CN109629425A - The construction method on pole bracket and the composite steel concrete bridge concrete edge of a wing using pole bracket - Google Patents

The construction method on pole bracket and the composite steel concrete bridge concrete edge of a wing using pole bracket Download PDF

Info

Publication number
CN109629425A
CN109629425A CN201811489002.6A CN201811489002A CN109629425A CN 109629425 A CN109629425 A CN 109629425A CN 201811489002 A CN201811489002 A CN 201811489002A CN 109629425 A CN109629425 A CN 109629425A
Authority
CN
China
Prior art keywords
steel
pole bracket
bracket
limiter
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811489002.6A
Other languages
Chinese (zh)
Other versions
CN109629425B (en
Inventor
聂鑫
郭宇韬
樊健生
陶慕轩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tsinghua University
Original Assignee
Tsinghua University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tsinghua University filed Critical Tsinghua University
Priority to CN201811489002.6A priority Critical patent/CN109629425B/en
Publication of CN109629425A publication Critical patent/CN109629425A/en
Application granted granted Critical
Publication of CN109629425B publication Critical patent/CN109629425B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/10Cantilevered erection

Abstract

A kind of construction method on the composite steel concrete bridge concrete edge of a wing the present invention provides removable pole bracket and using pole bracket.The pole bracket includes: steel bracket, bolt, round steel bar, billet and rotary limit device;The shape of steel bracket is obtuse triangle, and obtuse angle end is provided with connecting plate;Acute ends are provided with steel bushing;One end of round steel bar is fixedly connected with billet, and the other end passes through steel bushing;Billet is abutted with steel beam web plate;Rotary limit device includes first limiter and second limiter;Internal screw thread corresponding with the external screw thread on round steel bar is provided in first limiter and second limiter;First limiter and second limiter pass through external screw thread and inner screw sheath is located on the round steel bar, and are located at the both ends of steel bushing, and steel bushing is fixed on the round steel bar.The Fast Installation and disassembly of pole bracket may be implemented using the present invention, improve speed of application, save use cost, and to structure without destruction.

Description

Pole bracket and the composite steel concrete bridge concrete edge of a wing for using pole bracket Construction method
Technical field
This application involves building structure technology fields, more particularly to one kind to be used for the composite steel concrete bridge concrete edge of a wing The construction method on the pole bracket of construction and the composite steel concrete bridge concrete edge of a wing using pole bracket.
Background technique
Composite steel concrete bridge refers to be connect integral and considers with concrete slab by girder steel by shear connector The bridge structure form of common stress.Compared to steel structural bridge, composite bridge is small with steel using amount, rigidity is big, Compression Stability is good The advantages that, compared to concrete bridge, composite bridge has many advantages, such as that structure height is low, small, the applicable span of self weight is big, ductility is high.This Outside, composite beam bridge is convenient for the factorial production using reasonable manufacture and working procedure, installation quality is high, operating expenses is low, Speed of application is fast.
Composite bridge has obtained a large amount of application in China.When composite steel concrete bridge is constructed, the concrete edge of a wing Plate is poured to control action from the duration.Pass through superimposed sheet bridge floor plate technique (Nie Jianguo, Liu Ming, the flat steel-concrete group of blade row Conjunction structure [M] China Construction Industry Press, 2005), concrete slab partial precast is become into superimposed sheet, as coagulation Template when soil pours, integral common stress after rear pouring concrete solidification, eliminates full cast-in-place concrete floorings Template erection problem, greatly improve speed of application.
However, concrete slab cantilever flange portions, pour at present in also need using pole bracket mold method, and it is outstanding The installation of arm support mostly uses welding, needs to cut bolt, connecting plate etc. when dismantling, easily causes destruction to structure, It is beautiful to influence structure, speed of application is slow.
Summary of the invention
In view of this, being mixed the present invention provides a kind of pole bracket and using the composite steel concrete bridge of pole bracket The construction method on the solidifying soil edge of a wing improves speed of application so as to realize the Fast Installation and disassembly of pole bracket, saves and uses Cost, and to structure without destruction.
Technical solution of the present invention is specifically achieved in that
A kind of removable pole bracket for the construction of the composite steel concrete bridge concrete edge of a wing, the removable cantilever branch Frame includes: steel bracket, bolt, round steel bar, billet and rotary limit device;
The shape of the steel bracket is obtuse triangle;The obtuse angle end of the steel bracket is provided with connecting plate;The connection The bolt hole for passing through for bolt is provided on plate;
One acute ends of the steel bracket are provided with steel bushing;
One end of the round steel bar is fixedly connected with the billet;The billet is abutted with steel beam web plate;The circle The other end of steel pole passes through the steel bushing;External screw thread is provided on the round steel bar;
The rotary limit device includes first limiter and second limiter;The first limiter and second limiter In be provided with internal screw thread corresponding with the external screw thread on the round steel bar;
The first limiter and second limiter pass through the external screw thread and inner screw sheath is located on the round steel bar, And the both ends of the steel bushing are located at, the steel bushing is fixed on the round steel bar.
Preferably, the bolt is dismountable hex bolts.
Preferably, the steel bushing and the steel bracket are integrally formed.
Preferably, the steel bracket is welded using fashioned iron or round steel pipe.
Preferably, the removable pole bracket further include: washer;
The washer is arranged between the bolt and the bottom of girder steel top flange sponson.
The present invention also provides a kind of constructions on composite steel concrete bridge concrete edge of a wing using above-mentioned pole bracket Method, this method comprises the following steps:
Required pole bracket is selected according to demand;
According to the thickness of the stress size of selected pole bracket and girder steel top flange, the ruler of used bolt is determined Very little and quantity;
Threaded hole is opened up on the girder steel top flange sponson on the composite steel concrete bridge concrete edge of a wing;
Bolt is passed through into the threaded hole on connecting plate and the threaded hole on girder steel top flange, the top of pole bracket is consolidated Due to the bottom of girder steel top flange, and by the position of rotary limit device adjusting round steel bar, so that billet and girder steel upper limb Steel beam web plate under edge sponson is held out against, and steel bushing is fixed on round steel bar;
It installs and is poured with cushion block and template on pole bracket;Then continue that prefabricated superimposed sheet is installed if it is superimposed sheet;
Carry out pouring for concrete slab cantilever part;
After concrete setting, back-out bolt, removes pole bracket;
To the safeguard procedures for carrying out the later period at the threaded hole on girder steel top flange.
As above as it can be seen that in the present invention for the composite steel concrete bridge concrete edge of a wing construction removable cantilever branch In frame, due to having used the bracing members of detachable bolt and contact as the mode that is connected and fixed, above-mentioned pole bracket Top is to be bolted, and the billet of lower part is only abutted with steel beam web plate, and is not to be fixedly connected with steel beam web plate, Therefore it is fixed by the bolt on top and the positioning of the rotary limit device of lower part can be realized and be quickly installed, in installation process not It needs to weld, and it is small to bolt workload;And after concreting is completed, only bolt need to directly be back-outed, avoid Traditional pole bracket process to be cut when dismantling, may be implemented fast quick-detach, so as to greatly improve speed of application.Separately Outside, after being disassembled, all components can be repeatedly utilized so that entire pole bracket, thus can be effectively saved use at This, increases economic efficiency.In addition, the entire disassembly process of the above-mentioned pole bracket in the present invention is without welding and cuts, to knot Structure is without destruction, therefore the influence to original structure is small, and the influence to ambient enviroment is small, and convenient beauty meets the requirement of green construction. In addition, the stress of the pole bracket in the present invention is clear, force path is clear, and power transmission is reliable, convenient for calculating and designing, can apply In the composite structure of any section form with the overhanging edge of a wing of girder steel.
Detailed description of the invention
Fig. 1 is the removable cantilever branch for the construction of the composite steel concrete bridge concrete edge of a wing in the embodiment of the present invention Frame uses schematic diagram (the cantilever edge of a wing is all cast-in-place).
Fig. 2 is the removable cantilever branch for the construction of the composite steel concrete bridge concrete edge of a wing in the embodiment of the present invention Frame uses schematic diagram (the cantilever edge of a wing uses superimposed sheet, and part is cast-in-place).
Fig. 3 is the removable cantilever branch for the construction of the composite steel concrete bridge concrete edge of a wing in the embodiment of the present invention The side view of frame.
Fig. 4 is the structural schematic diagram of the steel bracket in the embodiment of the present invention.
Fig. 5 be the embodiment of the present invention in round steel bar, billet and rotary limit device structural schematic diagram.
Fig. 6 is the removable cantilever branch for the construction of the composite steel concrete bridge concrete edge of a wing in the embodiment of the present invention The stress sketch of frame.
Fig. 7 is the flow diagram of the construction method on the composite steel concrete bridge concrete edge of a wing in the embodiment of the present invention.
Specific embodiment
For technical solution of the present invention and advantage is more clearly understood, below in conjunction with drawings and the specific embodiments, to this Invention is described in further detail.
As shown in fig. 1~fig. 5, in the embodiment of the present invention for the composite steel concrete bridge concrete edge of a wing construction can Dismounting pole bracket includes: steel bracket 11, bolt 12, round steel bar 13, billet 14 and rotary limit device 15;
The shape of the steel bracket 11 is obtuse triangle;The obtuse angle end of the steel bracket 11 is provided with connecting plate 16;Institute State the bolt hole 17 being provided on connecting plate 16 for passing through for bolt 12;
One acute ends of the steel bracket 11 are provided with steel bushing 18;
One end of the round steel bar 13 is fixedly connected with the billet 14;The billet 14 is supported with steel beam web plate 10 It connects;The other end of the round steel bar 13 passes through the steel bushing 18;External screw thread 31 is provided on the round steel bar 13;
The rotary limit device 15 includes first limiter 51 and second limiter 52;The first limiter 51 and Internal screw thread 53 corresponding with the external screw thread 31 on the round steel bar 13 is provided in two limiters 52;
The first limiter 51 and second limiter 52 are set in by the external screw thread 31 and internal screw thread 53 described On round steel bar 13, and the both ends of the steel bushing 18 are located at, the steel bushing 18 is fixed on the round steel bar 13.
It, can be first outside the girder steel top flange on the composite steel concrete bridge concrete edge of a wing when stating pole bracket in use Threaded hole 20 is opened up in extending portion point, it is then that the threaded hole 20 and the threaded hole 17 on the connecting plate 16 at steel bracket obtuse angle end is right Together, then by bolt 12 it is each passed through threaded hole 17 and above-mentioned threaded hole 20, is tightened with tool, thus by the top of above-mentioned pole bracket Portion is fixed on the bottom of girder steel top flange sponson.Then, by rotation first limiter and second limiter, round steel is adjusted The position of bar, so that billet is held out against with the steel beam web plate under the sponson of girder steel top flange;It adjusts and then twists in position Tight first limiter and second limiter, the steel bushing is fixed on the round steel bar.
In addition, preferably, in one particular embodiment of the present invention, the bolt is dismountable hex bolts.
In addition, preferably, in one particular embodiment of the present invention, the steel bushing and the steel bracket are integrated into Type.Certainly, in another specific embodiment, the steel bushing can also be directly welded to the acute ends of the steel bracket On.
In addition, preferably, in one particular embodiment of the present invention, the steel bracket is using fashioned iron or round steel pipe It is welded.
In addition, preferably, in one particular embodiment of the present invention, the pole bracket further include: washer 19;It is described Washer 19 is arranged between the bolt 12 and the bottom of girder steel top flange sponson.
In the inventive solutions, the top of above-mentioned pole bracket is solid by bolt and girder steel top flange sponson It is fixed, it is provided vertically and lateral support for steel bracket, and the billet of pole bracket lower part is then abutted with steel beam web plate, for cantilever Bracket provides lateral support.Therefore, the gravity of cantilever water-bearing concreae is the bolt by being fixed on girder steel top flange and support In billet and round steel bar shared on steel beam web plate.
In addition, since the shape of the steel bracket of the pole bracket in the present invention is obtuse triangle, so that the steel branch Its Compression Stability is improved so as to shorten the bearing length of round steel bar relatively close to the direction of steel beam web plate in the lower end of frame.
Due to being to be bolted, and the billet of lower part is only abutted with steel beam web plate at the top of above-mentioned pole bracket, It and is not to be fixedly connected with steel beam web plate, therefore fixed by the bolt on top and the positioning of the rotary limit device of lower part Realization is quickly installed, and does not need to weld in installation process, and it is small to bolt workload;And after concreting is completed, only Bolt need to directly be back-outed, avoid process to be cut when the disassembly of traditional pole bracket, fast quick-detach may be implemented, So as to greatly improve speed of application.In addition, entire pole bracket, after being disassembled, all components are repeatable sharp With, therefore it can be effectively saved use cost, it increases economic efficiency.In addition, above-mentioned pole bracket in the present invention is entire Disassembly process welding, without cutting, therefore the influence to original structure is small, and the influence to ambient enviroment is small, meets green construction It is required that.In addition, the stress of the pole bracket in the present invention is clear, force path is clear, and power transmission is reliable, convenient for calculating and designing.
Fig. 6 is the removable cantilever branch for the construction of the composite steel concrete bridge concrete edge of a wing in the embodiment of the present invention The stress sketch of frame.It assume that and be provided with multiple above-mentioned pole brackets on the sponson of girder steel top flange, and set girder steel The length of top flange sponson is 1.5m, and thickness is uniformly 0.3m, and the space D between two neighboring pole bracket is 2.0m, The high H of pole bracket is 0.5m, and girder steel uses Q345 steel, and top flange thickness 20mm, concrete density 25kN/m3 then have:
