CN109624469A - A kind of laminated glass production dust-free storage room and conjunction piece room allocation plan - Google Patents

A kind of laminated glass production dust-free storage room and conjunction piece room allocation plan Download PDF

Info

Publication number
CN109624469A
CN109624469A CN201811553965.8A CN201811553965A CN109624469A CN 109624469 A CN109624469 A CN 109624469A CN 201811553965 A CN201811553965 A CN 201811553965A CN 109624469 A CN109624469 A CN 109624469A
Authority
CN
China
Prior art keywords
film
storage room
room
dust
laminated glass
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811553965.8A
Other languages
Chinese (zh)
Other versions
CN109624469B (en
Inventor
庄帝尊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huizhou Long Glass Energy Saving Glass Co Ltd
Original Assignee
Huizhou Long Glass Energy Saving Glass Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huizhou Long Glass Energy Saving Glass Co Ltd filed Critical Huizhou Long Glass Energy Saving Glass Co Ltd
Priority to CN201811553965.8A priority Critical patent/CN109624469B/en
Publication of CN109624469A publication Critical patent/CN109624469A/en
Application granted granted Critical
Publication of CN109624469B publication Critical patent/CN109624469B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B32LAYERED PRODUCTS
    • B32BLAYERED PRODUCTS, i.e. PRODUCTS BUILT-UP OF STRATA OF FLAT OR NON-FLAT, e.g. CELLULAR OR HONEYCOMB, FORM
    • B32B37/00Methods or apparatus for laminating, e.g. by curing or by ultrasonic bonding
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/24Structural elements or technologies for improving thermal insulation
    • Y02A30/249Glazing, e.g. vacuum glazing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B80/00Architectural or constructional elements improving the thermal performance of buildings
    • Y02B80/22Glazing, e.g. vaccum glazing

Abstract

The present invention discloses a kind of laminated glass production dust-free storage room and closes piece room allocation plan, including the film storage room closed piece operating space, place film for operating plate glass combination, the film surge chamber of control film disengaging, producers preparation house, described close is provided with the live-roller gear mobile for plate glass or laminated glass in the middle part of piece operating space, import and export is provided with Destaticizing device.Film surge chamber blocks the external world to be connected to the direct of film storage room, avoids dust from entering film storage room, it is ensured that the cleanliness and temperature and humidity of film storage room;Personnel's inlet/outlet is provided separately with film inlet and outlet, personnel are broken and film share the traditional design of an inlet/outlet, extraneous dust can be reduced to greatest extent to enter film storage room and close piece operating space, the influence that dust produces laminated glass is eliminated in reasonable disposition Destaticizing device and dust prevention to the full extent.

Description

A kind of laminated glass production dust-free storage room and conjunction piece room allocation plan
Technical field
The invention belongs to field of glass production technology, and in particular to a kind of laminated glass production dust-free storage room and conjunction piece Room allocation plan.
Background technique
Laminated glass be by two panels or divided glass, between pressed from both sides one or more layers organic polymer intermediate coat, by spy After different high temperature precompressed (or vacuumizing) and high-temperature high-pressure craft processing, it is integrated glass and intermediate coat permanent adhesive compound Glass product.During producing laminated glass, plate glass need to be integrated into having sticking organic polymer film One, this just needs to make the dustless state of its workshop as far as possible.Guarantee that laminated glass workshop is dustless state, it need to be from Piece process, electrostatic precipitator distribution configuration etc. configuration are closed in operator's control, raw materials for production control, simply on a large scale Arrangement electrostatic precipitator, for glass processing industry, on the one hand will affect remaining type large glass process equipment, increase On the other hand mass production load is that cost performance is low, cost unreasonable allocation, how from every side details rationally and effectively guarantees to press from both sides Layer Improving Glass Manufacturing Processes keep dustless state, are the production problems that industry personnels need emphasis to inquire into.
Summary of the invention
In order to solve the above technical problems, the present invention provides a kind of laminated glass production dust-free storage room and closes the configuration of piece room Scheme.
Technical solution used by this invention in order to achieve the above objectives is:
A kind of laminated glass production dust-free storage room and conjunction piece room allocation plan, including for operating plate glass combination Close piece operating space, place film film storage room, control film disengaging film surge chamber, producers preparation house, The producers preparation house is set in the middle part of the conjunction piece operating space by constituting between material storage room, dressing room, Airshower chamber, tool It is equipped with the live-roller gear mobile for plate glass or laminated glass, import and export is provided with Destaticizing device, the glue It is connected between piece storage room and conjunction piece operating space, film surge chamber, Airshower chamber, tool by the switch gate passed in and out, the film is slow It rushes the switch gate of room and film storage room and passes in and out 2# for film, the film surge chamber is connected by film inlet and outlet with extraneous Logical, the film import and export is provided with Destaticizing device;The dressing room facility has personnel's inlet/outlet, the dressing room and wind Room connection is drenched, human body is additionally provided in the dressing room and destatics ball.
The film transports film surge chamber with transition platform cart after wooden-box package is removed in extraneous workshop, then exists Hermetic bag is removed in film surge chamber, after hermetic bag work is torn in the completion of film surge chamber open, is opened film and is passed in and out 2# (glue at this time Piece inlet and outlet need to close), it is hung with row and film is lifted into film storage room carries out dehumidification treatments, i.e. film hangs in conjunction piece after the completion Operating space carries out plate glass to close piece operation.
It further illustrates, the conjunction piece operating space, film storage room, film surge chamber, producers preparation house It is each equipped with refrigeration ventilating system, maintains the temperature at 22 ± 3 DEG C.
It further illustrates, it is 22 ± 3 DEG C that the conjunction piece operating space, film storage room, which keep room temperature, and humidity is 23 ± 5%RH.
It further illustrates, for the film import and export in normally off, film need to be conveyed into film surge chamber when side It is openable.
Further illustrate, producers can only enter film storage room through dressing room, Airshower chamber, producers into Enter to need before Airshower chamber to touch human body and destatic ball to destatic Airshower chamber of being allowed for access.
It further illustrates, after Airshower chamber can at most enter Airshower chamber closing front/rear door into two people, producers every time, Wind drenches system starts automatically, handles the dust on human body clothes, and wind drenches system is automatically stopped after 10s, when wind drenches, production Personnel must stand against Airshower chamber blowing mouth, and thoroughly to blow off dust, wind can push after drenching into dust free room.
In the present invention, film surge chamber blocks the external world to be connected to the direct of film storage room, and dust is avoided to enter film storage Deposit room, it is ensured that the cleanliness and temperature and humidity of film storage room, the film outer packing hermetic bag after wooden case of dismantling are carried out in surge chamber It removes, avoids the dust on outer packaging bag from being brought directly to film storage room, while it is dustless to ensure that the film of Xin Kaibao is stored in Film surge chamber by workshop condition without being influenced;Personnel's inlet/outlet is provided separately with film inlet and outlet, has broken personnel The traditional design of an inlet/outlet is shared with film, can be reduced extraneous dust to greatest extent and be entered film storage room and close piece Operating space is provided with Destaticizing device in the inlet and outlet of production material, prevents the dust in extraneous workshop from importing and exporting by front and back Into film storage room and close piece operating space;Producers can only enter film storage room from dressing room, Airshower chamber or close piece behaviour Make area, into Airshower chamber before clean electrostatic work clothes, working cap and slippers dedicated need to be changed in dressing room, into Airshower chamber handle The dust adsorbed on human body clothes is dusted, and is prevented dust from entering dustless conjunction piece room and is polluted, reasonable disposition destatics dress It sets and dust prevention, eliminates the influence that dust produces laminated glass to the full extent.
Detailed description of the invention
Fig. 1 is allocation plan schematic diagram of the invention.
Specific embodiment
To make the object, technical solutions and advantages of the present invention clearer, the present invention is made into one below in conjunction with attached drawing Step ground detailed description.
It is 22 ± 3 DEG C that conjunction piece operating space, film storage room, which keep room temperature, and humidity is 23 ± 5%RH, need to produce interlayer When glass, the organic polymer film as laminated glass bonding is transported after wooden-box package is removed in workshop with transition platform cart It is defeated to arrive film surge chamber, hermetic bag then is removed in film surge chamber, after hermetic bag work is torn in the completion of film surge chamber open, is beaten The piece that comes unglued passes in and out 2# (at this time film inlet and outlet need to close), film is lifted into film storage room is carried out at dehumidifying with capable hang Reason, it is stand-by that film is placed in film storage room, and domestic order requirements shift to an earlier date 48 hours and be put into film storage room that (export order shifts to an earlier date 72 hours), it is ensured that the moisture content of film is effectively controlled, and film cannot be with ground face contact, and what need to be standardized is placed in glue On piece storage rack.
Producers need to change clean electrostatic work clothes, working cap and slippers dedicated before entering Airshower chamber in dressing room, When into Airshower chamber, hand, which must touch human body and destatic ball, eliminates static electricity on human body, and Airshower chamber at most can first keep watch every time into 2 people It drenches room front door to open, people enters in Airshower chamber, and wind, which drenches room front door, closes, and wind drenches system starts automatically, on human body clothes Dust is handled, and wind drenches system is automatically stopped after 10 seconds, is pushed wind leaching room back door open and is entered (the wind drenches system movement of film storage room Period, Airshower chamber front/rear door can not be opened).When wind drenches, producers are not allowed to lean against on the door or wall of Airshower chamber, it is necessary to opposite Airshower chamber blowing mouth is stood, thoroughly to blow off dust, it is necessary to film storage room of being allowed for access after waiting wind to drench.
Plate glass for producing laminated glass is transported by live-roller gear to closing in piece operating space, is closed piece operating space and is obtained Rear and front end is each equipped with Destaticizing device, prevents extraneous dust from entering by front and back end and closes piece operating space, closes piece room personnel Inlet/outlet is that producers are closing the channel passed in and out between piece operating space and film storage room, is usually in close state, film Disengaging 1# is film in storage room and closes the channel passed in and out between piece operating space, usually should be at closed state;Temperature when production When humidity exceeds standard value range, stop production immediately, technical staff has regulated and controled working condition, when temperature humidity restores standard value Shi Caineng continues to produce.
The above is only the preferred embodiments of the present invention, and is not intended to limit the present invention in any form, Any simple modification made to the above embodiment according to the technical essence of the invention, equivalent variations and modification, belong to The range of technical solution of the present invention.

Claims (6)

1. a kind of laminated glass production dust-free storage room and conjunction piece room allocation plan, it is characterised in that: including flat for operating The film storage room of glass sheet combination closed piece operating space, place film, the film surge chamber of control film disengaging, producers Preparation house, the producers preparation house between material storage room, dressing room, Airshower chamber, tool by constituting, the conjunction piece operating space Middle part be provided with the live-roller gear mobile for plate glass or laminated glass, import and export, which is provided with, destatics dress It sets, is connected between the film storage room and conjunction piece operating space, film surge chamber, Airshower chamber, tool by the switch gate passed in and out, institute It states film surge chamber to be in communication with the outside by film inlet and outlet, the film import and export is provided with Destaticizing device;It is described more Dressing Room facility has personnel's inlet/outlet, and the dressing room is connected to Airshower chamber, is additionally provided with human body in the dressing room and destatics ball.
The film transports film surge chamber with transition platform cart after wooden-box package is removed in extraneous workshop, then in film Hermetic bag is removed in surge chamber, after hermetic bag work is torn in the completion of film surge chamber open, open film pass in and out 2# (at this time film into Outlet needs to close), it is hung with row and film is lifted into film storage room carries out dehumidification treatments, i.e. film hangs in and closes piece and operate after the completion Area carries out plate glass to close piece operation.
2. a kind of laminated glass production dust-free storage room according to claim 1 and conjunction piece room allocation plan, feature Be: the conjunction piece operating space, film storage room, film surge chamber, producers preparation house are each equipped with refrigeration ventage System, maintains the temperature at 22 ± 3 DEG C.
3. a kind of laminated glass production dust-free storage room according to claim 1 and conjunction piece room allocation plan, feature Be: it is 22 ± 3 DEG C that the conjunction piece operating space, film storage room, which keep room temperature, and humidity is 23 ± 5%RH.
4. a kind of laminated glass production dust-free storage room according to claim 1 and conjunction piece room allocation plan, feature Be: the film import and export can be opened when film need to be conveyed into film surge chamber in normally off.
5. a kind of laminated glass production dust-free storage room according to claim 1 and conjunction piece room allocation plan, feature Be: producers can only enter film storage room through dressing room, Airshower chamber, and producers need to touch people before entering Airshower chamber Body destatics ball and destatics Airshower chamber of being allowed for access.
6. a kind of laminated glass production dust-free storage room according to claim 1 and conjunction piece room allocation plan, feature Be: after Airshower chamber can at most enter Airshower chamber closing front/rear door into two people, producers every time, wind drenches system starts automatically, Dust on human body clothes is handled, wind drenches system is automatically stopped after 10s, and when wind drenches, producers must be against Airshower chamber Blowing mouth is stood, and thoroughly to blow off dust, wind can push after drenching into dust free room.
CN201811553965.8A 2018-12-18 2018-12-18 Dust-free storage chamber and sheet combining chamber configuration scheme for laminated glass production Active CN109624469B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811553965.8A CN109624469B (en) 2018-12-18 2018-12-18 Dust-free storage chamber and sheet combining chamber configuration scheme for laminated glass production

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811553965.8A CN109624469B (en) 2018-12-18 2018-12-18 Dust-free storage chamber and sheet combining chamber configuration scheme for laminated glass production

Publications (2)

Publication Number Publication Date
CN109624469A true CN109624469A (en) 2019-04-16
CN109624469B CN109624469B (en) 2022-08-09

Family

ID=66075246

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811553965.8A Active CN109624469B (en) 2018-12-18 2018-12-18 Dust-free storage chamber and sheet combining chamber configuration scheme for laminated glass production

Country Status (1)

Country Link
CN (1) CN109624469B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113006551A (en) * 2021-03-04 2021-06-22 机械工业第九设计研究院有限公司 Logistics freight car in-out transition space system between three trolleys
CN114872315A (en) * 2022-06-13 2022-08-09 深圳市志凌伟业技术股份有限公司 Method for protecting film

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101003049A (en) * 2006-09-07 2007-07-25 汕头市华天富信息材料有限公司 Method and equipment for cleaning photographic film
CN101628289A (en) * 2008-07-18 2010-01-20 北京京东方光电科技有限公司 System and method for cleaning masks
CN106007412A (en) * 2016-05-10 2016-10-12 中航三鑫股份有限公司 Laminated glass one-time forming and continuous producing method
CN106362990A (en) * 2016-08-31 2017-02-01 安徽骆氏升泰汽车零部件有限公司 Dust-free automated assembling production line
CN207735304U (en) * 2017-02-25 2018-08-17 深圳市华明博机电设备工程有限公司 A kind of automatic sensing gate-type goods leaching room

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101003049A (en) * 2006-09-07 2007-07-25 汕头市华天富信息材料有限公司 Method and equipment for cleaning photographic film
CN101628289A (en) * 2008-07-18 2010-01-20 北京京东方光电科技有限公司 System and method for cleaning masks
CN106007412A (en) * 2016-05-10 2016-10-12 中航三鑫股份有限公司 Laminated glass one-time forming and continuous producing method
CN106362990A (en) * 2016-08-31 2017-02-01 安徽骆氏升泰汽车零部件有限公司 Dust-free automated assembling production line
CN207735304U (en) * 2017-02-25 2018-08-17 深圳市华明博机电设备工程有限公司 A kind of automatic sensing gate-type goods leaching room

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113006551A (en) * 2021-03-04 2021-06-22 机械工业第九设计研究院有限公司 Logistics freight car in-out transition space system between three trolleys
CN114872315A (en) * 2022-06-13 2022-08-09 深圳市志凌伟业技术股份有限公司 Method for protecting film

Also Published As

Publication number Publication date
CN109624469B (en) 2022-08-09

Similar Documents

Publication Publication Date Title
CN109624469A (en) A kind of laminated glass production dust-free storage room and conjunction piece room allocation plan
CN113566503B (en) Conveying system with automatic control dryer and control method of dryer
CN206729556U (en) Intelligent clothes cabinet control system
CN207552388U (en) A kind of feeding in continuous material vacuum heat treatment furnace
CN106429151A (en) Automatic-feeding-and-discharging warehouse sampling system and automatic-feeding-and-discharging warehouse sampling method
CN105867178A (en) System and method for controlling interlocking between glove box and transition cabin
CN204317455U (en) A kind of edible fungus drying equipment
CN208329712U (en) A kind of module type clean workroom based on intelligentized control method
CN206113523U (en) Two door box formula drying -machines of opening of adjustable speed
CN209018073U (en) A kind of Chinese medicine storage cabinet
CN206820262U (en) A kind of power distribution cabinet with dehumidification function
CN202350488U (en) Electromagnetic door for vacuum drying chamber
CN206969111U (en) Cigarette packer Yan Bao surfaces ash cleaning device
CN206428324U (en) Purging system and its chemical vapor depsotition equipment
CN206262588U (en) Aseptic operating platform
CN108972477A (en) A kind of maintenance of equipment management cabinet
CN210362535U (en) Novel pearl wool hot air bonder
CN114907948A (en) Respiratory tract pathogen detection device
CN202011012U (en) Storage cabinet capable of maintaining constant humidity and cleanness
CN206512193U (en) One-stop stem cell separation and Extraction integrated system
CN206050974U (en) Firming agent groove discharging system
CN206792696U (en) Portable vacuum ozone sterilizer
CN215250845U (en) Freeze-dried fungus powder dehumidification of bifidobacterium probiotic isolates processing apparatus
CN206425298U (en) A kind of integrated Airshower chamber of dedusting disinfection
CN204076292U (en) Full-automatic molding press glove box

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 516000 beside Qiubao Road, Qiuchang, Huiyang District, Huizhou City, Guangdong Province

Applicant after: Huizhou Longbo Energy Saving Glass Co.,Ltd.

Address before: 516000 beside Qiubao Road, Qiuchang, Huiyang District, Huizhou City, Guangdong Province

Applicant before: HUIZHOU DRAGON GLASS ENERGY SAVING GLASS CO.,LTD.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant