CN101440595A - Method for constructing red clay court - Google Patents

Method for constructing red clay court Download PDF

Info

Publication number
CN101440595A
CN101440595A CNA2008101890607A CN200810189060A CN101440595A CN 101440595 A CN101440595 A CN 101440595A CN A2008101890607 A CNA2008101890607 A CN A2008101890607A CN 200810189060 A CN200810189060 A CN 200810189060A CN 101440595 A CN101440595 A CN 101440595A
Authority
CN
China
Prior art keywords
clay
centimetres
layer
court
sand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2008101890607A
Other languages
Chinese (zh)
Other versions
CN101440595B (en
Inventor
孔明越
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2008101890607A priority Critical patent/CN101440595B/en
Publication of CN101440595A publication Critical patent/CN101440595A/en
Application granted granted Critical
Publication of CN101440595B publication Critical patent/CN101440595B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/91Use of waste materials as fillers for mortars or concrete

Landscapes

  • Road Paving Structures (AREA)

Abstract

The invention discloses a method for constructing a clay court, and relates to a method for constructing indoor and outdoor clay courts. The method for constructing the clay court comprises the following steps: channeling on the ground; then making a base layer, a stable layer, a clay bottom layer, a clay surface layer and a protective layer from the bottom up in sequence; and drawing line or arranging permanent court line, wherein the base layer consists of hard rock and sand rock, the stable layer consists of slag ash and quicklime, the clay bottom layer consists of clay, mechanically sieving sand, brick dust and crushed crude salt, the clay surface layer consists of clay and sand made by a brick dust machine, and the protective layer consists of sand. The clay court constructed by the method has moderate hardness with uneasy change, is durable in use, has low maintenance cost and does not need to draw the court line. In addition, the court is not sticky when encountering rain or watering.