Act on resultant force G=1.5 × 0.3 × 2.0 × 25=22.5kN of gravity on pole bracket;
The vertical directed force F being subject at bolt1y=G=22.5kN;
The distance between the gravity point of water-bearing concreae and bolt L=0.75m;
The horizontal applied force F being subject at bolt1x=F2=GL/H=33.8kN.
Wherein, F2For lateral support provided by round steel bar.
If girder steel top flange thickness is 20mm, the maximum gauge of threaded hole is 20mm, and material is calculated according to Q345. The load is smaller, and using plain bolt M24, Q345 material, plain nut uses 4.6 materials, and tensile bearing capacity guarantees Load is 79.4kN (" GBT3098.1-2000 fastener mechanical performance bolt, screw and stud "), and shear-carrying capacity guarantees Load are as follows:
225/31/2×π×122/ 1000=58.8kN,
The nut of M24 bolt is with a thickness of 21.5mm (" GB/T6170-2000 hex nut "), and bearing capacity is according to 20/ 21.5=93.0% reduction, guarantee load after reduction are 73.8kN and 54.7kN, 22.5/73.8+33.8/54.7=0.92 < 1.0, meet design requirement.In the inventive solutions, the size of steel bracket constructs use by and can meet the requirements. Big bracket spacing (for example, 5m) is such as used, then can increase the Number of Bolts (for example, using 2 bolts) at top to reach design It is required that.
In addition, in the inventive solutions, it is also proposed that a kind of steel-concrete combination using above-mentioned pole bracket The construction method on the bridge concrete edge of a wing.
Fig. 7 is the flow diagram of the construction method on the composite steel concrete bridge concrete edge of a wing in the embodiment of the present invention. As shown in fig. 7, in the inventive solutions, the construction method on the composite steel concrete bridge concrete edge of a wing includes such as Lower step:
Step 71, required pole bracket is selected according to demand.
In the inventive solutions, can be according to the specific requirements of Practical Project, the cantilever branch that is used needed for selection The size and spacing of frame.Required pole bracket can be directly made according to demand, and existing can be used directly also can be used Pole bracket.
Step 72, according to the thickness of the stress size of selected pole bracket and girder steel top flange, determine used in The size and quantity of bolt.
In the inventive solutions, under normal circumstances, using common bolt.
In addition, stress sketch according to figure 6, have formula below to set up:
G=F1y, F1x=F2, GL=F1xH;
Therefore, in of the invention one preferable specific embodiment, can also be made according to above-mentioned formula to determine The size and quantity of bolt.
Step 73, threaded hole is opened up on the girder steel top flange sponson on the composite steel concrete bridge concrete edge of a wing.
It in the inventive solutions, can be according to the practical application scene of engineering (for example, structure is all cast-in-place goes back It is that part is cast-in-place etc.), select a suitable position (for example, having corresponding construction to grasp on the sponson of girder steel top flange Make space, do not interfered with each other with other structures part), then screw thread is opened up in girder steel top flange on selected position Hole.Under normal circumstances, it can open up along girder steel top flange through thickness through threaded hole.
Step 74, bolt is passed through into the threaded hole on connecting plate and the threaded hole on girder steel top flange, by pole bracket Top be fixed on the bottom of girder steel top flange, and the position of round steel bar is adjusted by rotary limit device so that billet with Steel beam web plate under the sponson of girder steel top flange is held out against, and steel bushing is fixed on round steel bar.
In the inventive solutions, threaded hole 20 can be aligned with threaded hole 17, then bolt is each passed through spiral shell Pit 17 and above-mentioned threaded hole 20, are tightened with tool, thus overhanging by girder steel top flange is fixed at the top of above-mentioned pole bracket Partial bottom;Then, it is rotated further by first limiter and second limiter, the position of round steel bar is adjusted, so that billet and steel Steel beam web plate under the sponson of beam top flange is held out against;Adjust and then tighten first limiter and the second limit in position The steel bushing is fixed on the round steel bar by device.
Step 75, it installs and is poured with cushion block and template on pole bracket;Then continue to install if it is superimposed sheet prefabricated folded Plywood.
Step 76, pouring for concrete slab cantilever part is carried out.
Step 77, after concrete setting, back-out bolt, remove pole bracket.
Step 78, to the safeguard procedures for carrying out the later period at the threaded hole on girder steel top flange.
For example, in of the invention one preferable specific embodiment, can at the threaded hole on girder steel top flange into The safeguard procedures such as row later period coating.
Through the above steps 71~78, the construction on the composite steel concrete bridge concrete edge of a wing can be completed.
In conclusion in the inventive solutions, due to the pole bracket using detachable bolt with connect The bracing members of touch are to be bolted at the top of above-mentioned pole bracket as mode is connected and fixed, and the billet of lower part It is only abutted with steel beam web plate, and is not to be fixedly connected with steel beam web plate, therefore fixed by the bolt on top and the rotation of lower part Turning limiting device positioning can be realized and be quickly installed, and not need to weld in installation process, and it is small to bolt workload;And work as coagulation After soil pours completion, only bolt need to directly be back-outed, avoid process to be cut when the disassembly of traditional pole bracket, Fast quick-detach may be implemented, so as to greatly improve speed of application.In addition, entirely pole bracket is after being disassembled, institute Some components can be repeatedly utilized so that, therefore can be effectively saved use cost, increase economic efficiency.In addition, in the present invention For the entire disassembly process of above-mentioned pole bracket without welding and cutting, to structure without destruction, therefore the influence to original structure is small, right The influence of ambient enviroment is small, and convenient beauty meets the requirement of green construction.In addition, the stress of the pole bracket in the present invention is bright Really, force path is clear, and power transmission is reliable, convenient for calculating and designing, can be applied to any section shape with the overhanging edge of a wing of girder steel The composite structure of formula.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Within mind and principle, any modification, equivalent substitution, improvement and etc. done be should be included within the scope of the present invention.

Claims (6)

1. a kind of removable pole bracket for the construction of the composite steel concrete bridge concrete edge of a wing, which is characterized in that this is removable Filling pole bracket includes: steel bracket, bolt, round steel bar, billet and rotary limit device;
The shape of the steel bracket is obtuse triangle;The obtuse angle end of the steel bracket is provided with connecting plate;On the connecting plate It is provided with the bolt hole for passing through for bolt;
One acute ends of the steel bracket are provided with steel bushing;
One end of the round steel bar is fixedly connected with the billet;The billet is abutted with steel beam web plate;The round steel bar The other end pass through the steel bushing;External screw thread is provided on the round steel bar;
The rotary limit device includes first limiter and second limiter;It is set in the first limiter and second limiter It is equipped with internal screw thread corresponding with the external screw thread on the round steel bar;
The first limiter and second limiter pass through the external screw thread and inner screw sheath is located on the round steel bar, and point Not Wei Yu the steel bushing both ends, the steel bushing is fixed on the round steel bar.
2. removable pole bracket according to claim 1, it is characterised in that:
The bolt is dismountable hex bolts.
3. removable pole bracket according to claim 1, it is characterised in that:
The steel bushing and the steel bracket are integrally formed.
4. removable pole bracket according to claim 1, it is characterised in that:
The steel bracket is welded using fashioned iron or round steel pipe.
5. removable pole bracket according to claim 1, which is characterized in that the removable pole bracket further include: Washer;
The washer is arranged between the bolt and the bottom of girder steel top flange sponson.
6. a kind of construction party on the composite steel concrete bridge concrete edge of a wing using the pole bracket as described in claim 1 to 5 Method, which is characterized in that this method comprises the following steps:
Required pole bracket is selected according to demand;
According to the thickness of the stress size of selected pole bracket and girder steel top flange, determine used in bolt size with Quantity;
Threaded hole is opened up on the girder steel top flange sponson on the composite steel concrete bridge concrete edge of a wing;
Bolt is passed through into the threaded hole on connecting plate and the threaded hole on girder steel top flange, will be fixed at the top of pole bracket The bottom of girder steel top flange, and by the position of rotary limit device adjusting round steel bar, so that outside billet and girder steel top flange Steel beam web plate under extending portion point is held out against, and steel bushing is fixed on round steel bar;
It installs and is poured with cushion block and template on pole bracket;Then continue that prefabricated superimposed sheet is installed if it is superimposed sheet;
Carry out pouring for concrete slab cantilever part;
After concrete setting, back-out bolt, removes pole bracket;
To the safeguard procedures for carrying out the later period at the threaded hole on girder steel top flange.
CN201811489002.6A 2018-12-06 2018-12-06 Cantilever support and construction method of concrete flange of steel-concrete combined bridge using cantilever support Active CN109629425B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811489002.6A CN109629425B (en) 2018-12-06 2018-12-06 Cantilever support and construction method of concrete flange of steel-concrete combined bridge using cantilever support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811489002.6A CN109629425B (en) 2018-12-06 2018-12-06 Cantilever support and construction method of concrete flange of steel-concrete combined bridge using cantilever support

Publications (2)

Publication Number Publication Date
CN109629425A true CN109629425A (en) 2019-04-16
CN109629425B CN109629425B (en) 2020-04-10

Family

ID=66071579

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811489002.6A Active CN109629425B (en) 2018-12-06 2018-12-06 Cantilever support and construction method of concrete flange of steel-concrete combined bridge using cantilever support

Country Status (1)

Country Link
CN (1) CN109629425B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201406639Y (en) * 2009-05-20 2010-02-17 北京城乡建设集团有限责任公司 Support of construction formworks of side flange plate of concrete-steel beam
JP5020163B2 (en) * 2008-05-29 2012-09-05 日鐵住金建材株式会社 Support for overhanging slab
CN103388310A (en) * 2013-08-09 2013-11-13 北京市公路桥梁建设集团有限公司 Single-point fixing adjustable cantilever tripod
CN108193599A (en) * 2017-12-28 2018-06-22 中铁十局集团第四工程有限公司 Concrete-steel Beam cast-in-place flange plate cantilevered support structure system and construction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5020163B2 (en) * 2008-05-29 2012-09-05 日鐵住金建材株式会社 Support for overhanging slab
CN201406639Y (en) * 2009-05-20 2010-02-17 北京城乡建设集团有限责任公司 Support of construction formworks of side flange plate of concrete-steel beam
CN103388310A (en) * 2013-08-09 2013-11-13 北京市公路桥梁建设集团有限公司 Single-point fixing adjustable cantilever tripod
CN108193599A (en) * 2017-12-28 2018-06-22 中铁十局集团第四工程有限公司 Concrete-steel Beam cast-in-place flange plate cantilevered support structure system and construction method

Also Published As

Publication number Publication date
CN109629425B (en) 2020-04-10

Similar Documents

Publication Publication Date Title
CN109629424A (en) The construction method on pole bracket and the composite steel concrete bridge concrete edge of a wing using pole bracket
CN105484151B (en) The construction and its construction method connected between a kind of enhancing precast concrete segment
CN106284045A (en) A kind of secondary overlapping concrete slab girder steel combined bridge structure and construction method thereof
CN103276651B (en) No-cutting-seam cement concrete pavement structure and construction method thereof
CN107227821A (en) A kind of dry type connects precast assembly steel reinforced concrete combination beam
CN208122301U (en) A kind of floor support plate supporting apparatus
CN108532796A (en) Assembly concrete shear wall and face inner beam rigid connection node and construction method
CN205205646U (en) Structure of reinforcing prefabricated segment formula concrete bridge intersegmental connection of festival
CN207988490U (en) A kind of easy device that deformation joint shear wall formwork installs
CN215888972U (en) Large-span slow-bonding prestressed beam
CN107060323B (en) A kind of pulling-on piece structure aluminum alloy mould plate early tears system and construction method open
CN207296413U (en) A kind of light-duty assembled template stent
CN105113781B (en) Device is set up in a kind of overhanging complete pre-buried installation in side of setting a roof beam in place
CN207714129U (en) A kind of wet seam construction of floorings using T reinforcing bars
CN205874944U (en) Double T type wave form steel web profiled steel sheet combination beam
CN209384624U (en) A kind of builder&#39;s jack type steel support beam and anchor
CN209976016U (en) Combined steel formwork keel support with steel bar protection layer support
CN205557838U (en) Assembled antidetonation honeycomb girder steel - shear force wall connection structure
CN109629425A (en) The construction method on pole bracket and the composite steel concrete bridge concrete edge of a wing using pole bracket
CN215105454U (en) Prefabricated and cast-in-place piled raft foundation that combines together
CN209163422U (en) The fixed builder&#39;s jack of high-strength bolt oblique pull
CN210622367U (en) Prestressed concrete hollow slab reinforcing device
CN208899352U (en) A kind of concrete arch rib Covered with Angles sleeve-board group and its bracing means
CN206926045U (en) Superimposed sheet mould holder
CN208202336U (en) Prefabricated assembled steel-profiled sheet concrete combination beam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant