CN109630140B - 大断面渐变隧道穿越软弱围岩地层的动态分区导坑法 - Google Patents
大断面渐变隧道穿越软弱围岩地层的动态分区导坑法 Download PDFInfo
- Publication number
- CN109630140B CN109630140B CN201811530809.XA CN201811530809A CN109630140B CN 109630140 B CN109630140 B CN 109630140B CN 201811530809 A CN201811530809 A CN 201811530809A CN 109630140 B CN109630140 B CN 109630140B
- Authority
- CN
- China
- Prior art keywords
- tunnel
- dynamic
- fixed
- partition part
- area
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000005192 partition Methods 0.000 title claims abstract description 127
- 238000000034 method Methods 0.000 title claims abstract description 69
- 239000011435 rock Substances 0.000 title claims abstract description 33
- 238000010276 construction Methods 0.000 claims abstract description 55
- 238000009412 basement excavation Methods 0.000 claims abstract description 11
- 230000002787 reinforcement Effects 0.000 claims description 19
- 230000000694 effects Effects 0.000 abstract description 8
- 238000007789 sealing Methods 0.000 abstract description 5
- 238000001514 detection method Methods 0.000 abstract 1
- 230000003014 reinforcing effect Effects 0.000 description 5
- 239000004567 concrete Substances 0.000 description 4
- 238000010586 diagram Methods 0.000 description 4
- 238000005507 spraying Methods 0.000 description 3
- 230000007704 transition Effects 0.000 description 3
- 230000000149 penetrating effect Effects 0.000 description 2
- 238000010008 shearing Methods 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 238000013316 zoning Methods 0.000 description 2
- PUPZLCDOIYMWBV-UHFFFAOYSA-N (+/-)-1,3-Butanediol Chemical compound CC(O)CCO PUPZLCDOIYMWBV-UHFFFAOYSA-N 0.000 description 1
- -1 Poly Butylene Polymers 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- WNLRTRBMVRJNCN-UHFFFAOYSA-L adipate(2-) Chemical compound [O-]C(=O)CCCCC([O-])=O WNLRTRBMVRJNCN-UHFFFAOYSA-L 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 230000008014 freezing Effects 0.000 description 1
- 238000007710 freezing Methods 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 229920001748 polybutylene Polymers 0.000 description 1
- 239000011378 shotcrete Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
- KKEYFWRCBNTPAC-UHFFFAOYSA-L terephthalate(2-) Chemical compound [O-]C(=O)C1=CC=C(C([O-])=O)C=C1 KKEYFWRCBNTPAC-UHFFFAOYSA-L 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/04—Driving tunnels or galleries through loose materials; Apparatus therefor not otherwise provided for
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/003—Linings or provisions thereon, specially adapted for traffic tunnels, e.g. with built-in cleaning devices
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D19/00—Provisional protective covers for working space
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/03—Driving non-circular tunnels
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D20/00—Setting anchoring-bolts
- E21D20/02—Setting anchoring-bolts with provisions for grouting
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/001—Improving soil or rock, e.g. by freezing; Injections
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Environmental & Geological Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811530809.XA CN109630140B (zh) | 2018-12-14 | 2018-12-14 | 大断面渐变隧道穿越软弱围岩地层的动态分区导坑法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811530809.XA CN109630140B (zh) | 2018-12-14 | 2018-12-14 | 大断面渐变隧道穿越软弱围岩地层的动态分区导坑法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109630140A CN109630140A (zh) | 2019-04-16 |
CN109630140B true CN109630140B (zh) | 2020-10-30 |
Family
ID=66073779
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811530809.XA Active CN109630140B (zh) | 2018-12-14 | 2018-12-14 | 大断面渐变隧道穿越软弱围岩地层的动态分区导坑法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109630140B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112443331B (zh) * | 2020-11-25 | 2022-08-23 | 中交路桥建设有限公司 | 扰动敏感地层超小净距大断面群洞并行地铁隧道施工方法 |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101725358A (zh) * | 2008-10-31 | 2010-06-09 | 中铁四局集团有限公司 | 隧道超浅埋不均匀风化地层开挖施工方法 |
CN103559372B (zh) * | 2013-11-20 | 2016-05-11 | 中铁十三局集团第一工程有限公司 | 隧道开挖施工断面大拱脚crd分层进尺动态分析方法及装置 |
CN103775128B (zh) * | 2014-01-06 | 2016-03-02 | 中国建筑第五工程局有限公司 | 用于立体交叉隧道施工的监控量测方法 |
CN103867210B (zh) * | 2014-03-28 | 2015-12-30 | 西安建筑科技大学 | 一种城市地铁单渡线暗挖施工方法 |
WO2016102946A1 (en) * | 2014-12-22 | 2016-06-30 | James Crawford Thomson | Method and apparatus for forming tunnels for transport routes |
CN106979013A (zh) * | 2017-04-07 | 2017-07-25 | 中交第二航务工程局有限公司 | 一种偏压浅埋软弱围岩的超大断面隧道的开挖施工方法 |
CN107605490B (zh) * | 2017-08-28 | 2018-11-09 | 中交第二航务工程局有限公司 | 单洞大断面隧道双侧壁施工转换工艺 |
-
2018
- 2018-12-14 CN CN201811530809.XA patent/CN109630140B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN109630140A (zh) | 2019-04-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107060840B (zh) | 一种大断面隧道v级围岩开挖支护的施工方法 | |
CN105370304B (zh) | 高应力强扰动煤层沿空留巷多级加固方法 | |
CN108589771B (zh) | 一种已运营地下车站增层换乘节点施工方法 | |
CN110735656B (zh) | 软质岩地区基于拱盖法的超大断面暗挖车站洞内逆作法 | |
CN109026020B (zh) | 一种富水隧道溶洞处理与开挖方法 | |
CN103089270B (zh) | 一种适用于大断面黄土隧道的开挖方法 | |
CN108978676B (zh) | 一种基坑群和基础桩群的施工方法 | |
CN105804119A (zh) | 一桩二用地下廊道结构及其施工方法 | |
CN104594361B (zh) | 一种工字型围护桩以及围护结构兼做主体结构的施工方法 | |
CN105714831A (zh) | 一种支护基坑侧壁的异型双排桩及其施工方法 | |
CN103775095A (zh) | 山岭软基隧道超前双导洞及其施工方法 | |
CN203161244U (zh) | 既有地铁暗挖区间隧道保护结构 | |
CN103244143B (zh) | 一种地下工程暗挖施工方法及地下车站 | |
CN109630140B (zh) | 大断面渐变隧道穿越软弱围岩地层的动态分区导坑法 | |
CN106930768A (zh) | 隧洞施工方法及应用 | |
CN110939139B (zh) | 基于桩后异型挡墙刚性接触的桩板墙结构及其构建方法 | |
CN203499695U (zh) | 繁华城区浅埋暗挖隧道加固结构 | |
CN203716985U (zh) | 一种山岭软基隧道超前双导洞 | |
CN106368711A (zh) | 超浅埋矩形大断面四步暗挖施工方法 | |
CN110792449B (zh) | 一种大跨度浅埋隧道快速暗挖施工方法 | |
CN210264724U (zh) | 一种破碎地层超小净距城市隧道支护结构 | |
CN203321539U (zh) | 一种模筑衬砌支护结构 | |
CN110284900B (zh) | 一种破碎地层超小净距城市隧道支护结构及其跳槽施工工艺 | |
CN110924985A (zh) | 一种适用于上覆薄岩层的长岩柱施工方法 | |
CN109138484A (zh) | 一种顶升增层钢管混凝土柱与基础连接施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 100000 Beijing City Lucheng town Tongzhou District Tong Hu Street 8 No. 1 room 001 Applicant after: ROAD & BRIDGE INTERNATIONAL Co.,Ltd. Applicant after: GUANGXI University Address before: 530000 the Guangxi Zhuang Autonomous Region XiXiangTang Nanning University Road No. 100 Applicant before: GUANGXI University Applicant before: ROAD & BRIDGE INTERNATIONAL Co.,Ltd. |
|
CB02 | Change of applicant information | ||
CB03 | Change of inventor or designer information |
Inventor after: Lei Ling Inventor after: Hu Richeng Inventor after: Tang Xinghua Inventor after: Wang Jianfeng Inventor after: Wang Shengyang Inventor after: Wu Bo Inventor after: Lu Ming Inventor after: Liu Ning Inventor after: Tian Qingbiao Inventor after: Huang Wei Inventor after: Yao Huishan Inventor before: Wu Bo Inventor before: Hu Richeng Inventor before: Tang Xinghua Inventor before: Lei Ling Inventor before: Lu Ming Inventor before: Wang Jianfeng Inventor before: Liu Ning Inventor before: Tian Qingbiao Inventor before: Huang Wei Inventor before: Yao Huishan Inventor before: Wang Shengyang |
|
CB03 | Change of inventor or designer information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |