CN109630062A - A kind of fine pressure control well cementing operation method - Google Patents

A kind of fine pressure control well cementing operation method Download PDF

Info

Publication number
CN109630062A
CN109630062A CN201811286592.2A CN201811286592A CN109630062A CN 109630062 A CN109630062 A CN 109630062A CN 201811286592 A CN201811286592 A CN 201811286592A CN 109630062 A CN109630062 A CN 109630062A
Authority
CN
China
Prior art keywords
pressure control
well
fine
cementing
fine pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811286592.2A
Other languages
Chinese (zh)
Inventor
梁玉林
李枝林
陆灯云
杨玻
庞平
江迎军
肖润德
左星
唐国军
李照
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Natural Gas Co Ltd
CNPC Chuanqing Drilling Engineering Co Ltd
Original Assignee
China Petroleum and Natural Gas Co Ltd
CNPC Chuanqing Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Natural Gas Co Ltd, CNPC Chuanqing Drilling Engineering Co Ltd filed Critical China Petroleum and Natural Gas Co Ltd
Priority to CN201811286592.2A priority Critical patent/CN109630062A/en
Publication of CN109630062A publication Critical patent/CN109630062A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/02Surface sealing or packing
    • E21B33/03Well heads; Setting-up thereof

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses a kind of fine pressure control well cementing operation methods, and its step are as follows: preparing the well mouth sealing device of mating running string outer diameter;Fine pressure control cementing operation Parameters Optimal Design is carried out by conventional cementing software;Pit shaft drilling fluid density is adjusted to design value to well depth, turn on pump circulating exhaust is designed according to fine pressure control cementing design tripping in well cementing pipe string with pressure;After pit shaft drilling fluid density is stablized, termination of pumping guarantees that down-hole pressure is stablized, accesses cementing operation equipment by fine pressure control ground installation in well head ftercompction;It is pumped into prepad fluid, cement slurry, after pad and drilling fluid by fine pressure control cementing operation design, is intervened after the completion of liquid is pumped by fine pressure control ground installation, down-hole pressure decreasing value caused by compensating because of termination of pumping, guarantees that down-hole pressure is stablized;Well head continues ftercompction to theing cement solidifies, pressure release.The present invention can effectively solve drain spray complexity problem caused by being fluctuated in such stratum work progress as down-hole pressure, greatly improve deep well cementing quality.