Description

Method for constructing red clay court
Technical field
A kind of method for constructing red clay court, construction method with relating to the indoor and outdoor clay court.
Background technology
The tennis court can be divided into hard place (acrylic acid place as: U.S. Open Tennis and Australian Open Tennis), meadow (as: Wembledon tennis open competition), clay court and comprise three types in sand place (as: net of justice).Wherein the advantage of clay court is: cheap, comfortable, the health environment-friendly of motion.Be subjected to vast amateurish tennis fan, particularly person in middle and old age fan's favor deeply.By Huhehaote, tennis court, sandy soil ground surpasses 100, and the tennis fan of activity on clay court accounts for more than seventy percent of participation activity number at ordinary times.
Though the clay court is popular, the shortcoming of himself is also arranged, as poor flatness, regular maintenance is cumbersome, comprising: sprinkle water, sand and work such as line.The work of ruling exactly of wherein the most troubling thing, promptly lose time and be not easy to draw neat, because often pipeline purging and line, be easy to cause on the place wired local uneven, greatly influence participation activity personnel's mood, also had influence on the popularization and the use of clay court simultaneously.
For many years, domestic construction technology to ground, clay court does not have the way and the standard of a cover typing, just construction by rule of thumb.Traditional method is called as with the tabia construction promptly: be made of materials such as clay, lime and sands, the combination of three kinds of materials does not have fixing proportionate relationship, grasps by rule of thumb, the place of yet useful pure clay construction.After coming into operation in these places, there is drawback significantly, as: the planeness and the hardness in place do not meet standard; Added the hardening of lime place, do not added the lime place and seem soft; Be clamminess and can't use in the rainy or place, back of watering; Problems such as the place life cycle is short.
Summary of the invention
The construction method that the purpose of this invention is to provide a kind of sandy ground tennis court of standard improves the quality in sandy ground tennis court, makes it smooth more durable.
Method for constructing red clay court of the present invention is earlier in the ground grooving, takes turns doing basal layer, stabilized zone, laterite bottom, laterite surface layer and topping then from lower to upper, then setting-out or the permanent field ground wire is installed; Its specific practice is:
1, find horizon accurately after, to underground dig out with the tennis court onesize, 55-70 centimetres of dark grooves, and compacting;
2, basal layer: the hard rock with 8-12 centimetres is layered on the bottom, paves the back compacting, and its bed thickness is 10-12 centimetres; Be layered on the hard rock layer with the maximum sandstone that is no more than 7 centimetres then, pave back watering and compacting, its layer thickness is 12-17 centimetres, with the levelling of machine sieve sand, compacting again;
3, stabilized zone: the quicklime that is equipped with volume ratio 3-8% in slag ash is mixed thoroughly, is layered on the basal layer, flattens and spill water, compacting then, and its bed thickness is 10-12 centimetres, wherein the slag ash maximum is no more than 3 centimetres;
4, laterite bottom: its thickness is 10-12 centimetres; The material of this layer use has clay, machine sieve sand, brick powder and pulverizes crude salt; Earlier with clay and machine sieve sand by volume 1 to 1 the ratio mixing of granularity less than 2 centimetres, adding volume of mixture then stirs than 20% brick powder (powder that burned brick is worn into) and 1-3% pulverizing crude salt, wherein the brick powder will be higher than 150 orders, smooth is layered on the stabilized zone, water permeable then in the above, treat that water does water content 25-35% the time, this layer of compacting;
5, laterite surface layer: material therefor is particle less than 5 millimeters clay, is higher than 150 purpose brick powder and 50-120 purposes mechanism sand, their volume ratio is respectively: 35-45%, 25-35%, 25-35%, after three kinds of raw materials are stirred, smooth is layered on the laterite bottom, water permeable, treat that water does water content 25-35% the time, compacting, and make this aspect and ground on same horizontal plane;
6, topping: on the laterite surface layer, spill one deck 70-150 purpose sands;
7, dress permanent field ground wire: setting-out and fluting on corresponding position, court, the permanent field ground wire is installed.
The permanent field ground wire be by with the wide granite bar of place line, poly-ly constitute by ester material, quartz sand and paint; The granite bar is a bottom, and the poly-ester material of pressing of 3-5 millimeters thick is arranged on it, is stained with one deck 70-150 purpose quartz sands uniformly on poly-surface by ester material, and quartz sand accounts for poly-by 50-70% of ester material surface area, brushes paint in the superiors.
Through the clay court that this method is built, hardness is moderate, and malleable is not durable in use, and maintenance cost is low, and need not draw the place line again.In addition, chance is rained or is watered, and also can not be clamminess in the place.
The specific embodiment
The clay court of standard is made of: basal layer, stabilized zone, laterite bottom, laterite surface layer and topping.Construction sequence is as follows:
One, smooth place
After the moulding of place ± and turn over 60cm (covered court can the following 50cm of turning over) under 0 absolute altitude, original soil is transported in the excavation place, and smooth compacting is carried out in the place handled.If do not dig below the 60cm, use that road roller rolls repeatedly more than 12 tons, up to till the place compacting to original soil.
Two, basal layer construction
Basal layer adds stone two parts by hard rock and sand and constitutes, and molding thickness is 25cm., and way is as follows:
Hard rock is piled up: on the basis of place levelling compacting, select the hard rock of 8cm---12cm size for use, manually pile up one deck, levelling is carried out with rubble in the hard rock surface; With road roller compacting repeatedly more than 12 tons, its thickness is reached about 10cm; Sand adds the stone construction: on the hard rock basis, carry out sand and add the construction of stone layer, by moulding 15cm thickness unwrapping wire, the particle diameter maximum that interpolation sand adds stone can not surpass 7cm, sand is added stone evenly shakeout on the place, sprinkling water to the sandstone water content reaches 60-70%, uses road roller compacting repeatedly more than 12 tons then; Machine sieves compacting again after the husky surperficial levelling.
Three, stabilized zone
Stabilized zone is done raw material with slag ash and lime, particle diameter is equipped with 5% quicklime companion less than 3 centimetres of slag ash and evenly is layered on the basal layer, and with the height hanging wire of moulding 10cm, its void side should grasp at 15cm; On ashes the watering and make its humidity reach 40-50%, roll with 12 tons of road rollers then, levelling repeatedly constantly reaches requirement up to planeness and compactness when rolling.
Four, laterite bottom
Material requirements: granularity is sieved sand, 150-200 purpose common brick powder and is pulverized crude salt less than 1.5 centimetres high-quality red clay, machine; The match ratio (volume) that red clay and machine sieve sand are pressed 1:1; Add 20% the brick powder of their cumulative volumes and 2% pulverizing crude salt companion and evenly, on basal layer, shakeout permeable with watering after manually treading (layer water content 70-80%); Treat that soil layer does when water content reaches 25-35%, with 0.5-1 ton road roller compacting, the bed thickness after the moulding is 10 centimetres; As be outdoor place, two to three the aproll gradient of thousands of branch should be made in the limit of showing up, its center.
Five, laterite surface layer
Use material: granularity is less than 5 millimeters red clay, 150-200 purpose common brick powder, 50-120 purposes mechanism red sand; Above raw material by volume, the ratio uniform mixing of admaic earth 40%, machine-processed red yarn 30%, brick powder 30% is layered on the laterite bottom, manually treads and levelling; Watering irrigates it (water content is 70-80%) at twice; Treat that this layer does when water content reaches 25-35%, with 0.5-1 ton road roller pressing concora crush reality.
Six, topping
50-120 purposes mechanism red sand is sprinkled upon on the place equably, and the place is all covered, then use base on the ground with red sand drag lift even.The thickness of red sand topping should be grasped not spill laterite ground for well, is generally every place consumption at 0.6 cubic metre.
Seven, place location setting-out
Carry out place location setting-out by standard outdoor Tennis Court ground size; Under the situation that does not adopt the permanent field ground wire, the material of line usefulness is a white waterproof coating.If when using the permanent field ground wire, grooving to bury underground.
Eight, the installation of the fixing and net of net post
Dig pit and bury net post underground in ground on the scene.
So far ground, clay court construction is finished.
The method for production of permanent field ground wire
The wired position grooving in the place, place the granite bar of respective width according to live width, enclose with two side seals of sponge adhesive tape with granite, the sponge adhesive tape should exceed 3mm than granite during stickup, the pouring polyurethane material, before polyurethane solidified, last 70-150 purpose quartz sands that loose rested on polyurethane surface, in case permanent line is too smooth, circuit to ball exerts an influence, quartz sand accounts for 50-70% of total surface, treat that polyurethane material solidifies after, brush 2-3 layers of polyurethane paint in the above; The soil that clean out the sponge adhesive tape, will take out in the time of will opening Cao is clapped broken sieving, and adds an amount of water soil is mixed moist shape, and permanent line both sides are reverted to former state.So far permanent line construction is finished.

Claims (2)

1, a kind of method for constructing red clay court is earlier in the ground grooving, takes turns doing basal layer, stabilized zone, laterite bottom, laterite surface layer and topping then from lower to upper, then setting-out or the permanent field ground wire is installed; It is characterized in that:
A, to underground dig out with the tennis court onesize, 55-70 centimetres of dark grooves, and compacting;
B, basal layer: the hard rock with 8-12 centimetres is layered on the bottom, paves the back compacting, and its bed thickness is 10-12 centimetres; Be layered on the hard rock layer with the maximum sandstone that is no more than 7 centimetres then, pave back watering and compacting, its layer thickness is 12-17 centimetres, with the levelling of machine sieve sand, compacting again;
C, stabilized zone: the quicklime that is equipped with volume ratio 3-8% in slag ash is mixed thoroughly, is layered on the basal layer, flattens and spill water, compacting then, and its bed thickness is 10-12 centimetres, wherein the slag ash maximum is no more than 3 centimetres;
D, laterite bottom: its thickness is 10-12 centimetres; The material of this layer use has clay, machine sieve sand, brick powder and pulverizes crude salt; Earlier with clay and machine sieve sand by volume 1 to 1 the ratio mixing of granularity less than 2 centimetres, adding volume of mixture then stirs than 20% brick powder (powder that burned brick is worn into) and 1-3% pulverizing crude salt, wherein the brick powder will be higher than 150 orders, smooth is layered on the stabilized zone, water permeable then in the above, treat that water does water content 25-35% the time, this layer of compacting;
E, laterite surface layer: material therefor is particle less than 5 millimeters clay, is higher than 150 purpose brick powder and 50-120 purposes mechanism sand, their volume ratio is respectively: 35-45%, 25-35%, 25-35%, after three kinds of raw materials are stirred, smooth is layered on the laterite bottom, water permeable, treat that water does water content 25-35% the time, compacting, and make this aspect and ground on same horizontal plane;
F, topping: on the laterite surface layer, spill one deck 70-150 purpose sands;
G, setting-out or excavation groove are installed the permanent field ground wire.
2, method for constructing red clay court according to claim 1, it is characterized in that the permanent field ground wire be by with the wide granite bar of place line, poly-ly constitute by ester material, quartz sand and paint; The granite bar is a bottom, and the poly-ester material of pressing of 3-5 millimeters thick is arranged on it, is stained with one deck 70-150 purpose quartz sands uniformly on poly-surface by ester material, and quartz sand accounts for poly-by 50-70% of ester material surface area, brushes paint in the superiors.
CN2008101890607A 2008-12-16 2008-12-16 Method for constructing red clay court Expired - Fee Related CN101440595B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008101890607A CN101440595B (en) 2008-12-16 2008-12-16 Method for constructing red clay court

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008101890607A CN101440595B (en) 2008-12-16 2008-12-16 Method for constructing red clay court

Publications (2)

Publication Number Publication Date
CN101440595A true CN101440595A (en) 2009-05-27
CN101440595B CN101440595B (en) 2010-08-11

Family

ID=40725181

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008101890607A Expired - Fee Related CN101440595B (en) 2008-12-16 2008-12-16 Method for constructing red clay court

Country Status (1)

Country Link
CN (1) CN101440595B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102852070A (en) * 2012-09-28 2013-01-02 陕西速朗运动设施有限公司 Clay court and construction method thereof
CN106396497A (en) * 2016-08-27 2017-02-15 惠州市腾威新材料有限公司 Soft red earth material for tennis court and preparation method thereof
CN109183555A (en) * 2018-10-29 2019-01-11 林敦玉 A kind of prefabrication type synthetic court surface layer and its construction method
CN109537398A (en) * 2018-12-29 2019-03-29 孔明越 A kind of method of construction on laterite athletic ground
CN109646932A (en) * 2018-12-18 2019-04-19 赵莹 A kind of production method of the permanent line in laterite athletic ground
CN109853327A (en) * 2019-04-10 2019-06-07 吉林化工学院 A kind of production method of the natural Football pitch based on permanent line of demarcation
CN109944137A (en) * 2019-03-19 2019-06-28 江西中昌文化体育有限公司 A kind of clay court and its method of construction
CN111892333A (en) * 2020-09-18 2020-11-06 湖南云中再生科技股份有限公司 Construction waste laterite material for tennis court and preparation method thereof
TWI711480B (en) * 2018-09-17 2020-12-01 龍華科技大學 An improved marking line for a baseball stadium purpose
CN113152206A (en) * 2021-04-30 2021-07-23 山东体育学院 Maintenance-free artificial grass laterite tennis court and construction method

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102852070A (en) * 2012-09-28 2013-01-02 陕西速朗运动设施有限公司 Clay court and construction method thereof
CN102852070B (en) * 2012-09-28 2015-01-07 陕西速朗运动设施有限公司 Construction method of clay court
CN106396497A (en) * 2016-08-27 2017-02-15 惠州市腾威新材料有限公司 Soft red earth material for tennis court and preparation method thereof
CN106396497B (en) * 2016-08-27 2018-10-12 惠州市腾威新材料有限公司 A kind of tennis court soft laterite material and preparation method thereof
TWI711480B (en) * 2018-09-17 2020-12-01 龍華科技大學 An improved marking line for a baseball stadium purpose
CN109183555A (en) * 2018-10-29 2019-01-11 林敦玉 A kind of prefabrication type synthetic court surface layer and its construction method
CN109646932A (en) * 2018-12-18 2019-04-19 赵莹 A kind of production method of the permanent line in laterite athletic ground
CN109537398A (en) * 2018-12-29 2019-03-29 孔明越 A kind of method of construction on laterite athletic ground
CN109944137A (en) * 2019-03-19 2019-06-28 江西中昌文化体育有限公司 A kind of clay court and its method of construction
CN109853327A (en) * 2019-04-10 2019-06-07 吉林化工学院 A kind of production method of the natural Football pitch based on permanent line of demarcation
CN111892333A (en) * 2020-09-18 2020-11-06 湖南云中再生科技股份有限公司 Construction waste laterite material for tennis court and preparation method thereof
CN113152206A (en) * 2021-04-30 2021-07-23 山东体育学院 Maintenance-free artificial grass laterite tennis court and construction method

Also Published As

Publication number Publication date
CN101440595B (en) 2010-08-11

Similar Documents

Publication Publication Date Title
CN101440595B (en) Method for constructing red clay court
CN106046979B (en) A kind of pervious concrete pavement noctilucence cover protective agent and the protectant road surface of cover containing noctilucence and construction method
CN103866669A (en) Cement water-permeable concrete ground structure with different-color or different-material aggregates on surface for realization of gradual change effect, and manufacturing method thereof
CN104032930A (en) Press molded concrete ground construction method
CN103806356B (en) A kind of preparation method of decorative concrete earth construction
CN100444717C (en) Recovering technology for VRT base plate reparing and plastisizing vegitation
CN104631274A (en) Temporary road pavement technology
CN101586324A (en) Pervious environment protection encarpus brick and method for producing the same
CN107642217A (en) Efficient seamless stone level ground construction technology
CN105000850A (en) Glass artistic floor
CN105625140A (en) Construction method for air-permeable and water-drainage self-grained composite plastic track
CN107721271A (en) One kind is imitative to embroider stone and its manufacture craft
CN109537398A (en) A kind of method of construction on laterite athletic ground
CN102950955A (en) Quartz stone containing patterns formed through random distribution of color powder or color slurry, and its making method
CN202540466U (en) Secondary material distribution equipment of artificial quartz plate
CN208762826U (en) A kind of court composite silica PU terrace
CN203007772U (en) Red clay tennis court
CN105272034A (en) Artificial stone slurry and artificial stone prepared from artificial stone slurry through curing forming
CN101234878A (en) Litchi surface encaustic brick and preparation method thereof
CN205591074U (en) Landscape structure of mating formation
CN114876155A (en) Construction process for polishing ground by using non-ignition fine stone concrete
CN210368511U (en) Laterite sports field
DE8028909U1 (en) Paving stone
JP2006037437A (en) Grass prevention and ground protection method for creating coloring solidified layer
KR101407171B1 (en) A salt farm and construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100811

Termination date: 20211216