CN109625923A - A kind of construction site brick holding machine - Google Patents

A kind of construction site brick holding machine Download PDF

Info

Publication number
CN109625923A
CN109625923A CN201811460344.5A CN201811460344A CN109625923A CN 109625923 A CN109625923 A CN 109625923A CN 201811460344 A CN201811460344 A CN 201811460344A CN 109625923 A CN109625923 A CN 109625923A
Authority
CN
China
Prior art keywords
plate
bottom beam
brick
connecting rod
clamping plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811460344.5A
Other languages
Chinese (zh)
Other versions
CN109625923B (en
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou chuanglibo Technology Co., Ltd
Original Assignee
许永刚
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 许永刚 filed Critical 许永刚
Priority to CN201811460344.5A priority Critical patent/CN109625923B/en
Publication of CN109625923A publication Critical patent/CN109625923A/en
Application granted granted Critical
Publication of CN109625923B publication Critical patent/CN109625923B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G47/00Article or material-handling devices associated with conveyors; Methods employing such devices
    • B65G47/74Feeding, transfer, or discharging devices of particular kinds or types
    • B65G47/90Devices for picking-up and depositing articles or materials

Abstract

The present invention provides a kind of construction site brick holding machines, including the first bottom beam, the second bottom beam, moving apron component, clamping plate, pallet fork and hydraulic cylinder;Moving apron component includes lateral column, spring connecting rod, connection hinge, side guard plate and connecting shaft;Clamping plate is connected on lateral column by spring connecting rod, and removable along the axially opposing lateral column of spring connecting rod;Side guard plate can be stirred on lateral column, and around the axis of connection hinge with respect to lateral column by connection hinge connection;Connecting shaft is connected between clamping plate and side guard plate, and during the varus of side guard plate, the location status of connecting shaft becomes opposite spring connecting rod parastate from the opposite outer state of spring connecting rod becomes the opposite inner state of spring connecting rod again, and clamping plate becomes moving backward from forward movement;Hydraulic cylinder is along the direction of pallet fork, and in the telescopic process of hydraulic cylinder, the second bottom beam is moved along the direction of pallet fork relative to the first bottom beam.

Description

A kind of construction site brick holding machine
Technical field
The present invention relates to building block technique for fixing field, in particular to a kind of construction site brick holding machine.
Background technique
Brick is the essential production material of modern architecture industry.When brick banks out one by one, in fact simultaneously It is unstable.Therefore, it is necessary to which it is fixed by external auxiliary tool, make its stabilization.
Summary of the invention
In order to solve the above technical problems, the present invention proposes a kind of construction site brick holding machine, can consolidate to brick heap It is fixed.
To achieve the above object, the present invention provides the following technical scheme that
A kind of construction site brick holding machine including horizontally opposite the first bottom beam and the second bottom beam, is set to first bottom beam With above second bottom beam a pair of of moving apron component and by a pair of moving apron Component driver clamping plate, be set to institute The hydraulic cylinder stating the pallet fork below the first bottom beam and being connected between first bottom beam and second bottom beam;
The moving apron component includes lateral column, spring connecting rod, connection hinge, side guard plate and connecting shaft;The clamping plate is logical It crosses the spring connecting rod to be connected on the lateral column, and removable along the axially opposing lateral column of the spring connecting rod It is dynamic;The side guard plate by the connection hinge connection on the lateral column, and around the axis of the connection hinge with respect to institute Stating lateral column can stir;The connecting shaft is connected between the clamping plate and the side guard plate, and in the varus of the side guard plate In the process, the location status of the connecting shaft becomes the relatively described spring connecting rod from the relatively described outer state of spring connecting rod Parastate becomes the relatively described inner state of spring connecting rod again, and the clamping plate becomes moving backward from forward movement;
The hydraulic cylinder along the pallet fork direction, and in the telescopic process of the hydraulic cylinder, described second Bottom beam is moved along the direction of the pallet fork relative to first bottom beam.
As an embodiment, the pallet fork includes the first brick fork and the second brick fork parallel to each other;The liquid Compressing cylinder includes two respectively along first brick fork and second brick fork;In stretching for two hydraulic cylinders Cheng Zhong, second bottom beam are moved along the direction that first brick fork and second brick are pitched relative to first bottom beam.
As an embodiment, first bottom beam includes the first roof beam structure, the first fixed liner plate, the first polyurethane Plate, the first fixed upper side frame and the first fixed lower frame;
First roof beam structure, the first fixed liner plate and first polyurethane sheet are sequentially connected;
The first fixation upper side frame and the first fixed lower frame are respectively overlay in first roof beam structure, first fixation Above and below liner plate and first polyurethane sheet.
As an embodiment, first polyurethane sheet is flexible board.
As an embodiment, second bottom beam includes the second roof beam structure, the second fixed liner plate, the second polyurethane Plate, the second fixed upper side frame and the second fixed lower frame;
Second roof beam structure, the second fixed liner plate and second polyurethane sheet are sequentially connected;
The both ends of second roof beam structure open up installing port, and second roof beam structure is inlaid in first brick by the installing port and pitches On second brick fork;
The second fixation upper side frame and the second fixed lower frame are respectively overlay in second roof beam structure, second fixation Above and below liner plate and second polyurethane sheet.
As an embodiment, second polyurethane sheet is flexible board.
As an embodiment, the side guard plate includes sequentially connected installation plate, connection plate and clamping Plate;
It is vertical between the installation plate and the clamping plate;
The connection plate is connected between the installation plate and the clamping plate, the connection plate and the mounting plate Angle between block is less than the angle between the connection plate and the clamping plate.
As an embodiment, the side guard plate further includes the scattered stress hole being provided on the clamping plate.
The beneficial effect of the present invention compared with the prior art is:
The present invention provides a kind of construction site brick holding machines, and in the second bottom beam with respect in the first bottom beam moving process, clamping plate is to brick The sandwich of block heap is fixed.During side guard plate varus, side guard plate fixes the other sandwich of brick heap.And During the varus of side guard plate, clamping plate, which first moves forward, flattens brick heap, and subsequent side guard plate again presss from both sides brick heap Hold fixation.Under the action of spring connecting rod and connecting shaft, side guard plate holding grips state to brick heap.
Detailed description of the invention
Fig. 1 is the perspective view of construction site brick holding machine provided in an embodiment of the present invention;
Fig. 2 perspective view of moving apron component for the second bottom beam provided in an embodiment of the present invention and thereon;
Fig. 3 top view of moving apron component for the second bottom beam provided in an embodiment of the present invention and thereon;
Fig. 4 is the partial enlarged view for the moving apron component that Fig. 3 is provided;
Fig. 5 is the perspective view of the first bottom beam provided in an embodiment of the present invention;
Fig. 6 is the perspective view of the second bottom beam provided in an embodiment of the present invention;
Fig. 7 is the perspective view of side guard plate provided in an embodiment of the present invention.
In figure: 1, the first bottom beam;1a, the first roof beam structure;1b, the first fixed liner plate;1c, the first polyurethane sheet;1d, first are consolidated Determine upper side frame;1e, the first fixed lower frame;2, the second bottom beam;2a, the second roof beam structure;2b, the second fixed liner plate;2c, the second poly- ammonia Ester plate;2d, the second fixed upper side frame;2e, the second fixed lower frame;2f, installing port;3, moving apron component;3a, lateral column;3b, Spring connecting rod;3c, connection hinge;3d, side guard plate;3da, installation plate;3db, connection plate;3dc, clamping plate;3dd, Dissipate stress hole;3e, connecting shaft;4, clamping plate;5, pallet fork;5a, the first brick fork;5b, the second brick fork;6, hydraulic cylinder.
Specific embodiment
Below in conjunction with attached drawing, the technical characteristic and advantage above-mentioned and other to the present invention are clearly and completely described, Obviously, described embodiment is only section Example of the invention, rather than whole embodiments.
In one embodiment, as shown in Figure 1.Construction site brick holding machine provided in this embodiment comprising horizontally Opposite the first bottom beam 1 and the second bottom beam 2, a pair of of 3 and of moving apron component above the first bottom beam 1 and the second bottom beam 2 By the clamping plate 4 of a pair of of moving apron component 3 driving, the pallet fork 5 below the first bottom beam 1 and it is connected to the first bottom beam 1 And the second hydraulic cylinder 6 between bottom beam 2;Direction of the hydraulic cylinder 6 along pallet fork 5, and stretching in hydraulic cylinder 6 Cheng Zhong, the second bottom beam 2 are moved along the direction of pallet fork 5 relative to the first bottom beam 1.In the present embodiment, a vehicle brick is piled up Between first bottom beam 1 and the second bottom beam 2, during the retraction of hydraulic cylinder 6, two clamping plates 4 are close to each other, to brick heap Sandwich is fixed.3 varus of moving apron component on moving apron component 3 and the second bottom beam 2 on subsequent first bottom beam 1, The other sandwich of brick heap is fixed.As shown in Fig. 2, clamping plate 4 can be opposite when a pair of of 3 varus of moving apron component Lateral column 3a is moved forward and backward.As shown in figure 3, the direction a1 shows the direction of 3 varus of moving apron component, the direction a2 shows clamping plate 4 directions moved forward, the direction a3 shows the direction that clamping plate 4 moves backward.Concrete details is as shown in figure 4, moving apron Component 3 includes lateral column 3a, spring connecting rod 3b, connection hinge 3c, side guard plate 3d and connecting shaft 3e.Clamping plate 4 is connected by spring Extension bar 3b is connected on lateral column 3a, and removable along the axially opposing lateral column 3a of spring connecting rod 3b;In its natural state, Clamping plate 4 is leaned on backward by the effect of spring connecting rod 3b.In addition, side guard plate 3d is connected on lateral column 3a by connecting hinge 3c, And the axis around connection hinge 3c can be stirred with respect to lateral column 3a;And during side guard plate 3d is inwardly stirred, clamping plate 4 is logical The effect for crossing spring connecting rod 3b and connecting shaft 3e first turns forward, then leans on backward.Specifically, connecting shaft 3e is connected to 4 He of clamping plate Between side guard plate 3d, and during the varus of side guard plate 3d, the location status of connecting shaft 3e is from opposite spring connecting rod 3b Outer state becomes opposite spring connecting rod 3b parastate becomes the opposite inner state of spring connecting rod 3b again, clamping plate 4 to Preceding movement becomes moving backward.In the present embodiment, during the varus of side guard plate 3d, clamping plate 4 is first moved forward brick Heap is flattened, and subsequent side guard plate 3d again grips brick heap.In the effect of spring connecting rod 3b and connecting shaft 3e Under, side guard plate 3d holding grips state to brick heap.It should be noted that by more preferably fixed after the leveling of brick heap.
