finishing, setting-out etc. processes line is fixed Ground on the scene is allowed to should not to wear, is durable and can be kept fixed for a long time constant.Specific step is as follows:
One, field positioning
Field positioning is carried out according to the rule that International Tennis Federation formulates on molding athletic ground, determines position and the width of line It spends, wherein baseline 10cm wide, other line 5cm wide;Snap the line positioning is carried out using line bag or ink fountain that lime is housed.
Two, it slots
Using self-control or the directly cutting machine bought by wired part cutting fluting, the depth of cutting in 10mm or so, The protective edge of customization is bumped among joint-cutting while fluting, it should be noted that flatness and straight degree;
Three, soil is taken
The soil being bumped into the slot of protective edge is taken away, the depth of soil is taken to rest between 6mm -8mm, the depth of soil is taken to want in slot It is almost the same and accomplish straight;
Four, protective edge is done
It is protected using the high molecular polythene flat bar material of customization or the high-intensitive strap of purchase the two sides of slot.
Five, it is fixedly connected
It is divided into two-row spacing 12cm or so using the nail of 7cm to be fixed in wire casing, then carries out intersection company with No. 14 iron wires Connect, make an entirety, the height of iron nail need to below wire casing 2mm.
Six, wire casing is poured
It is cast in wire casing after mixing evenly using PU or silicon PU or polyurethane material according to match ratio.
Seven, recondition
Permanent line requirement after molding is straight, to carry out recondition to the place not reached requirement.
Eight, it draws lines
Striping jobs can just be carried out by determining that there is no problem by the finishing to line after the molding of PU material, and setting-out paint will use Mating setting-out Qi Jinhang setting-out consistent with PU material properties, to keep the clear and durable of line.

Claims (2)

1. the production method of permanent line on a kind of laterite or sandy soil athletic ground is to pass through place on built athletic ground It positions, slot, soil, inserting slot is taken to do protective edge, fixedly connected part, pour wire casing, then the processes such as finishing, setting-out secure the wire in field On the ground, it is characterised in that:
A, field positioning: field positioning is carried out according to the rule that International Tennis Federation formulates on molding athletic ground, is determined The position of line and width, wherein baseline 10cm wide, other line 5cm wide;It is fixed that snap the line is carried out using line bag or ink fountain that lime is housed Position;
B, slot: using self-control or the cutting machine directly bought by wired part cutting fluting, the depth of cutting is in 15mm The protective edge of customization is bumped among joint-cutting by left and right while fluting, it should be noted that flatness and straight degree;
C, it takes soil: the soil being bumped into the slot of protective edge is taken away, the depth of soil is taken to rest between 6mm -8mm, soil is taken in slot Depth is wanted almost the same and is accomplished straight;
D, it does protective edge: being brought into using the high molecular polythene flat bar material of customization or the high-intensitive stone material packing of purchase the two sides of slot Row protection;
E, it is fixedly connected: two-row spacing 12cm or so being divided into using the nail of 7cm and is fixed in wire casing, then with No. 14 iron wires Carry out interconnection, make an entirety, the height of iron nail need to below wire casing 2mm;
F, it pours wire casing: being cast in wire casing after mixing evenly using PU or silicon PU or polyurethane material according to match ratio;
G, recondition: permanent line requirement after molding is straight, to carry out recondition to the place not reached requirement;
H, draw lines: striping jobs can just be carried out by determining that there is no problem by the finishing to line after the molding of PU material, be drawn lines Paint will be using mating setting-out Qi Jinhang setting-out consistent with PU material properties, to keep the clear and durable of line.
2. the production method of permanent line on laterite as described in claim 1 or sandy soil athletic ground, which is characterized in that the system It is mainly used for building tennis court, gate ball court, softball field and ball park as method.
CN201811549431.8A 2018-12-18 2018-12-18 Manufacturing method of laterite sports field permanent line Active CN109646932B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811549431.8A CN109646932B (en) 2018-12-18 2018-12-18 Manufacturing method of laterite sports field permanent line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811549431.8A CN109646932B (en) 2018-12-18 2018-12-18 Manufacturing method of laterite sports field permanent line