Description

A kind of fine pressure control well cementing operation method
Technical field
The present invention relates to sulfur crude gas well well cementing operation fields, specifically relate to a kind of close for the narrow safety of sulfur-bearing formation Close window well cementing operation method.
Background technique
As deep layer bad ground is gradually moved towards in exploration and development, drillng operation is faced with more drain sprays complexity, fine to control Pressure drilling well becomes the important sharp weapon for solving drain spray complexity, is reducing drilling fluid leakage, raising drilling well timeliness, realization geologic objective etc. Aspect has played important function.But drain spray complex situations are equally existed during well cementing operation, are true due to strata pressure sensitivity Protect well control safety, using usual manner pressure quietly layer when, easily caused in kill-job, setting of casing and be pumped into cement slurry during The case where serious even well head mistake is returned is missed when circulation, is caused to return difficulty on cement slurry, can not be replaced to predetermined position, consolidate The ropy problem of well, the complex engineering problems such as well head gas blowby.
Publication No. 104563870A, publication date are that the Chinese patent literature on April 29th, 2015 discloses a kind of pressure control Gas drilling device and method, device include supercharging air system, well head system, pneumatics drilling machine and drilling machine choke manifold, wherein Supercharging air system includes supercharger and/or air compressor machine, gas flow and manograph, relief tube and/or bypass pipe, emptying Pipe, control valve.It further include back pressure system and fine choke manifold in device, well head system is equipped with swivel control head, back pressure system System and fine choke manifold are connect with swivel control head.The invention this propose pressure control gas drilling method, comprising the following steps: Formation pore pressure is calculated by well-log information;In the case of normal drilling, stratum annular pressure etc. is maintained by well head throttle valve In formation pore pressure;When making up a joint or making a trip, the loss of pit shaft circulating pressure is adjusted and compensated with back pressure system.It should Invention solves in gas drilling implementation process, and there are formation water output phenomenon, very good solution bad ground safety drilling is asked Topic.
But using above patent document as the prior art of representative, still can not solve in such stratum work progress by Drain spray complexity problem caused by down-hole pressure fluctuates, deep well cementing are of low quality.
Summary of the invention
The present invention is directed to provide a kind of fine pressure control well cementing operation for defect and deficiency present in the above-mentioned prior art Method can effectively solve drain spray complexity problem caused by being fluctuated in such stratum work progress as down-hole pressure, greatly improve depth Well cementing quality.
The present invention is realized by using following technical proposals:
A kind of fine pressure control well cementing operation method, it is characterised in that steps are as follows:
Step 1: preparing the well mouth sealing device of mating running string outer diameter;
Step 2: carrying out fine pressure control cementing operation Parameters Optimal Design by conventional cementing software, guarantee that bottom pressure is being pacified In full operation Density Window;
Step 3: adjusting well to well depth, turn on pump circulating exhaust is designed according to fine pressure control cementing design tripping in well cementing pipe string with pressure Cylinder drilling fluid density is to design value;
Step 4: termination of pumping guarantees well by fine pressure control ground installation in well head ftercompction after pit shaft drilling fluid density is stablized Lower pressure is stablized, and cementing operation equipment is accessed;
Step 5: by fine pressure control cementing operation design be pumped into prepad fluid, after the completion of liquid is pumped by
Fine pressure control ground installation intervention, down-hole pressure decreasing value caused by compensating because of termination of pumping guarantee that down-hole pressure is stablized;
Step 6: by fine pressure control cementing operation design be pumped into cement slurry, after the completion of liquid is pumped by
Fine pressure control ground installation intervention, down-hole pressure decreasing value caused by compensating because of termination of pumping guarantee that down-hole pressure is stablized;
Step 7: by fine pressure control cementing operation design be pumped into after pad, after the completion of liquid is pumped by
Fine pressure control ground installation intervention, down-hole pressure decreasing value caused by compensating because of termination of pumping guarantee that down-hole pressure is stablized;
Step 8: it is pumped into replacement drilling fluid by fine pressure control cementing operation design, the termination of pumping after drilling fluid displacing to design position, Fine pressure control ground installation intervention, down-hole pressure decreasing value caused by compensating because of termination of pumping guarantee that down-hole pressure is stablized;
Step 9: well head continues ftercompction to theing cement solidifies, pressure release.
The mating well mouth sealing device is according to the matched rotary sealing appts of running string outer diameter.
The fine pressure control ground installation includes self-choke control system, and back pressure compensation system being capable of fine offsetting well Mouth pressure realizes that bottom pressure is stablized.
Compared with prior art, the beneficial effects obtained by the present invention are as follows it is as follows:
By above-mentioned process flow, entire cementing operation process bottom pressure control can effectively control stratum in scope of design Fluid enters pit shaft, guarantees cementing quality.Solve the fluctuation of down-hole pressure in conventional cementing work progress, it can be substantially Improve drain spray bad ground cementing quality;Fine pressure control well cementation software can effectively simulate whole process well head pressure controlling value, And with fine pressure control software link operation, realize fine control on wellhead pressure, guarantee down-hole pressure stablize.
Detailed description of the invention
Below in conjunction with specification drawings and specific embodiments, the present invention is described in further detail, in which:
Fig. 1 is the principle of the present invention schematic diagram.
Specific embodiment
As shown, as preferred forms of the invention, step includes:
Step 1: preparing the well mouth sealing device of mating running string outer diameter;
Step 2: carrying out fine pressure control cementing operation Parameters Optimal Design by conventional cementing software, guarantee that bottom pressure is being pacified In full operation Density Window;
Step 3: adjusting well to well depth, turn on pump circulating exhaust is designed according to fine pressure control cementing design tripping in well cementing pipe string with pressure Cylinder drilling fluid density is to design value;
Step 4: termination of pumping guarantees well by fine pressure control ground installation in well head ftercompction after pit shaft drilling fluid density is stablized Lower pressure is stablized, and cementing operation equipment is accessed;
Step 5: by fine pressure control cementing operation design be pumped into prepad fluid, after the completion of liquid is pumped by
Fine pressure control ground installation intervention, down-hole pressure decreasing value caused by compensating because of termination of pumping guarantee that down-hole pressure is stablized;
Step 6: by fine pressure control cementing operation design be pumped into cement slurry, after the completion of liquid is pumped by
Fine pressure control ground installation intervention, down-hole pressure decreasing value caused by compensating because of termination of pumping guarantee that down-hole pressure is stablized;
Step 7: by fine pressure control cementing operation design be pumped into after pad, after the completion of liquid is pumped by
Fine pressure control ground installation intervention, down-hole pressure decreasing value caused by compensating because of termination of pumping guarantee that down-hole pressure is stablized;
Step 8: it is pumped into replacement drilling fluid by fine pressure control cementing operation design, the termination of pumping after drilling fluid displacing to design position, Fine pressure control ground installation intervention, down-hole pressure decreasing value caused by compensating because of termination of pumping guarantee that down-hole pressure is stablized;
Step 9: well head continues ftercompction to theing cement solidifies, pressure release.
The mating well mouth sealing device is according to the matched rotary sealing appts of running string outer diameter.
The fine pressure control ground installation includes self-choke control system, and back pressure compensation system being capable of fine offsetting well Mouth pressure realizes that bottom pressure is stablized.
By above-mentioned process flow, entire cementing operation process bottom pressure control can be controlled effectively in scope of design Formation fluid enters pit shaft, guarantees cementing quality.

Claims (2)

1. a kind of fine pressure control well cementing operation method, it is characterised in that steps are as follows:
Step 1: preparing the well mouth sealing device of mating running string outer diameter;
Step 2: carrying out fine pressure control cementing operation Parameters Optimal Design by conventional cementing software, guarantee that bottom pressure is being pacified In full operation Density Window;
Step 3: adjusting well to well depth, turn on pump circulating exhaust is designed according to fine pressure control cementing design tripping in well cementing pipe string with pressure Cylinder drilling fluid density is to design value;
Step 4: termination of pumping guarantees well by fine pressure control ground installation in well head ftercompction after pit shaft drilling fluid density is stablized Lower pressure is stablized, and cementing operation equipment is accessed;
Step 5: by fine pressure control cementing operation design be pumped into prepad fluid, after the completion of liquid is pumped by
Fine pressure control ground installation intervention, down-hole pressure decreasing value caused by compensating because of termination of pumping;
Step 6: by fine pressure control cementing operation design be pumped into cement slurry, after the completion of liquid is pumped by
Fine pressure control ground installation intervention, down-hole pressure decreasing value caused by compensating because of termination of pumping;
Step 7: by fine pressure control cementing operation design be pumped into after pad, after the completion of liquid is pumped by
Fine pressure control ground installation intervention, down-hole pressure decreasing value caused by compensating because of termination of pumping;
Step 8: it is pumped into replacement drilling fluid by fine pressure control cementing operation design, the termination of pumping after drilling fluid displacing to design position, Fine pressure control ground installation intervention, down-hole pressure decreasing value caused by compensating because of termination of pumping;
Step 9: well head continues ftercompction to theing cement solidifies, pressure release.
2. a kind of fine pressure control well cementing operation method according to claim 1, it is characterised in that: the mating wellhead sealing Device is according to the matched rotary sealing appts of running string outer diameter.
CN201811286592.2A 2018-10-31 2018-10-31 A kind of fine pressure control well cementing operation method Pending CN109630062A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811286592.2A CN109630062A (en) 2018-10-31 2018-10-31 A kind of fine pressure control well cementing operation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811286592.2A CN109630062A (en) 2018-10-31 2018-10-31 A kind of fine pressure control well cementing operation method

Publications (1)

Publication Number Publication Date
CN109630062A true CN109630062A (en) 2019-04-16

Family

ID=66067069

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811286592.2A Pending CN109630062A (en) 2018-10-31 2018-10-31 A kind of fine pressure control well cementing operation method

Country Status (1)

Country Link
CN (1) CN109630062A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110593856A (en) * 2019-10-21 2019-12-20 中国石油集团川庆钻探工程有限公司 Method for measuring density window of well cementation safety operation
CN111058794A (en) * 2019-11-26 2020-04-24 中国石油天然气股份有限公司 Control method and device for applying back pressure to annulus
CN114183070A (en) * 2021-12-07 2022-03-15 托普威尔石油技术股份公司 Drilling method without drilling and closing under pressure

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0410304A2 (en) * 1989-07-28 1991-01-30 KELLER GRUNDBAU GmbH Device for injecting a suspension
CN101139919A (en) * 2007-10-24 2008-03-12 北京德美高科科技有限责任公司 Negative pressure well cementing system and control method thereof
CN102029649A (en) * 2009-09-29 2011-04-27 四机赛瓦石油钻采设备有限公司 Automatic control method of well-cementing cement mixing operation

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0410304A2 (en) * 1989-07-28 1991-01-30 KELLER GRUNDBAU GmbH Device for injecting a suspension
CN101139919A (en) * 2007-10-24 2008-03-12 北京德美高科科技有限责任公司 Negative pressure well cementing system and control method thereof
CN102029649A (en) * 2009-09-29 2011-04-27 四机赛瓦石油钻采设备有限公司 Automatic control method of well-cementing cement mixing operation

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
郭继刚: "精细动态控压固井技术在顺南区块的应用", 《钻井液与完井液》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110593856A (en) * 2019-10-21 2019-12-20 中国石油集团川庆钻探工程有限公司 Method for measuring density window of well cementation safety operation
CN111058794A (en) * 2019-11-26 2020-04-24 中国石油天然气股份有限公司 Control method and device for applying back pressure to annulus
CN114183070A (en) * 2021-12-07 2022-03-15 托普威尔石油技术股份公司 Drilling method without drilling and closing under pressure

Similar Documents

Publication Publication Date Title
CN101864921B (en) Well completion and oil production string of horizontal well and well completion and oil production processes thereof
CN109630062A (en) A kind of fine pressure control well cementing operation method
He et al. Development and prospect of separated zone oil production technology
CN108915635A (en) The method for preventing has channeling after high-pressure gas well drilling liner cementing
CN201705219U (en) Lateral drilling gravel pack completion string
CN105672927B (en) A kind of well killing method after gas drilling blowout
CN109577954A (en) Gu a kind of fine pressure control of complete integration of brill-survey-- is drilled well operations method
CN105114043A (en) System and method for increasing recovery ratio of water drainage and gas production by gas lift in deepwater gas field
CN201705276U (en) Well completion and flow string of horizontal well
CN108361001A (en) A kind of deep trona drilling well exploitation cementing stage technique
CN109723403A (en) A kind of tail pipe pressure control well shaft fixing technology
CN110886594B (en) Method for exploiting coal bed gas
CN115110893A (en) Complex oil reservoir stratum double-gradient drilling and completion integrated operation system and method
CN205858311U (en) A kind of bore hole staged fracturing completion tubular column
CN112878904B (en) Well body structure optimization method of double-pipe double-gradient drilling technology
CN107780879A (en) A kind of reverse inlet well well formation device and method
CN208900028U (en) A kind of double-gradient well drilling system
CN203412535U (en) Drilling fluid shunt device for starting or stopping pump through multiple steps
CN110388195B (en) Coal bed gas drainage and extraction method and system
CN110984917A (en) Production-increasing water-controlling sand-preventing well completion method for low-permeability reservoir
CN107143296A (en) A kind of horizontal gas well negative pressure drags for sand method, horizontal gas well negative pressure and drags for sand system
CN110905441A (en) Well cementation method of low-pressure easy-to-leak well and casing string
AU2021104224A4 (en) Sectional Cementing Technology for Deep Trona Drilling and Mining
CN109403861A (en) A kind of oil field welldrilling does not stop to infuse boring method
CN108643871A (en) Control gas extracting device of oil and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190416