CN109622856B - Axial distance adjusting method for combined die in full-fiber crankshaft upsetting-extruding forming process - Google Patents
Axial distance adjusting method for combined die in full-fiber crankshaft upsetting-extruding forming process Download PDFInfo
- Publication number
- CN109622856B CN109622856B CN201811524403.0A CN201811524403A CN109622856B CN 109622856 B CN109622856 B CN 109622856B CN 201811524403 A CN201811524403 A CN 201811524403A CN 109622856 B CN109622856 B CN 109622856B
- Authority
- CN
- China
- Prior art keywords
- die
- upsetting
- horizontal
- crankshaft
- crank
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 29
- 239000000835 fiber Substances 0.000 title claims abstract description 8
- 238000005242 forging Methods 0.000 claims abstract description 10
- 230000004323 axial length Effects 0.000 claims abstract description 8
- 238000003754 machining Methods 0.000 abstract 1
- 230000015572 biosynthetic process Effects 0.000 description 2
- 239000002131 composite material Substances 0.000 description 2
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21J—FORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
- B21J13/00—Details of machines for forging, pressing, or hammering
- B21J13/02—Dies or mountings therefor
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21J—FORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
- B21J5/00—Methods for forging, hammering, or pressing; Special equipment or accessories therefor
- B21J5/06—Methods for forging, hammering, or pressing; Special equipment or accessories therefor for performing particular operations
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21J—FORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
- B21J5/00—Methods for forging, hammering, or pressing; Special equipment or accessories therefor
- B21J5/06—Methods for forging, hammering, or pressing; Special equipment or accessories therefor for performing particular operations
- B21J5/08—Upsetting
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21K—MAKING FORGED OR PRESSED METAL PRODUCTS, e.g. HORSE-SHOES, RIVETS, BOLTS OR WHEELS
- B21K1/00—Making machine elements
- B21K1/06—Making machine elements axles or shafts
- B21K1/08—Making machine elements axles or shafts crankshafts
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- Geometry (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Forging (AREA)
- Shafts, Cranks, Connecting Bars, And Related Bearings (AREA)
Abstract
The invention discloses a method for adjusting the axial distance of a combined die in the upsetting-extruding forming process of an all-fiber crankshaft, which aims at solving the problem that the combined die structure adopted by the upsetting-extruding forming process inevitably generates axial plastic flow to cause the length of a main journal to be out of tolerance, the horizontal distance of the combined die is adjusted before forming according to the geometric parameters of a preformed blank, a crankshaft forging piece and the combined die, the axial length of a single main journal can be controlled within the range of +/-0.5 mm of a design value, the deviation value of the machining allowance of each crank arm of the crankshaft is less than or equal to 1mm, and the yield and the quality consistency of the all-fiber crankshaft forging piece can be effectively improved by the method.
Description
Technical Field
The invention belongs to the field of precision plastic forming process and equipment, in particular to a forming process method of an all-fiber crankshaft forge piece, which can be used on various upsetting-extruding composite forming (or all-fiber forming) devices.
Background
The existing diesel engine greatly improves the power density and reduces the sizes of main parts of the existing diesel engine. The crankshaft is the most important part of the engine, and the fatigue performance of the crankshaft directly influences the reliability of the operation of the engine. The fatigue strength of the crankshaft prepared by the traditional free forging and other processes does not match the requirement of a high-power-density engine. The fatigue resistance of the crankshaft prepared by upsetting-extruding composite forming can be greatly improved, and the method is a preferred forming process of the high-performance crankshaft.
The upsetting-extruding forming process adopts a gradually-bent forming mode, and when the process is used for forming each bent, the angle of the current forming crank throw must be positioned, so that the angle between the bent throws is ensured. At present, in the upsetting-extruding forming process, the distance between the combined dies is generally calculated according to the design sizes of a step shaft blank drawing and a forging drawing. However, the problems that result directly from the design values of the two drawings are: firstly, the heated blank is difficult to put into a die; secondly, the axial length of the formed single crank throw is seriously out of tolerance.
In order to ensure that the axial dimension of the crankshaft meets the design requirements, it is important to calculate the internal spacing of the split molds and the spacing between the split molds.
Disclosure of Invention
Aiming at the requirement of the gap between the inside of the combined die and each combined die by feeding during the upsetting-extruding forming process of the crankshaft, the method for adjusting the axial distance between the combined dies during the upsetting-extruding forming process of the full-fiber crankshaft is improved, and the method comprises the following solving processes:
under the condition that original designs of a step shaft blank and a crankshaft forging are not changed, the size precision of the axial direction length of a main journal of the crankshaft forging is improved by adjusting the horizontal distance of the combined die.
The distance between a horizontal upsetting die and a horizontal thrust die of the upsetting-extruding forming die is P, and the axial lengths of a main journal, a connecting rod journal and a crank arm area of the step shaft blank are assumed to be PZ、PL、PQ(ii) a The axial length of the single-throw main journal and the connecting rod journal of the crankshaft forge piece and the axial thickness of the crank arm are FZ、FL、FQ(ii) a Thickness of upsetting die is TD(ii) a The upsetting die is used for fixing the length Dz of the blank; the crankshaft has N crank throws; under the known conditions that all the cranks are formed from left to right in sequence, and the like, the distance of the die before forming each crank is determined in the horizontal direction according to the following method:
(1) before the 1 st crank throw is formed, the distances L1 between the horizontal upsetting dies on the left side and the horizontal upsetting dies on the right side and the staggered die are set to be PZ + PQ-FQ +5 mm-25 mm; the forming and thrust die clearance L2 in the right-side horizontal upsetting die was PL +0.5 × (PZ-DZ).
(2) When 2-N-1 crank throws are formed, the distances L1 between the horizontal upsetting dies on the left side and the horizontal upsetting dies on the right side and the middle staggered-turning dies on the middle side are set to be PQ-FQ +5 mm-25 mm; the distance L2 between the right horizontal upsetting die and the thrust die is PQ +1 mm-5 mm; the distance L0 between the left horizontal upsetting die and the thrust die is FQ +2 mm-10 mm, and L0+ DZ = FZ + FQ-1 mm-2 mm.
(3) When the Nth crank throw is formed, the distances between the horizontal upsetting dies on the left side and the horizontal upsetting dies on the right side and the middle staggered-crank die are set to be PQ-FQ +5 mm-25 mm; the distance L0 between the horizontal upsetting die and the thrust die on the left side is PQ +2 mm-5 mm, L0+ DZ = FZ + FQ-1 mm-2 mm, and L2 is equal to the designed size of the blank.
According to the invention, under the condition that the original design of the step shaft blank and the crankshaft forging is not changed, the dimensional accuracy of the axial length of the main journal of the crankshaft forging is improved by adjusting the horizontal distance of the combined die.
Drawings
FIG. 1 is a key dimension of a crankshaft forging;
FIG. 2 is an enlarged view of the left portion of FIG. 1;
FIG. 3 illustrates the combined mold position and parameter definition for the 1 st inflection mold;
FIG. 4 is an enlarged view of the left portion of FIG. 3;
FIG. 5 shows the relative positions of the combined mold from 2 nd corner to N-1 th corner;
FIG. 6 is an enlarged view of the middle of FIG. 5;
FIG. 7 shows the relative positions of the combined molds for the Nth turn forming;
fig. 8 is an enlarged view of the middle of fig. 7.
In the figure, 3-1 is a staggered-turning die, 3-2 is a right horizontal thrust die, 3-3 is a right horizontal upsetting die, 3-4 is a left horizontal upsetting die, and 3-5 is a left horizontal thrust die.
Detailed Description
The invention is further described with reference to the following figures and specific embodiments.
Example 1
The length Fz of a main journal of a single crank of a 6-crank crankshaft is =30mm, and the thickness of a crank armFQ =28mm, connecting rod neck length FL =60 mm; the length Pz of a main journal of a step shaft preform =32mm and the thickness P of a crank armQ=58mm, connecting rod neck length PL=62 mm; t of upsetting dieD=20mm, Dz =28 mm. The horizontal spacing of the mold before the formation of each bell crank:
when the 1 st crutch is formed:
L1=PZ+PQ-FQ+5 mm-25 mm =32mm +58mm-28mm + 5-25 mm =62mm + 5-25 mm, considering the small size of the crankshaft, L1The value is 70 mm.
L2=PL+0.5×(PZ−DZ)=62mm+0.5×(32mm−28)=64mm
And 2, when forming turning from 2 nd to 5 th:
L1=PQ-FQ+5 mm-25 mm =58mm-28mm +5 mm-25 mm =30mm +5 mm-25 mm, considering the small size of the crankshaft, L1The value is 38 mm.
L2=PQ+1 mm-5 mm =58mm +1 mm-5 mm, 60mm being taken
L0=FQ+2 mm-10 mm =28mm +2 mm-10 mm, due to L0+28=30+28-1 mm-2 mm, 29mm being taken.
When the 6 th crutch is formed:
L1=PQ-FQ+5 mm-25 mm =58mm-28mm +5 mm-25 mm =30mm +5 mm-25 mm, considering the small size of the crankshaft, L1The value is 38 mm.
L0=FQ+2 mm-10 mm =28mm +2 mm-10 mm, due to L0+28=30+28-1 mm-2 mm, 29mm being taken.
L2Depending on the length of the stub bar,
example 2
In an 18-throw crankshaft, the length Fz of a main journal of a single throw =50mm and the thickness F of a crank armQ=72mm, connecting rod neck length FL=96 mm; the length Pz of a main journal of a step shaft preform =60mm and the thickness P of a crank armQ=124mm, connecting rod neck length PL=98 mm; t of upsetting dieD=112mm, Dz =48 mm. The horizontal spacing of the mold before the formation of each bell crank:
when the 1 st crutch is formed:
L1=PZ+PQ-FQ+5 mm-25 mm =60mm +124mm-72mm + 5-25 mm =112mm + 5-25 mm, considering the larger crankshaft size, L1The value is 130 mm.
L2=PL+0.5×(PZ−DZ)=98mm+0.5×(60mm−48)=104mm
2 nd to 17 th in the forming process:
L1=PQ-FQ+5 mm-25 mm =124mm-72mm +5 mm-25 mm =52mm +5 mm-25 mm, considering the larger crankshaft size, L1The value is 70 mm.
L2=PQ+1 mm-5 mm =124+1 mm-5 mm, 130mm
L0=FQ+2 mm-10 mm =72mm +2 mm-10 mm, due to L0+48=50+72+1 mm-2 mm, 73 mm.
When the 18 th crutch is formed
L1=PQ-FQ+5 mm-25 mm =124mm-72mm +5 mm-25 mm =52mm +5 mm-25 mm, considering the larger crankshaft size, L1The value is 70 mm.
L0=FQ+2 mm-10 mm =72mm +2 mm-10 mm, due to L0+48=50+72+1 mm-2 mm, 73 mm.
Aiming at the problem that the length of a main journal is out of tolerance because axial plastic flow is inevitably generated by a combined die structure adopted by an upsetting-extruding forming process, the method can control the axial length of a single main journal within the range of +/-0.5 mm of a design value by adjusting the horizontal spacing of the combined die before forming according to the geometric parameters of a preformed blank, a crankshaft forge piece and the combined die, and the deviation value of the processing allowance of each crank arm of a crankshaft is less than or equal to 1 mm.
Claims (1)
1. The axial distance adjusting method of the combined die in the upsetting-extruding forming process of the full-fiber crankshaft is characterized in that the original design of a step shaft blank and a crankshaft forge piece is not changed, and the axial lengths of a main journal, a connecting rod journal and a crank arm area of the step shaft blank are respectively PZ、PL、PQ(ii) a Single-throw main journal of crankshaft forging andthe axial length of the connecting rod neck and the axial thickness of the crank arm are FZ、FL、FQ(ii) a Thickness of upsetting die is TD(ii) a The upsetting die is used for fixing the length Dz of the blank; the crankshaft has N crank throws; the crank throws are sequentially formed from left to right, and the distance of the die in the horizontal direction before forming each crank throw is determined according to the following method:
(1) before the 1 st crank throw is formed, the distance L between the horizontal upsetting die and the staggered crank throw die on the left side and the right side1Are all set as PZ+PQ-FQ+5mm to 25 mm; distance L between right horizontal upsetting die and right horizontal thrust die2Is PL+0.5×(PZ-DZ);
(2) When the 2 nd to N-1 th crank throws are formed, the distance L between the horizontal upsetting dies on the left side and the horizontal upsetting dies on the right side and the middle staggered die1Are all set as PQ-FQ+5mm to 25 mm; distance L between right horizontal upsetting die and right horizontal thrust die2Is PQ+1mm to 5 mm; left horizontal upsetting die and left horizontal thrust die spacing L0Is FQ+2 mm-10 mm, and L0+DZ=FZ+FQ-1mm~2mm;
(3) When the Nth crank throw is formed, the distances between the horizontal upsetting dies on the left side and the horizontal upsetting dies on the right side and the middle staggered die are set to be PQ-FQ+5mm to 25 mm; left horizontal upsetting die and left horizontal thrust die spacing L0Is FQ+2 mm-10 mm, and L0+DZ=FZ+FQ-1mm~2mm,L2Equal to the designed size of the blank.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811524403.0A CN109622856B (en) | 2018-12-13 | 2018-12-13 | Axial distance adjusting method for combined die in full-fiber crankshaft upsetting-extruding forming process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811524403.0A CN109622856B (en) | 2018-12-13 | 2018-12-13 | Axial distance adjusting method for combined die in full-fiber crankshaft upsetting-extruding forming process |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109622856A CN109622856A (en) | 2019-04-16 |
CN109622856B true CN109622856B (en) | 2020-06-05 |
Family
ID=66073491
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811524403.0A Active CN109622856B (en) | 2018-12-13 | 2018-12-13 | Axial distance adjusting method for combined die in full-fiber crankshaft upsetting-extruding forming process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109622856B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117644174B (en) * | 2024-01-26 | 2024-03-29 | 山东宝鼎重工实业有限公司 | Device of adjustable size production crank forging |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2502936Y (en) * | 2001-09-26 | 2002-07-31 | 刘长福 | Hot upset extrusion forming mould for multi-corner crankshaft |
CN1949232A (en) * | 2006-11-01 | 2007-04-18 | 中国科学院金属研究所 | Crankshaft crank throw curved forging mould for large ship and designing method of preformed blank |
CN103128209A (en) * | 2011-11-28 | 2013-06-05 | 上海重型机器厂有限公司 | Half die forging method and half die forging device of crank throw for large ship |
CN106853503A (en) * | 2017-02-27 | 2017-06-16 | 辽宁五八内燃机配件有限公司 | The positioning combined mould in crankshaft crank upsetting shaping axial direction |
CN108057838A (en) * | 2017-12-19 | 2018-05-22 | 中国兵器工业第五九研究所 | A kind of Whole fiber mulit-turning crankshaft forging design method |
CN108067580A (en) * | 2016-11-11 | 2018-05-25 | 辽宁五八内燃机配件有限公司 | A kind of air compressor crank upsetting method and mold |
CN108097865A (en) * | 2017-12-19 | 2018-06-01 | 中国兵器工业第五九研究所 | A kind of Step Shaft prefabricated blank design method for being exclusively used in upsetting squeeze combined shaping |
WO2018100810A1 (en) * | 2016-11-29 | 2018-06-07 | 新日鐵住金株式会社 | Production method for forged crankshaft |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3584749B2 (en) * | 1998-09-16 | 2004-11-04 | 住友金属工業株式会社 | Deburring method for forged crankshafts |
JP2005009595A (en) * | 2003-06-19 | 2005-01-13 | Toyota Motor Corp | Crank shaft and its manufacturing method |
-
2018
- 2018-12-13 CN CN201811524403.0A patent/CN109622856B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2502936Y (en) * | 2001-09-26 | 2002-07-31 | 刘长福 | Hot upset extrusion forming mould for multi-corner crankshaft |
CN1949232A (en) * | 2006-11-01 | 2007-04-18 | 中国科学院金属研究所 | Crankshaft crank throw curved forging mould for large ship and designing method of preformed blank |
CN103128209A (en) * | 2011-11-28 | 2013-06-05 | 上海重型机器厂有限公司 | Half die forging method and half die forging device of crank throw for large ship |
CN108067580A (en) * | 2016-11-11 | 2018-05-25 | 辽宁五八内燃机配件有限公司 | A kind of air compressor crank upsetting method and mold |
WO2018100810A1 (en) * | 2016-11-29 | 2018-06-07 | 新日鐵住金株式会社 | Production method for forged crankshaft |
CN106853503A (en) * | 2017-02-27 | 2017-06-16 | 辽宁五八内燃机配件有限公司 | The positioning combined mould in crankshaft crank upsetting shaping axial direction |
CN108057838A (en) * | 2017-12-19 | 2018-05-22 | 中国兵器工业第五九研究所 | A kind of Whole fiber mulit-turning crankshaft forging design method |
CN108097865A (en) * | 2017-12-19 | 2018-06-01 | 中国兵器工业第五九研究所 | A kind of Step Shaft prefabricated blank design method for being exclusively used in upsetting squeeze combined shaping |
Also Published As
Publication number | Publication date |
---|---|
CN109622856A (en) | 2019-04-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106812646B (en) | Fuel distributor and method for manufacturing fuel distributor | |
CN103861987B (en) | Hollow shaft is swaged the method for designing of mould | |
JP4823367B2 (en) | Method for forming member having undercut portion | |
JP4900092B2 (en) | Method for manufacturing hose fittings | |
CN105127681B (en) | Braking automobile vacuum servo pump rotor cold extrusion technology | |
JPH10510615A (en) | Method of manufacturing a joint housing | |
CN107405675B (en) | Pipe thickens forming method and thickens pipe | |
CN109622856B (en) | Axial distance adjusting method for combined die in full-fiber crankshaft upsetting-extruding forming process | |
WO2016009620A1 (en) | Method for manufacturing cast crankshaft | |
CN105710273A (en) | Method for determining rotary swaging circle-feeding technological parameters of constant velocity shaft of car | |
CN105745039A (en) | Production method for forged crank shaft | |
CN104148574A (en) | Precise cold forging formed cam sheet manufacturing method | |
CN112719178B (en) | Method for manufacturing bearing pin for welding of vehicle | |
JP2592171B2 (en) | Forming method of torsion bar for steering | |
CN110328267B (en) | Method for forming thick-wall nozzle of super pipeline | |
KR100843363B1 (en) | Method for producing a housing for a ball joint | |
CN211071645U (en) | Cold heading forming die assembly for passenger car engine oil delivery pipe bolt | |
US7104109B2 (en) | Double-cavity heading die | |
CN104801648A (en) | Motor gear shaft cold heading forming process | |
CN206604887U (en) | High accuracy, the cold-drawing molding die of the flat ellipse shape heat absorption plate core structure of high intensity | |
CN106001364A (en) | Molding mold for first radial inner ring of thin-walled cylinder inner wall | |
JPH06335747A (en) | Forming method for hollow shaft | |
CN206882679U (en) | A kind of cold upsetting forming die of engine bulb stopper | |
CN108097865A (en) | A kind of Step Shaft prefabricated blank design method for being exclusively used in upsetting squeeze combined shaping | |
CN204827741U (en) | A section bar rail for high pressure common rail system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20240313 Address after: 400039 Chongqing Jiulongpo Yuzhou Road No. 33 Patentee after: Southwest Institute of technology and engineering of China Ordnance Equipment Group Country or region after: China Address before: 400039 Chongqing Jiulongpo Shiqiaopu Yuzhou Road No. 33 Patentee before: NO 59 Research Institute OF CHINA ORDNACE INDUSTRY Country or region before: China |
|
TR01 | Transfer of patent right |