CN109629517A - A kind of method in reclaiming land around sea domain - Google Patents
A kind of method in reclaiming land around sea domain Download PDFInfo
- Publication number
- CN109629517A CN109629517A CN201811469233.0A CN201811469233A CN109629517A CN 109629517 A CN109629517 A CN 109629517A CN 201811469233 A CN201811469233 A CN 201811469233A CN 109629517 A CN109629517 A CN 109629517A
- Authority
- CN
- China
- Prior art keywords
- mud
- embankment
- blockship
- sea
- belt conveyor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/18—Reclamation of land from water or marshes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F5/00—Dredgers or soil-shifting machines for special purposes
- E02F5/22—Dredgers or soil-shifting machines for special purposes for making embankments; for back-filling
- E02F5/26—Combined conveying-bridges and dredgers
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F7/00—Equipment for conveying or separating excavated material
- E02F7/02—Conveying equipment mounted on a dredger
- E02F7/023—Conveying equipment mounted on a dredger mounted on a floating dredger
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Treatment Of Sludge (AREA)
Abstract
The present invention provides a kind of method in reclaiming land around sea domain, includes the following steps: step (1), and embankment is arranged on the periphery that need to enclose sea region, has blockship cooperation in embankment, is equipped with grab claw and belt conveyor on blockship;Step (2) grabs mud in the sea area that distance encloses sea region embankment periphery suitable distance using dredger, and shipping is to sea region is enclosed, close to blockship side;Step (3), is grabbed using the mud that the grab claw on blockship ships dredger to belt conveyor, is filled by belt conveyor to progress land-based area backfill in embankment, mobile blockship is until form land-based area.The method in reclaiming land around sea domain of the invention, it is grabbed by the mud that grab claw ships dredger to belt conveyor, so that the concentration of the mud of hydraulic reclamation increases, water content reduces, the construction cost in reclaiming land around sea domain is low, the duration is fast, it is environmentally protective, prevent the status that current strand inhales ship sewage discharge pollution environment.
Description
Technical field
The invention belongs to technical fields of reclaiming fields from the sea, and in particular to a kind of method in reclaiming land around sea domain.
Background technique
With the people's livelihood such as industry park, harbour, airport, power station building the development demand in seashore soil, especially population
Development, many countries need to want soil, that is, to reclaim fields from the sea to ocean.And enclose extra large reclamation by pumping filling can be the advantage of lower cost the case where
Under, problems of land utilization is solved, plays relaxation effect for alleviating economic development and the insufficient contradiction of construction land.Extra large hydraulic reclamation is enclosed to make
The major project content on ground is divided into two steps: first is that first enclosing sea builds embankment, second is that into embankment, hydraulic reclamation backfills to form land-based area again.
The method reclaimed fields from the sea common at present is to inhale the silt particle that ship deposits sea area beach with strand to pass through waterpower hydraulic reclamation extremely
Presumptive area forms warp.These barged-in fill concentration are low, water content is high, sewage is more, and environment is polluted in sewage discharge.
Summary of the invention
Purpose of the invention is to overcome the shortcomings in the prior art, provides a kind of method in reclaiming land around sea domain.
In order to achieve the above object, the invention is realized by the following technical scheme:
A kind of method in reclaiming land around sea domain, includes the following steps:
Step (1) is arranged embankment on the periphery that need to enclose sea region, has blockship cooperation in embankment, grab bucket is equipped on blockship
Machine and belt conveyor;
Step (2) grabs mud in the sea area that distance encloses sea region embankment periphery suitable distance using dredger, and shipping is extremely
Sea region is enclosed, close to blockship side;
Step (3), is grabbed to belt conveyor using the mud that the grab claw on blockship ships dredger, by belt
Land-based area backfill is carried out in the Belt Conveying to embankment of conveyer, mobile blockship is until form land-based area.
Preferred embodiment in accordance with the present invention, the embankment in step (1) are formed for segment sync.
Preferred embodiment in accordance with the present invention, the belt conveyor include bracket, bracket both ends on be arranged roll shaft,
The feed belt that is sheathed on roll shaft has been installed on motor on specific roll shaft for drive roller shaft rotation.
The surface of preferred embodiment in accordance with the present invention, the feed belt is equipped with V-arrangement raised line, is conveyed with increasing mud
Frictional force in journey.
Funnel, grab bucket is arranged in one end of the feed belt of the belt conveyor in preferred embodiment in accordance with the present invention
Machine is grabbed the mud come and is firstly placed in funnel, then the mud in funnel is placed on to one end of the feed belt of the belt conveyor
On, mud is delivered to by the other end of feed belt by the operation of feed belt, needs to backfill mud in embankment until being put into
Region in.
Preferred embodiment in accordance with the present invention, the grab claw and belt conveyor are individually positioned on two blockships, this
It is connected between two blockships by pull rod.
Preferred embodiment in accordance with the present invention, Grab grab the sea area of mud apart from 0.05-500 kilometers of embankment periphery.
Compared with prior art, the method in reclaiming land around sea domain of the invention, which has the following beneficial effects:, of the invention encloses sea
The method in epeirogenetic domain is grabbed by the mud that grab claw ships dredger to belt conveyor, and the concentration of the mud of backfill increases
High, water content reduces, and the construction cost in reclaiming land around sea domain is low, the duration is fast, environmentally protective, has prevented current strand and has inhaled ship sewage discharge
Pollute the status of environment.
Detailed description of the invention
Fig. 1 is the top view of grab claw of the present invention and belt conveyor.
Fig. 2 is the front view of grab claw of the present invention and belt conveyor.
Specific embodiment
Below in conjunction with specific embodiment, the present invention will be further described.It should be understood that following embodiment is merely to illustrate this
The range of invention and is not intended to limit the present invention.
Embodiment 1, certain reclaiming land around sea domain engineering
In conjunction with Fig. 1, Fig. 2, the construction method of the reclaiming land around sea domain engineering of the present embodiment includes the following steps:
Step (1) is arranged embankment in the peripheral section that need to enclose sea region, has the cooperation of blockship 1 in embankment, install on blockship 1
There are grab claw 2 and belt conveyor 3;
Step (2) grabs mud in the sea area that distance encloses sea region embankment periphery suitable distance using dredger, and shipping is extremely
Sea region is enclosed, close to 1 side of blockship;
Step (3) is grabbed using the mud that the grab claw 2 on blockship 1 ships dredger to belt conveyor 3, is passed through
The belt 33 of belt conveyor 3 is delivered to the region progress land-based area backfill for needing to backfill mud in embankment, while moving blockship 1
Mud backfill is carried out, until forming land-based area.
Preferably, the belt conveyor 3 include bracket 31, bracket 31 both ends on be arranged roll shaft 32, be sheathed on roller
Feed belt 33 on axis 32 has been installed on the motor rotated on specific roll shaft 32 for drive roller shaft 32 and (has not shown in figure
Out).It is highly preferred that the surface of the feed belt 33 is equipped with V-arrangement raised line 331, to increase the frictional force in mud transmission process.
In one end of the feed belt 33 of the belt conveyor 3, funnel 4 is set, grab claw 2 is grabbed the mud come and is firstly placed in funnel 4,
Then the mud in funnel 4 is placed on one end of feed belt 33 of the belt conveyor 3, passes through the fortune of feed belt 33
It is about to mud and is delivered to the other end of feed belt 33, until being put into the region for needing to backfill mud in embankment.It is highly preferred that
Grab claw 2 and belt conveyor 3 are individually positioned on two blockships 1, are connected between the two blockships 1 by pull rod 5.
Preferably, Grab grabs the sea area of mud apart from 0.05-500 kilometers of embankment periphery, for example, 10 kilometers, 50 kilometers,
100 kilometers, 200 kilometers or 400 kilometers.
The mud water content of method backfill of the invention is close with the water content of undisturbed soil, and generally less than 65%, it is native
Concentration is close to 100%.The strand of the prior art inhales the water content of the mud of ship hydraulic reclamation generally 300% or more, and native concentration exists
10%-20%.