Publications (2)

Publication Number Publication Date
CN109646932A true CN109646932A (en) 2019-04-19
CN109646932B CN109646932B (en) 2021-03-23

Family

ID=66114550

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811549431.8A Active CN109646932B (en) 2018-12-18 2018-12-18 Manufacturing method of laterite sports field permanent line

Country Status (1)

Country Link
CN (1) CN109646932B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB182833A (en) * 1921-01-14 1922-07-14 Henry Gardiner Lloyd Improvements in or relating to floors or paving for tennis courts and other purposes
US6227989B1 (en) * 1998-05-16 2001-05-08 Michael Reid Sports field line marking system
CN101440595A (en) * 2008-12-16 2009-05-27 孔明越 Method for constructing red clay court
CN102852070A (en) * 2012-09-28 2013-01-02 陕西速朗运动设施有限公司 Clay court and construction method thereof
CN103397587A (en) * 2013-08-07 2013-11-20 浙江赢牌体育用品有限公司 Silicon PU court and manufacturing method thereof
CN104857696A (en) * 2015-05-12 2015-08-26 广州星太体育场地设施工程有限公司 Line planting method of natural lawn stadium

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB182833A (en) * 1921-01-14 1922-07-14 Henry Gardiner Lloyd Improvements in or relating to floors or paving for tennis courts and other purposes
US6227989B1 (en) * 1998-05-16 2001-05-08 Michael Reid Sports field line marking system
CN101440595A (en) * 2008-12-16 2009-05-27 孔明越 Method for constructing red clay court
CN102852070A (en) * 2012-09-28 2013-01-02 陕西速朗运动设施有限公司 Clay court and construction method thereof
CN103397587A (en) * 2013-08-07 2013-11-20 浙江赢牌体育用品有限公司 Silicon PU court and manufacturing method thereof
CN104857696A (en) * 2015-05-12 2015-08-26 广州星太体育场地设施工程有限公司 Line planting method of natural lawn stadium

Also Published As

Publication number Publication date
CN109646932B (en) 2021-03-23

Similar Documents

Publication Publication Date Title
CN101440595B (en) Method for constructing red clay court
CN208803413U (en) Highway planting protective fence
US2067356A (en) Court for games
CN109646932A (en) A kind of production method of the permanent line in laterite athletic ground
CN205476837U (en) Sprinkling irrigation formula gardens rail
CN207452616U (en) A kind of dysfunction person's acclimatization training place
Thomas Recent Acquisitions by Birmingham City Museum
CN203795265U (en) Ecological grass embedded floor structure
CN209283827U (en) A kind of intelligence spends indoor fresh flower Ecology environment rack
CN208219911U (en) A kind of band vegetation wall
CN206828911U (en) A kind of novel garden Pavement Skid Resistance brick
CN207210874U (en) A kind of motor pool drain bar
JP2007202496A (en) Natural turf vegetation panel
CN213836154U (en) Artificial lawn block
CN216239400U (en) Roof waterproof greening concrete
CN213836152U (en) Court 8mm silicon pu surface course
CN220395348U (en) Urban landscape greening guardrail
CN211621080U (en) Combined multifunctional field with assembly structure roller skating field
CN1328944C (en) Method of planting rock plant using planting level ground
CN210368511U (en) Laterite sports field
CN206581670U (en) A kind of antiseep landscape pond
CN220630370U (en) Municipal afforestation protector
CN218999067U (en) Afforestation tree strutting arrangement
CN214994314U (en) Concentrate and filter wet return mouth of a river parallel and level ground device
CN209384163U (en) Road guard-rail

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20190926

Address after: 010000 Unit 103, Building 1, 18 Binhe Road, Hohhot, Inner Mongolia Autonomous Region

Applicant after: Kong Ming Yue

Address before: 221137 Houshizhuang, Qingshan Spring Town, Jiawang District, Xuzhou City, Jiangsu Province

Applicant before: Zhao Ying

Applicant before: Kong Ming Yue

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant