CN109615319A - Process based on cloud data management constructs system - Google Patents

Process based on cloud data management constructs system Download PDF

Info

Publication number
CN109615319A
CN109615319A CN201811460015.0A CN201811460015A CN109615319A CN 109615319 A CN109615319 A CN 109615319A CN 201811460015 A CN201811460015 A CN 201811460015A CN 109615319 A CN109615319 A CN 109615319A
Authority
CN
China
Prior art keywords
management node
attribute
personnel
item
item processing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201811460015.0A
Other languages
Chinese (zh)
Inventor
项文增
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiangshan Qiu Fu Gang Information Technology Co Ltd
Original Assignee
Xiangshan Qiu Fu Gang Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiangshan Qiu Fu Gang Information Technology Co Ltd filed Critical Xiangshan Qiu Fu Gang Information Technology Co Ltd
Priority to CN201811460015.0A priority Critical patent/CN109615319A/en
Publication of CN109615319A publication Critical patent/CN109615319A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06KGRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
    • G06K17/00Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations
    • G06K17/0022Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisious for transferring data to distant stations, e.g. from a sensing device
    • G06K17/0029Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisious for transferring data to distant stations, e.g. from a sensing device the arrangement being specially adapted for wireless interrogation of grouped or bundled articles tagged with wireless record carriers

Abstract

The present invention relates to process constructing technology fields, disclose a kind of process building system based on cloud data management, comprising: organizational structure obtains module;For obtaining the organizational structure of enterprise, organizational structure is tree, contains management node and branch's relationship, and management node respectively corresponds corresponding personnel;Management node attribute setup module, for setting the item processing attribute of each management node;Item attribute module;For setting the item processing attribute of item needs;Process generation module, for the item processing attribute according to incoming event, with path minimum principle, connection in tree-shaped organizational structure from bottom to top has the management node of identical item processing attribute with product process line, and the corresponding personnel of each management node on flowline are read, ultimately generate process output.Related personnel is quickly found out convenient for user, it is fine to avoid personnel's transfer-position to cause process to promote difficult or the case where do not remember or misremember process and reduce item processing progress.