Specific embodiments of the present invention are described in detail above, but it is only used as example, the present invention is not intended to limit
In particular embodiments described above.To those skilled in the art, it is any to the invention carry out equivalent modifications and replace
In generation, is also all among scope of the invention.Therefore, without departing from the spirit and scope of the invention made by equal transformation and repair
Change, all should be contained within the scope of the invention.
Claims (7)
1. a kind of method in reclaiming land around sea domain, which comprises the steps of:
Step (1) is arranged embankment on the periphery that need to enclose sea region, has blockship cooperation in embankment, be equipped on blockship grab claw and
Belt conveyor;
Step (2) grabs mud in the sea area that distance encloses sea region embankment periphery suitable distance using dredger, and shipping is to enclosing sea
Region, close to blockship side;
Step (3), is grabbed to belt conveyor using the mud that the grab claw on blockship ships dredger, by Belt Conveying
Land-based area backfill is carried out in the Belt Conveying to embankment of machine, mobile blockship is until form land-based area.
2. the method according to claim 1, wherein the embankment in step (1) is formed for segment sync.
3. the method according to claim 1, wherein the belt conveyor includes on the both ends of bracket, bracket
The roll shaft of setting, has been installed on the motor rotated on specific roll shaft for drive roller shaft at the feed belt being sheathed on roll shaft.
4. according to the method described in claim 3, it is characterized in that, the surface of the feed belt is equipped with V-arrangement raised line, to increase
Frictional force in mud transmission process.
5. according to the method described in claim 4, it is characterized in that, being arranged in one end of the feed belt of the belt conveyor
Funnel, grab claw are grabbed the mud come and are firstly placed in funnel, then the mud in funnel is placed on to the transmission of the belt conveyor
On one end of belt, mud is delivered to, until being put into embankment domestic demand by the other end of feed belt by the operation of feed belt
It backfills in the region of mud.
6. the method according to claim 1, wherein the grab claw and belt conveyor are individually positioned in two
On blockship, connected between the two blockships by pull rod.
7. the method according to claim 1, wherein Grab grabs the sea area of mud apart from embankment periphery 0.05-
500 kilometers.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811469233.0A CN109629517A (en) | 2018-11-28 | 2018-11-28 | A kind of method in reclaiming land around sea domain |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811469233.0A CN109629517A (en) | 2018-11-28 | 2018-11-28 | A kind of method in reclaiming land around sea domain |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109629517A true CN109629517A (en) | 2019-04-16 |
Family
ID=66070678
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811469233.0A Withdrawn CN109629517A (en) | 2018-11-28 | 2018-11-28 | A kind of method in reclaiming land around sea domain |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109629517A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111519681A (en) * | 2020-04-02 | 2020-08-11 | 中建四局第六建设有限公司 | Tool and method for backfilling fertilizer groove of deep foundation pit |
CN111794189A (en) * | 2020-07-15 | 2020-10-20 | 浙江恒昌建设有限公司 | Backfill system of enclosing sea and making field |
CN116219960A (en) * | 2023-02-17 | 2023-06-06 | 上海港湾基础建设(集团)股份有限公司 | Green island building process |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1997020995A1 (en) * | 1995-12-08 | 1997-06-12 | Nigel Chattey | Modular caissons for use in constructing, expanding and modernizing ports and harbors |
CN1632244A (en) * | 2005-01-18 | 2005-06-29 | 刘振东 | City internal river watercourse desilting construction process |
CN104355127A (en) * | 2014-11-04 | 2015-02-18 | 宁波高新区围海工程技术开发有限公司 | Sludge conveying system |
CN207130685U (en) * | 2017-06-29 | 2018-03-23 | 武汉二航路桥特种工程有限责任公司 | Island environment protection device is built in a kind of dredging markets solidification |
CN208136999U (en) * | 2018-05-05 | 2018-11-23 | 深圳市蛇口招商港湾工程有限公司 | A kind of mud transportation system |
-
2018
- 2018-11-28 CN CN201811469233.0A patent/CN109629517A/en not_active Withdrawn
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1997020995A1 (en) * | 1995-12-08 | 1997-06-12 | Nigel Chattey | Modular caissons for use in constructing, expanding and modernizing ports and harbors |
CN1632244A (en) * | 2005-01-18 | 2005-06-29 | 刘振东 | City internal river watercourse desilting construction process |
CN104355127A (en) * | 2014-11-04 | 2015-02-18 | 宁波高新区围海工程技术开发有限公司 | Sludge conveying system |
CN207130685U (en) * | 2017-06-29 | 2018-03-23 | 武汉二航路桥特种工程有限责任公司 | Island environment protection device is built in a kind of dredging markets solidification |
CN208136999U (en) * | 2018-05-05 | 2018-11-23 | 深圳市蛇口招商港湾工程有限公司 | A kind of mud transportation system |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111519681A (en) * | 2020-04-02 | 2020-08-11 | 中建四局第六建设有限公司 | Tool and method for backfilling fertilizer groove of deep foundation pit |
CN111519681B (en) * | 2020-04-02 | 2021-11-16 | 中建四局第六建设有限公司 | Tool and method for backfilling fertilizer groove of deep foundation pit |
CN111794189A (en) * | 2020-07-15 | 2020-10-20 | 浙江恒昌建设有限公司 | Backfill system of enclosing sea and making field |
CN116219960A (en) * | 2023-02-17 | 2023-06-06 | 上海港湾基础建设(集团)股份有限公司 | Green island building process |
CN116219960B (en) * | 2023-02-17 | 2024-06-25 | 上海港湾基础建设(集团)股份有限公司 | Green island building process |
WO2024169191A1 (en) * | 2023-02-17 | 2024-08-22 | 上海港湾基础建设(集团)股份有限公司 | Green island building process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109629517A (en) | A kind of method in reclaiming land around sea domain | |
CN101824820B (en) | Construction process for reclamation by hydraulic filling of silt and device thereof | |
CN103334469B (en) | The treatment system removed for inner city pollution of river bed mud and treatment process | |
CN104314129B (en) | For architectural engineering embankment dredging mud filling Mixing Machine and construction method thereof | |
WO2019076061A1 (en) | Disposal method for gold mine cyanide tailing paste | |
CN105731758A (en) | Sea dredged silt dewatering and solidifying treatment integrated device and method | |
CN102587979B (en) | Method for treating salty mud generated in rock salt solution mining sodium sulfate type brine purification | |
CN109208537A (en) | A kind of dredging markets solidify the construction method for building island | |
CN104355127A (en) | Sludge conveying system | |
CN102704496B (en) | Method for achieving slurry water separation and solidification of filling soil by utilizing filling bag and construction device | |
CN101445313B (en) | Device for reutilization and treatment of oil-containing silt | |
CN108313218B (en) | Ocean mining and mineral separation platform | |
CN201605617U (en) | Combined type reservoir desilting device | |
CN201842221U (en) | High concentration soil curing pumping vessel | |
RU2052130C1 (en) | Process of hardening filling of underground workings with waste of metallurgical works and equipment for its implementation | |
CN202644475U (en) | Filling device for separation and solidification of muddy water | |
CN111203313A (en) | Coastal zirconite sand mining and selecting platform and mining and selecting process thereof | |
CN101314532A (en) | Industry method of oil backfilling by manufacturing alkaline residue after the entire cleaning of the alkaline residue pool | |
CN109944288A (en) | A kind of coal mine underground sump clearing and digging machine device people and clear excavation method | |
CN204238282U (en) | For construction work embankment dredged mud filling Mixing Machine | |
CN213231777U (en) | Electric underground water remediation system | |
CN205259151U (en) | Fast cloth put and retrieve from inflatable railing for oil system | |
CN110482810B (en) | Method for water-resisting solidification of underwater sludge and solidification device used by method | |
CN207130685U (en) | Island environment protection device is built in a kind of dredging markets solidification | |
CN202644610U (en) | Dredging device of environmental protection air hydraulic suction dredge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20190416 |