In one embodiment, as shown in Figure 1.Pallet fork 5 provided in this embodiment comprising the first brick parallel to each other It pitches 5a and the second brick pitches 5b;Hydraulic cylinder 6 includes two that 5a and the second brick fork 5b are pitched respectively along the first brick;It is hydraulic at two In the telescopic process of oil cylinder 6, the second bottom beam 2 is moved along the direction that the first brick pitches 5a and the second brick fork 5b relative to the first bottom beam 1.
In one embodiment, as shown in Figure 5.First bottom beam 1 provided in this embodiment comprising the first roof beam structure 1a, One fixed liner plate 1b, the first polyurethane sheet 1c, the first fixed fixed lower frame 1e of upper side frame 1d and first;First roof beam structure 1a, First fixed liner plate 1b and the first polyurethane sheet 1c is sequentially connected;The first fixed fixed lower frame 1e of upper side frame 1d and first It is respectively overlay in above and below the first roof beam structure 1a, the first fixed liner plate 1b and the first polyurethane sheet 1c.Preferably, One polyurethane sheet 1c is flexible board.In the present embodiment, when construction site brick holding machine grips brick heap, first Polyurethane sheet 1c is attached to the surface of brick heap, is conducive to protect brick.
In one embodiment, as shown in Figure 6.Second bottom beam 2 provided in this embodiment comprising the second roof beam structure 2a, Two fixed liner plate 2b, the second polyurethane sheet 2c, the second fixed fixed lower frame 2e of upper side frame 2d and second;Second roof beam structure 2a, Second fixed liner plate 2b and the second polyurethane sheet 2c is sequentially connected;The both ends of second roof beam structure 2a open up installing port 2f, the second beam Frame 2a is inlaid in the first brick by installing port 2f and pitches on 5a and the second brick fork 5b;Second fixed upper side frame 2d and second is fixed following Frame 2e is respectively overlay in above and below the second roof beam structure 2a, the second fixed liner plate 2b and the second polyurethane sheet 2c.It is preferred that , the second polyurethane sheet 2c is flexible board.In the present embodiment, when construction site brick holding machine grips brick heap When, the second bottom beam 2 is moved along the direction that the first brick pitches 5a and the second brick fork 5b, and the second polyurethane sheet 2c is attached to the table of brick heap Face is conducive to protect brick.
In one embodiment, as shown in Figure 7.Side guard plate 3d provided in this embodiment comprising sequentially connected installation Plate 3da, connection plate 3db and clamping plate 3dc;It installs vertical between plate 3da and clamping plate 3dc;Connect plate 3db is connected between installation plate 3da and clamping plate 3dc, and the angle for connecting plate 3db and installing between plate 3da is less than It connects plate 3db and clamps the angle between plate 3dc.In the present embodiment, since connection plate 3db is connected to installation plate 3da and clamping plate 3dc between, and connect plate 3db and install plate 3da between angle be less than connection plate 3db and The angle between plate 3dc is clamped, so that clamping plate 3dc has better clamping effect.
In a preferred embodiment, side guard plate 3d further includes the scattered stress hole 3dd being provided on clamping plate 3dc. In the present embodiment, dissipating stress hole 3dd increases the effective active area for clamping plate 3dc, in particular for clamping brick heap When, surface and nonideal plane due to brick heap, so having when clamping plate 3dc is tightly attached to the surface of brick heap It imitates active area to increase, so that clamping plate 3dc has better clamping effect.In a preferred embodiment, stress is dissipated Hole 3dd includes the multiple of multiple and longitudinal arrays of horizontal array, and the area for dissipating stress hole 3dd is greater than cutting for single brick Area.So effective active area increases when clamping plate 3dc is tightly attached to the surface of brick heap.
Particular embodiments described above has carried out further the purpose of the present invention, technical scheme and beneficial effects It is described in detail, it should be understood that the above is only a specific embodiment of the present invention, the protection being not intended to limit the present invention Range.It particularly points out, to those skilled in the art, all within the spirits and principles of the present invention, that is done any repairs Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.

Claims (8)

1. a kind of construction site brick holding machine, which is characterized in that including horizontally opposite the first bottom beam (1) and the second bottom beam (2), a pair of of moving apron component (3) for being set to above first bottom beam (1) and second bottom beam (2) and by described in a pair Moving apron component (3) driving clamping plate (4), be set to first bottom beam (1) below pallet fork (5) and be connected to institute State the hydraulic cylinder (6) between the first bottom beam (1) and second bottom beam (2);
The moving apron component (3) include lateral column (3a), spring connecting rod (3b), connection hinge (3c), side guard plate (3d), with And connecting shaft (3e);The clamping plate (4) is connected on the lateral column (3a) by the spring connecting rod (3b), and along institute The axially opposing lateral column (3a) for stating spring connecting rod (3b) is removable;The side guard plate (3d) passes through the connection hinge (3c) is connected on the lateral column (3a), and can be stirred around the relatively described lateral column (3a) of axis of connection hinge (3c); The connecting shaft (3e) is connected between the clamping plate (4) and the side guard plate (3d), and in the interior of the side guard plate (3d) During turning over, the location status of the connecting shaft (3e) becomes relatively described from the outer state of the spring connecting rod (3b) relatively Spring connecting rod (3b) parastate becomes the inner state of the spring connecting rod (3b) relatively again, and the clamping plate (4) is from forward Movement becomes moving backward;
The hydraulic cylinder (6) along the pallet fork (5) direction, and in the telescopic process of the hydraulic cylinder (6), Second bottom beam (2) is mobile relative to first bottom beam (1) along the direction of the pallet fork (5).
2. construction site brick holding machine according to claim 1, which is characterized in that the pallet fork (5) includes parallel to each other The first brick fork (5a) and the second brick pitch (5b);The hydraulic cylinder (6) includes respectively along first brick fork (5a) and institute Two for stating the second brick fork (5b);In the telescopic process of two hydraulic cylinders (6), second bottom beam (2) is along institute The direction for stating the first brick fork (5a) and second brick fork (5b) is mobile relative to first bottom beam (1).
3. construction site brick holding machine according to claim 1 or 2, which is characterized in that first bottom beam (1) includes first Under roof beam structure (1a), first fixed liner plate (1b), the first polyurethane sheet (1c), first fixed upper side frame (1d) and first are fixed Frame (1e);
First roof beam structure (1a), first fixed liner plate (1b) and first polyurethane sheet (1c) are sequentially connected;
First fixed upper side frame (1d) and first fixation lower frame (1e) be respectively overlay in first roof beam structure (1a), Described first fixes above and below liner plate (1b) and first polyurethane sheet (1c).
4. construction site brick holding machine according to claim 3, which is characterized in that first polyurethane sheet (1c) is flexibility Plate.
5. construction site brick holding machine according to claim 2, which is characterized in that second bottom beam (2) includes the second beam Frame (2a), second fixed liner plate (2b), the second polyurethane sheet (2c), second fixed upper side frame (2d) and second are fixed following Frame (2e);
Second roof beam structure (2a), second fixed liner plate (2b) and second polyurethane sheet (2c) are sequentially connected;
The both ends of second roof beam structure (2a) open up installing port (2f), and second roof beam structure (2a) is embedding by the installing port (2f) On first brick fork (5a) and second brick fork (5b);
Second fixed upper side frame (2d) and second fixation lower frame (2e) be respectively overlay in second roof beam structure (2a), Described second fixes above and below liner plate (2b) and second polyurethane sheet (2c).
6. construction site brick holding machine according to claim 5, which is characterized in that second polyurethane sheet (2c) is flexibility Plate.
7. construction site brick holding machine according to claim 1, which is characterized in that the side guard plate (3d) includes being sequentially connected Installation plate (3da), connection plate (3db) and clamping plate (3dc);
It is vertical between the installation plate (3da) and the clamping plate (3dc);
The connection plate (3db) is connected between the installation plate (3da) and the clamping plate (3dc), the connection Angle between plate (3db) and installation plate (3da) is less than the connection plate (3db) and the clamping plate Angle between (3dc).
8. construction site brick holding machine according to claim 7, which is characterized in that the side guard plate (3d) further includes being provided with Scattered stress hole (3dd) on clamping plate (3dc).
CN201811460344.5A 2018-12-01 2018-12-01 Brick machine is embraced to building site Active CN109625923B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811460344.5A CN109625923B (en) 2018-12-01 2018-12-01 Brick machine is embraced to building site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811460344.5A CN109625923B (en) 2018-12-01 2018-12-01 Brick machine is embraced to building site

Publications (2)

Publication Number Publication Date
CN109625923A true CN109625923A (en) 2019-04-16
CN109625923B CN109625923B (en) 2020-11-13

Family

ID=66070222

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811460344.5A Active CN109625923B (en) 2018-12-01 2018-12-01 Brick machine is embraced to building site

Country Status (1)

Country Link
CN (1) CN109625923B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112520651A (en) * 2020-12-01 2021-03-19 安徽宇锋智能科技有限公司 Forklift lifting device capable of improving safety performance

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1534194A (en) * 1977-03-31 1978-11-29 Sims C Lifting device
US6003917A (en) * 1996-07-11 1999-12-21 Tygard Machine And Manufacturing Co. Clamping apparatus
KR20120066240A (en) * 2010-12-14 2012-06-22 김승용 Bricks carrying handcart
CN204897330U (en) * 2015-09-10 2015-12-23 安特威尔叉车属具(漳州)有限公司 Fork truck presss from both sides with two -way swing fragment of brick
CN106078786A (en) * 2016-08-12 2016-11-09 镇江成泰自动化技术有限公司 A kind of electrokinetic cell height suitability not damaged automatic clamping grip device
CN206244349U (en) * 2016-11-17 2017-06-13 安特威尔叉车属具(漳州)有限公司 A kind of ultrathin brick pile clamp of fork truck with sidesway

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1534194A (en) * 1977-03-31 1978-11-29 Sims C Lifting device
US6003917A (en) * 1996-07-11 1999-12-21 Tygard Machine And Manufacturing Co. Clamping apparatus
KR20120066240A (en) * 2010-12-14 2012-06-22 김승용 Bricks carrying handcart
CN204897330U (en) * 2015-09-10 2015-12-23 安特威尔叉车属具(漳州)有限公司 Fork truck presss from both sides with two -way swing fragment of brick
CN106078786A (en) * 2016-08-12 2016-11-09 镇江成泰自动化技术有限公司 A kind of electrokinetic cell height suitability not damaged automatic clamping grip device
CN206244349U (en) * 2016-11-17 2017-06-13 安特威尔叉车属具(漳州)有限公司 A kind of ultrathin brick pile clamp of fork truck with sidesway

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112520651A (en) * 2020-12-01 2021-03-19 安徽宇锋智能科技有限公司 Forklift lifting device capable of improving safety performance
CN112520651B (en) * 2020-12-01 2023-03-21 安徽宇锋智能科技有限公司 Forklift lifting device capable of improving safety performance

Also Published As

Publication number Publication date
CN109625923B (en) 2020-11-13

Similar Documents

Publication Publication Date Title
US20180009066A1 (en) Adjustable clamp used for marine deck welding test
CN205184139U (en) Automotive body panel self -adaptation clamping mechanism
CN205309678U (en) Steel sheet preset's frock
CN109909325B (en) Steel box girder edge straightening machine
CN109625923A (en) A kind of construction site brick holding machine
CN219113914U (en) Quick clamping device for hydraulic cylinder assembly
CN211336211U (en) Cab protection device for engineering machinery
CN109514084B (en) Welding tool and welding method for ribbed wallboard structure
CN208731180U (en) The bulkhead peculiar to vessel that keeps out the wind
JP2018003411A (en) Base-isolated building positioning tool
CN107470820B (en) Reverse assembly welding tool
CN202291865U (en) Welding fixture device
CN108820128A (en) The bulkhead peculiar to vessel that keeps out the wind
KR20120007883A (en) Ladder up and down device for vessel
CN107882027B (en) Clamp for piling corrugated sheet piles
CN208772836U (en) A kind of dipper tooling
CN202439674U (en) Supporting leg for engineering machinery and engineering machinery
CN219561080U (en) Long hole punching tool
CN205363096U (en) Diesel locomotive top cap equipment mould
CN219649072U (en) Welding tool for corner of longitudinal beam of frame
CN208019342U (en) A kind of discharging frame of wire rod straightening blanking machine
CN215357385U (en) Double-shaft hydraulic clamp
CN220642397U (en) Lifting equipment for assembling aluminum alloy bridge frame
CN217759409U (en) Beam bottom and wall end plate integrated mounting profile
CN114991365B (en) Dry-method artificial lump dry-hanging curtain wall system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20201028

Address after: 201-95, 2 / F, building 4, No. 521, nanguandu Road, economic development zone, Wuzhong District, Suzhou City, Jiangsu Province

Applicant after: Suzhou chuanglibo Technology Co., Ltd

Address before: Room 618, North Office Building of Administrative Committee of Urban-Rural Integration Demonstration Zone, Anyang City, Henan Province, 455000

Applicant before: Xu Yonggang

GR01 Patent grant
GR01 Patent grant