CN209163422U - High-strength bolt diagonal pulling fixed type overhanging scaffold - Google Patents

High-strength bolt diagonal pulling fixed type overhanging scaffold Download PDF

Info

Publication number
CN209163422U
CN209163422U CN201822043219.6U CN201822043219U CN209163422U CN 209163422 U CN209163422 U CN 209163422U CN 201822043219 U CN201822043219 U CN 201822043219U CN 209163422 U CN209163422 U CN 209163422U
Authority
CN
China
Prior art keywords
fixed
wall
bolt
steel pipe
strength bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822043219.6U
Other languages
Chinese (zh)
Inventor
王富
李雨豪
鄢瑞文
刘金波
邵利永
高阳
谭海燕
黄冶
郭建军
张秀平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
Third Construction Co Ltd of China Construction First Group Co Ltd
Original Assignee
China Construction First Group Corp Ltd
Third Construction Co Ltd of China Construction First Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, Third Construction Co Ltd of China Construction First Group Co Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN201822043219.6U priority Critical patent/CN209163422U/en
Application granted granted Critical
Publication of CN209163422U publication Critical patent/CN209163422U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

本实用新型提供高强螺栓斜拉固定式悬挑脚手架,包括墙体,所述墙体右端通过穿墙螺栓固定型钢支座,所述型钢支座右上端焊接下节拉杆,所述下节拉杆上端通过螺纹连接套筒,所述套筒内上部通过螺纹连接上节拉杆,所述上节拉杆上端通过穿墙螺栓固定在墙体上,所述型钢支座架体上端安装脚手板,所述脚手板上端右部安装踢脚板,所述脚手板上端通过螺栓固定钢管,所述钢管设置在套筒后侧,所述钢管上端通过连墙件与墙体右上端连接,所述钢管右侧捆绑安全网,该设计节约材料,制作、安装及拆卸方便,安全可靠,既保证了施工进度,又取得了良好的经济效益。

The utility model provides a high-strength bolt oblique-pulling fixed cantilevered scaffold, which comprises a wall body, the right end of the wall body is fixed with a profiled steel support through wall bolts, the upper right end of the profiled steel support is welded with a lower section tie rod, and the upper end of the lower section tie rod is welded. The sleeve is threadedly connected, the inner and upper part of the sleeve is threadedly connected to the upper tie rod, the upper end of the upper tie rod is fixed on the wall by means of wall bolts, the upper end of the profiled steel support frame body is installed with a scaffolding board, and the foot A skirting board is installed on the upper right part of the hand board, the steel pipe is fixed by bolts at the upper end of the foot board, the steel pipe is arranged on the back side of the sleeve, the upper end of the steel pipe is connected with the upper right end of the wall through a connecting wall piece, and the right side of the steel pipe is bound with a safety net , The design saves materials, is convenient for fabrication, installation and disassembly, is safe and reliable, not only ensures the construction progress, but also achieves good economic benefits.

Description

高强螺栓斜拉固定式悬挑脚手架High-strength bolt oblique-pulling fixed cantilever scaffolding

技术领域technical field

本实用新型是高强螺栓斜拉固定式悬挑脚手架,属于建筑施工设备领域。The utility model relates to a high-strength bolt oblique-pulling fixed overhanging scaffold, which belongs to the field of building construction equipment.

背景技术Background technique

目前,随着城市化进程的加快,建筑业对工程的施工进度和工程品质提出了更高要求。当框架结构或剪力墙结构采用悬挑脚手架时,如何加快悬挑层的施工速度、减少渗漏隐患,成为现阶段的一个施工难点。At present, with the acceleration of the urbanization process, the construction industry has put forward higher requirements for the construction progress and quality of the project. When the frame structure or the shear wall structure adopts the cantilevered scaffold, how to speed up the construction speed of the cantilever layer and reduce the hidden leakage has become a construction difficulty at the current stage.

现有技术中,使用传统的型钢悬挑脚手架,悬挑层型钢铺设时间较长,且必须保证型钢锚固端长度不小于1.25倍悬挑端长度的规范要求,导致悬挑层在作业面内存在较多的型钢和穿墙洞,不利于后期二次结构施工穿插,且作业时,脚手板缝隙容易落下灰尘,影响下层的人员作业,甚至进入眼部,所以急需高强螺栓斜拉固定式悬挑脚手架来解决上述出现的问题。In the prior art, using the traditional section steel cantilever scaffolding, the laying time of the section steel of the cantilever layer is long, and the length of the section steel anchorage end must be guaranteed not less than 1.25 times the length of the cantilever end, resulting in the existence of the cantilever layer on the working surface. There are many profiles and holes through the wall, which is not conducive to the interspersed construction of the secondary structure in the later stage, and during operation, the gap between the scaffolding board is easy to drop dust, which affects the operation of the lower-level personnel, and even enters the eyes. Therefore, high-strength bolts are urgently needed. Scaffolding to solve the above problems.

实用新型内容Utility model content

针对现有技术存在的不足,本实用新型目的是提供高强螺栓斜拉固定式悬挑脚手架,以解决上述背景技术中提出的问题,本实用新型节约材料,制作、安装及拆卸方便,安全可靠,既保证了施工进度,又取得了良好的经济效益。In view of the deficiencies in the prior art, the purpose of the present invention is to provide a high-strength bolt oblique-pulled fixed cantilever scaffold to solve the problems raised in the above-mentioned background technology. It not only ensures the construction progress, but also achieves good economic benefits.

为了实现上述目的,本实用新型是通过如下的技术方案来实现:高强螺栓斜拉固定式悬挑脚手架,包括墙体,所述墙体右端通过穿墙螺栓固定型钢支座,所述型钢支座右上端焊接下节拉杆,所述下节拉杆上端通过螺纹连接套筒,所述套筒内上部通过螺纹连接上节拉杆,所述上节拉杆上端通过穿墙螺栓固定在墙体上,所述型钢支座上端安装脚手板,所述脚手板上端右部安装踢脚板,所述脚手板上端通过螺栓固定钢管,所述钢管设置在套筒后侧,所述钢管上端通过连墙件与墙体右上端连接,所述钢管右侧捆绑安全网,所述脚手板下端固定防尘机构,所述防尘机构包括吸盘一、固定条、防尘布、转动杆、盘簧、固定块以及吸盘二,所述吸盘一固定在脚手板下端左部,所述固定条通过连接绳与吸盘一相连接,所述防尘布左端与固定条固定连接,所述转动杆通过盘簧安装在固定块内,所述防尘布右端缠绕在转动杆环形侧面上,所述固定块通过连接绳固定在吸盘二下端,所述吸盘二固定在脚手板下端右部In order to achieve the above purpose, the utility model is realized by the following technical solutions: a high-strength bolt oblique-pulling fixed cantilever scaffold, including a wall body, the right end of the wall body is fixed with a profiled steel support by means of through-wall bolts, and the profiled steel support The upper right end is welded with the lower tie rod, the upper end of the lower tie rod is connected with the sleeve by the thread, the inner and upper part of the sleeve is connected with the upper tie rod by the thread, and the upper end of the upper tie rod is fixed on the wall by the wall bolt, the said A scaffolding board is installed on the upper end of the section steel support, a skirting board is installed on the upper right part of the scaffolding board, the steel pipe is fixed by bolts at the upper end of the scaffolding board, the steel pipe is arranged on the rear side of the sleeve, and the upper end of the steel pipe is connected to the upper right of the wall through a connecting wall piece. The right side of the steel pipe is bound with a safety net, and the lower end of the scaffolding plate is fixed with a dust-proof mechanism, which includes a suction cup 1, a fixing strip, a dust-proof cloth, a rotating rod, a coil spring, a fixing block and a suction cup 2. The suction cup is fixed on the left part of the lower end of the scaffolding plate, the fixing strip is connected with the suction cup through a connecting rope, the left end of the dustproof cloth is fixedly connected with the fixing strip, and the rotating rod is installed in the fixing block through a coil spring, The right end of the dustproof cloth is wound on the annular side surface of the rotating rod, the fixing block is fixed on the lower end of the second suction cup through the connecting rope, and the second suction cup is fixed on the right part of the lower end of the scaffolding board.

在一实施例中,所述固定块右端开设螺纹孔,所述螺纹孔内通过螺纹连接紧固螺栓,所述紧固螺栓左端与转动杆相接触。In one embodiment, a threaded hole is formed at the right end of the fixing block, a fastening bolt is threaded in the threaded hole, and the left end of the fastening bolt is in contact with the rotating rod.

在一实施例中,所述墙体右端开设预留孔,所述预留孔内固定预留管,所述穿墙螺栓穿过预留管内。In one embodiment, a reserved hole is formed at the right end of the wall, a reserved pipe is fixed in the reserved hole, and the wall-penetrating bolt passes through the reserved pipe.

在一实施例中,所述穿墙螺栓两侧设置钢垫片,且通过双螺帽进行固定。In one embodiment, steel washers are provided on both sides of the wall bolt, and are fixed by double nuts.

在一实施例中,所述上节拉杆环形侧面下部加工螺纹,所述套筒内加工螺纹,所述下节拉杆环形侧面上部加工螺纹。In one embodiment, threads are processed on the lower part of the annular side surface of the upper tie rod, threads are processed in the sleeve, and threads are processed on the upper part of the annular side surface of the lower tie rod.

本实用新型的有益效果:本实用新型的高强螺栓斜拉固定式悬挑脚手架,因添加了墙体、型钢支座、上节拉杆、下节拉杆、套筒、穿墙螺栓、钢管、脚手板、踢脚板、安全网以及连墙件,该设计节约材料,制作、安装及拆卸方便,安全可靠,既保证了施工进度,又取得了良好的经济效益,解决了使用传统的型钢悬挑脚手架,悬挑层型钢铺设时间较长,且必须保证型钢锚固端长度不小于1.25倍悬挑端长度的规范要求,导致悬挑层在作业面内存在较多的型钢和穿墙洞,不利于后期二次结构施工穿插的问题。Beneficial effects of the present utility model: The high-strength bolt oblique-pulling fixed cantilever scaffold of the present utility model has the advantages of adding walls, profiled steel supports, upper tie rods, lower tie rods, sleeves, wall bolts, steel pipes, and scaffolding boards. , skirting boards, safety nets and connecting wall parts, the design saves materials, is convenient for production, installation and disassembly, and is safe and reliable, which not only ensures the construction progress, but also achieves good economic benefits. The laying time of the cantilevered section steel is long, and the length of the anchoring end of the section steel must not be less than 1.25 times the length of the cantilever end, resulting in more section steel and wall-penetrating holes in the cantilever layer on the working surface, which is not conducive to the later secondary Structural construction interspersed problems.

因添加了吸盘一、固定条、防尘布、转动杆、盘簧、固定块以及吸盘二,该设计便于通过防尘布进行防尘,避免灰尘之间落在人员身体上,且便于拆装和存放,解决了脚手板缝隙容易落下灰尘,影响下层的人员作业,甚至进入眼部的问题,本实用新型节约材料,制作、安装及拆卸方便,安全可靠,既保证了施工进度,又取得了良好的经济效益。Due to the addition of suction cup 1, fixing strip, dustproof cloth, rotating rod, coil spring, fixed block and suction cup 2, the design is convenient for dustproof through dustproof cloth, avoids dust falling on the body of personnel, and is easy to disassemble and assemble The utility model saves materials, is convenient for production, installation and disassembly, is safe and reliable, not only ensures the construction progress, but also achieves good economic benefits.

附图说明Description of drawings

通过阅读参照以下附图对非限制性实施例所作的详细描述,本实用新型的其它特征、目的和优点将会变得更明显:Other features, objects and advantages of the present invention will become more apparent by reading the detailed description of non-limiting embodiments with reference to the following drawings:

图1为本实用新型高强螺栓斜拉固定式悬挑脚手架的结构示意图;Fig. 1 is the structural representation of the high-strength bolt oblique-pulling fixed cantilever scaffold of the present utility model;

图2为本实用新型高强螺栓斜拉固定式悬挑脚手架中型钢支座的安装示意图;Fig. 2 is the installation schematic diagram of the utility model high-strength bolt oblique-pulling fixed type cantilevered scaffold medium-shaped steel support;

图3为本实用新型高强螺栓斜拉固定式悬挑脚手架中上节拉杆、套筒以及下节拉杆的结构示意图;3 is a schematic structural diagram of the upper section tie rod, the sleeve and the lower section tie rod in the high-strength bolt oblique-pulling fixed cantilever scaffold of the present invention;

图4为本实用新型高强螺栓斜拉固定式悬挑脚手架中防尘机构的结构示意图;4 is a schematic structural diagram of a dust-proof mechanism in a high-strength bolt oblique-pulling fixed cantilever scaffold of the present invention;

图中:1-墙体、2-型钢支座、3-上节拉杆、4-下节拉杆、5-套筒、6-穿墙螺栓、7-钢管、8-脚手板、9-踢脚板、10-安全网、11-连墙件、12-吸盘一、13-固定条、14-防尘布、15-转动杆、16-盘簧、17-紧固螺栓、18-固定块、19-吸盘二。In the picture: 1-wall, 2-section steel support, 3-upper tie rod, 4-lower tie rod, 5-sleeve, 6-wall bolt, 7-steel pipe, 8-scaffold board, 9-skirting board, 10-safety net, 11-connecting wall piece, 12-suction cup 1, 13-fixing strip, 14-dust cloth, 15-rotating rod, 16-coil spring, 17-fastening bolt, 18-fixing block, 19- Suction cup two.

具体实施方式Detailed ways

在详细描述实施例之前,应该理解的是,本实用新型不限于本申请中下文或附图中所描述的详细结构或元件排布。本实用新型可为其它方式实现的实施例。而且,应当理解,本文所使用的措辞及术语仅仅用作描述用途,不应作限定性解释。本文所使用的“包括”、“包含”、“具有”等类似措辞意为包含其后所列出之事项、其等同物及其它附加事项。特别是,当描述“一个某元件”时,本实用新型并不限定该元件的数量为一个,也可以包括多个。Before the embodiments are described in detail, it is to be understood that the invention is not limited to the detailed structure or arrangement of elements described below in this application or in the accompanying drawings. The present invention can be implemented in other ways. Also, it is to be understood that the phraseology and terminology used herein is for the purpose of description and should not be interpreted as limiting. As used herein, "including", "including", "having" and similar expressions are meant to encompass the items listed thereafter, their equivalents, and other additional items. In particular, when describing "a certain element", the present invention does not limit the number of the element to one, and may also include a plurality of elements.

请参阅图1-图4,本实用新型提供一种技术方案:高强螺栓斜拉固定式悬挑脚手架,包括墙体1,墙体1右端通过穿墙螺栓6固定型钢支座2,型钢支座2右上端焊接下节拉杆4,下节拉杆4上端通过螺纹连接套筒5,套筒5内上部通过螺纹连接上节拉杆3,上节拉杆3上端通过穿墙螺栓6固定在墙体1上,型钢支座2上端安装脚手板8,脚手板8上端右部焊接安装踢脚板9,脚手板8上端通过螺栓固定钢管7,钢管7设置在套筒5后侧,钢管7上端通过连墙件11与墙体1右上端连接,钢管7右侧捆绑安全网10,脚手板8下端固定防尘机构,悬挑水平钢梁采用16#工字钢,其中建筑物外悬挑段长度为1.0~3.00米,悬挑钢梁的最大间距不超过1.5米,脚手架立杆不在悬挑钢梁上面时联梁采用 12.6#槽钢,槽口水平与工字钢焊接在根据悬挑架布置图将加工好的预埋件提前预埋在结构中。对工字钢进行加工,一端焊接10mm厚、长200mm宽180mm的连接钢板(并在钢板上开孔,一侧孔径22mm的圆孔,另一侧为椭圆形孔洞,在立杆放置的位置上焊接相应根数的150mm长、Φ25的短钢筋以放置立杆,梁和剪力墙的结构强度报告达到设计的75%以上方可安装悬挑梁,将加工好的工字钢与预埋在结构中的预埋件对齐,再用M20的两个高强螺栓穿过垫片和连接钢板后插入预埋件中的钢管7内两端用螺母固定牢固,工字钢下侧用脚手架托起,以保证结构稳定和安全,待结构强度完全达到设计强度后,拆除下侧起托起作用的脚手架,当悬挑端工字钢长度小于1.5m时,设置一道斜拉,当长度大于等于1.5m时设置两道斜拉以保证结构稳定,在搭设立杆后,按步距搭设水平杆和小横杆,水平杆与立杆相连,大横杆距工字钢面200mm开始搭设,相邻步架的大横杆应错开布置在立杆的里侧和外侧,立杆和大横杆必须用十字扣件扣紧,小横杆贴近立杆设置,搭于大横杆上,在立杆之间可根据需要加设小横杆,在立杆、水平杆及小横杆搭设后,设置剪刀撑,剪刀撑沿架高连续布置,斜杆与地面夹角为45°~60°,每6根立杆开始加设,剪刀撑的斜杆除两端用旋转扣件与外架相连外,在其中间应增设2~4个扣结点,脚手架高度应超出操作层上皮1.5米,外排架在1.2米的位置增加拦腰杆的设置,每层设连墙杆,连墙件11采用刚性连接,脚手板8与小横杆用铁丝绑扎压板条固定脚手板8,所有脚手架立面均密闭密目网。结构墙体1距外架300mm缝隙使用水平安全网10封闭,每两层设置一道,作业面300mm缝隙必须密闭,底层须满铺脚手板8密闭整个底部,拆除时应遵守由上而下的原则,先搭后拆的原则,缩短整个工程的施工工期,尤其是主体与二次结构施工进度,降低外墙渗漏风险,节约施工成本,取得了良好的综合效益。Please refer to FIG. 1-FIG. 4, the present utility model provides a technical solution: a high-strength bolt oblique-pulling fixed cantilever scaffold, including a wall body 1, the right end of the wall body 1 is fixed by a wall-penetrating bolt 6 to a profiled steel support 2, and the profiled steel support 2. Weld the lower tie rod 4 at the upper right end, the upper end of the lower tie rod 4 is connected to the sleeve 5 by the thread, the upper part of the sleeve 5 is threadedly connected to the upper tie rod 3, and the upper end of the upper tie rod 3 is fixed on the wall 1 through the wall bolt 6 , the upper end of the section steel support 2 is installed with a scaffolding plate 8, and the right part of the upper end of the scaffolding plate 8 is welded and installed with a skirting plate 9. The upper end of the scaffolding plate 8 is fixed with a steel pipe 7 by bolts. It is connected to the upper right end of the wall 1, the right side of the steel pipe 7 is bound with a safety net 10, the lower end of the scaffolding plate 8 is fixed with a dust-proof mechanism, the cantilevered horizontal steel beam is made of 16# I-beam, and the length of the cantilevered section outside the building is 1.0 to 3.00 The maximum distance between the cantilevered steel beams is not more than 1.5 meters. When the scaffolding poles are not on the cantilevered steel beams, the connecting beams are made of 12.6# channel steel. The embedded parts are embedded in the structure in advance. The I-beam is processed, and a connecting steel plate with a thickness of 10mm, a length of 200mm and a width of 180mm is welded at one end (and a hole is made in the steel plate, a circular hole with a diameter of 22mm on one side and an oval hole on the other side, on the position where the pole is placed. Weld the corresponding number of 150mm long, Φ25 short steel bars to place the vertical poles, and the structural strength report of the beam and shear wall can reach more than 75% of the design before the cantilever beam can be installed, and the processed I-beam and pre-buried in Align the embedded parts in the structure, and then use two M20 high-strength bolts to pass through the gasket and the connecting steel plate and then insert the steel pipe 7 into the embedded parts. The inner ends are fixed with nuts, and the underside of the I-beam is supported by scaffolding. In order to ensure the stability and safety of the structure, after the structural strength fully reaches the design strength, remove the scaffolding that supports the lower side. When the length of the I-beam at the cantilever end is less than 1.5m, set up a diagonal pull, when the length is greater than or equal to 1.5m To ensure the stability of the structure, two oblique pulls are set up at any time to ensure the stability of the structure. After erecting the poles, set up horizontal poles and small horizontal poles according to the step distance. The horizontal poles are connected with the vertical poles. The large crossbar of the stand should be staggered on the inside and outside of the vertical rod. The vertical rod and the large crossbar must be fastened with cross fasteners. Small crossbars can be added according to needs. After the vertical rods, horizontal rods and small crossbars are erected, scissors braces are set up. The scissor braces are continuously arranged along the height of the erection. The angle between the inclined rods and the ground is 45°~60°. The root poles are added. Except that the two ends of the scissor braces are connected to the outer frame with rotating fasteners, 2 to 4 fastening points should be added in the middle. The height of the scaffolding should exceed the operation layer epithelium by 1.5 meters. At the position of 1.2 meters, the setting of the middle bar is added, and the connecting wall is installed on each floor. The connecting wall pieces 11 are rigidly connected. The scaffolding board 8 and the small cross bar are bound with iron wires to fix the scaffolding board 8. All the facades of the scaffolding are airtight and airtight Mesh net. The gap 300mm between the structural wall 1 and the outer frame is closed with a horizontal safety net 10, one for every two layers, the 300mm gap on the working surface must be sealed, and the bottom layer must be covered with scaffolding boards 8 to seal the entire bottom. The principle of building first and then dismantling shortens the construction period of the entire project, especially the construction progress of the main and secondary structures, reduces the leakage risk of the outer wall, saves the construction cost, and achieves good comprehensive benefits.

防尘机构包括吸盘一12、固定条13、防尘布14、转动杆15、盘簧16、固定块18以及吸盘二19,吸盘一12固定在脚手板8下端左部,固定条13通过连接绳与吸盘一12相连接,防尘布14左端与固定条13固定连接,转动杆15通过盘簧16安装在固定块18内,防尘布14右端缠绕在转动杆15环形侧面上,固定块18通过连接绳固定在吸盘二19下端,吸盘二19固定在脚手板8下端右部,首先将吸盘一12挤压固定在脚手板8下端,然后保证固定条13不动,在拿住固定块18向右移动,固定块18带动防尘布14伸出,进而防尘布14带动转动杆15转动,转动杆15带动盘簧16转动,直至防尘布14完全将脚手板8进行遮挡,然后锁紧紧固螺栓17,将转动杆15进行固定,避免在盘簧16作用下,将防尘布14回收,进而使吸盘一12与脚手板8分离,然后将吸盘二19固定在脚手板8下端,进而完成安装,进而通过防尘布14进行防尘,从而便于通过防尘布14进行防尘,避免灰尘之间落在人员身体上,且便于拆装和存放。The dustproof mechanism includes a suction cup 12, a fixing strip 13, a dustproof cloth 14, a rotating rod 15, a coil spring 16, a fixing block 18 and a suction cup 2 19. The suction cup 1 12 is fixed on the left part of the lower end of the scaffolding plate 8, and the fixing strip 13 is connected by The rope is connected with the suction cup one 12, the left end of the dustproof cloth 14 is fixedly connected with the fixing strip 13, the rotating rod 15 is installed in the fixed block 18 through the coil spring 16, and the right end of the dustproof cloth 14 is wound on the annular side of the rotating rod 15, the fixed block 18 is fixed on the lower end of the second suction cup 19 by the connecting rope, and the second suction cup 19 is fixed on the right part of the lower end of the scaffolding board 8. First, the suction cup one 12 is squeezed and fixed on the lower end of the scaffolding board 8, and then the fixing strip 13 is not moved, and the fixing block is held. 18 moves to the right, the fixed block 18 drives the dustproof cloth 14 to extend, and then the dustproof cloth 14 drives the rotating rod 15 to rotate, and the rotating rod 15 drives the coil spring 16 to rotate until the dustproof cloth 14 completely covers the scaffolding board 8, and then Tighten the tightening bolts 17, and fix the rotating rod 15 to prevent the dust-proof cloth 14 from being recovered under the action of the coil spring 16, so as to separate the suction cup one 12 from the scaffolding board 8, and then fix the suction cup two 19 on the scaffolding board 8 The lower end is installed to complete the installation, and then the dustproof cloth 14 is used for dustproofing, so as to facilitate the dustproofing through the dustproof cloth 14, prevent the dust from falling on the body of the personnel, and facilitate disassembly and storage.

固定块18右端开设螺纹孔,螺纹孔内通过螺纹连接紧固螺栓17,紧固螺栓17左端与转动杆15相接触,通过螺纹孔以及紧固螺栓17,便于将转动杆15进行固定,避免转动,使防尘布14回收。The right end of the fixing block 18 is provided with a threaded hole, and the fastening bolt 17 is threaded in the threaded hole. The left end of the fastening bolt 17 is in contact with the rotating rod 15, and the rotating rod 15 is easily fixed through the threaded hole and the tightening bolt 17 to avoid rotation. , so that the dustproof cloth 14 is recycled.

墙体1右端开设预留孔,预留孔内固定预留管,穿墙螺栓6穿过预留管内,便于穿墙螺栓6进行安装。The right end of the wall body 1 is provided with a reserved hole, the reserved pipe is fixed in the reserved hole, and the wall bolt 6 passes through the reserved pipe, which is convenient for the wall bolt 6 to be installed.

穿墙螺栓6两侧设置钢垫片,且通过双螺帽进行固定,提高固定效果。Steel washers are arranged on both sides of the wall bolt 6, and are fixed by double nuts to improve the fixing effect.

上节拉杆3环形侧面下部加工螺纹,套筒5内加工螺纹,下节拉杆4环形侧面上部加工螺纹,便于与套筒5进行安装和调节。The lower part of the annular side surface of the upper tie rod 3 is threaded, the inner part of the sleeve 5 is threaded, and the upper part of the annular side of the lower tie rod 4 is threaded, which is convenient for installation and adjustment with the sleeve 5 .

本文所描述的概念在不偏离其精神和特性的情况下可以实施成其它形式。所公开的具体实施例应被视为例示性而不是限制性的。因此,本实用新型的范围是由所附的权利要求,而不是根据之前的这些描述进行确定。在权利要求的字面意义及等同范围内的任何改变都应属于这些权利要求的范围。The concepts described herein may be embodied in other forms without departing from the spirit and characteristics thereof. The specific embodiments disclosed are to be regarded as illustrative and not restrictive. Accordingly, the scope of the invention is to be determined by the appended claims, rather than by these preceding descriptions. Any changes that come within the literal meaning and equivalency of the claims are intended to fall within the scope of these claims.

Claims (5)

1. the fixed builder's jack of high-strength bolt oblique pull, including wall, it is characterised in that: the wall right end passes through spiral shell through walls Bolt fixed bridle iron, the fashioned iron support upper right side weld lower section pull rod, and the lower section pull rod upper end is connected through a screw thread set Cylinder, the sleeve internal upper part are connected through a screw thread section pull rod, and the upper section pull rod upper end is fixed on wall by through-wall bolt On, scaffold board, scaffold board upper end right part welding installation skirting board, the scaffold board upper end are installed in fashioned iron support upper end It is bolted steel pipe, the steel pipe is arranged on rear side of sleeve, and the steel pipe upper end is connected by wall-connecting piece and wall upper right side It connects, safety net, the fixed dust-proof mechanism in the scaffold board lower end is bundled on the right side of the steel pipe;
The dust-proof mechanism includes sucker one, fixed strip, dustcloth, rotating bar, disc spring, fixed block and sucker two, the suction Disk one is fixed on scaffold board lower end left part, and the fixed strip is connected by connecting rope with sucker one, the dustcloth left end and Fixed strip is fixedly connected, and the rotating bar is mounted in fixed block by disc spring, and the dustcloth right end is wrapped in rotation burr On shape side, the fixed block is fixed on two lower end of sucker by connecting rope, and the sucker two is fixed on scaffold board lower end right part.
2. the fixed builder's jack of high-strength bolt oblique pull according to claim 1, it is characterised in that: the fixed block is right End opens up threaded hole, fastening bolt is connected through a screw thread in the threaded hole, the fastening bolt left end is in contact with rotating bar.
3. the fixed builder's jack of high-strength bolt oblique pull according to claim 1, it is characterised in that: the wall right end Preformed hole is opened up, provided pipe is fixed in the preformed hole, the through-wall bolt passes through in provided pipe.
4. the fixed builder's jack of high-strength bolt oblique pull according to claim 1, it is characterised in that: the through-wall bolt Steel plate washer is arranged in two sides, and is fixed by double nut.
5. the fixed builder's jack of high-strength bolt oblique pull according to claim 1, it is characterised in that: the upper section pull rod Annular side lower part processes screw thread, and screw thread is processed in the sleeve, and the lower section pull rod annular side top processes screw thread.
CN201822043219.6U 2018-12-06 2018-12-06 High-strength bolt diagonal pulling fixed type overhanging scaffold Expired - Fee Related CN209163422U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822043219.6U CN209163422U (en) 2018-12-06 2018-12-06 High-strength bolt diagonal pulling fixed type overhanging scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822043219.6U CN209163422U (en) 2018-12-06 2018-12-06 High-strength bolt diagonal pulling fixed type overhanging scaffold

Publications (1)

Publication Number Publication Date
CN209163422U true CN209163422U (en) 2019-07-26

Family

ID=67342528

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822043219.6U Expired - Fee Related CN209163422U (en) 2018-12-06 2018-12-06 High-strength bolt diagonal pulling fixed type overhanging scaffold

Country Status (1)

Country Link
CN (1) CN209163422U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110388041A (en) * 2019-07-30 2019-10-29 海通建设集团有限公司 Turnbuckle draw bar type overhanging scaffold

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110388041A (en) * 2019-07-30 2019-10-29 海通建设集团有限公司 Turnbuckle draw bar type overhanging scaffold

Similar Documents

Publication Publication Date Title
CN105888230B (en) A kind of lowering or hoisting gear and its construction method for building curtain wall construction
CN203808484U (en) Integrated cantilevered and attached external scaffolding
CN105672678A (en) Method for mounting overall steel protective shed cantilever frame
CN211447708U (en) Super high-rise building construction elevator feeding platform support system that encorbelments
CN110306774B (en) Method and device for installing socket type cantilever scaffold
CN213572924U (en) Novel overhanging bearing scaffold
CN212583186U (en) Adjustable pull rod type overhanging type steel scaffold for assembly structure
CN209780193U (en) Suspension type scaffold
CN209163422U (en) High-strength bolt diagonal pulling fixed type overhanging scaffold
CN212336672U (en) I-steel overhanging bearing frame of basket pull rod for constructional engineering
CN211229608U (en) Safety rope column for steel structure construction
CN105442840B (en) A kind of building method of supporting frame for overhanging mold plate
CN210563352U (en) Wall connecting device for climbing frame
CN209413271U (en) Casing wall-through pull rod formula connects wall fixed Combination device
CN202718375U (en) Installation and operation platform of high-altitude cantilever structure
CN201943350U (en) Supporting steel frame for die holder of high-altitude large span overhanging structure
CN214575517U (en) Cantilever operation platform
CN207749818U (en) A kind of suspension type hanging basket for anti-lift-slb construction
CN205804908U (en) A kind of shaped steel combination crosshead
CN204715720U (en) The attachment supporting arrangement of the attachment type raise scaffold outside the building section of receipts within the walls
CN213174742U (en) Top bracing steel stand structure
CN211974259U (en) Adjustable scaffold bracket of encorbelmenting and scaffold structure of encorbelmenting
CN116464188A (en) Steel frame-cold-formed thin-wall steel shear wall
CN117090408A (en) Attached lifting protection shed and installation and lifting method thereof
CN203475793U (en) Bracket type overhanging scaffold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190726