Description

Process based on cloud data management constructs system
Technical field
The present invention relates to process constructing technology field, specially a kind of process based on cloud data management constructs system.
Background technique
Cloud data management (cloud data manage, abbreviation CDM) is in the conceptive extension of cloud computing and to developed A new concept.Cloud data management makes the possibility that is treated as of more big data quantity, and referred to as follow-on internet is under The data center of a generation.
With development scientific and technological now, under this overall situation of cloud data management, process design work can also pass through meter The next intelligent completion of calculation machine system, however existing process design system, are mostly focused on industrial circle, such as to aircraft, height It is general to require to be managed maintenance process according to maintenance instruction when the large-scale and complicated devices such as iron car repair, such as it is directed to Specific equipment needs to formulate the maintenance flow of the one group of maintenance step being together in series or parallel composition in advance, wherein each step Suddenly the contents such as the resource inventories such as task clearly to be done, renewal part inventory, personnel/tool/facility are needed.Existing mode It is, according to the successive of maintenance step, to make the maintenance stream of a set of huge linear advancement for each different types of equipment Then journey drives the expansion of maintenance activity in Maintenance Management Information Sys term according to process.
Likewise, especially large enterprise, many management work requirements of process buildings can also adopt in business administration Process is carried out in the same way intelligently to construct.
Summary of the invention
The invention is intended to provide a kind of process building system based on cloud data management, to realize to the stream in business administration Cheng Jinhang is intelligently constructed.
Process provided by the invention based on cloud data management constructs system, comprising:
Module is obtained including organizational structure, for obtaining the organizational structure of enterprise, the organizational structure is tree, packet Management node and branch's relationship are contained, the management node respectively corresponds corresponding personnel;
Management node attribute setup module, at the item processing attribute and the item for setting each management node The process attribute of attribute is managed, the process attribute is for distinguishing termination management node or mistake that current management node belongs to process Management node in journey;
Item attribute module;For setting the item processing attribute of item needs;
Process generation module, for the item processing attribute according to input transaction, with path minimum principle, in organizational structure In from bottom to top connection have identical item processing attribute management node, until a certain management node the item handle belong to Property process attribute be to terminate management node, thus product process line, and read the corresponding of each management node on flowline Personnel ultimately generate process output.
Process inquiry is directly carried out by the attribute of item, it is minimum former by the path in tree-shaped organizational structure Then, quickly generate process, and not corresponding in order to avoid stage and personnel, management node involved in direct querying flow and Non- personnel are quickly found out related personnel convenient for user, avoid personnel's transfer-position well and process is caused to promote difficult or note The case where incessantly or misremembering process and reduce item processing progress.
Further, the organizational structure is divided into multilayer, and the professional level of personnel corresponding to management node is identical in same layer, together Interlayer is 0 not across department's set distance, and upper one layer is 1 at a distance from next layer.
It successively calculates apart from very simple.
Further, the item processing attribute of the item is multiple, including primary attribute and adeditive attribute;The process generates Module, the connection tool for the primary attribute according to input transaction, with path minimum principle, in tree-shaped organizational structure from bottom to top There is the management node of identical item processing attribute with product process line, and reads the corresponding human of each management node on flowline Member ultimately generates process output, while according to the subsidiarity of item, finding the management node with identical item processing attribute, List is made a copy in generation, and reads the corresponding personnel for making a copy for each management node in list, and list is made a copy in generation.
It needs other people to know involved in process but when management node without decision, area can be carried out using subsidiarity Point, it is disposable to generate.
Further, the system uses B/S framework, and deployment beyond the clouds, is accessed by browser.
Without downloading user terminal, it is readily accessible to.
Further, the process is shown by diagrammatic form, wherein according to management node corresponding to personnel in flowline On sequencing arrange personnel's name.
Name more can intuitively be found into corresponding processing people according to precedence arrangement in order.
Further, described to make a copy for list and shown by diagrammatic form, including making a copy for personnel corresponding to management node Name, and distinguished by color and the process.
It is avoided confusion using different colors, more intuitively.
Detailed description of the invention
Fig. 1 is that the present invention is based on the schematic diagrames that the process of cloud data management constructs system embodiment.
Fig. 2 is the tree-shaped illustrated example of organizational structure used in the embodiment of the present invention.
Specific embodiment
The process building system based on cloud data management in the present embodiment is basic as shown in Figure 1, the system deployment is in cloud End, is accessed by browser, so using B/S framework, which includes: that organizational structure obtains module;It is looked forward to for obtaining The organizational structure of industry, the organizational structure are tree, contain management node and branch's relationship, the management node difference Corresponding corresponding personnel;Management node attribute setup module, for setting the item processing attribute of each management node, the process Attribute be used for distinguish current management point belong to process terminations management node still during management node;Item attribute mould Block;For setting the item processing attribute of item needs and the process attribute of the item processing attribute;The organizational structure point For multilayer, the professional level of personnel corresponding to management node is identical in same layer, is 0 with interlayer set distance, upper one layer with it is next The distance of layer is 1, process generation module, for the item processing attribute according to incoming event, with path minimum principle, tree-shaped Organizational structure in from bottom to top connection have identical item processing attribute management node, until a certain management node should The process attribute of event handling attribute is termination management node, thus product process line, and read each management on flowline The corresponding personnel of node ultimately generate process output.
Process inquiry is directly carried out by the attribute of item, it is minimum former by the path in tree-shaped organizational structure Then, quickly generate process, and not corresponding in order to avoid stage and personnel, management node involved in direct querying flow and Non- personnel are quickly found out related personnel convenient for user, avoid personnel's transfer-position well and process is caused to promote difficulty, or note The case where incessantly or misremembering process and reduce item processing progress.
On the other hand, the item processing attribute of the item is multiple, including primary attribute and adeditive attribute;The process is raw Connection at module, for the primary attribute according to input transaction, with path minimum principle, in tree-shaped organizational structure from bottom to top Management node with identical item processing attribute reads the corresponding of each management node on flowline with product process line Personnel ultimately generate process output, while according to the subsidiarity of item, finding the management section with identical item processing attribute Point, list is made a copy in generation, and reads the corresponding personnel for making a copy for each management node in list, and list is made a copy in generation.
The course of work of the present embodiment is as follows:
By taking business personnel carries out contract approval item as an example, the primary attribute of item is " business ", and subsidiarity is " deduction ";According to Organizational structure dendrogram in Fig. 2, business personnel are in the bottom of organizational structure, there is department manager, business chief inspector and finance thereon These management nodes of chief inspector have " business " attribute, wherein the process attribute of " business " attribute of only business chief inspector is " to terminate Management node ", remaining is " process management node ", and in addition HR chief inspector's management node has " deduction " item attribute;
Then, " contract approval " item is inputted, according to the line in dendrogram, first management node of business personnel is portion Door supervisor, then upper one layer is business chief inspector, Chief Financial Officer and HR chief inspector at the same level with business chief inspector.
Thus according to the most short principle in path, process at this time should be " supervisor → business chief inspector → financial summary ";It makes a copy for List includes HR chief inspector;
It should be noted that first, although distance is 0 between the supervisor of same level, in dendrogram between supervisor and supervisor In there is no directapath, so it is 2 that actual path, which is " supervisor → business chief inspector → peer supervisor " so distance, so system It wrong will not select.
Second, likewise, due to, without directapath, needing to first pass through business chief inspector between Chief Financial Officer and supervisor, so Even if the actual range of finance to supervisor are 0, system still can be generated and first pass through industry because of first passing through business chief inspector on path The flowline of Superintendent of Mines.
Last process is shown by diagrammatic form, wherein successive on flowline according to management node corresponding to personnel Name more can intuitively be found corresponding processing people according to precedence arrangement by sequence arrangement personnel's name in order.
It makes a copy for list to show also by diagrammatic form on the side of process, including making a copy for people corresponding to management node The name of member, and distinguished by color and the process, it is avoided confusion using different colors, more intuitively.
Process inquiry is directly carried out by the attribute of item, the path minimum principle in tree-shaped organizational structure, fastly Fast product process, and it is not corresponding in order to avoid stage and personnel, directly select personnel involved in process and non-management section Point is quickly found out related personnel convenient for user, avoids personnel's transfer-position well and process is caused to promote difficulty, or do not remember Or the case where misremembering process and reducing item processing progress.
In the present embodiment, carried out corresponding to the management node in organizational structure by the RFID sensing device on station The acquisition of personnel;Station and management node correspond, and install RFID sensing device, each RFID induction on station in advance Device can be differentiated corresponding to the RFID sensing device according to its corresponding management node access system, system by access interface Management node.
For the first time in use, RFID sensing device passes through the RFID contactless card of induction personnel, personnel individual ID is read, and return System, system find corresponding personnel's data by the ID in the database, and with management section corresponding to the RFID sensing device Point association obtains corresponding administration authority;
If necessary to the personnel of interim adjustment management node, then need to scan RFID contactless card again, since ID has occurred Variation, system can prompt to need to input identifying code, which is inputted by the keyboard on RFID sensing device, while inputting There are also the time of temporary takeover permission, prompt information can be shown by the display screen on RFID sensing device, at the same time, system Identifying code, claimant's information and adapter tube time are sent by the phone number in the data of a personnel on the node, is needed interim The personnel for obtaining management node permission need to keep up with a personnel and contact to obtain identifying code, after being verified, this people's meeting of swiping the card By system and the management node extemporaneous association;Correlation time is set to the adapter tube time of input.
Daily working can also be checked card using RFID inductor, while trigger the pass of normal personnel and management node Connection, but require to be compared with last personnel;Change if it is job position, then need to realize by resetting, resetting is only It can be executed by backstage related personnel, association will no longer be compared for the first time after resetting, so backstage manager only needs Setting resetting when certain day is gone to work, so that it may which the disposable solution same day has all people of change of personnel to be associated with for the first time.
Through this embodiment, the interim adjustment for present framework may be implemented, give temporary authority, avoid in process phase Pass personnel not when can not promote process, in addition extremely convenient acquisition and the change current framework of company, backstage personnel only need Respective nodes are reset, so that it may quickly form new framework using the RFID induction of staff, and due to must It must be scanning input, it is necessary to can just come into force after personnel to hilllock, the empty window-like condition of appearance be avoided, so that all processes are ok Find the responsible person of respective nodes.
What has been described above is only an embodiment of the present invention, and the common sense such as well known specific structure and characteristic are not made herein in scheme Excessive description.It, without departing from the structure of the invention, can be with it should be pointed out that for those skilled in the art Several modifications and improvements are made, these also should be considered as protection scope of the present invention, these all will not influence what the present invention was implemented Effect and patent practicability.The scope of protection required by this application should be based on the content of the claims, in specification The records such as specific embodiment can be used for explaining the content of claim.

Claims (6)

1. the process based on cloud data management constructs system, it is characterised in that:
Module is obtained including organizational structure, for obtaining the organizational structure of enterprise, the organizational structure is tree, is contained Management node and branch's relationship, the management node respectively correspond corresponding personnel;
Management node attribute setup module, item processing attribute and item processing for setting each management node belong to Property process attribute, the process attribute be used for distinguish current management node belong to process termination management node or during Management node;
Item attribute module;For setting the item processing attribute of item needs;
Process generation module, for the item processing attribute according to input transaction, with path minimum principle, in organizational structure certainly Connection on down has the management node of identical item processing attribute, until the item processing attribute of a certain management node Process attribute is termination management node, thus product process line, and the corresponding personnel of each management node on flowline are read, Ultimately generate process output.
2. the process according to claim 1 based on cloud data management constructs system, it is characterised in that: the organizational structure Be divided into multilayer, the professional level of personnel corresponding to management node is identical in same layer, with interlayer not across department's set distance be 0, Upper one layer is 1 at a distance from next layer.
3. the process according to claim 1 based on cloud data management constructs system, it is characterised in that: the thing of the item Processing attribute is multiple, including primary attribute and adeditive attribute;The process generation module, for the master according to input transaction Property, with path minimum principle, in organizational structure from bottom to top connection have identical item processing attribute management node with Product process line, until the terminal node of item, and the corresponding personnel of each management node on flowline are read, it ultimately generates Process output, while according to the subsidiarity of item, the management node with identical item processing attribute is found, column are made a copy in generation Table, and the corresponding personnel for making a copy for each management node in list are read, list is made a copy in generation.
4. the process according to claim 1 based on cloud data management constructs system, it is characterised in that: described to be based on cloud number B/S framework is used according to the process building system of management, deployment beyond the clouds, is accessed by browser.
5. the process according to claim 3 based on cloud data management constructs system, it is characterised in that: process passes through chart Form is shown, wherein arranging personnel's name according to sequencing of the management node corresponding to personnel on flowline.
6. the process according to claim 5 based on cloud data management constructs system, it is characterised in that: described to make a copy for list It is shown by diagrammatic form, is distinguished including the name for making a copy for personnel corresponding to management node, and by color and process It opens.
CN201811460015.0A 2018-11-30 2018-11-30 Process based on cloud data management constructs system Withdrawn CN109615319A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811460015.0A CN109615319A (en) 2018-11-30 2018-11-30 Process based on cloud data management constructs system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811460015.0A CN109615319A (en) 2018-11-30 2018-11-30 Process based on cloud data management constructs system

Publications (1)

Publication Number Publication Date
CN109615319A true CN109615319A (en) 2019-04-12

Family

ID=66006714

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811460015.0A Withdrawn CN109615319A (en) 2018-11-30 2018-11-30 Process based on cloud data management constructs system

Country Status (1)

Country Link
CN (1) CN109615319A (en)

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102254246A (en) * 2011-06-17 2011-11-23 中国建设银行股份有限公司 Workflow managing method and system
CN102521693A (en) * 2011-12-05 2012-06-27 陕西东显永益机电技术有限公司 Administrative information mobile approval management system
CN102831497A (en) * 2012-07-26 2012-12-19 深圳市融创天下科技股份有限公司 Method, system and terminal device for establishing working process
CN103366234A (en) * 2012-03-30 2013-10-23 徐育宏 System and method for operation procedure management
US20160335142A1 (en) * 2014-12-27 2016-11-17 Huawei Technologies Co., Ltd. Notification Service Processing Method for Business Process Management and Business Process Management Engine
CN106339850A (en) * 2015-07-17 2017-01-18 北京奇虎科技有限公司 Automatic generation method and device of contract approval process
CN106537426A (en) * 2014-10-09 2017-03-22 谷歌公司 Automatically generating execution sequences for workflows
CN106873957A (en) * 2016-06-23 2017-06-20 阿里巴巴集团控股有限公司 The processing method and equipment of a kind of operation flow
CN106897806A (en) * 2015-12-17 2017-06-27 北京奇虎科技有限公司 Workflow creation method and system, operation system
CN106919688A (en) * 2017-03-03 2017-07-04 济南浪潮高新科技投资发展有限公司 A kind of membership credentials methods of exhibiting and device
CN107943457A (en) * 2017-11-17 2018-04-20 中山大学 A kind of workflow modeling method and system of service-oriented object
CN108428109A (en) * 2018-02-12 2018-08-21 广东绍林科技开发有限公司 A kind of flow processing system of high efficient and flexible, method, terminal and medium
CN108596557A (en) * 2018-03-15 2018-09-28 兴业数字金融服务(上海)股份有限公司 A kind of method and system for realizing event flow based on tree

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102254246A (en) * 2011-06-17 2011-11-23 中国建设银行股份有限公司 Workflow managing method and system
CN102521693A (en) * 2011-12-05 2012-06-27 陕西东显永益机电技术有限公司 Administrative information mobile approval management system
CN103366234A (en) * 2012-03-30 2013-10-23 徐育宏 System and method for operation procedure management
CN102831497A (en) * 2012-07-26 2012-12-19 深圳市融创天下科技股份有限公司 Method, system and terminal device for establishing working process
CN106537426A (en) * 2014-10-09 2017-03-22 谷歌公司 Automatically generating execution sequences for workflows
US20160335142A1 (en) * 2014-12-27 2016-11-17 Huawei Technologies Co., Ltd. Notification Service Processing Method for Business Process Management and Business Process Management Engine
CN106339850A (en) * 2015-07-17 2017-01-18 北京奇虎科技有限公司 Automatic generation method and device of contract approval process
CN106897806A (en) * 2015-12-17 2017-06-27 北京奇虎科技有限公司 Workflow creation method and system, operation system
CN106873957A (en) * 2016-06-23 2017-06-20 阿里巴巴集团控股有限公司 The processing method and equipment of a kind of operation flow
CN106919688A (en) * 2017-03-03 2017-07-04 济南浪潮高新科技投资发展有限公司 A kind of membership credentials methods of exhibiting and device
CN107943457A (en) * 2017-11-17 2018-04-20 中山大学 A kind of workflow modeling method and system of service-oriented object
CN108428109A (en) * 2018-02-12 2018-08-21 广东绍林科技开发有限公司 A kind of flow processing system of high efficient and flexible, method, terminal and medium
CN108596557A (en) * 2018-03-15 2018-09-28 兴业数字金融服务(上海)股份有限公司 A kind of method and system for realizing event flow based on tree

Similar Documents

Publication Publication Date Title
CN103761624A (en) Implementing method of integrated power grid dispatching operation intelligent mistaken-early-warning preventing system
WO2003041003A1 (en) Method and apparatus for work management for facility maintenance
CN107967313A (en) A kind of method for merging different industries data based on field data and coordinate general character
CN109829034A (en) A kind of enterprise's tree spectrogram methods of exhibiting based on main market players's credit data
WO2022139154A1 (en) Expert matching system for supporting startup
CN106096916A (en) The data of a kind of personal information process implementation method and realize system
CN110083632A (en) A kind of project cost listing service system
US20030055937A1 (en) Qualification information management method and apparatus
JP2006268717A (en) Civil engineering cost integration system
CN105225176B (en) Warrant basic information system
CN103473305A (en) Method and system for performing decision-making process show in statistic analysis
US20150134563A1 (en) Report data management server, report data management program, and report data management device
CN106570189B (en) Computer application system and convenient document management method
JP6073912B2 (en) Work slip recording support system and program
CN109615319A (en) Process based on cloud data management constructs system
CN106708869B (en) Group data processing method and device
CN107451722A (en) A kind of emolument provides monitor and analysis system
CN104881740B (en) By paper lattice color matching generation with the method and device of the multiple BOM of money in ERP
CN108320180A (en) Construction project cost auditing system
CN107833019B (en) Channel management method and device, computer equipment and readable storage medium
Abudayyeh et al. The design and implementation of a maintenance information model for rural municipalities
JP2006079224A (en) Method and system supporting construction of individual system based on ea
Taylor III et al. Applying Goldratt's thinking process and the theory of constraints to the invoicing system of an oil and gas engineering consulting firm
CN104836858A (en) Electronization procedure system supporting teamwork
Artandi Computers and the Postindustrial Society: Symbiosis or Information Tyranny?

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20190412

WW01 Invention patent application withdrawn after publication